About this file

This document contains questions and answers related to a solicitation for repair work on Dormitory B460 at Joint Base Charleston - Air Base in South Carolina. The solicitation is issued as a competitive 8(a) small business set-aside using trade-off procedures. The contractor shall provide all labor, equipment, materials and supervision to complete project number DKFX1072202, repairing Dormitory B460. The solicitation number is FA441824R0002. The project magnitude is over $10 million. The notice to proceed date is approximately 45 days after contract award. The NAICS code is 236220 for residential remodelers with a size standard of $45 million. Any questions should be directed to the point of contact provided.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JB Charleston Offeror Question and Answer Form

Specification Reference (Section & Paragraph

Reference, i.e. 23 00 00, para 1.3)

Drawing Reference (Sheet and Detail or

Note Reference, i.e. M- 101, Detail 2)

Solicitation Reference (Section, paragraph, sub-paragraph Reference, i.e.

Section M, Paragraph 2.3)

Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.)

F-109 through F-116 General Notes #3; A- 111 through A-116;

AD101 through AD106; record drawings

Solicitation Number Project Name:

Answer

The documents lack clarity regarding whether material sales tax is required or if it is tax-exempt. A/E, please provide guidance on this matter.

Question

Question

Answer

The solicitation (page 1) indicates that the Government has 180 days to accept the offer. Due to unpredictable market conditions, we request a reduction in the Government's acceptance period to 90 days. This adjustment would enable the Government to receive offers with reduced risks to contractors, otherwise contractors will have to add significant costs to the bid to hold price for six months. Please provide guidance.

FA441824R0002

Repair Dormitory B460

NOTICE TO OFFERORS

Any offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all offerors before the submission of their proposals. Oral explanations or instructions given before the award of a contract will not be binding. Answers to offeror questoins concerning a solicitation will be posted to sam.gov, if that information is necessary in preparing proposals or if the lack of it would be prejudicial to others.

Answer

The anticipated Notice to Proceed (NTP) date is approximately 45 days after award of the contract and shall be preceeded by the on site pre-performance conference and review and approval of the following pre-construction submittals: (1) The baseline cost loaded schedule, (2) The Quality Control Plan and (3) the Accident Prevention Plan.

Tax exemptions exist and are a matter of state and federal jurisdiction. Offerors are advised to make their own determination, with the input of a tax expert. Reference for SC is Form ST-10-G, SC Code Section 12-36-2120 (29), and the form titled APPLICATION FOR EXEMPTION FOR FEDERAL GOVERNMENT CONTRACT and STANDARD FORM 1094 Prescribed by GSA-FAR (48 CFR) 53.229

Refer to Record Drawings

Match existing swing gate at same location. Contractor has option toremove and reuse the existing gate.

Answer

Question

F-109 through F-116 Fire Suppression Plans General Notes #3 state, “Provide seismic bracing as indicated on record drawings.” A-111 through A-116 Reflected Ceiling Plan, Sheet Keynotes A18 add new seismic bracing. AD101 through AD106 Demolition show locations for seismic bracing. Fire Suppression as-built (record drawings) show locations of existing seismic bracing. Quantities and locations of seismic bracing do not match between drawings. Should we provide seismic bracing as indicated on the record drawings and/or Architectural Drawings? A/E, please clarify.

Answer

Question

CS101 Site Improvement Sheet Keynotes C7 Replace existing double swing gate (metal). Documents do not show or provide details of the metal swing gate. A/E, please provide a detail of the metal swing gate.

Due to the undertainty relative to the timing of available funding for this contract, the 180 day period will remain as-is at this time.

Question

Please provide anticipated NTP date.

Specification Reference (Section & Paragraph

Reference, i.e. 23 00 00, para 1.3)

Drawing Reference (Sheet and Detail or

Note Reference, i.e. M- 101, Detail 2)

Solicitation Reference (Section, paragraph, sub-paragraph Reference, i.e.

Section M, Paragraph 2.3)

Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.)

Solicitation Number Project Name:

FA441824R0002

Repair Dormitory B460

NOTICE TO OFFERORS

Any offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all offerors before the submission of their proposals. Oral explanations or instructions given before the award of a contract will not be binding. Answers to offeror questoins concerning a solicitation will be posted to sam.gov, if that information is necessary in preparing proposals or if the lack of it would be prejudicial to others.

M-001 General Notes

There is no condenser water. No cooling tower.

Question

Documents do not show a demolition plan for any existing CWS. A/E please confirm there are no existing CWS to be removed.

Answer

Question

A/E, please confirm refrigerators are Government Furnish and Government Install.

Answer

See General Note #1 on Sheet A-401. Refrigerators are GFGI. Contractor to confirm sizes and locations of all appliances with Government before constructiong cabinetry.

Question

We acquired information regarding the lead time for procuring switchboards for this specific project. We have a project duration of 455 days and a minimum lead time of 60 weeks for switchboards. We recommend the duration to be extended to the project duration of 545 days in lieu of 455 days. A/E, please accept this extension.

Answer

The project duration of 455 days will remain unchanged, requests for time extensions will be evaluated IAW Specification Section 01 32 00, paragraph 3.9.

Question

M-001 General Notes 14 states,” The project area is not suspected of containing any hazardous materials (asbestos, Lead, PCBS.)…” There’s a spec section 02 83 00 Lead Remediation. A/E please confirm there is no Lead remediation required.

Answer

While lead is not identified in these documents, contractor is to follow requirements of Specification 02 83 00 where potential lead may occur during demolition procedures.

Question

Add Option for ceramic showers. Documents do not clearly show new shower doors. Are we to assume new shower glass doors. A/E please advise.

Answer A shower rod and curtain will be required for the new tile shower.

Typical shower rod spec: ASI (1214), Bobrick (B-207), Bradley (9539) - Unit shall be of type 304 stainless steel, 1.006mm (20-gage), with satin finish. Outside diameter shall be 25.4mm (1-inch). Flanges shall be 80mm (3 3/16-inch) maximum diameter with satin finish. Unit shall include concealed mounting brackets.

Typical shower curtain spec: ASI (1200-V), Bobrick (B-204-3), Bradley (9537) - Shower curtain shall be opaque, matte white vinyl, mildew resistant. Curtain shall include rust-proof grommets along top, one at every 150mm (6")intervals. Bottom and sides shall be hemmed. Curtain shall be 1830mm (72") high and 1778mm (70") wide.

Specification Reference (Section & Paragraph

Reference, i.e. 23 00 00, para 1.3)

Drawing Reference (Sheet and Detail or

Note Reference, i.e. M- 101, Detail 2)

Solicitation Reference (Section, paragraph, sub-paragraph Reference, i.e.

Section M, Paragraph 2.3)

Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.)

Solicitation Number Project Name:

FA441824R0002

Repair Dormitory B460

NOTICE TO OFFERORS

Any offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all offerors before the submission of their proposals. Oral explanations or instructions given before the award of a contract will not be binding. Answers to offeror questoins concerning a solicitation will be posted to sam.gov, if that information is necessary in preparing proposals or if the lack of it would be prejudicial to others.

Sheet C-501 Environmental Requirements

Sheets S-105 and S- 106 detail 8/S-301

02 41 00 3.1.15

Question

The documents do not show existing blinds and curtains to be removed. A/E please confirm we should include removing and disposing all existing blinds and curtains.

Answer

Existing blinds and hardware are to be removed for the installation of new blackout roller shades. See General Note #9 on Sheets A-401 & A-402 for roller shades.

Question

Sheet C-501 Environmental Requirements #4 states “If dewatering is necessary, all groundwater extracted from the subsurface within specified work area (Area A) must be contained in Frac Tanks (mobile steel storage tanks used to hold liquids) or a similar type of storage tank(s).” A/E please confirm dewatering is required and amount of water to dewater.

For bidding purposes, please provide an allowance.

Answer

The need for dewatering is unknown and to be determined by contractor during construction. Contractor to assume cost for this requirement. Current site conditions allow for Environmental Requirements notes 1-4 on sheet C-501 to be omitted as the Air Base’s contamination boundary no longer conflicts with this project’s limits of construction.

Question

Refer to Sheets S-105 and S-106 Sheet Keynotes S6 and S7, as well as detail 8/S-301. The documents currently do not depict the existing Mechanical ductwork, Electrical conduits, Plumbing pipes, and etc. to remain in the attic space. Is it anticipated that conflicts may arise with the existing ductwork, conduits, and piping scheduled to remain. If so, A/E please provide an allowance or estimated quantity, or will this be addressed as a change order after award. A/E please advise.

Answer

The contract documents have identified there will be conflicts between the existing utlities and systems and the installation of the new reinforcing. Contractor shall make every attempt to install reinforcing system including the temporary removal and reinstallation of Mechanical ductwork, Electrical conduits, Plumbing pipes, and etc.

Question

For the B460 Dorm Renovation, is it required to demo existing wire and use new wire for the fire alarm and mass notification system or can wire be reused if it is in good working condition?

Answer

Yes, demo the existing wiring & conduit and replace with new.

Question

02 41 00 3.1.15 - Electrical Equipment and Fixtures. Please confirm that motor, motor controllers, light fixtures, electrical devices (i.e. switches, conduit, conductors, breakers, and etc.) to be removed and salvage.

Answer

Specification Reference (Section & Paragraph

Reference, i.e. 23 00 00, para 1.3)

Drawing Reference (Sheet and Detail or

Note Reference, i.e. M- 101, Detail 2)

Solicitation Reference (Section, paragraph, sub-paragraph Reference, i.e.

Section M, Paragraph 2.3)

Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.)

Solicitation Number Project Name:

FA441824R0002

Repair Dormitory B460

NOTICE TO OFFERORS

Any offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all offerors before the submission of their proposals. Oral explanations or instructions given before the award of a contract will not be binding. Answers to offeror questoins concerning a solicitation will be posted to sam.gov, if that information is necessary in preparing proposals or if the lack of it would be prejudicial to others.

02 41 00 3.1.14

Once the building is vacated, the Government will remove and store: any control IP addressable components such as the Trane BCU, Field Server Bridge, ILON and the Boiler Honeywell Burner flame safeguard module, and the Monaco fire alarm transmitter. The Government does not intend for contractors to salvage motor, motor controllers, light fixtures, electrical devices (i.e. switches, conduit, conductors, breakers, and etc.) unless specifically indicated in contract documents.

Question

02 41 00 3.1.14 - Mechanical Equipment and Fixtures – “Remove and Salvage fixtures, motors and machines associated with plumbing, heating, air conditioning, refrigeration, and other mechanical system installation”. It appears most of the equipment is in poor condition. Please confirm if HVAC equipment is to be salvaged and protected from damage.

Answer

Once the building is vacated, the Government will remove and store: any control IP addressable components such as the Trane BCU, Field Server Bridge, ILON and the Boiler Honeywell Burner flame safeguard module, and the Monaco fire alarm transmitter. The Government does not intend for contractors to salvage and protect HVAC equipment unless specifically indicated in contract documents..

Question The specifications state that “It is incumbent on the Contractor to ascertain the current security and base access requirements appropriate to the project location and incorporate the cost, if any, for compliance to said requirements into Contractor's proposal.” What, if any, security requirements apply to this contract beyond compliance with the installation

Answer JS-US007 - Level I Antiterrorism Awareness Training is required to be completed by all contractors within 30 days of requiring access, and annually thereafter. Coordination for training shall be by the contractor after contract award. This provision shall NOT apply to contractors requiring access on contracts awarded through 30 September 2023. It shall apply

Question

Answer

Question

Answer

Question

Answer

Specification Reference (Section & Paragraph

Reference, i.e. 23 00 00, para 1.3)

Drawing Reference (Sheet and Detail or

Note Reference, i.e. M- 101, Detail 2)

Solicitation Reference (Section, paragraph, sub-paragraph Reference, i.e.

Section M, Paragraph 2.3)

Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.)

Solicitation Number Project Name:

FA441824R0002

Repair Dormitory B460

NOTICE TO OFFERORS

Any offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all offerors before the submission of their proposals. Oral explanations or instructions given before the award of a contract will not be binding. Answers to offeror questoins concerning a solicitation will be posted to sam.gov, if that information is necessary in preparing proposals or if the lack of it would be prejudicial to others.

Sheet1