Appendix G - Points of Demarcation.docx

DOCX document 28 KB Posted

Attached to
Naval Nuclear Power Training Command - Facility Maintenance Services Federal contract opportunity
Solicitation number
FA441820Q0002
Issued by
Department of the Air Force Air Mobility Command

View the file

Other files for this federal contract opportunity

Other files attached to Naval Nuclear Power Training Command - Facility Maintenance Services, newest first.
File Type Posted
FA441820Q0002 Site Visit Questions.pdf PDF
FA441820Q0002 PreProposalMtg Technical Slides.pptx PPTX presentation
Copy of Appendix A - RPIE (Rev A01).xlsx XLSX spreadsheet
FA441820Q0002 PreProposalMtgSlides.pptx PPTX presentation
FA441820Q0002 PWS APPENDIX D.pdf PDF
FA441820Q0002 Attachment 1 - NNPTC PWS (Rev A01).pdf PDF
FA441820Q0002 Attachment 5 - NNPTC FAC MX Past Performance Questionaire.docx DOCX document
Appendix B - NRPIE.xlsx XLSX spreadsheet
FA441820Q0002 Attachment 1 - NNPTC PWS.docx DOCX document
Appendix H - Base Access Form.pdf PDF
FA441820Q0002 Attachment 2 - Service Wage Determination WD 2015-4427.pdf PDF
Appendix I - Facility Inspection Checklist (Example).docx DOCX document
Appendix A - RPIE.xlsx XLSX spreadsheet
Appendix M - Engineering Technical Advisory_Legionellos Mitigation Actions.docx DOCX document
FA441820Q0002 Combined Synopsis Solicitation.docx DOCX document
Appendix J - Engineering Technical Advisory_Legionellos Mitigation Actions.docx DOCX document
Appendix C - Historical Data NNPTC.xlsx XLSX spreadsheet
FA441820Q0002 Attachment 3 - Construction Wage Determination SC20190022.pdf PDF
Appendix E - Facility List.docx DOCX document
FA441820Q0002 Attachment 4 - Price Worksheet.xlsx XLSX spreadsheet
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix G – Points of Demarcation

The Contractor shall be responsible for maintenance and repairs of exterior water lines as follows:

· Water supply lines from the shutoff valve to the building or five feet from the building if no valve exist, will be the responsibility of the Contractor.

· Water supply from the shut off valve or five feet from the building to the source main will be the responsibility of the Base Civil Engineer (BCE).

· If no shut off valve exist, the BCE will assist with isolation and the five foot rule will take effect.

Responsibility for maintenance and repairs of sewage mains are as follows:

· From the building clean-out to the building or five feet from the building if no clean-out exist, will be the responsibility of the contractor.

· From the clean-out to the sewer main or five feet from the building if no clean-out exist, will the responsibility of the BCE

Responsibility for maintenance and repairs of Low Voltage Lines are as follows:

· High Voltage Lines will end at the primary side of the main distribution breaker(s).

· The contractor shall be responsible for the main distribution breaker(s) and all components downstream.

FOR OFFICIAL USE ONLY

File details come from the government source that posted it. Updated .