Attachment 1 - RANGE CLEANING PWS (Monthly) - Jan 2024.pdf

PDF 1021 KB Posted

Attached to
Combat Arms Range Cleaning & Maintenance Federal contract opportunity
Solicitation number
FA442724Q0042
Issued by
Department of the Air Force Air Mobility Command

About this file

This performance work statement outlines the requirements for a contractor to provide combat arms range cleaning and maintenance services at Travis Air Force Base in California. The contractor will conduct weekly scheduled cleanings and emergency cleanings as needed on the firing range from April 2023 through March 2024. Services include emptying bullet collection buckets, cleaning the concrete drainage ditch behind the range, replacing filters on the dust collection system, inspecting range equipment, and disposing of hazardous waste in accordance with federal, state and local regulations. The contractor must have personnel trained in hazardous waste operations and follow detailed safety protocols for this work.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

COMBAT ARMS RANGE CLEANING/MAINTENANCE

Travis Air Force Base, California 1 April 2024– 31 March 2025

A. Description of Services: The contractor shall provide all labor, materials, transportation, and services necessary to provide Combat Arms Range maintenance service as described in this Statement of Work (SOW)/Performance Work Statement (PWS) for the 60th Security Forces Squadron (SFS), in around and near Bldg 1379 Travis AFB, CA. Contractor shall conduct weekly (12 per year) scheduled cleanings and (12 per year) service calls for emergency cleanings on the firing range (recurring dates for these scheduled cleanings shall be scheduled in agreement with 60th SFS at least 2 weeks before cleanup based upon agreement with COR and 60th SFS for range usage dates and times when maintenance can be accomplished. The service calls will be utilized on an as needed basis). This full scope option shall comply with all the steps for cleanup maintenance on the firing range). These 12 emergency cleaning calls shall augment daily range servicing and cleanup that range personnel from 60th SFS shall be accomplishing.

1. Pictures of range:

1.1. Bullet buckets with ventilation collection 1.2. Concrete lined drainage system (≈200 feet long system above the buckets X 3 feet wide X 3 feet deep)

1.3.Target area and front of backstop 1.4. Front of backstop 1.5. Solid material collected under backside of backstop

1.6. Firing Platform 1.7. 2x4 holes for target stands 1.8. Sludge collected inside of concrete lined drainage channel

2. Project Specific Plans

Kickoff Meeting - Contractor shall set-up and facilitate a kick-off conference call no later than 5 days after contract award. This meeting shall address issues related to the project, such as schedule, lay down/processing area, work hours, base access, and other relevant issues. The Contractor shall be responsible for developing agenda and distributing meeting minutes no later than 3 working days after this meeting. The Contractor shall coordinate one additional meeting the day before the start of fieldwork and at the conclusion of fieldwork at the end of the contract year to meet with Range Staff and the Contracting Officer’s Representative to verify adherence to this performance work statement.

The Contractor shall prepare a brief and accelerated draft and final versions of a Project Specific

Work Plan (WP) for government approval for the 12 scheduled cleanups of the range and disposal of any hazardous wastes detailing the approach to be used to accomplish the work as outlined under this SOW/performance work statement. The Project specific WP shall identify and incorporate all DoD, and Air Force policies, directives and instructions applicable to small arms range projectile removal and maintenance the work plan also shall comply with any state and local regulations for hazardous wastes and cleanup operations.

The WP shall identify and incorporate all applicable Federal, State and Local laws, codes and regulations. Additionally, the WP shall include a project schedule and any required laydown requests. The WP shall at a minimum address the following as separate sections:

Schedule Contractor Quality Control (CQC) Environmental Management Underground Utility Location (if necessary) Sampling and Analysis Disposal of Contaminated Materials and Soil Accident Prevention Plan Safety Measures employed to protect workers

Schedule Section: See Section A below for hours of contract operations.

CQC Section: The contractor shall, address, at a minimum all quality control methods to be used to control all field activities on the project. The CQC shall discuss how the contractor intends to implement all phases of control for all site operations, including any QC personnel proposed and their qualifications. The CQC section shall address the methods to be employed to ensure the project goal of maximum remediation of any encountered existing contaminates on the range shall be achieved (from both concrete lined drainage ditch in back of firing range and any solid material found in front of the concrete lined trench under the backstop). Additionally it shall discuss any items to be replaced or repaired (bullet buckets, brackets etc.) and how that shall be achieved.

Environmental Management Section shall describe, at a minimum, the approach, methods, and operational procedures to be employed to protect the natural and cultural environment during performance of this project. The Contractor shall ensure compliance with Federal, State, local, and installation requirements.

Underground Utility Location Section shall include a description of procedures to identify utilities and course of action for avoidance. There shall be no utilities within the area that shall be effected in the concrete lined ditch in back of the firing range and within the firing range.

Sampling and Analysis Section shall include a description of the sampling equipment (hand-held XRF) and to ensure accuracy of the XRF. Type and numbers of samples to be collected to ensure adequate characterization and how handheld XRF is calibrated (per manufacturers recommendation).

Disposal Section Contaminated materials and soil shall be a hazardous waste (disposal shall be in accordance with Federal, State, and local regulations/statues/and requirements;

including sampling and analysis for waste characterization). This section in the plan shall address all necessary documentation including packaging, shipping, disposal certification, manifests, regulations, permits, notifications, etc., and any other information pertinent to disposal. Note previous sampling has found that the dust and materials in buckets and in concrete lined trench in back of firing range and under back-side of backstop is hazardous waste- the main contaminates are copper and zinc; range manager shall ensure lead based rounds are not used on range.

Safety Measures Employed to Protect Workers: All contractor personnel involved in the maintenance shall have completed training on hazardous waste operations (HAZWOPER) IAW 29 CFR and shall have records provided to the government Contracting Officers Representation (COR) for this training completion prior to start of maintenance cleanup operations.

o In addition, all contractor personnel shall have site specific training completed for operating and proper procedures to follow for a hazardous waste accumulation site.

o Contractor shall prepare and submit to Travis Air Force Base Environmental Office a

Safety Protocol and Plan for Maintenance Cleanup of the contamination on the firing range that shall occur under this SOW. This plan as a minimum shall include the following requirements:

All Personnel involved in the cleanup of the firing range shall be briefed on the hazards physical and chemical that would be encountered on the site at the beginning of each day and the employees shall sign a document that they got this daily briefing.

All contractor personnel shall have documented experience for cleanup operations of contaminated sites this shall include initial HAZWOPER certification, annual recertification, and any other required training and certifications per state and federal regulations.

Training: All contractor personnel shall have completed training on hazardous waste operations (HAZWOPER) IAW 29 CFR and shall have records provided to the government Contracting Officers Representation (COR) for this training completion prior to start of cleanup operations. In addition, all contractor personnel shall have site specific training completed for operating and proper procedures to follow for a hazardous waste accumulation site.

All personnel involved in cleanup operations shall be provided by contractor with the appropriate safety equipment approved by the COR for the cleanup: this equipment at a minimum shall include: rubber gloves. Tyvek suit with hood and Tyvek booties that can go over boots, face shield, at least a half face piece respirator with appropriate canisters for both the dry cleaning operations that may create dust, and canisters for wet cleaning operations that may create contaminated water drops and mist.

At the end of each work day on the cleanup site, the Tyvek suits and booties and respirator canisters (if the respirator cartridges exceeded the manufacturers hours of usage- otherwise the canisters can be used until expired for hours of usage) shall be disposed of in a 55 gallon drum as a manifested hazardous waste.

Respirators, face shield, and rubber gloves can be cleaned with a wet wipe and then dry wipe at end of each day for reuse and those wipes disposed also at the end of each day as a manifested hazardous waste in the 55 gallon drums. Put accumulation start date on each drum and when 50% full for disposal the contractor shall contact the Travis Hazardous Waste Manager.

Contract lead for cleanup shall ensure all cleanup operations per this section are followed and shall stop operations if any safety issues are encountered and not resume cleanup operations until safety issues are resolved.

A. Hours of Operation. Unless notified, the contractor normally shall perform maintenance services every 3rd Friday (for monthly cleanings) or within 48 hours of notification (for emergency calls) from 8:00 a.m. to 4:30 p.m., excluding holidays and Wing down days, at Bldg. 1379. Two (2) weeks prior notification required to COR and 60 SFS/S4C (Combat Arms) for scheduled shutdown of the range. It is essential contractor coordinate with Range Manager for days and times of cleanup operations (confirmation for this cleanup shall also be obtained 3 days out and a day prior to the scheduled cleanup to ensure no conflicts with range usage).

B. Required Services:

1. Contractor shall provide monthly, 12 annual cleanings scheduled service calls, for deep-clean and maintenance on the firing range (recurring dates for these scheduled service calls shall be scheduled in agreement with 60th SFS at least 2 weeks before cleanup based upon agreement with COR and 60th SFS for range usage dates and times when maintenance can be accomplished). As well as 12 as needed emergency calls that will be completed within 48 hours. This full scope option shall comply with all the steps for cleanup maintenance on the firing range.

1. Empty the buckets when they are no more than 1/3 full of projectile remains. Doing this reduces the weight in the buckets that was a reason for breakage of the buckets when weight was too high. Prior to removal of a bucket (for any reason), a tarp shall be spread over concrete lined trench drain/and under the bucket area to collect any material spilled from removing the bucket. Any spilled material collected on the tarp shall be emptied into the hazardous waste accumulation drum. Any spilled material not collected on the tarp shall be swept up and placed in the accumulation drum.

2. The hazardous waste drum shall be secured from the weather and sealed to prevent any spillage. The drums shall have the accumulation date and proper labels. Containers shall be properly labeled, managed, and manifested in accordance with TAFB Hazardous Waste Management Plan. Because of the weight of metals the hazardous waste drums shall be filled no more than 50% capacity.

3. Test the concrete ditch when dry behind the range with an hand-held XRF for metals and clean the ditch of all debris, and if metal is detected with the XRF handle the material as a hazardous waste by placing in 55-gallon hazardous waste drums and call the Travis hazardous waste manager to pick up the drums immediately when ready for hazardous waste disposal. Also test any solid dry material spilled on the range under and in front of the backstop with the XRF. Model of handheld XRF to consider is the Hitachi X-MET8000 Geo Expert (or equivalent manufacturer) that can measure copper, zinc and lead. Also the Hitachi options of the pole and bi-pod shall be used for ease of operations (or equivalent manufacturer). Renting of XRF could also be considered but because of frequency of cleanup maintenance on range it may be more cost effective to buy a hand-held XRF. Also insure folks who use the XRF are trained in operation, calibration and maintenance of the

XRF.

4. Fix any brackets holding the buckets and replace missing brackets during each bi-monthly service. Replace existing restraining straps holding the buckets, brackets with stainless steel brackets and screws and bolts to ensure rusting and failure of the brackets is less likely to occur. Ensure all buckets are labeled “HAZARDOUS WASTE.” Daily check all buckets;

brackets, and screws; bolts and restraining straps; and service, as necessary.

5. Install new buckets labeled “HAZARDOUS WASTE” every year and at start of this service contract. Ensure that stainless steel bolts and stainless steel washers and locking nuts are used to secure buckets to the brackets (the contractor shall supply all the new buckets annually and any stainless steel bolts, washers and locking nuts and any other supplies associated with the buckets).

6. Contractor shall clean and/or replace dust collector filters as indicated by the photohelic gauge; the filters need to be replaced per manufacturer’s recommendation for the baghouse and disposed of as hazardous waste. The photohelic gauge measures the pressure drop across the filters (clean side vs dirty side). In order to get a starting point (base line) the dust collector shall have clean filters. (Procedure: Start the system up and record the pressure gauge reading. From this point once the gauge reaches 4” above base line the filters shall be changed. The dust collector system at Travis Range has a filter cleaning system called a pulse system. At timed intervals, a blast of compressed air is shot through the clean side of the cartridge filter to dislodge heavier material and dust on the dirty side to prolong the life of the filters. This dust and debris goes into the waste barrel located under the dust collector.

The dust collector has a control panel on it that contains the filter pulse clean timer. The pulse cleaning timer is set to “pulse” the filters at set intervals and needs to be adjusted as the filters load up with material as indicated by the pressure gauge). When replaced, filters need to be disposed of as a hazardous waste.

7. Contractor shall check the photohelic set points and adjust pressure controls as necessary per baghouse manufacturer’s recommendation and following steps in #6 above.

8. Contractor shall empty plastic bullet buckets into the 55 gallon drum supplied by government and replace any buckets that are deteriorated or broken. (NOTE: 55 gallon drum can only be filled to the halfway (50% full) mark due to transportation weight requirements).

9. Contractor shall inspect bullet trap plates, bucket restraining straps, baffles, brackets, screws, joint straps, deflectors, and chambers for wear and tighten joints, if necessary, and shall notify the COR and range manager of any discrepancies. Contractor shall outline these discrepancies on a monthly written report to the COR.

10. Contractor shall pick up debris, and vacuum all accessible range, area under backstop that may have soil (Note this red soil under the backstop has tested positive for metals as outlined under Description of Services 1.5.) and control room floors (to include the in ground 2X4 inch holes, Description of Services 1.7.) using an explosive-proof vacuum equipped with high efficiency particulate air filter (HEPA) vacuum (an example to consider is the Vactagon Single Venturi Explosion Proof Vacuum with appropriate clamps, hoses, and the Aluminum Floor Nozzle and Aluminum Bulk Nozzle- or one from a manufacturer that is of equivalent specifications).

11. Contractor shall wet-wipe the firing platform, removing any dirt, debris and red soil from the surface.

12. Potential metals at the firing range include- Copper, Zinc and Lead. Regulatory levels for these metals are shown below Table B-1. The concrete lined drainage trench behind the firing range shall be tested every 2 weeks by the contractor using the handheld XRF. This shall be completed during the 52 service calls to ensure no metal contamination is present past the below regulatory limits. If levels exceed limits, contractor shall clean all areas and retest to ensure it is below limits. If metals exceeding regulatory limits are found on the range by the Department of Toxic Substances Control (DTSC) – very heavy fines over $70,000/day per incident could be levied against Travis AFB and subsequently passed along to the contractor.

Total Threshold Limit Concentration (TTLC) for copper shall not exceed 2,500 mg/kg (ppm) for solids and shall not exceed a Soluble Threshold Limit Concentration (STLC) limit of 25 mg/Liter (mg/L); TCLP is not applicable for copper in California.

TTLC for zinc shall not exceed 5,000 mg/kg; and shall not exceed a STLC of 250mg/L;

TCLP is not applicable for zinc in California.

TTLC for lead is 1,000 mg/kg for lead solids and since lead is one of 8 federally listed regulated metals it cannot exceed a TCLP or a STLC limit of 5 mg/Liter (mg/L).

RIFE, WILLIAM J JR A1C USAF AMC 60 CONS/PKC

Number the steps above

RIFE, WILLIAM J JR A1C USAF AMC 60 CONS/PKC

Improper reference, please double check the “flow” of the document (points, sub points, etc.)

Note: Previously, concentrations of solid dry material found on range exceeded regulatory levels for copper (highest level measured 848,000 ppm with regulatory level of 2,500 ppm), zinc (highest level measured 5810 ppm with regulatory level of 5,000 ppm)) and lead (per measured TCLP test 23.1 mg/Liter with regulatory level of 5 mg/Liter). Sludge levels in concrete lined drainage channel exceeded regulatory levels for copper (highest measured level 193,000 ppm with regulatory level of 2,500 ppm), zinc and lead did not exceed regulatory levels in the sludge.

13. Contractor shall inspect overall safety, functions, and maintenance of range and provide 60 SFS/S4C staff with a detailed monthly report with any range discrepancies. As well as provide 1 hour of training on operation of equipment used at range.

14. Any consumables the contractor provides i.e., filters, belts, brackets, bolts, screws, buckets etc., shall be provided by the contractor at no additional cost to the government.

Table B-1:

C. SPECIAL CONDITIONS

1. Although there may be no need to take pictures under this contract; if the contractor thinks there is need to take pictures that need shall be explained to the COR for permission to take pictures. The Contractor shall obtain written approval from the appropriate installation personnel prior to obtaining photographic records, still or motion picture, and aerial or ground photographs; in accordance with Public Law 18 U.S. Code 795 and applicable Station Regulations. The Government may provide a representative to act in an advisory capacity to prevent unauthorized disclosure of classified information.

2. Any oral directions, instructions, explanations, commitments and/or acceptances given by any Government employee to the Contractor, shall not be construed by the Contractor as a change in scope to this delivery order. Any change in the scope of work shall be issued to the Contractor, in writing, by the Contracting Officer in order to be binding to the Government.

3. The Contractor shall ensure that all personnel are qualified or have been appropriately trained for the tasks and duties assigned. The Contractor shall maintain and provide upon request, records of training and qualifications of individuals involved in the project.

4. Station Regulations: Contractor personnel and all Sub-Contractors shall become familiar with and obey all installation regulations, including fire, range access, traffic, and security regulations.

Contractor personnel employed on the installation shall keep within the limits of the work (and avenues of ingress and egress from the range), and shall not enter restricted areas unless required to do so and are cleared for such entry by proper authorities. All Contractor equipment shall be conspicuously marked for identification.

5. Identification badges and vehicle passes shall be coordinated through the COR. No employee or representative of the Contractor shall be admitted to the installation without satisfactory proof of United States citizenship and any other documentation required by the installation.

6. The Contractor shall be responsible for obtaining permission and clearance from appropriate Air Force Security Personnel, including EOD, to enter and perform range field work. The Contractor shall schedule the range field work with the installations operational and environmental representatives, the COR and other key personnel, as required.

7. The Contractor shall make every effort to prevent the spread of contamination or release of contaminants to the environment in accordance with all Federal, State and local laws, regulations and instructions. All work shall be completed in accordance with all applicable Department of Air Force, Department of Navy (DoN), Federal, State and local laws, regulations, and guidance.

8. The Contractor shall establish an explosive certification and documentation process for all Contractor and Sub Contractor personnel working within exclusion zones, if such are required.

9. The Contractor shall develop signage for designated safe zones, munitions debris process zones, and construction areas as appropriate.

10. Scheduling: The Contractor shall schedule work so as to cause the least amount of interference with station operations. Work schedules shall be subject to the approval of the COR.

11. The Contractor shall comply with all appropriate DoD, Department of Air Force, and DoN policies and guidance.

12. 55-gallon drums that shall be located at the firing range (shall be supplied for use at the firing range by the government for hazardous waste disposal –estimated 25 drums/year).

13. Hazardous Waste labels for the 55-gallon drums shall be supplied by the government the labels shall be filled out by the contractor as directed by the Travis AFB Hazardous Waste Manager.

14. Government shall be responsible for hazardous waste disposal of the 55 gallon drums and signing of the hazardous waste manifest once the government approves the drums for disposal and approves the manifest.

D. CONTRACT ADMINISTRATION DATA:

POINTS-OF-CONTACT:

Project Manager (PM)/Contracting Officer’s Representative (COR):

Name: SSgt Frank M. Joseph Address: BLDG 1219 Combat Arms

Travis AFB, CA 94535 Phone: 707-424-2122 Email: frank.joseph@us.af.mil

Alternate Project Manager (PM):

Name: SSgt Jacob A. Eszlinger Address: BLDG 1219 Combat Arms

Travis AFB, CA 94535 Phone: 707-424-2122 Email: jacob.eszlinger@us.af.mil

Travis AFB/HAZWASTE POC Contact:

Name: Douglas R. Berndsen Address: Bldg 570 Environmental Flight Travis AFB, CA 94535 Phone: 837-3739 Email: douglas.berndsen.2@us.af.mil

Contract Specialist (CS):

Name: (NEED THIS SECTION FILLED IN WITH NAME ETC.)

Address:

Phone:

Email: