NPTU_FAC_MX_Pricing_Worksheet_8_Jan_19.doc

DOC document 168 KB Posted

Attached to
NPTU Facility Maintenance
Solicitation number
FA441819RA011
Issued by

About this file

Pricing Worksheet - Word Doc ( NO CHAGES MADE)

View the file

Other files

File Type Posted
REVISED_Questions_and_Answers_40_and_41.pdf PDF
NPTU_FAC_MX_Pricing_Worksheet_REVISED_05_FEB_19.pdf PDF
Inspection_Checklist.docx DOCX document
NPTF_Charleston_OMSI_Manual_Part_IV_Section_4_HVAC.pdf PDF
NPTFCH~3.PDF PDF
FA441819RA011_-_Questions_and_Answers.pdf PDF
NPTFCH~2.PDF PDF
H1MB10~1.PDF PDF
NPTF_Charleston_OMSI_Manual_Part_IV_Cover_and_TOC.pdf PDF
G7LPV0~1.PDF PDF
Site_Visit_Attendance__Redacted.pdf PDF
WD_2015-4427_Rev_10_12_26_2018.pdf PDF
PPQ_NPTU_Facility_Maintenance.pdf PDF
FA441819RA011_Facility_Mx_Site-Visit_Agenda.pdf PDF
NPTU_Facility_Maintenance_Site_Visit.pdf PDF
E_-_Facility_Inventory_-_RP_&_Non-RP.xlsx XLSX spreadsheet
Appendix_J_-_Engineering_Technical_Advisory_Legionellos_Mitigation_Actions.docx DOCX document
A_-_Real_Prop_Equip_Inventory.xlsx XLSX spreadsheet
NPTU_FAC_MX_Pricing_Worksheet_8_Jan_19.pdf PDF
REVISED_Solicitation_-_FA441819RA011_NPTU_Facility_Maintenance.pdf PDF
H_-_Backflow_Preventer_Inventory.xlsx XLSX spreadsheet
D_-_Service_Call__Data_-_Non-Real.xlsx XLSX spreadsheet
PPQ_NPTU_Facility_Maintenance.pdf PDF
Appendix_L_-_Contractor_Special_Conditions_05JUN18.pdf PDF
G_-_Points_of_Demarcation.docx DOCX document
C_-_Service_Call_Data_-_Real_Property.xlsx XLSX spreadsheet
NPTU_PWS__20_Dec_2018.pdf PDF
I_-__Electrical_Substation_Inventory.xlsx XLSX spreadsheet
B_-_Equip_Inventory_-_NR_Property.xlsx XLSX spreadsheet
Appendix_K_-_Contractor_Base_Security_and_Access.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NPTU Facility Maintenance Pricing Worksheet

Quantity
Price per Month
Extended Price

Base Period (1 Apr 19-30 Sep 19)

CLIN 0001 – Real Property Installed Equipment (RPIE) Preventive

Maintenance & Inspection (PMI), service calls & repairs below Limitation of Liability (LoL) O&M funded

*Includes 20% of Real Property Facility Inspections reqm’t Annually

CLIN 0002 – Real Property Installed Equipment (RPIE) Preventive

Limitation of Liability (LoL)(Bldgs. 2626, 2701, 2711) Navy funded

CLIN 0003 RPIE Repairs above the LoL - O&M funded
6

CLIN 0004 RPIE Repairs above the LoL (Bldgs. 2626,2701,2711) Navy funded

CLIN 0005 Non Real Property Barges PMI, service calls & repairs below the LoL – Navy funded

CLIN 0006 Non Real Property Barges Repairs above the LoL-

Navy funded

CLIN 0007 N4 & N5 Electrical Substation PM & Inspection –

N4 Pricing Only
Each
N5 Pricing Only
Each

CLIN 0008 Electrical Substation PM & Inspections – O&M funded

Substation N1
Each
Substation N2
Each
Substation N3
Each
Substation S1
Each
Substation S2
Each
Substation S3
Each
Total for Base Year 01 Apr 19-30 Sep 19
6

1st Option Period (1 Oct 19 - 30 Sep 20)

CLIN 1001 – Real Property Installed Equipment (RPIE) Preventive

Limitation of Liability (LoL) O&M

CLIN 1002 – Real Property Installed Equipment (RPIE) Preventive

CLIN 1003 RPIE Repairs above the LoL - O&M funded
12

CLIN 1004 RPIE Repairs above the LoL

CLIN 1005 Non Real Property Barges PMI, service calls & repairs

CLIN 1006 Non Real Property Barges Repairs above the LoL-

CLIN 1007 N4 & N5 Electrical Substation PM & Inspection –

N4 Pricing Only
Each
N5 Pricing Only
Each

CLIN 1008 Electrical Substation PM & Inspections – O&M funded

Substation N1
Each
Substation N2
Each
Substation N3
Each
Substation S1
Each
Substation S2
Each
Substation S3
Each
Total for 1st Option Period 1 Oct 19- 30 Sep 20
12

2nd Option Period (1 Oct 20 - 30 Sep 21)

CLIN 2001 – Real Property Installed Equipment (RPIE) Preventive

CLIN 2002 – Real Property Installed Equipment (RPIE) Preventive

CLIN 2003 RPIE Repairs above the LoL - O&M funded
12

CLIN 2004 RPIE Repairs above the LoL

CLIN 2005 Non Real Property Barges PMI, service calls & repairs

CLIN 2006 Non Real Property Barges Repairs above the LoL-

CLIN 2007 N4 & N5 Electrical Substation PM & Inspection –

N4 Pricing Only
Each
N5 Pricing Only
Each

CLIN 2008 Electrical Substation PM & Inspections – O&M funded

Substation N1
Each
Substation N2
Each
Substation N3
Each
Substation S1
Each
Substation S2
Each
Substation S3
Each

Total 2nd Option Period 1 Oct 20- 30 Sep 21

3rd Option Period (1 Oct 21 - 30 Sep 22)

CLIN 3001 – Real Property Installed Equipment (RPIE) Preventive

CLIN 3002 – Real Property Installed Equipment (RPIE) Preventive

CLIN 3003 RPIE Repairs above the LoL - O&M funded
12

CLIN 3004 RPIE Repairs above the LoL

CLIN 3005 Non Real Property Barges PMI, service calls & repairs

CLIN 3006 Non Real Property Barges Repairs above the LoL-

CLIN 3007 N4 & N5 Electrical Substation PM & Inspection –

N4 Pricing Only
Each
N5 Pricing Only
Each

CLIN 3008 Electrical Substation PM & Inspections – O&M funded

Substation N1
Each
Substation N2
Each
Substation N3
Each
Substation S1
Each
Substation S2
Each
Substation S3
Each
Total for 3rd Option Period 01 Oct 21-30 Sep 22
12

4th Option Period (1 Oct 22- 30 Sep 23)

CLIN 4001 – Real Property Installed Equipment (RPIE) Preventive

CLIN 4002 – Real Property Installed Equipment (RPIE) Preventive

CLIN 4003 RPIE Repairs above the LoL - O&M funded
12

CLIN 4004 RPIE Repairs above the LoL

CLIN 4005 Non Real Property Barges PMI, service calls & repairs

CLIN 4006 Non Real Property Barges Repairs above the LoL-

CLIN 4007 N4 & N5 Electrical Substation PM & Inspection –

N4 Pricing Only
Each
N5 Pricing Only
Each
CLIN 4008 Electrical Substation PM & Inspections – O&M funded
12
Substation N1
Each
Substation N2
Each
Substation N3
Each
Substation S1
Each
Substation S2
Each
Substation S3
Each
Total for 4th Option Period 1 Oct 22-30 Sep 23
12

6 Month Extension of Services

CLIN 5001 – Real Property Installed Equipment (RPIE) Preventive Maintenance & Inspection (PMI), service calls & repairs below Limitation of Liability (LoL) O&M
6

CLIN 5002 – Real Property Installed Equipment (RPIE) Preventive

CLIN 5003 RPIE Repairs above the LoL - O&M funded
6

CLIN 5004 RPIE Repairs above the LoL

CLIN 5005 Non Real Property Barges PMI, service calls & repairs

CLIN 5006 Non Real Property Barges Repairs above the LoL-

CLIN 5007 N4 & N5 Electrical Substation PM & Inspection –

N4 Pricing Only
Each
N5 Pricing Only
Each
CLIN 5008 Electrical Substation PM & Inspections – O&M funded
12
Substation N1
Each
Substation N2
Each
Substation N3
Each
Substation S1
Each
Substation S2
Each
Substation S3
Each
Total 6 Month Extension
6

Total (CLINs 0001 – 4008) Anticipated Award Value

$
$

Repair Parts Cost Mark-Up: _____% (Estimated annual repairs greater than the limitation of liability) *Parts only- no mark-up is allowed on shipping and handling. See PWS.

Regular Repair Cost Labor Rate : ________ (Estimated annual repairs greater than the limitation of liability) OT Repair Rate: _________ * Quote Fully Burdened Labor Rates

NOTE: Per PWS, offeror’s mark-up for repairs shall include any and all costs such as labor taxes and benefits, overhead, Health and Welfare, G&A, profit, etc. The estimated amount shown in the calculation above is for evaluation purposes only and does not reflect historical or anticipated repairs. This mark-up percentage and labor rates will apply to repair quotes in all performance periods.

Pricing Schedule Worksheet (07 Dec 2019) Attachment 2

File details come from the government source that posted it.