DOH Electrical Work RFIs.pdf

PDF 92 KB Posted

Attached to
DOH Office Electrical Work Travis AFB
Solicitation number
FA442726Q1114
Issued by

About this file

This is a Request for Information (RFI) document for the Department of Health (DOH) Office electrical work project.

The project involves installing electrical infrastructure to support office reconfiguration, including the installation of approximately 6-10 drop poles with 20-amp circuits and 2 outlets per pole throughout the office space. Existing outlets from removed cubicles will be retained for use rather than removed and replaced, though outlets in back partitions will be rewired to eliminate extensions from old cubicle outlets. The contractor will install 7-9 new circuits total, subject to electrical panel capacity and final layout requirements. Outlets will be 20-amp dedicated white outlets, either single or double gang configurations, as long as the breaker does not trip. Power poles will be white in color. The work will be performed in accordance with a floor plan identified in the attached DOH Furniture Layout.png document, which specifies pole locations and circuit requirements per pole. The period of performance is 60 days from contract award. Work hours are Monday through Friday, 0700-1600, with weekend and holiday work available by coordination with the Facility Manager. Power pole connection methodology (direct to slab connection and slab tension specifications) is at the contractor's discretion. Certified payroll submission procedures will be provided following contract award.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFIs- DOH Office Electrical Work

• Shall existing outlets for removed cubicles be removed and have 20amp dedicated outlets installed in its place on the wall? At this time, I would say no. The outlets closest to the wall can be utilized with the desks already there. It will all depend on the new layout.

• What kind of outlet? (20amp dedicated white is standard outlet) yes or alike to what is currently there. May use single gang or double gang outlets, as long as the breaker doesn’t trip.

• Could you provide the period of performance? You mentioned 60 to 90 days from the day awarded, is that correct? 60 days

• Please provide a layout/floor plan that includes the desired location of the power poles to be installed. See attached DOH Furniture Layout.png

• Is there a color of power poles you prefer, such as black, white or gray? White is sufficient

• How many circuits per pole are required (2-20amp circuits per pole)? 2 20-amp circuits per pole or under the discretion of the FM and what the electrical panel can handle. the attached DOH Furniture Layout.png identifies how many circuits per pole are needed.

• Is the back partition to stay? Yes

• Are the outlets in the back partitions to be rewired to remove extension of old cubicle outlets? Yes

• How many new circuits in all will be required? 7-9 new circuits depending on what the panel can hold and how many desks are added. See attached DOH Furniture Layout.png

• What are the available hours/times to work on site? Monday through Friday 0700-1600.

Work with Facility Manager if work need to done during weekends and/or holidays.

• Who will the certified payroll be turned into? Information will be provided after contract award.

• Can the power poles be connected directly to slab and is it a tension slab? Under the discretion of the contractor awarded

• It was noted to install 10 Drop Poles w/ 20A Circuits w/ 2 outlets per pole. Can you please provide a floor plan with locations these poles need to be installed? See attached

DOH Furniture Layout.png. layout shows 6 poles needed, but can be adjusted based on electrical needs/requirements if the requested outlets cannot fit on one pole.