JB Charleston - Question and Answers_Govt Response.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Repair Airfield Parking Ramp PH III
Solicitation number
FA441825R0003
Issued by

About this file

This document is a Questions and Answers (Q&A) file for a federal solicitation to repair the Airfield Parking Ramp at Joint Base Charleston (JBC). The solicitation (FA441825R0003) covers milling and overlay of asphalt pavements for 9 aircraft parking spaces, including new pavement markings, joint resealing, and miscellaneous concrete repairs. Key administrative details include a pre-proposal conference and site visit scheduled for 11 Mar 2025 at 9:00 AM EST, with attendees meeting at a specified location in North Charleston to board government transportation to the airfield.

The Q&A file addresses three specific contractor inquiries, including clarifications on demolition sawcut requirements, base access security protocols, and project scheduling. Notably, contractors must complete JS-US007 - Level I Antiterrorism Awareness Training within 30 days of base access and submit a Baseline Cost Loaded CPM Project Schedule within 30 calendar days after the Notice of Award. The project is being managed by the Department of the Air Force Air Mobility Command, with a question submission deadline of 17 Mar 2025 at 2:00 PM EST.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 JB Charleston Offeror Question and Answer Form NOTICE TO OFFERORS Any offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all offerors before the submission of their proposals. Oral explanations or instructions given before the award of a contract will not be binding. Answers to offeror questoins concerning a solicitation will be posted to sam.gov, if that information is necessary in preparing proposals or if the lack of it would be prejudicial to others.

Solicitation NumberFA441825R0003
Project Name:Airfield Parking Ramp PH III
#Specification Reference (Section & Paragraph Reference, i.e. 23 00 00, para 1.3)Drawing Reference (Sheet and Detail or Note Reference, i.e. M-101, Detail 2)Solicitation Reference (Section, paragraph, sub-paragraph Reference, i.e. Section M, Paragraph 2.3)Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.)
1Question
C101 & C102C101 and C102 show the scheduled demolition for the project however note #7 (provide a 2.5" deep sawcut at lmits of milling to existing asphalt) is shown only at the western most limits below the parking ramp itself. Is the Engineers intention to sawcut at all new/existing asphalt limits? Specifically, the parking bays surrounded by existing pavement to be resealed
Answer
Key Note #7 only applies to the western most limit as shown.
2Question
01 14 00 para 1.3.1Are there any security/base access requirements to be aware of beyond the background check and Real ID required for badging?
Answer
Yes: JS-US007 - Level I Antiterrorism Awareness Training is required to be completed by all contractors within 30 days of requiring access, and annually thereafter. Coordination for training shall be by the contractor after contract award. This provision shall not apply to deliveries, contractors requiring access using single day passes, or any contractors requiring access for less than or equal to 180 continuous calendar days in a 1 year period. JS-US007 - Level I Antiterrorism Awareness Training can be located here:

https://jko.jten.mil/courses/AT-level1/launch.html Submit all completion certificates to the Contracting Officer for information only.

3Question
01 32 00, Para 3.201 32 00, Para 3.2 states "The Baseline Cost Loaded CPM Project Schedule shall be submitted for approval within 30 Calendar Days after the Notice of Award has been acknowledged." The solicitation states that "The Notice to Proceed will be issued within 45 days of award." Please confirm the intent is for the Contractor to submit a cost loaded CPM Schedule prior to the Government issuing Notice to Proceed.
Answer
Correct. The Baseline Cost Loaded CPM Project Schedule is a pre-construction submittal (SD-01), and its acceptance is a condition precedent to starting demo/construction activities (01 32 00, ¶3.4.1.a).
4

8 Question

Answer

9 Question

Answer

10 Question

Answer

11 Question

Answer

12 Question

Answer

13 Question

Answer

14 Question

Answer

15 Question

Answer

16 Question

Answer

17 Question

Answer

18 Question

Answer

19 Question

Answer

20 Question