Appendix G - Points of Demarcation.docx

DOCX document 28 KB Posted

Attached to
Naval Nuclear Power Training Command - Facility Maintenance Services
Solicitation number
FA441820Q0002
Issued by

View the file

Other files

File Type Posted
FA441820Q0002 Site Visit Questions.pdf PDF
FA441820Q0002 PreProposalMtgSlides.pptx PPTX presentation
Copy of Appendix A - RPIE (Rev A01).xlsx XLSX spreadsheet
FA441820Q0002 PWS APPENDIX D.pdf PDF
FA441820Q0002 PreProposalMtg Technical Slides.pptx PPTX presentation
FA441820Q0002 Attachment 1 - NNPTC PWS (Rev A01).pdf PDF
FA441820Q0002 Attachment 5 - NNPTC FAC MX Past Performance Questionaire.docx DOCX document
FA441820Q0002 Combined Synopsis Solicitation.docx DOCX document
Appendix M - Engineering Technical Advisory_Legionellos Mitigation Actions.docx DOCX document
FA441820Q0002 Attachment 1 - NNPTC PWS.docx DOCX document
Appendix I - Facility Inspection Checklist (Example).docx DOCX document
Appendix B - NRPIE.xlsx XLSX spreadsheet
FA441820Q0002 Attachment 4 - Price Worksheet.xlsx XLSX spreadsheet
Appendix H - Base Access Form.pdf PDF
Appendix A - RPIE.xlsx XLSX spreadsheet
FA441820Q0002 Attachment 2 - Service Wage Determination WD 2015-4427.pdf PDF
Appendix J - Engineering Technical Advisory_Legionellos Mitigation Actions.docx DOCX document
Appendix C - Historical Data NNPTC.xlsx XLSX spreadsheet
FA441820Q0002 Attachment 3 - Construction Wage Determination SC20190022.pdf PDF
Appendix E - Facility List.docx DOCX document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix G – Points of Demarcation

The Contractor shall be responsible for maintenance and repairs of exterior water lines as follows:

· Water supply lines from the shutoff valve to the building or five feet from the building if no valve exist, will be the responsibility of the Contractor.

· Water supply from the shut off valve or five feet from the building to the source main will be the responsibility of the Base Civil Engineer (BCE).

· If no shut off valve exist, the BCE will assist with isolation and the five foot rule will take effect.

Responsibility for maintenance and repairs of sewage mains are as follows:

· From the building clean-out to the building or five feet from the building if no clean-out exist, will be the responsibility of the contractor.

· From the clean-out to the sewer main or five feet from the building if no clean-out exist, will the responsibility of the BCE

Responsibility for maintenance and repairs of Low Voltage Lines are as follows:

· High Voltage Lines will end at the primary side of the main distribution breaker(s).

· The contractor shall be responsible for the main distribution breaker(s) and all components downstream.