RFI ANSWERS.pdf
PDF 118 KB Posted
- Solicitation number
- FA442724R0029
About this file
This document contains the answers to Requests for Information (RFIs) regarding Solicitation FA442724R0029 for the Repair Generator and Transfer Switch, B10 project at Travis AFB, CA. The key details are:
The RFI answers provide clarification on various aspects of the project, including requests for pictures of electrical panels, as-built drawings, cost and timeline for permits, requirements for the main panel and fire pump controller, work schedule, concrete pad, equipment specifications, design drawings, cost estimates, and past performance. The Air Force confirmed that the entire main panel will be replaced, not just a section. They also stated that the electrical design drawings must be stamped by a registered engineer, but a concrete pad is no longer required. The Air Force will accept past performance under a different NAICS code. Several attachments were provided, including 10 pictures of electrical panels, 3 as-built drawings, and a picture of the annunciator panel.
The related federal contract opportunity is Solicitation FA442724R0029 for the Repair Generator and Transfer Switch, B10 project at Travis AFB, CA, issued by the Department of the Air Force Air Mobility Command.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA442724R0029 – Travis AFB, CA
Repair Generator and Transfer Switch, B10
RFI Answers
1. Can COR provide picture of the inside of the 2 section of the Main Switch Board and
Transfer Switch; this was mentioned during walk through?
a. 10 pictures of the electrical panels are attached. The request for pictures was sent to Power Pro for the ATS.
2. Can COR provide as built drawings of the Switch Gear and One Lines; this was also mentioned during walk through?
a. Attached 3 as-built drawings that should provide much more information. If other information is needed that could be in other drawings, please let us know. I am limited by email attachment size, so I sent the most relevant drawings
3. Can COR provide picture of Annunciator Mounting; this was also mentioned during walk through?
a. Annunciator Picture attached
4. Can COR provide cost and normal length of time for BAAQMD permit?
a. From 60 CES Environmental: estimated cost is $3,000.00, permit takes 3 months depending on how responsive the permit submitter is responding to the
BAAQMD office. Correspondence is done over email.
5. Main Panel: The existing main panel shall be demolished and replaced with new panel.
Fire Pump Controller: The ktr shall bypass this breaker and relabel the breaker as “spare” and shall directly connect the fire pump to the line side of the newly installed main breaker per NEC requirements. If we are to demolish and replace with new two sections of main panel; would this not be redundant or is only one section to be replaced?
a. This would be redundant and the fire pump breaker would no longer be needed or labeled as spare if the entire panel is removed and replaced.
6. By arriving early a leaving late to avoid traffic and more home time, will the COR accept
4 x 10 hour days?
a. From a PM standpoint, as long as the total outage for the building does not exceed
15 consecutive days as stated in the SOW then this acceptable.
7. It appears that the existing concrete pad is in good repair and would support the new switch gear. Is there a reason why the US Air Force would want it replaced?
a. The concrete statement can be ignored. When the project was in CE Ops, the original plan was to have the switchgear outside. This has been changed.
8. SOW calls for brand name “ Cummins” do you accept equal product?
a. No, this requirement was set by the shop that will maintain the generator and ATS.
9. Is there as built plan and information about existing equipment? One page as built provided in RFP shows only Transformer.
a. Attached 2 as-built drawings that should provide much more information. If other information is needed that could be in other drawings, please let us know. I am limited by email attachment size, so I sent the most relevant drawings.
10. Do we need stamped design drawings for concrete pad and electrical by registered
Engineers?
a. The electrical yes. The concrete verbiage used was from the previous plan of moving the main panel outside which would have needed a cement pad but now the plan is to replace it in the same location
11. Do we need 35%, 65% and 100% design drawings? SOW calls for only 35% design submittal.
a. This project only goes to a 35% design
12. SOW requires Cost estimate as part of 35% design. Do you need independent cost estimate by third party or in house estimate is acceptable since this is after award design.
a. That can be done in house
13. RFP Calls for NAICS code 238210 and a completed past performance with same NAICS code. We have completed electrical with similar SOW under NAICS code 236220. Do you accept past performance with other NAICS code?
a. Yes
14. Please provide pictures that identify the location and configuration of the remote annunciator panel to be replaced in ATCT cab.
a. 10 pictures of the electrical panels are attached. The request for pictures was sent to Power Pro for the ATS.
15. Please provide pictures that identify the location and configuration of the remote annunciator panel to be replaced in ATCT cab.
a. Picture is attached.
16. Please provide As-Builts for the Generator ductwork.
a. Attached 3 as-built drawings that should provide much more information. If other information is needed that could be in other drawings, please let us know. I am limited by email attachment size, so I sent the most relevant drawings.