Drawings.pdf
PDF 9 MB Posted
- Attached to
- Repair Airfield Parking Ramp PH III
- Solicitation number
- FA441825R0003
About this file
This is a set of engineering drawings and construction plans for a project to repair an aircraft parking ramp at Joint Base Charleston Air Base in South Carolina. The drawings detail Phase 3 of repairs to multiple aircraft parking spaces (numbered 24-29), including site plans, grading plans, marking details, and civil engineering specifications.
The technical drawings show detailed site layouts, pavement marking requirements, and construction specifications for milling and overlay of asphalt pavements, joint sealing, and concrete repairs. Key details include pavement marking specifications for taxiway centerlines, restricted areas, and parking spot identification; civil engineering details for asphalt concrete mill and overlay; joint sealing requirements; and drainage specifications. The work area is clearly defined on the base layout drawings with match lines between different sections. The plans include both existing site conditions and new construction requirements, with typical sections showing pavement structure details and construction joint specifications. Specific technical requirements are provided for items like joint sealant application, pavement markings, and concrete repair methods.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AutoCAD SHX Text
CHARLESTON
AutoCAD SHX Text
GEORGETOWN
AutoCAD SHX Text o
AutoCAD SHX Text
NORTH CAROLINA
AutoCAD SHX Text
ATLANTIC OCEAN
AutoCAD SHX Text p
AutoCAD SHX Text
GEORGIA
AutoCAD SHX Text
SAVANNAH
AutoCAD SHX Text
ORANGEBURG
AutoCAD SHX Text
COLUMBIA
AutoCAD SHX Text
AUGUSTA
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text p
AutoCAD SHX Text o
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text
AutoCAD SHX Text o
AutoCAD SHX Text p
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text
GREENVILLE
AutoCAD SHX Text
AutoCAD SHX Text
SPARTANBURG
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text
FLORENCE
AutoCAD SHX Text
CHARLOTTE
AutoCAD SHX Text o
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text o
AutoCAD SHX Text
MYRTLE
AutoCAD SHX Text
BEACH
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text
AutoCAD SHX Text
WILMINGTON
AutoCAD SHX Text
SOUTH CAROLINA
AutoCAD SHX Text
SCALE (MILES)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BEAUFORT
AutoCAD SHX Text o
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE (MILES)
AutoCAD SHX Text
CHARLESTON
AutoCAD SHX Text
SAVANNAH HWY
AutoCAD SHX Text
AutoCAD SHX Text
FOLLY BEACH
AutoCAD SHX Text
FOLLY ROAD
AutoCAD SHX Text
AutoCAD SHX Text
ISLAND
AutoCAD SHX Text
JOHNS
AutoCAD SHX Text
STONO
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
ATLANTIC OCEAN
AutoCAD SHX Text
SULLIVANS ISLAND
AutoCAD SHX Text
JAMES ISLAND
AutoCAD SHX Text
FT. JOHNSON ROAD
AutoCAD SHX Text
CHARLESTON
AutoCAD SHX Text
HARBOR
AutoCAD SHX Text
AutoCAD SHX Text
CHARLESTON
AutoCAD SHX Text
ASHLEY
AutoCAD SHX Text
AutoCAD SHX Text
MT. PLEASANT
AutoCAD SHX Text
AutoCAD SHX Text o
AutoCAD SHX Text
AutoCAD SHX Text
COOPER
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text
BEES FERRY ROAD
AutoCAD SHX Text o
AutoCAD SHX Text
CHARLESTON CO.
AutoCAD SHX Text
LANDFILL
AutoCAD SHX Text
AVIATION AVE.
AutoCAD SHX Text
CHARLESTON
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text o
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
ASHLEY RIVER ROAD
AutoCAD SHX Text
DORCHESTER ROAD
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text
AutoCAD SHX Text
MONTAGUE AVE.
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
CAINHOY ROAD
AutoCAD SHX Text
MARK CLARK EXPY.
AutoCAD SHX Text
REMOUNT ROAD
AutoCAD SHX Text
RIVERS AVE.
AutoCAD SHX Text
ASHLEY PHOSPHATE ROAD
AutoCAD SHX Text
AIR FORCE BASE
AutoCAD SHX Text
CHARLESTON
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text O
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text U
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text Z
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text No. 00253
AutoCAD SHX Text
INC.
AutoCAD SHX Text
ENGINEERING
AutoCAD SHX Text
ADC
AutoCAD SHX Text
REV
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
APPR'D
AutoCAD SHX Text THE APPROVAL AND COORDINATION SIGNATURES APPEARING IN THE TITLE BLOCK ON THIS SHEET CONSTITUTE APPROVAL OF ALL DRAWINGS LISTED IN THE INDEX.
AutoCAD SHX Text
CONSTRUCTION MANAGEMENT
AutoCAD SHX Text
CORROSION ENGINEER
AutoCAD SHX Text
SECURITY POLICE
AutoCAD SHX Text
PROJECT ENGINEER
AutoCAD SHX Text
DEM DATE
AutoCAD SHX Text
BASE COMMUNICATIONS
AutoCAD SHX Text
BIO-ENVIRONMENTAL ENG.
AutoCAD SHX Text
USING AGENCY
AutoCAD SHX Text
SAFETY
AutoCAD SHX Text
FIRE CHIEF
AutoCAD SHX Text
REPAIR AIRCRAFT PARKING RAMP - PH 3
AutoCAD SHX Text
AIR MOBILITY COMMAND
AutoCAD SHX Text
JOINT BASE CHARLESTON - AIR BASE
AutoCAD SHX Text
G.P. EVERSMANN
AutoCAD SHX Text
J.G. JONES
AutoCAD SHX Text
CHIEF ENGINEER
AutoCAD SHX Text
CIVIL ENGINEER
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
COMMANDER
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
JBC-AB PROJECT NUMBER
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
ADC PROJECT NUMBER
AutoCAD SHX Text
SUBMITTED
AutoCAD SHX Text 1093395
AutoCAD SHX Text 12/19/2024
AutoCAD SHX Text 24099
AutoCAD SHX Text
100%%% DESIGN SUBMITTAL
AutoCAD SHX Text
XX
AutoCAD SHX Text X
AutoCAD SHX Text
LIST OF DRAWINGS
AutoCAD SHX Text
JOINT BASE CHARLESTON - AIR BASE
AutoCAD SHX Text
JBC-AB PROJECT 1093395
AutoCAD SHX Text
REPAIR AIRCRAFT PARKING RAMP - PH 3
AutoCAD SHX Text
CHARLESTON, SOUTH CAROLINA
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text B
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text R
AutoCAD SHX Text D
AutoCAD SHX Text N
AutoCAD SHX Text C
AutoCAD SHX Text Y
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text
PROJECT SITE
AutoCAD SHX Text
LOCATION MAP
AutoCAD SHX Text
PROJECT SITE
AutoCAD SHX Text
LOCATION MAP
AutoCAD SHX Text
PROJECT SITE
AutoCAD SHX Text
LOCATION MAP SCALE: 1" = 1000'
AutoCAD SHX Text
TITLE SHEET
T001
WORK AREA
GRAVES AVE
AutoCAD SHX Text
EUTAW
AutoCAD SHX Text
CIRCLE
AutoCAD SHX Text
SHAWAWO
AutoCAD SHX Text
PARK
AutoCAD SHX Text
CUSABEE TRAIL
AutoCAD SHX Text
ARTHUR DRIVE
AutoCAD SHX Text
ARTHUR DRIVE
AutoCAD SHX Text
STEWART
AutoCAD SHX Text
AVE
AutoCAD SHX Text
HILL BLVD
AutoCAD SHX Text
GRAVES AVE
AutoCAD SHX Text M
AutoCAD SHX Text c
AutoCAD SHX Text
CAW ST
AutoCAD SHX Text
SCOTT ST
AutoCAD SHX Text
SIMPSON ST
AutoCAD SHX Text
SLOAN ST
AutoCAD SHX Text
DAVIS
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text
LONG ST.
AutoCAD SHX Text
DAVIS DR.
AutoCAD SHX Text
BATES ST
AutoCAD SHX Text
TENNIS COURT
AutoCAD SHX Text
TENNIS COURT
AutoCAD SHX Text
TENNIS COURT
AutoCAD SHX Text
SWIMMING POOL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BLDG 519
AutoCAD SHX Text
BLDG 63
AutoCAD SHX Text
BLDG 700
AutoCAD SHX Text
TWY DELTA
AutoCAD SHX Text
TAXIWAY
AutoCAD SHX Text
TWY ECHO
AutoCAD SHX Text
TOWWAY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TWY F
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
JOINT BASE CHARLESTON - AIR BASE
AutoCAD SHX Text
AIR MOBILITY COMMAND
AutoCAD SHX Text
REV
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
APPR'D
AutoCAD SHX Text
CHIEF ENGINEER
AutoCAD SHX Text
CIVIL ENGINEER
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
COMMANDER
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
JBC-AB PROJECT NUMBER
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
ADC PROJECT NUMBER
AutoCAD SHX Text
SUBMITTED
AutoCAD SHX Text
REPAIR AIRCRAFT PARKING RAMP - PH 3
AutoCAD SHX Text O
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text U
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text Z
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text No. 00253
AutoCAD SHX Text
INC.
AutoCAD SHX Text
ENGINEERING
AutoCAD SHX Text
ADC
AutoCAD SHX Text
G.P. EVERSMANN
AutoCAD SHX Text
J.G. JONES
AutoCAD SHX Text 1093395
AutoCAD SHX Text 12/19/2024
AutoCAD SHX Text 24099
AutoCAD SHX Text
100%%% DESIGN SUBMITTAL
AutoCAD SHX Text
XX
AutoCAD SHX Text
CSPP - OVERALL
AutoCAD SHX Text G200
AutoCAD SHX Text A
AutoCAD SHX Text
%%UCLOSED PAVEMENT BARRICADE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text SOLAR POWERED (WITH BATTERY BACK-UP) RED LIGHT MOUNTED ON BARRICADE, TWO PER BARRICADE, OR APPROVED EQUAL
AutoCAD SHX Text
FLUORESCENT ORANGE AND FLUORESCENT WHITE STRIPES
AutoCAD SHX Text WATER FILLED WEIGHTED BARRIER, 10" x 10" x 8' LONG, PAINTED TWO SIDES AND TOP AS NOTED
AutoCAD SHX Text
6" - 12" WIDE PAINTED STRIPES
AutoCAD SHX Text 20" x 20" FLUORESCENT ORANGE FLAG, TWO PER BARRICADE
AutoCAD SHX Text
(2) GALVANIZED STEEL SADDLECLIPS WITH FASTENERS
AutoCAD SHX Text NOTES: 1. THE LOCATION OF THE BARRICADES AS SHOWN REPRESENTS THE MOST TYPICAL LOCATIONS. ACTUAL . THE LOCATION OF THE BARRICADES AS SHOWN REPRESENTS THE MOST TYPICAL LOCATIONS. ACTUAL LOCATION OF BARRICADES FOR WORK AREAS SHALL BE COORDINATED WITH AIRFIELD MANAGER. 2. BARRICADES SHALL BE PLACED ON 25' CENTERS ACROSS FULL WIDTH OF PAVEMENT CLOSED TO TRAFFIC INCLUDING SHOULDERS. 3. FLASHING LIGHTS SHALL BE AT LEAST FIVE CANDELAS EFFECTIVE INTENSITY AND FLASH RATE AT A RATE OF 55 TO 160 FLASHES PER MINUTE. 4. BARRICADES SHALL BE TEMPORARILY REMOVED AND REINSTALLED, BY THE CONTRACTOR, AS NEEDED TO MINIMIZE THE IMPACT OF THIS PROJECT ON AIRPORT OPERATIONS.
AutoCAD SHX Text GENERAL NOTES: 1. ACTIVE AIRFIELD: AIRFIELD, INCLUDING ALL AIRCRAFT PARKING SPOTS, EXCEPT SPOTS 24-28, ACTIVE AIRFIELD: AIRFIELD, INCLUDING ALL AIRCRAFT PARKING SPOTS, EXCEPT SPOTS 24-28, AIRFIELD, INCLUDING ALL AIRCRAFT PARKING SPOTS, EXCEPT SPOTS 24-28, 64, WILL REMAIN OPEN AND OPERATIONAL FOR THE DURATION OF CONSTRUCTION EXCEPT AS OTHERWISE INDICATED. 2. RESTRICTED AREA: DO NOT CROSS RESTRICTED AREA RED LINE WITHOUT PRIOR COORDINATION RESTRICTED AREA: DO NOT CROSS RESTRICTED AREA RED LINE WITHOUT PRIOR COORDINATION DO NOT CROSS RESTRICTED AREA RED LINE WITHOUT PRIOR COORDINATION AND APPROVAL FROM CONTRACTING OFFICER. 3. ALL WORK SHALL BE COORDINATED AND SCHEDULED SO AS TO MAINTAIN MAXIMUM USE OF ALL WORK SHALL BE COORDINATED AND SCHEDULED SO AS TO MAINTAIN MAXIMUM USE OF TAXIWAY DELTA AND ALL IMC AREAS. CONTRACTOR SHALL COORDINATE WITH THE BASE OPERATIONS FOR EXACT LAYOUT OF CLOSED PAVEMENT BARRICADES.
AutoCAD SHX Text KEYNOTES: 1. PROVIDE, INSTALL AND MAINTAIN CLOSED PAVEMENT BARRICADES IAW DETAIL A/G200.PROVIDE, INSTALL AND MAINTAIN CLOSED PAVEMENT BARRICADES IAW DETAIL A/G200.
AutoCAD SHX Text
PRIMARY HAUL ROUTE (SEE HAUL ROUTE NOTES, G201 FOR RESTRICTIONS)
AutoCAD SHX Text
HAUL ROUTE - ACCESS TO WORK AREAS VIA RIVERS GATE
AutoCAD SHX Text
GATE V-1 CONTRACTOR ACCESS GATE (FOD CHECK)
AutoCAD SHX Text
EXISTING HYDRANT CONTRACTOR WATER SOURCE
AutoCAD SHX Text
FH
AutoCAD SHX Text
TYP
AutoCAD SHX Text
TYP
AutoCAD SHX Text
TYP
AutoCAD SHX Text
TYP
AutoCAD SHX Text
TO RIVERS GATE
AutoCAD SHX Text
GATE V-2 ALTERNATE CONTRACTOR ACCESS GATE (FOD CHECK)
AutoCAD SHX Text
ALTERNATE HAUL ROUTE
AutoCAD SHX Text 1 inch = ft.
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
HORIZONTAL SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TYP
SAFETY SECURITY COORDINATION
PROJECT DURATION
AutoCAD SHX Text
JOINT BASE CHARLESTON - AIR BASE
AutoCAD SHX Text
AIR MOBILITY COMMAND
AutoCAD SHX Text
REV
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
APPR'D
AutoCAD SHX Text
CHIEF ENGINEER
AutoCAD SHX Text
CIVIL ENGINEER
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
COMMANDER
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
JBC-AB PROJECT NUMBER
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
ADC PROJECT NUMBER
AutoCAD SHX Text
SUBMITTED
AutoCAD SHX Text
REPAIR AIRCRAFT PARKING RAMP - PH 3
AutoCAD SHX Text O
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text U
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text Z
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text No. 00253
AutoCAD SHX Text
INC.
AutoCAD SHX Text
ENGINEERING
AutoCAD SHX Text
ADC
AutoCAD SHX Text
G.P. EVERSMANN
AutoCAD SHX Text
J.G. JONES
AutoCAD SHX Text 1093395
AutoCAD SHX Text 12/19/2024
AutoCAD SHX Text 24099
AutoCAD SHX Text
100%%% DESIGN SUBMITTAL
AutoCAD SHX Text
XX
AutoCAD SHX Text
CSPP - NOTES
AutoCAD SHX Text G201
AutoCAD SHX Text SAFETY: 1. SAFETY PLAN (SPCD): CONTRACTOR SHALL SUBMIT A SAFETY PLAN COMPLIANCE DOCUMENT (SPCD) TO THE CONTRACTING OFFICER SAFETY PLAN (SPCD): CONTRACTOR SHALL SUBMIT A SAFETY PLAN COMPLIANCE DOCUMENT (SPCD) TO THE CONTRACTING OFFICER : CONTRACTOR SHALL SUBMIT A SAFETY PLAN COMPLIANCE DOCUMENT (SPCD) TO THE CONTRACTING OFFICER DESCRIBING HOW IT WILL COMPLY WITH THE REQUIREMENTS OF THE CONSTRUCTION OPERATIONAL SAFETY AND PHASING PLAN (COSPP OR CSPP) AND AND SUPPLYING DETAILS THAT COULD NOT BE DETERMINED BEFORE CONTRACT AWARD. NO WORK WILL BE ALLOWED UNTIL THE SAFETY PLAN COMPLIANCE DOCUMENT IS APPROVED. 2. PROGRESS MEETINGS: CONTRACTOR SHALL CONDUCT WEEKLY PROGRESS MEETINGS WITH PRIMARY EMPLOYEES, SUBCONTRACTORS, DESIGNATED PROGRESS MEETINGS: CONTRACTOR SHALL CONDUCT WEEKLY PROGRESS MEETINGS WITH PRIMARY EMPLOYEES, SUBCONTRACTORS, DESIGNATED : CONTRACTOR SHALL CONDUCT WEEKLY PROGRESS MEETINGS WITH PRIMARY EMPLOYEES, SUBCONTRACTORS, DESIGNATED BASE ENGINEER AND CONTRACTING OFFICER (OR CONTRACTING OFFICER REPRESENTATIVE). 3. EMERGENCY: IN THE EVENT OF AN EMERGENCY, THE CONTRACTOR SHALL MOVE EQUIPMENT AND PERSONNEL TO A SAFE DISTANCE FROM EMERGENCY: IN THE EVENT OF AN EMERGENCY, THE CONTRACTOR SHALL MOVE EQUIPMENT AND PERSONNEL TO A SAFE DISTANCE FROM : IN THE EVENT OF AN EMERGENCY, THE CONTRACTOR SHALL MOVE EQUIPMENT AND PERSONNEL TO A SAFE DISTANCE FROM OPERATIONAL PAVEMENT AS DIRECTED BY AIRFIELD MANAGEMENT OR OTHER EMERGENCY RESPONDERS AND SHALL REMAIN CLEAR UNTIL NOTIFIED THAT WORK MAY BE RESUMED. 4. VEHICLE MARKING: CONTRACTOR'S VEHICLES SHALL BE MARKED WITH FLASHING AMBER LIGHTS AND EQUIPMENT WITH 3'X3' ORANGE AND VEHICLE MARKING: CONTRACTOR'S VEHICLES SHALL BE MARKED WITH FLASHING AMBER LIGHTS AND EQUIPMENT WITH 3'X3' ORANGE AND : CONTRACTOR'S VEHICLES SHALL BE MARKED WITH FLASHING AMBER LIGHTS AND EQUIPMENT WITH 3'X3' ORANGE AND WHITE CHECKERED FLAGS VISIBLE FROM THE AIR AND 360 DEGREES ABOUT THE VEHICLE AND EQUIPMENT. THE FLASHING LIGHTS MUST HAVE PEAK INTENSITY WITHIN THE RANGE OF 40 TO 400 CANDELAS AND MUST FLASH AT 75± 15 FLASHES PER MINUTE. 5. PAVEMENT SWEEPING & VACUUMING: CONTRACTOR SHALL MAINTAIN, BY CONTINUOUS VACUUMING, ALL PAVEMENTS IMPACTED BY CONTRACTOR PAVEMENT SWEEPING & VACUUMING: CONTRACTOR SHALL MAINTAIN, BY CONTINUOUS VACUUMING, ALL PAVEMENTS IMPACTED BY CONTRACTOR : CONTRACTOR SHALL MAINTAIN, BY CONTINUOUS VACUUMING, ALL PAVEMENTS IMPACTED BY CONTRACTOR OPERATIONS, INCLUDING BUT NOT LIMITED TO HAUL ROUTE PAVEMENTS, AND PAVEMENT ADJACENT TO THE AREA OF WORK. PAVEMENTS SHALL BE KEPT FREE OF CONSTRUCTION MATERIALS, DIRT, ROCKS, AND OTHER DEBRIS AT ALL TIMES FOR THE LIFE OF THIS PROJECT BY VACUUMING OPERATIONS DURING ALL WORKING HOURS. AT THE COMPLETION OF CONSTRUCTION AND PRIOR TO FINAL ACCEPTANCE, THE CONTRACTOR SHALL CONDUCT A FINAL VACUUMING OF ALL PAVEMENTS UTILIZED/IMPACTED BY CONTRACTOR OPERATIONS. STEEL WIRE BROOM VEHICLES ARE NOT PERMITTED. 6. WILDLIFE ATTRACTANTS: CONTRACTOR SHALL MAINTAIN WORK AREAS, LAYDOWN AREA, AND HAUL ROUTE TO BE FREE OF WILDLIFE WILDLIFE ATTRACTANTS: CONTRACTOR SHALL MAINTAIN WORK AREAS, LAYDOWN AREA, AND HAUL ROUTE TO BE FREE OF WILDLIFE : CONTRACTOR SHALL MAINTAIN WORK AREAS, LAYDOWN AREA, AND HAUL ROUTE TO BE FREE OF WILDLIFE ATTRACTANTS INCLUDING BUT NOT LIMITED TO TRASH, FOOD SCRAPS, AND PONDED WATER. 7. PAVEMENT PROTECTION: CONTRACTOR SHALL PROVIDE SPECIAL CARE WHERE CONTRACTOR'S TRAFFIC USES AND CROSSES AIRFIELD PAVEMENT. PAVEMENT PROTECTION: CONTRACTOR SHALL PROVIDE SPECIAL CARE WHERE CONTRACTOR'S TRAFFIC USES AND CROSSES AIRFIELD PAVEMENT. : CONTRACTOR SHALL PROVIDE SPECIAL CARE WHERE CONTRACTOR'S TRAFFIC USES AND CROSSES AIRFIELD PAVEMENT. CONTRACTOR SHALL NOT CROSS ANY AIRFIELD PAVEMENT TO REMAIN WITH TRACKED EQUIPMENT OR STEEL WHEELED ROLLERS WITHOUT A FORM OF PAVEMENT PROTECTION. PAVEMENT PROTECTION SHALL CONSIST OF A NON-SLIP MATERIAL SUCH AS NEOPRENE OR RUBBER MATTING. 8. UNATTENDED VEHICLES: CONTRACTOR SHALL NOT LEAVE EQUIPMENT OR VEHICLES UNATTENDED ON THE AIRFIELD UNLESS INSIDE WORK AREA UNATTENDED VEHICLES: CONTRACTOR SHALL NOT LEAVE EQUIPMENT OR VEHICLES UNATTENDED ON THE AIRFIELD UNLESS INSIDE WORK AREA : CONTRACTOR SHALL NOT LEAVE EQUIPMENT OR VEHICLES UNATTENDED ON THE AIRFIELD UNLESS INSIDE WORK AREA DURING WORK HOURS. 9. ACTIVE AIRFIELD PAVEMENTS: CONTRACTOR SHALL NOT PARK EQUIPMENT OR VEHICLES ON ACTIVE AIRFIELD PAVEMENT. ACTIVE AIRFIELD PAVEMENTS: CONTRACTOR SHALL NOT PARK EQUIPMENT OR VEHICLES ON ACTIVE AIRFIELD PAVEMENT. : CONTRACTOR SHALL NOT PARK EQUIPMENT OR VEHICLES ON ACTIVE AIRFIELD PAVEMENT. 10. DUST CONTROL: CONTRACTOR SHALL PAY PARTICULAR ATTENTION TO DUST CONTROL. THE OPERATIONS OF THE RUNWAYS, TAXIWAYS, AND DUST CONTROL: CONTRACTOR SHALL PAY PARTICULAR ATTENTION TO DUST CONTROL. THE OPERATIONS OF THE RUNWAYS, TAXIWAYS, AND : CONTRACTOR SHALL PAY PARTICULAR ATTENTION TO DUST CONTROL. THE OPERATIONS OF THE RUNWAYS, TAXIWAYS, AND ASSOCIATED NAVAIDS ARE SENSITIVE TO DUST. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DUST CONTROL WITHIN THE LIMITS OF CONSTRUCTION AS WELL AS ALONG ANY HAUL ROUTES USED BY HIS EQUIPMENT AND VEHICLES LOCATED ON THE AIRFIELD. THE GOVERNMENT RESERVES THE RIGHT TO STOP GRADING, HAULING, OR OTHER WORK AS NECESSARY TO BRING DUST UNDER CONTROL. 11. FOREIGN OBJECT DEBRIS/DAMAGE (FOD): CONTRACTOR SHALL CONTROL FOD AT ALL TIMES. CONTRACTOR SHALL IMPLEMENT ALL FOREIGN OBJECT DEBRIS/DAMAGE (FOD): CONTRACTOR SHALL CONTROL FOD AT ALL TIMES. CONTRACTOR SHALL IMPLEMENT ALL : CONTRACTOR SHALL CONTROL FOD AT ALL TIMES. CONTRACTOR SHALL IMPLEMENT ALL NECESSARY PROTOCOLS TO CONTROL FOD DURING CONSTRUCTION, INCLUDING, BUT NOT LIMITED TO, CONTROLLING VEHICLE TRACKING OF SOIL AND ROCKS, CONTROLLING LOOSE DEBRIS FROM VEHICLES, CONTROLLING OF DEMOLITION AND CONSTRUCTION MATERIALS. IF IN THE OPINION OF THE CONTRACTING OFFICER, THE CONTRACTOR'S PROTOCOLS ARE INSUFFICIENT TO PREVENT SPREAD OF FOD, THE CONTRACTOR SHALL IMPROVE PROTOCOLS TO THE SATISFACTION OF THE CONTRACTING OFFICER AT NO ADDITIONAL COST. 12. FLIGHT LINE DRIVERS TRAINING: CONTRACTOR'S PERSONNEL AND ALL SUBCONTRACTOR'S PERSONNEL THAT WILL BE OPERATING A VEHICLE OR FLIGHT LINE DRIVERS TRAINING: CONTRACTOR'S PERSONNEL AND ALL SUBCONTRACTOR'S PERSONNEL THAT WILL BE OPERATING A VEHICLE OR CONTRACTOR'S PERSONNEL AND ALL SUBCONTRACTOR'S PERSONNEL THAT WILL BE OPERATING A VEHICLE OR EQUIPMENT ON THE AIRFIELD ARE REQUIRED TO ATTEND AND PASS FLIGHT LINE OPERATIONS TRAINING. FLIGHT LINE OPERATIONS TRAINING CONSISTS OF CLASS ROOM INSTRUCTION & TESTING (APPROXIMATELY 1 HOURS), COMPUTER BASED TRAINING INSTRUCTION & TESTING (APPROXIMATELY 30 MINUTES), AND FLIGHT LINE ORIENTATION (APPROXIMATELY 30 MINUTES). ONLY EXCEPTION IS FOR HAULERS (TRUCK DRIVERS), WHO WILL BE ESCORTED ON AND OFF THE AIRFIELD BY SOMEONE WITH PROPER FLIGHT LINE CERTIFICATION. CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER FOR DETAILED REQUIREMENTS. 13. CONTROLLED MOVEMENT AREA DRIVERS TRAINING: ALL CONTRACTOR AND SUBCONTRACTOR PERSONNEL CONDUCTING WORK IN CONTROLLED CONTROLLED MOVEMENT AREA DRIVERS TRAINING: ALL CONTRACTOR AND SUBCONTRACTOR PERSONNEL CONDUCTING WORK IN CONTROLLED ALL CONTRACTOR AND SUBCONTRACTOR PERSONNEL CONDUCTING WORK IN CONTROLLED MOVEMENT AREA ARE REQUIRED TO ATTEND AN APPROXIMATELY 1 HOUR MOVEMENT TRAINING AREA COURSE, HANDS-ON TRAINING AS NEEDED PROVIDED BY AIRFIELD MANAGEMENT, AND PASS A WRITTEN EXAM. 14. CHECK IN: EACH MORNING & EVENING CONTRACTOR SHALL CHECK IN/OUT WITH AIRFIELD MANAGEMENT AT BASE OPERATIONS BUILDING. AS CHECK IN: EACH MORNING & EVENING CONTRACTOR SHALL CHECK IN/OUT WITH AIRFIELD MANAGEMENT AT BASE OPERATIONS BUILDING. AS EACH MORNING & EVENING CONTRACTOR SHALL CHECK IN/OUT WITH AIRFIELD MANAGEMENT AT BASE OPERATIONS BUILDING. AS WELL AS CALL IN TO AIRFIELD MANAGEMENT (843-963-3024/3026) AND SECURITY FORCES (843-963-3100/2695). 15. RADIOS & ATC: CONTRACTOR SHALL PROVIDE NECESSARY BATTERY POWERED TWO-WAY RADIOS EQUIPPED WITH TOP MOUNTED ANTENNAS AND RADIOS & ATC: CONTRACTOR SHALL PROVIDE NECESSARY BATTERY POWERED TWO-WAY RADIOS EQUIPPED WITH TOP MOUNTED ANTENNAS AND CONTRACTOR SHALL PROVIDE NECESSARY BATTERY POWERED TWO-WAY RADIOS EQUIPPED WITH TOP MOUNTED ANTENNAS AND CAPABLE OF TUNING AIR NAVIGATION FREQUENCY BANDS. RADIOS MUST BE KEPT IN GOOD WORKING ORDER AT ALL TIMES WORK IS IN PROGRESS ON THE AIRFIELD WITHIN THE LANDING AREAS. THE CONTRACTOR SHALL HAVE AN OPERATOR (WHO SPEAKS FLUENT ENGLISH) AVAILABLE FOR RADIO CONTACT AT ALL TIMES. CONTRACTOR SHALL MAINTAIN CONTACT WITH THE AIR TRAFFIC CONTROL TOWER (FREQUENCY 121.9) AT ALL TIMES WHILE WORK IS BEING CONDUCTED WITHIN THE LANDING AREAS.
AutoCAD SHX Text SECURITY: 1. SECURITY GUARDS: CONTRACTOR SHALL PROVIDE AND MAINTAIN SECURITY FROM A PROFESSIONAL (BONDED) SECURITY FIRM AT SECURITY GUARDS: CONTRACTOR SHALL PROVIDE AND MAINTAIN SECURITY FROM A PROFESSIONAL (BONDED) SECURITY FIRM AT : CONTRACTOR SHALL PROVIDE AND MAINTAIN SECURITY FROM A PROFESSIONAL (BONDED) SECURITY FIRM AT CONTRACTOR ACCESS GATES FOR THE DURATION OF USE. 2. SECURITY GUARD TRAINING: ALL SECURITY PERSONNEL THAT WILL BE CONTROLLING CONTRACTOR ACCESS GATES ARE REQUIRED SECURITY GUARD TRAINING: ALL SECURITY PERSONNEL THAT WILL BE CONTROLLING CONTRACTOR ACCESS GATES ARE REQUIRED : ALL SECURITY PERSONNEL THAT WILL BE CONTROLLING CONTRACTOR ACCESS GATES ARE REQUIRED TO ATTEND A 2 HOUR SECURITY WORKSHOP. THE WORKSHOP WILL BE HELD AT JOINT BASE CHARLESTON. 3. ENTRY AUTHORIZATION LETTER (EAL):CONTRACTOR SHALL OBTAIN AN ENTRY AUTHORIZATION LETTER (EAL) LISTING ALL ENTRY AUTHORIZATION LETTER (EAL):CONTRACTOR SHALL OBTAIN AN ENTRY AUTHORIZATION LETTER (EAL) LISTING ALL :CONTRACTOR SHALL OBTAIN AN ENTRY AUTHORIZATION LETTER (EAL) LISTING ALL EMPLOYEES APPROVED TO WORK ON THE AIRFIELD. A COPY OF THE LETTER SHALL BE MAINTAINED BY SECURITY AT ALL CONTRACTOR ACCESS GATES. CONTRACTOR SHALL COORDINATE SECURITY PROTOCOLS WITH THE CONTRACTING OFFICER AND SECURITY FORCES. 4. GUARD RESPONSIBILITIES: GUARD RESPONSIBILITIES: : GUARDS SHALL NOT BE ARMED. GUARDS SHALL BE EQUIPPED WITH OPERATIONAL CELL PHONES. A SINGLE SECURITY GUARD SHALL BE STATIONED AT EACH CONTRACTOR ACCESS GATE BEING UTILIZED BY THE CONTRACTOR. THIS INCLUDES EXISTING ACCESS CONTROL GATES AND ANY TEMPORARY CONSTRUCTION GATES. AT CONTRACTOR ACCESS GATES, GUARDS SHALL INSPECT ALL BADGES AND MAINTAIN A LOG OF ALL VEHICLES ENTERING AND LEAVING THE AIRFIELD AND INSPECT ALL VEHICLES. ALL CONTRACTOR ACCESS GATES SHALL BE SECURED BY LOCK AT THE END OF EACH WORK SESSION. ALL CONTRACTOR ACCESS GATES SHALL BE KEPT CLOSED WHEN NOT IN USE AND OPENED ONLY FOR ENTERING AND EXITING VEHICLES.
AutoCAD SHX Text HAUL ROUTES: 1. LOCATION: CONTRACTOR SHALL UTILIZE HAUL ROUTES (PRIMARY) AS SHOWN ON SHEET G200. CONTRACTOR SHALL BE ADVISED LOCATION: CONTRACTOR SHALL UTILIZE HAUL ROUTES (PRIMARY) AS SHOWN ON SHEET G200. CONTRACTOR SHALL BE ADVISED : CONTRACTOR SHALL UTILIZE HAUL ROUTES (PRIMARY) AS SHOWN ON SHEET G200. CONTRACTOR SHALL BE ADVISED THAT, FOR BASE SECURITY, JBC MAY CLOSE GATE V-1 AT ANY TIME WITHOUT NOTICE. CONTRACTOR SHALL UTILIZE ALTERNATE HAUL ROUTE GATE V-6 TO GAIN ACCESS TO SPECIFIED WORK AREAS AT NO ADDITIONAL COST TO THE GOVERNMENT, WHEN GATE V-1 IS CLOSED BY JBC. CONTRACTOR SHALL BE ADVISED THAT ALL TRUCKS GOING THROUGH RIVERS GATE WILL BE SCANNED BY SECURITY. 2. EXISTING ROADS: HAUL ROUTES UTILIZING EXISTING BASE ROADWAYS WILL REMAIN OPEN TO PATRON TRAFFIC AT ALL TIMES EXISTING ROADS: HAUL ROUTES UTILIZING EXISTING BASE ROADWAYS WILL REMAIN OPEN TO PATRON TRAFFIC AT ALL TIMES : HAUL ROUTES UTILIZING EXISTING BASE ROADWAYS WILL REMAIN OPEN TO PATRON TRAFFIC AT ALL TIMES DURING CONSTRUCTION. CONTRACTOR SHALL EXERCISE ALL NECESSARY PROTOCOLS TO INSURE SAFETY TO THE GENERAL PUBLIC ON ALL HAUL ROUTES. 3. DAMAGE: CONTRACTOR SHALL PREPARE A PHOTOGRAPHIC RECORD OF EXISTING ROADWAYS PRIOR TO CONSTRUCTION. DAMAGE DAMAGE: CONTRACTOR SHALL PREPARE A PHOTOGRAPHIC RECORD OF EXISTING ROADWAYS PRIOR TO CONSTRUCTION. DAMAGE : CONTRACTOR SHALL PREPARE A PHOTOGRAPHIC RECORD OF EXISTING ROADWAYS PRIOR TO CONSTRUCTION. DAMAGE TO EXISTING ROADWAYS, CAUSED BY CONSTRUCTION TRAFFIC, SHALL BE REPAIRED TO THE GOVERNMENT'S SATISFACTION AT NO ADDITIONAL COST. 4. TRAFFIC CONTROL: IF DEEMED NECESSARY BY EITHER THE CONTRACTOR OR GOVERNMENT, THE CONTRACTOR SHALL, AT NO TRAFFIC CONTROL: IF DEEMED NECESSARY BY EITHER THE CONTRACTOR OR GOVERNMENT, THE CONTRACTOR SHALL, AT NO : IF DEEMED NECESSARY BY EITHER THE CONTRACTOR OR GOVERNMENT, THE CONTRACTOR SHALL, AT NO ADDITIONAL COST TO THE GOVERNMENT, PREPARE AND SUBMIT A TRAFFIC CONTROL PLAN IN KEEPING WITH THE LATEST MUTCD MANUAL FOR APPROVAL. 5. FLAGMEN: PROVIDE AND MAINTAIN FLAG MEN TO DIRECT AND CONTROL CONSTRUCTION TRAFFIC WHERE ALL UTILIZED HAUL FLAGMEN: PROVIDE AND MAINTAIN FLAG MEN TO DIRECT AND CONTROL CONSTRUCTION TRAFFIC WHERE ALL UTILIZED HAUL : PROVIDE AND MAINTAIN FLAG MEN TO DIRECT AND CONTROL CONSTRUCTION TRAFFIC WHERE ALL UTILIZED HAUL ROUTES ARE ON ACTIVE ROADWAYS OR ACTIVE AIRFIELD PAVEMENTS, CROSS ACTIVE ROADS OR ACTIVE AIRFIELD PAVEMENTS OR OTHERWISE IMPACT ACTIVE ROADWAYS OR ACTIVE AIRFIELD PAVEMENTS. COORDINATE FLAGMEN LOCATIONS WITH THE CONTRACTING OFFICER. 6. TEMPORARY HAUL ROUTES: CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTING AND MAINTAINING TEMPORARY HAUL TEMPORARY HAUL ROUTES: CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTING AND MAINTAINING TEMPORARY HAUL : CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTING AND MAINTAINING TEMPORARY HAUL ROUTES AS REQUIRED. CONTRACTOR SHALL RESTORE HAUL ROUTES TO EXISTING OR BETTER CONDITIONS AT COMPLETION OF PROJECT. 7. LAND DISTURBANCE PERMIT: IF LOCATED OUTSIDE THE PERMIT AREA OF DISTURBANCE FOR THE PROJECT, THE CONTRACTOR SHALL LAND DISTURBANCE PERMIT: IF LOCATED OUTSIDE THE PERMIT AREA OF DISTURBANCE FOR THE PROJECT, THE CONTRACTOR SHALL : IF LOCATED OUTSIDE THE PERMIT AREA OF DISTURBANCE FOR THE PROJECT, THE CONTRACTOR SHALL OBTAIN A SEPARATE LAND DISTURBANCE/STORMWATER PERMIT FOR CONSTRUCTION OF HAUL ROUTES. 8. APPEARANCE: THE CONTRACTOR SHALL MAINTAIN THE HAUL ROUTES IN A GOOD STATE OF APPEARANCE. APPEARANCE: THE CONTRACTOR SHALL MAINTAIN THE HAUL ROUTES IN A GOOD STATE OF APPEARANCE. : THE CONTRACTOR SHALL MAINTAIN THE HAUL ROUTES IN A GOOD STATE OF APPEARANCE. 9. FOD: THE CONTRACTOR SHALL MAINTAIN THE HAUL ROUTES SUCH THAT IT DOES NOT GENERATE OR BECOME A SOURCE OF FOD: THE CONTRACTOR SHALL MAINTAIN THE HAUL ROUTES SUCH THAT IT DOES NOT GENERATE OR BECOME A SOURCE OF : THE CONTRACTOR SHALL MAINTAIN THE HAUL ROUTES SUCH THAT IT DOES NOT GENERATE OR BECOME A SOURCE OF FOREIGN OBJECT DEBRIS.
AutoCAD SHX Text LAYDOWN AREA: 1. LOCATION: CONTRACTOR'S LAYDOWN AREA SHALL BE LOCATED OUTSIDE THE SECURE AREA OF THE AIRFIELD AT A LOCATION WITHIN 1 LOCATION: CONTRACTOR'S LAYDOWN AREA SHALL BE LOCATED OUTSIDE THE SECURE AREA OF THE AIRFIELD AT A LOCATION WITHIN 1 : CONTRACTOR'S LAYDOWN AREA SHALL BE LOCATED OUTSIDE THE SECURE AREA OF THE AIRFIELD AT A LOCATION WITHIN 1 MILE OF THE PROJECT SITE TO BE DETERMINED BY THE CONTRACTING OFFICER AT THE TIME OF AWARD. INSIDE THE SECURE AREA OF THE AIRFIELD, THE CONTRACTOR MAY STORE EQUIPMENT WITHIN THE LIMITS OF THE WORK AREA WHILE IT IS ACTIVE. 2. UTILITIES: CONTRACTOR SHALL PERFORM ALL NECESSARY COORDINATION AND SHALL BEAR ALL COSTS NECESSARY TO ESTABLISH UTILITIES: CONTRACTOR SHALL PERFORM ALL NECESSARY COORDINATION AND SHALL BEAR ALL COSTS NECESSARY TO ESTABLISH : CONTRACTOR SHALL PERFORM ALL NECESSARY COORDINATION AND SHALL BEAR ALL COSTS NECESSARY TO ESTABLISH ELECTRICAL, WATER AND SEWER SERVICE TO THE LAYDOWN AREA. 3. WATER: CONTRACTOR MAY OBTAIN WATER VIA EXISTING FIRE HYDRANT. CONTRACTOR SHALL PROVIDE HYDRANT METERS AND BACKFLOW WATER: CONTRACTOR MAY OBTAIN WATER VIA EXISTING FIRE HYDRANT. CONTRACTOR SHALL PROVIDE HYDRANT METERS AND BACKFLOW : CONTRACTOR MAY OBTAIN WATER VIA EXISTING FIRE HYDRANT. CONTRACTOR SHALL PROVIDE HYDRANT METERS AND BACKFLOW PREVENTION. WATER LINES SHALL BE SECURED AT ALL TIMES AND REMOVED UPON COMPLETION. 4. PORTABLE TOILETS: PRIOR TO ANY CONSTRUCTION ACTIVITIES PROVIDE TEMPORARY SEWER AND SANITATION FACILITIES, AS DEFINED IN PORTABLE TOILETS: PRIOR TO ANY CONSTRUCTION ACTIVITIES PROVIDE TEMPORARY SEWER AND SANITATION FACILITIES, AS DEFINED IN PRIOR TO ANY CONSTRUCTION ACTIVITIES PROVIDE TEMPORARY SEWER AND SANITATION FACILITIES, AS DEFINED IN THE SPECIFICATIONS, FOR ALL WORK AREAS AND ACCESS GATES. 5. ADDITIONAL FACILITIES: IN ADDITION TO THE CONTRACTOR'S OFFICE TRAILERS, THE CONTRACTOR SHALL PROVIDE THE PROJECT ADDITIONAL FACILITIES: IN ADDITION TO THE CONTRACTOR'S OFFICE TRAILERS, THE CONTRACTOR SHALL PROVIDE THE PROJECT : IN ADDITION TO THE CONTRACTOR'S OFFICE TRAILERS, THE CONTRACTOR SHALL PROVIDE THE PROJECT GOVERNMENT ENGINEER WITH OFFICE FACILITIES IN ACCORDANCE WITH THE SPECIFICATIONS. 6. SECURITY: THE CONTRACTOR IS SOLELY RESPONSIBLE FOR MAINTAINING SECURITY AT THE LAYDOWN AREA. SECURITY: THE CONTRACTOR IS SOLELY RESPONSIBLE FOR MAINTAINING SECURITY AT THE LAYDOWN AREA. : THE CONTRACTOR IS SOLELY RESPONSIBLE FOR MAINTAINING SECURITY AT THE LAYDOWN AREA. 7. APPEARANCE: THE CONTRACTOR SHALL MAINTAIN THE LAYDOWN AREA IN A GOOD STATE OF APPEARANCE. APPEARANCE: THE CONTRACTOR SHALL MAINTAIN THE LAYDOWN AREA IN A GOOD STATE OF APPEARANCE. : THE CONTRACTOR SHALL MAINTAIN THE LAYDOWN AREA IN A GOOD STATE OF APPEARANCE. 8. FOD: THE CONTRACTOR SHALL, MAINTAIN THE LAYDOWN AREA SUCH THAT IT DOES NOT GENERATE OR BECOME A SOURCE OF FOREIGN FOD: THE CONTRACTOR SHALL, MAINTAIN THE LAYDOWN AREA SUCH THAT IT DOES NOT GENERATE OR BECOME A SOURCE OF FOREIGN : THE CONTRACTOR SHALL, MAINTAIN THE LAYDOWN AREA SUCH THAT IT DOES NOT GENERATE OR BECOME A SOURCE OF FOREIGN OBJECT DEBRIS. 9. OFFSITE LAYDOWN AREA: THE AIRFIELD HAS LIMITED SPACE AVAILABLE FOR A CONTRACTOR'S LAYDOWN AREA. OBTAINING, MAINTAINING OFFSITE LAYDOWN AREA: THE AIRFIELD HAS LIMITED SPACE AVAILABLE FOR A CONTRACTOR'S LAYDOWN AREA. OBTAINING, MAINTAINING : THE AIRFIELD HAS LIMITED SPACE AVAILABLE FOR A CONTRACTOR'S LAYDOWN AREA. OBTAINING, MAINTAINING ANY REQUIRED OFF-SITE LAYDOWN AREA THAT THE CONTRACTOR SHALL NEED IS THE RESPONSIBILITY OF THE CONTRACTOR. 10. LAND DISTURBANCE PERMIT: IF LOCATED OUTSIDE THE PERMIT AREA OF DISTURBANCE FOR THE PROJECT, THE CONTRACTOR SHALL LAND DISTURBANCE PERMIT: IF LOCATED OUTSIDE THE PERMIT AREA OF DISTURBANCE FOR THE PROJECT, THE CONTRACTOR SHALL : IF LOCATED OUTSIDE THE PERMIT AREA OF DISTURBANCE FOR THE PROJECT, THE CONTRACTOR SHALL OBTAIN A SEPARATE LAND DISTURBANCE/STORMWATER PERMIT FOR AN OFFSITE LAYDOWN AREA. 11. OTHER PERMITS: CONTRACTOR SHALL OBTAIN ALL PERMITS NECESSARY FOR THE ERECTION AND OPERATION OF PLANTS / CRUSHER. OTHER PERMITS: CONTRACTOR SHALL OBTAIN ALL PERMITS NECESSARY FOR THE ERECTION AND OPERATION OF PLANTS / CRUSHER. : CONTRACTOR SHALL OBTAIN ALL PERMITS NECESSARY FOR THE ERECTION AND OPERATION OF PLANTS / CRUSHER. 12. AIR SPACE LIMITATIONS/7460'S/NOTAMS: THE CONTRACTOR SHALL SUBMIT ALL NECESSARY FORM 7460'S TO FAA AND COORDINATE ALL AIR SPACE LIMITATIONS/7460'S/NOTAMS: THE CONTRACTOR SHALL SUBMIT ALL NECESSARY FORM 7460'S TO FAA AND COORDINATE ALL : THE CONTRACTOR SHALL SUBMIT ALL NECESSARY FORM 7460'S TO FAA AND COORDINATE ALL NECESSARY NOTAM'S WITH CONTRACTING OFFICER. APPROVAL OF 7460'S IS NOT GUARANTEED. REFER TO AIRSPACE IMAGINARY SURFACE LIMITATION NOTES.
AutoCAD SHX Text AIRSPACE IMAGINARY SURFACE LIMITATIONS/7460's/NOTAM's: 1. NOTAMS: BEFORE BEGINNING ANY CONSTRUCTION ACTIVITIES, THE CONTRACTOR MUST, THROUGH THE CONTRACTING OFFICER, GIVE NOTICE . NOTAMS: BEFORE BEGINNING ANY CONSTRUCTION ACTIVITIES, THE CONTRACTOR MUST, THROUGH THE CONTRACTING OFFICER, GIVE NOTICE NOTAMS: BEFORE BEGINNING ANY CONSTRUCTION ACTIVITIES, THE CONTRACTOR MUST, THROUGH THE CONTRACTING OFFICER, GIVE NOTICE : BEFORE BEGINNING ANY CONSTRUCTION ACTIVITIES, THE CONTRACTOR MUST, THROUGH THE CONTRACTING OFFICER, GIVE NOTICE ISSUING THE NOTICE TO AIRMAN (NOTAM) OF PROPOSED LOCATION, TIME, AND DATE OF COMMENCEMENT OF CONSTRUCTION. ISSUANCE OF MULTIPLE NOTAMS DURING THE COURSE OF CONSTRUCTION MAY BE REQUIRED. UPON COMPLETION OF WORK AND RETURN OF ALL SUCH AREAS TO STANDARD OPERATING CONDITIONS, THE CONTRACTOR MUST, THROUGH THE CONTRACTING OFFICER, VERIFY THE CANCELLATION OF ALL NOTICES ISSUED VIA THE NOTAM SYSTEM. CONTRACTOR SHALL PROVIDE A MINIMUM OF 7 DAYS NOTICE TO ALLOW FOR EACH NOTAM TO BE FILED IN A TIMELY MANNER. 2. 7460-1: CONTRACTOR SHALL SUBMIT TO THE FAA, FOR APPROVAL, ALL NECESSARY 7460-1 FORMS A MINIMUM OF 60 DAYS PRIOR TO THE 7460-1: CONTRACTOR SHALL SUBMIT TO THE FAA, FOR APPROVAL, ALL NECESSARY 7460-1 FORMS A MINIMUM OF 60 DAYS PRIOR TO THE : CONTRACTOR SHALL SUBMIT TO THE FAA, FOR APPROVAL, ALL NECESSARY 7460-1 FORMS A MINIMUM OF 60 DAYS PRIOR TO THE START OF ANY CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL IDENTIFY ALL NECESSARY FORM 7460'S AS A NRA (NON-RULE MAKING AIRPORT) NOTICE (I.E. CONSTRUCTION IS LOCATED ON AN AIRPORT). 3. 7460-2: CONTRACTOR SHALL SUBMIT TO THE FAA ALL NECESSARY 7460-2 FORMS TO NOTIFY THE FAA THAT CONSTRUCTION WILL SOON 7460-2: CONTRACTOR SHALL SUBMIT TO THE FAA ALL NECESSARY 7460-2 FORMS TO NOTIFY THE FAA THAT CONSTRUCTION WILL SOON : CONTRACTOR SHALL SUBMIT TO THE FAA ALL NECESSARY 7460-2 FORMS TO NOTIFY THE FAA THAT CONSTRUCTION WILL SOON COMMENCE. THE CONTRACTOR SHALL IDENTIFY ALL NECESSARY FORM 7460'S AS A NRA (NON-RULE MAKING AIRPORT) NOTICE (I.E. CONSTRUCTION IS LOCATED ON AN AIRPORT). 4. AIRSPACE IMAGINARY SURFACES: PARTIAL AIRSPACE IMAGINARY SURFACES ARE PROVIDED FOR AIR FORCE STANDARDS HEREIN. ANY AIRSPACE IMAGINARY SURFACES: PARTIAL AIRSPACE IMAGINARY SURFACES ARE PROVIDED FOR AIR FORCE STANDARDS HEREIN. ANY : PARTIAL AIRSPACE IMAGINARY SURFACES ARE PROVIDED FOR AIR FORCE STANDARDS HEREIN. ANY PERMANENT OR TEMPORARY PENETRATIONS TO AIRSPACE IMAGINARY SURFACES SHALL BE AUTHORIZED VIA A CONTRACTOR PREPARED AND SUBMITTED 7460'S. 5. EQUIPMENT: CONTRACTOR SHALL MOVE EQUIPMENT TO A SAFE AREA OUTSIDE THE AIRSPACE IMAGINARY SURFACES FOR RUNWAY 03/21 AND RUNWAY 15/33 AT THE END OF EACH WORK SHIFT. ALL EQUIPMENT SHALL BE KEPT IN AN ORGANIZED MANNER TO THE SATISFACTION OF USAF AIRFIELD MANAGEMENT.
AutoCAD SHX Text SECURITY CLEARANCE: 1. FORM 74s: ALL CONTRACTOR AND SUBCONTRACTOR PERSONNEL SHALL FILL OUT SFS FORM 74 AND SUBMIT IT TO THE FORM 74s: ALL CONTRACTOR AND SUBCONTRACTOR PERSONNEL SHALL FILL OUT SFS FORM 74 AND SUBMIT IT TO THE : ALL CONTRACTOR AND SUBCONTRACTOR PERSONNEL SHALL FILL OUT SFS FORM 74 AND SUBMIT IT TO THE CONTRACTING OFFICER. IN GENERAL, TO OBTAIN SECURITY CLEARANCES, EACH PERSON SHALL SUBMIT AN APPLICATION TO THE CONTRACTING OFFICER FOR PROCESSING AND UNDERGO A BACKGROUND CHECK. THE SECURITY CLEARANCE PROCESS TYPICALLY REQUIRES APPROXIMATELY A WEEK TO COMPLETE.
AutoCAD SHX Text AIRFIELD ACCESS: 1. PREREQUISITES TO ACCESS: CONTRACTOR WILL NOT BE ALLOWED ACCESS TO THE AIRFIELD UNTIL: PREREQUISITES TO ACCESS: CONTRACTOR WILL NOT BE ALLOWED ACCESS TO THE AIRFIELD UNTIL: : CONTRACTOR WILL NOT BE ALLOWED ACCESS TO THE AIRFIELD UNTIL: A. COMPLETION OF ALL NECESSARY SECURITY CLEARANCES, BADGES, ETC... B. COMPLETION OF ALL NECESSARY DRIVER TRAINING AND OTHER SAFETY PROTOCOLS. C. APPROVAL OF ALL NECESSARY CONSTRUCTION SUBMITTALS D. APPROVAL OF THE CONTRACTOR'S SAFETY PLAN COMPLIANCE DOCUMENT (SPCD) E. APPROVAL OF THE CONTRACTOR'S QUALITY CONTROL PLAN F. COMPLETION OF OTHER NECESSARY APPROVALS. 2. LOCATION: ACCESS TO AIRFIELD SHALL BE VIA EXISTING CONTRACTOR ACCESS GATES IN THE VICINITY OF LOCATION: ACCESS TO AIRFIELD SHALL BE VIA EXISTING CONTRACTOR ACCESS GATES IN THE VICINITY OF : ACCESS TO AIRFIELD SHALL BE VIA EXISTING CONTRACTOR ACCESS GATES IN THE VICINITY OF WORK ON GOING AS INDICATED ON THE PLANS.
AutoCAD SHX Text PROJECT DURATION: 1. COMPLETION OF THE PROJECT SHALL BE IN COMPLIANCE WITH THE PROJECT DURATION CHART SHOWN BELOW. COMPLETION OF THE PROJECT SHALL BE IN COMPLIANCE WITH THE PROJECT DURATION CHART SHOWN BELOW. 2. PROJECT & TASK DURATIONS ARE BASED ON CONTIGUOUS CALENDAR DAYS. PROJECT & TASK DURATIONS ARE BASED ON CONTIGUOUS CALENDAR DAYS. 3. SCHEDULE INCLUDES HISTORICAL AVERAGE ADVERSE WEATHER DAYS.SCHEDULE INCLUDES HISTORICAL AVERAGE ADVERSE WEATHER DAYS.
PROJECT DURATION CHART:
W O
R K
AR
EA
AutoCAD SHX Text
FENCE ON PROPERTY LINE
AutoCAD SHX Text
FENCE ON PROPERTY LINE
AutoCAD SHX Text
FENCE ON PROPERTY LINE
AutoCAD SHX Text
FENCE ON PROPERTY LINE
AutoCAD SHX Text
C FENCE
AutoCAD SHX Text
C FENCE
AutoCAD SHX Text
DEFENSE ST.
AutoCAD SHX Text
AutoCAD SHX Text
SOUTHERN R.R. SPUR
AutoCAD SHX Text
AutoCAD SHX Text
PAD
AutoCAD SHX Text
FARM
AutoCAD SHX Text
FUEL
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
KEEP CLEAR
AutoCAD SHX Text
KEEP CLEAR
AutoCAD SHX Text
KEEP CLEAR
AutoCAD SHX Text
KEEP CLEAR
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
WARNING
AutoCAD SHX Text
FUTURE CONCOURSE A EXPANSION
AutoCAD SHX Text
FUTURE DRIVE/PARKING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GAS
AutoCAD SHX Text
REG
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .