Attachment 17 - Questions and Answers.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
Base Pavements Maintenance and Repair IDIQ
Solicitation number
FA441823R0015
Issued by

About this file

This document contains answers to questions from offerors regarding Solicitation Number FA441823R0015 for Base Pavements Maintenance and Repair IDIQ services. The solicitation is seeking proposals for an Indefinite Delivery Indefinite Quantity contract with the Department of the Air Force Air Mobility Command to provide paving services at Joint Base Charleston, with a minimum value of $2,500 and maximum of $16.5 million over the life of the contract. The base period of performance is one year with four optional one-year extension periods. Pricing will be evaluated using the schedule in Attachment 11. Rideability testing will use standards in SC-M-403, with repairs required for segments above 100% payment thresholds. Five most relevant past federal or commercial contracts may be listed. Estimated task order values will range from $25,000 to $1 million.

View the file

Other files

File Type Posted
Attachment 11 Schedule B Paving IDIQ - Revised 20230918.xlsx XLSX spreadsheet
Attachment 16 - Site Visit Sign In Sheet.pdf PDF
Solicitation Amendment FA441823R00150002 SF 30.pdf PDF
Solicitation Amendment - FA441823R00150002.pdf PDF
Attachment 1 - Statement of Work - Revised 20230918.pdf PDF
Solicitation Amendment FA441823R00150001 SF 30.pdf PDF
Solicitation Amendment - FA441823R00150001.pdf PDF
Attachment 5 - Temporary Environmental Controls.pdf PDF
Attachment 10 - SC DOT SC-M-403 Rideability for Asphalt Mixtures.pdf PDF
Attachment 3 - Green Procurement.pdf PDF
Attachment 15 - JB Charleston - Question and Answer Form.xlsx XLSX spreadsheet
Attachment 12 - Wage Determination SC20230034.pdf PDF
Attachment 9 - SC DOT Standard Specifications for Highway Construction.pdf PDF
Attachment 6 - Submittal Procedures.pdf PDF
Attachment 11 - Schedule B.xlsx XLSX spreadsheet
Attachment 7 - Ionizing Radiation Protection Program.pdf PDF
Attachment 2 - Environmental Specifications.pdf PDF
Solicitation - FA441823R0015.pdf PDF
Attachment 13 - Wage Determination SC20230040.pdf PDF
Attachment 4 - Construction and Demolition Waste Management.pdf PDF
Attachment 14 - Past Performance Questionnaire.pdf PDF
Attachment 1 - Statement of Work.pdf PDF
Attachment 8 - Base Access Worksheet.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 17 - QA JB Charleston Offeror Question and Answers NOTICE TO OFFERORS Any offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all offerors before the submission of their proposals. Oral explanations or instructions given before the award of a contract will not be binding. Answers to offeror questions concerning a solicitation will be posted to sam.gov, if that information is necessary in preparing proposals or if the lack of it would be prejudicial to others.

Solicitation NumberFA4418-23-R-0015
Project Name:Joint Base Charleston - Paving IDIQ
#Specification Reference (Section & Paragraph Reference, i.e. 23 00 00, para 1.3)Drawing Reference (Sheet and Detail or Note Reference, i.e. M-101, Detail 2)Solicitation Reference (Section, paragraph, sub-paragraph Reference, i.e. Section M, Paragraph 2.3)Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.)
1Question
Item No. 401-02BFA4418-23-R-0015Attachment 10, Schedule BRegarding Rideability; what is repair threshold when comparing the initial ride and the final ride?
Answer
IAW Revised Statement of Work Paragraph 53, The IRI Rideability threshold at which repair shall be required is an IRI Roughness above the range identified in SC-M-403 that corresponds to 100% or full payment, as identified for the corresponding types of construction. Pay adjustments identified in SC-M-403 tables above or below 100% will not be applied to line item unit costs on task orders. Repairs shall be at least a 1" mill and overlay for the segment(s) of roadway that do not meet the standard in order to meet the maximum acceptable repair IRI corresponding to 100% payment in Table 6. If patches are within 250 feet of each other, they shall be combined into a single patch. Patches shall be at least for the width of the paving lane and at least 100 feet in length.
2Question
Item No. 401-02BFA4418-23-R-0015Attachment 10, Schedule BWhat is considered an unacceptable rideability score that will necessitate the contractor to make repairs?
Answer
IAW Revised Statement of Work Paragraph 53, The IRI Rideability threshold at which repair shall be required is an IRI Roughness above the range identified in SC-M-403 that corresponds to 100% or full payment, as identified for the corresponding types of construction. Pay adjustments identified in SC-M-403 tables above or below 100% will not be applied to line item unit costs on task orders. Repairs shall be at least a 1" mill and overlay for the segment(s) of roadway that do not meet the standard in order to meet the maximum acceptable repair IRI corresponding to 100% payment in Table 6. If patches are within 250 feet of each other, they shall be combined into a single patch. Patches shall be at least for the width of the paving lane and at least 100 feet in length.
3Question
Solicitation L - 1.1The solicitation states that Submission of Proposal : Offerors shall submit a complete, original, signed proposal electronically via DOD SAFE. No other means of delivery will be accepted. However, when going to the DOD SAFE website, this message is there front and center: The DOD SAFE is NOT to be used for contract solicitation or proposal submission. Please confirm the method of delivery for the submission of proposals.
Answer
In accordance with Section L L-1.1, Offerors shall submit a complete, original, signed proposal electronically via DOD SAFE (https://safe.apps. mil). No other means of delivery will be accepted.
4Question
SolicitationPlease confirm the period of performance time frames
Answer
See solicitation amendment FA441823R00150002. Performance periods will end on 30 June and Option Years will begin on 1 July.
5Question
SolicitationPlease confirm that “Section B: Supplies or Services & Prices or Costs” is not part of the Proposal Submission and that only the IGE FY 2023 IDIQ Paving Pricing Schedule will be used for cost analysis
Answer
In accordance with Section L L-2.3, Price Evaluation will be performed using values from Attachment11 - Schedule

B, not the CLINs from Section B of the solicitation.

6Question
Amendment 0001 Pg 5 Part II Factor 2States "Provide a list of no more than five (5) of the most relevant contracts performed for Federal agencies and commercial customers within the last three (3) years." Can this 3 years be expanded to 5 years?
Answer
No.
7Question
SolicitationAssuming that the various line items within the scope sections of the price schedule may or may not be performed in one mobilization, how many mobilizations or TO’s should we figure per Option Year? The Solicitation states that the majority of the TO’s will range between $25K to $1M, which is anywhere from 17 to 660 TO’s in a $16.5M IDIQ.
Answer
IAW Standard Form 1442, "Project Magnitude: $2,500.00 minimum and maximum NTE $16,500,000.00 for life of contract." The government cannot guarantee more than the minimum specified. Past task orders are not a guarantee of future work. However, for reference see below task order history on previous contract:

Ordering Period Task Orders $ Awarded

Base Year 4 $715,328.34 Option 1 1 $256,444.62 Option 2 5 $1,706,650.87 Option 3 16 $6,741,230.71 Option 4 (active) 1 $194,386.97

8Question
Will the rideability requirements apply if the posted speed limit is below 45 mph?
Answer
IAW Revised Statement of Work Paragraph 53, Rideability requirements shall still apply to roads with a posted speed limit below 45 mph. Contractor shall request permission for testing with proposed speed of testing no less than 3 weeks in advance using the Outage Request Form.
9Question
After award, how will line item unit prices be calculated between the base period and option years?
Answer
IAW revised Attachment11 - Schedule B, the CLIN 0001 Base Period unit prices used shall be the unit prices submitted as part of Attachment11 - Schedule B. For CLIN 1001-4001 Option Years 1-4, the Unit Cost for the Price Schedule for Each Line Item shall be calculated by multiplying the Unit Cost from the Previous Period by the proposed Line Item Escalation and rounding to the nearest cent. For the 6 month extension, unit costs shall be the same as Option Year 4.
10Question
Will Economic Price Adjustments be permitted on the contract?
Answer
IAW Revised Statement of Work Paragraph 51, Economic Price Adjustments shall not be allowed on the contract.
11Question

Answer

12 Question

Answer

13 Question

Answer

14 Question

Answer

15 Question

Answer

16 Question

Answer

17 Question

Answer

18 Question

Answer

19 Question

Answer

20 Question

Answer

File details come from the government source that posted it. Updated .