SEE SCHEDULE XDAT 07-9002A/B/E
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Re-establish solicitation closing date and providing corrected documents
SEE CONTINUATION PAGES
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Jan-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4427-12-R-0108
X 9B. DATED (SEE ITEM 11)
18-Dec-2012
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Jan-2013
CODE
60 CONS/LGCC
350 HANGAR AVE
ATTN: EBENEZER WILSON
TRAVIS AFB CA 94535
FA4427 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4427-12-R-0108
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 17-Jan-2013 10:00 AM to 07-Feb-2013 10:00 AM.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed:
FROM: Renovate Bay D of Building 237 in accordance with the specifications and drawings provided by the government (Atch #1 dated 2 Sep 2011, 484 pages). PERFORMANCE PERIOD is 180 Calendar Days after Notice to Proceed (NTP). NTP will be issued after receipt of bonds.
TO: Renovate Bay D of Building 237 in accordance with the specifications and drawings provided by the government (Atch #1 dated 7 Jan 2013, 470 pages). PERFORMANCE PERIOD is 180 Calendar Days after Notice to Proceed (NTP). NTP will be issued after receipt of bonds.
CLIN 0002
FROM: Renovate Bay E, Bldg 237 in accordance with the specifications and drawings provided by the government (Atch #2 dated 2 Sep 2011, 389 pages). PERFORMANCE PERIOD is 90 Calendar Days after Notice to Proceed (NTP). NTP will be issued within 5 days of acceptance of Bay D (CLIN 0001).
TO: Renovate Bay E, Bldg 237 in accordance with the specifications and drawings provided by the government (Atch #2 dated 7 Jan 2013, 379 pages). PERFORMANCE PERIOD is 90 Calendar Days after Notice to Proceed (NTP). NTP will be issued within 5 days of acceptance of Bay D (CLIN 0001).
CLIN 0003
FROM: Renovate Bay F, Bldg 237 in accordance with the specifications and drawings provided by the government (Atch #3 dated 02 Sep 2011, 436 pages). PERFORMANCE PERIOD is 180 Calendar Days after Notice to Proceed (NTP). NTP will be issued within 5 days of acceptance of Bay E (CLIN 0002).
TO: Renovate Bay F, Bldg 237 in accordance with the specifications and drawings provided by the government (Atch #3 dated 07 Jan 2013, 424 pages). PERFORMANCE PERIOD is 270 Calendar Days after Notice to Proceed (NTP). NTP will be issued within 5 days of acceptance of Bay E (CLIN 0002).
FA4427-12-R-0108
SECTION I - CONTRACT CLAUSES
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 550 calendar days (consisting of Bay D 180 days + 5 days for NTP + Bay E 90 days + 5 days for NTP + Bay F 270 days). Note each phase has a separate performance period after the Notice to Proceed is issued.
(End of clause)
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF ATTACHMENTS
ATCH# DESCRIPTION PAGES DATED
1 Specifications Renovate Bays D (470 pages), E (379 pages), & F (424 pages) of Bldg 237
1,273 07 JAN 2013
2 Schedule of Drawings (3 separate packages) Bay D – 28, Bay E – 19, & Bay F ‐ 39
86 02 SEP 2011
3 Wage Determination Applicability CA13‐0009 Mod 1, dated 11 Jan 2013
1 11 JAN 2013
4 Schedule of Material Submittals AF66 (EXCEL FORMAT) Bay D (14), Bay E (10), & Bay F (11)
35 30 JUN 2010
5 Past Performance Questionnaire & Letter 6 03 DEC 2012
6 Subcontractor Consent Form 1 03 DEC 2012
7 Structural Interior Design (SID) 54 07 JAN 2013
a. Amendments issued to this solicitation shall be a part of the resultant contract, in which event, they will be listed above at the time of award.
b. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplement thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
c. Sections K, L and M will be physically removed from any resultant award. Section K, L and M will be deemed to be incorporated, by reference, in that award.
d. Atch #5, Past Performance Questionnaire will be physically removed from any resultant award. Atch #5 will not be listed above at time of award but will be deemed to be incorporated, by reference, in that award.
(End of Summary of Changes)