Attachment 12 - Wage Determination SC20230034.pdf

PDF 41 KB Posted

Attached to
Base Pavements Maintenance and Repair IDIQ
Solicitation number
FA441823R0015
Issued by

About this file

This document provides a wage determination applicable to the solicitation for Base Pavements Maintenance and Repair IDIQ opportunities with the Department of the Air Force Air Mobility Command. The wage determination sets the minimum prevailing wage rates for various labor classifications involved in highway construction projects in Berkeley, Charleston, Dorchester and Horry counties in South Carolina. Covered classifications include carpenters, cement masons, ironworkers, laborers, equipment operators, truck drivers and welders. The wage determination is effective as of January 6, 2023 and includes the applicable minimum wages of either $16.20 or $12.15 per hour under current executive orders for contracts subject to the Davis-Bacon Act. Procedures are outlined for appealing wage determination decisions issued by the Wage and Hour Division of the Department of Labor.

View the file

Other files

File Type Posted
Attachment 11 Schedule B Paving IDIQ - Revised 20230918.xlsx XLSX spreadsheet
Attachment 16 - Site Visit Sign In Sheet.pdf PDF
Attachment 17 - Questions and Answers.xlsx XLSX spreadsheet
Solicitation Amendment FA441823R00150002 SF 30.pdf PDF
Solicitation Amendment - FA441823R00150002.pdf PDF
Attachment 1 - Statement of Work - Revised 20230918.pdf PDF
Solicitation Amendment FA441823R00150001 SF 30.pdf PDF
Solicitation Amendment - FA441823R00150001.pdf PDF
Attachment 5 - Temporary Environmental Controls.pdf PDF
Attachment 10 - SC DOT SC-M-403 Rideability for Asphalt Mixtures.pdf PDF
Attachment 3 - Green Procurement.pdf PDF
Attachment 15 - JB Charleston - Question and Answer Form.xlsx XLSX spreadsheet
Attachment 9 - SC DOT Standard Specifications for Highway Construction.pdf PDF
Attachment 6 - Submittal Procedures.pdf PDF
Attachment 11 - Schedule B.xlsx XLSX spreadsheet
Attachment 7 - Ionizing Radiation Protection Program.pdf PDF
Attachment 2 - Environmental Specifications.pdf PDF
Solicitation - FA441823R0015.pdf PDF
Attachment 13 - Wage Determination SC20230040.pdf PDF
Attachment 4 - Construction and Demolition Waste Management.pdf PDF
Attachment 14 - Past Performance Questionnaire.pdf PDF
Attachment 1 - Statement of Work.pdf PDF
Attachment 8 - Base Access Worksheet.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"General Decision Number: SC20230034 01/06/2023

Superseded General Decision Number: SC20220034

State: South Carolina

Construction Type: Highway

Counties: Berkeley, Charleston, Dorchester and Horry Counties in South Carolina.

HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction;

bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction;

and other major bridges).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2023

SUSC2011-032 09/15/2011

Rates Fringes

CARPENTER (Form Work Only) Berkeley, Dorchester........$ 13.50 ** Charleston..................$ 13.07 ** Horry.......................$ 14.29 **

CEMENT MASON/CONCRETE FINISHER

Berkeley, Dorchester........$ 14.79 ** Charleston..................$ 14.33 ** Horry.......................$ 14.62 **

IRONWORKER, REINFORCING..........$ 15.35 **

LABORER

Asphalt, Includes Asphalt Distributor, Raker, Shoveler, and Spreader Berkeley, Charleston, Dorchester.................$ 11.62 ** Asphalt, Includes Asphalt Distributor, Shoveler and Spreader Horry......................$ 11.54 ** Common or General Berkeley...................$ 10.06 ** Charleston.................$ 10.16 ** Dorchester.................$ 11.69 ** Horry......................$ 9.72 ** Luteman.....................$ 11.61 ** Mason Tender- Cement/Concrete.............$ 10.40 ** Pipelayer...................$ 13.98 ** Traffic Control-Cone Setter Berkeley, Charleston, Dorechester................$ 13.19 ** Horry......................$ 12.63 ** Traffic Control-Flagger.....$ 11.07 **

POWER EQUIPMENT OPERATOR:

Backhoe/Excavator/Trackhoe Berkeley...................$ 15.68 ** Charleston.................$ 16.09 ** Dorchester.................$ 16.06 ** Horry......................$ 15.04 ** Bulldozer...................$ 14.81 ** Crane Berkeley, Dorchester.......$ 20.00 4.73 Charleston.................$ 20.08 Horry......................$ 20.58 Grader/Blade................$ 14.61 ** Hydroseeder.................$ 11.00 ** Loader (Front End/Track)....$ 16.80 Mechanic Berkeley, Dorchester.......$ 19.07 Charleston.................$ 19.21 Horry......................$ 19.48 Milling Machine.............$ 11.84 **

Paver Berkeley, Charleston, Dorchester.................$ 18.85 Horry......................$ 13.29 ** Roller......................$ 15.17 ** Scraper.....................$ 12.71 ** Screed......................$ 13.56 ** Tractor.....................$ 13.28 **

TRUCK DRIVER

Dump Truck..................$ 10.67 ** Lowboy Truck................$ 15.55 **

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658 ($12.15). Please see the Note at the top of the wage determination for more information.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or

""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISIO"

File details come from the government source that posted it. Updated .