NPTFCH~2.PDF
PDF 191 KB Posted
- Attached to
- NPTU Facility Maintenance
- Solicitation number
- FA441819RA011
About this file
OMSI 1
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Operation and Maintenance Support Information (OMSI) Manual for
SAEP, TSB-2, TSB-2A
Nuclear Power Training Facilities Joint Base Charleston
P099 – P100 Charleston, South Carolina
Part IV – Preventive Maintenance
Section 1.0 Blast Protection Volume 1 of 10 April 23, 2018
Prepared for:
Nuclear Power Training Unit
Joint Base Charleston
Prepared by:
Burns & McDonnell
Engineers-Architects-Consultants Kansas City, Missouri
Part IV 1.0 Blast Protection OMSI NPTU Charleston 04-23-18 VTC-1 Table of Contents
IV PREVENTIVE MAINTENANCE
Blast Protection ........................................................................................................................... 1.1-1
1.1 SAEP Blast Protection ............................................................................................................ 1.1-1
1.1.1 Preventive Maintenance Plan .......................................................................................... 1.1-1
1.1.2 Preventive Maintenance Checklists ................................................................................ 1.1-2
1.2 TSB-2 Blast Protection ........................................................................................................... 1.2-1
1.2.1 Preventive Maintenance Plan .......................................................................................... 1.2-1
1.2.2 Preventive Maintenance Checklists ................................................................................ 1.2-2
1.3 TSB-2A Blast Protection ........................................................................................................ 1.3-1
1.3.1 Preventive Maintenance Plan .......................................................................................... 1.3-1
1.3.2 Preventive Maintenance Checklists ................................................................................ 1.3-2
1.4 TSB Blast Protection – RESERVE ......................................................................................... 1.4-1
1.4.1 Preventive Maintenance Plan .......................................................................................... 1.4-1
1.4.2 Preventive Maintenance Checklists ................................................................................ 1.4-1
1.5 Pier Blast Protection – RESERVE .......................................................................................... 1.5-1
1.5.1 Preventive Maintenance Plan .......................................................................................... 1.5-1
1.5.2 Preventive Maintenance Checklists ................................................................................ 1.5-1
1.6 Shore Power Boom Blast Protection – RESERVE ................................................................. 1.6-1
1.6.1 Preventive Maintenance Plan .......................................................................................... 1.6-1
1.6.2 Preventive Maintenance Checklists ................................................................................ 1.6-1
1.7 Port Security Barrier Blast Protection – RESERVE ............................................................... 1.7-1
1.7.1 Preventive Maintenance Plan .......................................................................................... 1.7-1
1.7.2 Preventive Maintenance Checklists ................................................................................ 1.7-1
Part IV 1.0 OMSI, Part IV Blast Protection 04-23-18 Page IV-1.1-1 NPTU Charleston
Blast Protection
1.1 SAEP Blast Protection
1.1.1 Preventive Maintenance Plan
This section provides a preventive maintenance (PM) plan using manufacturer’s recommendations, and best engineering practice. The major components of the blast protection systems are included. All inspections and preventive maintenance should be performed by qualified maintenance personnel or a qualified contractor.
SAEP MAINTENANCE PLAN
Maintenance Plan Abbreviation Table BP RH Blast Resistant Roof Hatch BP INT Blast Protection / Resistance Interiors Accessories BP PD Blast Protection Personnel Doors Operators
No Equip Maintenance Requirement Title
Reference Frequency Notes
1. BP RH Semi-Annual Inspection and Maintenance
GPS Specialty Doors IOM Manual: Maintenance and Lubrication Procedure 12/09/15
Semi- Annually
2. BP INT Interior Systems Inspection and Maintenance
Interior Door System Pemko ASSA ABLOY 4301_RL_x
3. BP PD Interior Door Operator Inspection at Personnel Doors
Interior Door Operator Brookfield Industries Inc.
NB-500 Main/Sub Door Operator Manual 4th Ed 09/01/15
04-23-18 Page IV-1.1-2 NPTU Charleston
1.1.2 Preventive Maintenance Checklists
NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)
GOOSE CREEK, SC
BUILDING: SAEP
OPERATOR SERVICING REQUIREMENTS / TASK CARD
Maintenance Task No. 1 Semi-Annual Inspection and Maintenance Associated Equipment Blast Protection Roof Hatch (BP RH) Frequency: Semi-Annually References: GPS Specialty Doors IOM Manual: Maintenance and Lubrication
Procedure 12/09/15 Special Tools/Parts Needed: Tools, Cleaning Materials, Inspection Light, Lubrication Safety Instructions & Precautions: Whenever performing maintenance or inspections, always disconnect the power source. Wear applicable PPE as required.
CAUTION: Exercise caution when opening and closing doors. Pinch / crush hazard exists. Never force actuated doors while they are under power. Serious bodily injury and damage to equipment can occur WARNING: Shock hazard exists for actuated doors. Exercise caution when inspecting electrical components. Never force actuated doors while they are under power. Serious bodily injury and damage to equipment can occur Job Task
Description
1. Hatch Locking Mechanism: Inspect for debris accumulation. Verify hatch is free and clear for normal operation.
2. Hatch Locking Mechanism: Lubricate connections lightly with SAE10 oil.
3. Gas Spring: Inspect and check for debris accumulation.
4. Gas Spring: Inspect to verify that bleed valve is closed at all times. Lubricate fittings lightly with
SAE10 oil.
5. Gasket: Inspect for damage / debris buildup around seal and retainer. Clean and / or replace gasket as necessary.
6. Note: See spare parts / supply list in the manufacturer’s maintenance manual for material information.
04-23-18 Page IV-1.1-3 NPTU Charleston
NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)
GOOSE CREEK, SC
BUILDING: SAEP
OPERATOR SERVICING REQUIREMENTS / TASK CARD
Maintenance Task No. 2 Interior Systems Inspection and Maintenance Associated Equipment Blast Protection / Resistance Interiors (BP INT) Frequency: Semi-Annually References: Interior Door System Pemko ASSA ABLOY
4301_RL_x; Door Seal Accessories Special Tools/Parts Needed: Tools, Cleaning Materials, Inspection Light Safety Instructions & Precautions: Whenever performing maintenance or inspections, always disconnect the power source. Wear applicable PPE as required.
CAUTION: Exercise caution when opening and closing doors. Pinch / crush hazard exists. Never force actuated doors while they are under power. Serious bodily injury and damage to equipment can occur WARNING: Shock hazard exists for actuated doors. Exercise caution when inspecting electrical components. Never force actuated doors while they are under power. Serious bodily injury and damage to equipment can occur Job Task
Description
1. Inspect door accessories and seal assemblies for wear or damage. Replace when required.
2. Clean Door Accessories: Pemko’s aluminum products and solid gasket products can be cleaned with a mild soap with warm water. A clean non-abrasive cloth should be used to clean the surface of these products.
3. Remove Excessive Grease: For removing grease, sealant, or other minimal adhesives a mild solvent such as mineral spirits may be used; then clean with mild soap mixed with warm water.
To dry, either allow to air dry or wipe dry with a chamois, squeegee, or lint-free cloth.
4. Clean and insect gasket and weather-strip products:
For sponge gasket and weather-strip products, wipe with a damp cloth.
NOTE: Do not use mineral spirits or other chemical as this may cause the plastic to “melt” or deteriorate.
To dry, either allow to air dry or wipe dry with a chamois, squeegee, or lint-free cloth.
5. NOTE: The use of strong solvents or cleaner concentrations may cause damage to the finish surface and isn’t recommended.
04-23-18 Page IV-1.1-4 NPTU Charleston
NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)
GOOSE CREEK, SC
BUILDING: SAEP
OPERATOR SERVICING REQUIREMENTS / TASK CARD
Maintenance Task No. 3 Interior Door Operator Inspection at Personnel Doors Associated Equipment Blast Protection Personnel Doors Operators (BP PD) Frequency: Semi-Annually References: Interior Door Operator
Brookfield Industries Inc.
NB-500 Main/Sub Door Operator Manual 4th Ed 09/01/15
Special Tools/Parts Needed: Tools, Cleaning Materials, Inspection Light Safety Instructions & Precautions: Whenever performing maintenance or inspections, always disconnect the power source. Wear applicable PPE as required.
CAUTION: Exercise caution when opening and closing doors. Pinch / crush hazard exists. Never force actuated doors while they are under power. Serious bodily injury and damage to equipment can occur WARNING: Shock hazard exists for actuated doors. Exercise caution when inspecting electrical components. Never force actuated doors while they are under power. Serious bodily injury and damage to equipment can occur Job Task
Description
1. Check hardware and assemblies for NB-500, NB-1000, and NB-2000 devices.
2. Inspect for loose hardware or loose bolted devices at operators.
3. Inspect the operator for wear or damage to any of its components Frequency of inspections will vary upon installations and will be directly proportional to the usage of the operator.
NOTE: Do not use the operator if any component is worn or damaged
04-23-18 Page IV-1.2-1 NPTU Charleston
1.2 TSB-2 Blast Protection
1.2.1 Preventive Maintenance Plan
This section provides a preventive maintenance (PM) plan using manufacturer’s recommendations, and best engineering practice. The major components of the blast protection systems are included. All inspections and preventive maintenance should be performed by qualified maintenance personnel or a qualified contractor.
TSB-2 MAINTENANCE PLAN
Maintenance Plan Abbreviation Table BP INT Blast Protection / Resistance Interiors BP PD Blast Protection Personnel Doors BP SD Blast Protection Sliding Doors
Title
Reference Frequency Notes
1. BP SD Blast Protection Sliding Doors Inspection and Lubrication (2 doors
Micanan Serial # 277684 PRO-GSD Installation and Instruction Manual
Quarterly There are 2 sliding blast doors.
2. BP INT Interior Systems Inspection and Maintenance
Interior Door System Pemko ASSA ABLOY 4301_RL_x
Inspection at Personnel Doors
Interior Door Operator Brookfield Industries Inc.
NB-500 Main/Sub Door Operator Manual 4th Ed 09/01/15
4. BP SD Blast Protection Sliding Doors Inspection
Micanan Serial # 277684 PRO-GSD Installation and Instruction Manual
Semi- Annually
There are 2 sliding blast doors.
5. BP SD Blast Protection Sliding Doors Annual Service Check.
Micanan Serial # 277684 PRO-GSD Installation and Instruction Manual
Annually There are 2 sliding blast doors.
04-23-18 Page IV-1.2-2 NPTU Charleston
1.2.2 Preventive Maintenance Checklists
NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)
GOOSE CREEK, SC
BUILDING: TSB-2
OPERATOR SERVICING REQUIREMENTS / TASK CARD
Maintenance Task No. 1 Blast Protection Sliding Doors Inspection and Lubrication Associated Equipment Blast Protection Sliding Doors (BP SD) Frequency: Quarterly References: Micanan Serial # 277684 PRO-GSD Installation and Instruction
Manual Special Tools/Parts Needed: Tools, Cleaning Materials, Inspection Light, Lubrication Safety Instructions & Precautions: Whenever performing maintenance or inspections, always disconnect the power source. Wear applicable PPE as required.
CAUTION: Exercise caution when opening and closing doors. Pinch / crush hazard exists. Never force actuated doors while they are under power. Serious bodily injury and damage to equipment can occur WARNING: Shock hazard exists for actuated doors. Exercise caution when inspecting electrical components. Never force actuated doors while they are under power. Serious bodily injury and damage to equipment can occur Job Task
Description
1. Verify door area, including door track, is kept clean. Remove any obstructions that would prevent proper door operation. Inspect door and hardware condition.
2. Check for any excessive slack in chains. If adjustment is required, verify and adjust limit switches if necessary.
3. Verify and adjust clutch and brake (Do not lubricate).
4. Lubricate chains, bearings, and limit shaft.
5. Verify that motor, solenoid, and operator runs smoothly and quietly. Verify carriage runs smoothly on tracks.
6. Note: There are 2 sliding blast doors.
04-23-18 Page IV-1.2-3 NPTU Charleston
NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)
GOOSE CREEK, SC
BUILDING: TSB-2
OPERATOR SERVICING REQUIREMENTS / TASK CARD
Maintenance Task No. 2 Interior Systems Inspection and Maintenance Associated Equipment Blast Protection / Resistance Interiors (BP INT) Frequency: Semi-Annually References: Interior Door System Pemko ASSA ABLOY
4301_RL_x; Door Seal Accessories Special Tools/Parts Needed: Tools, Cleaning Materials, Inspection Light Safety Instructions & Precautions: Whenever performing maintenance or inspections, always disconnect the power source. Wear applicable PPE as required.
CAUTION: Exercise caution when opening and closing doors. Pinch / crush hazard exists. Never force actuated doors while they are under power. Serious bodily injury and damage to equipment can occur WARNING: Shock hazard exists for actuated doors. Exercise caution when inspecting electrical components. Never force actuated doors while they are under power. Serious bodily injury and damage to equipment can occur Job Task
Description
1. Inspect door accessories and seal assemblies for wear or damage. Replace when required.
2. Clean Door Accessories: Pemko’s aluminum products and solid gasket products can be cleaned with a mild soap with warm water. A clean non-abrasive cloth should be used to clean the surface of these products.
3. Remove Excessive Grease: For removing grease, sealant, or other minimal adhesives a mild solvent such as mineral spirits may be used; then clean with mild soap mixed with warm water.
To dry, either allow to air dry or wipe dry with a chamois, squeegee, or lint-free cloth.
4. Clean and insect gasket and weather-strip products:
For sponge gasket and weather-strip products, wipe with a damp cloth.
NOTE: Do not use mineral spirits or other chemical as this may cause the plastic to “melt” or deteriorate.
To dry, either allow to air dry or wipe dry with a chamois, squeegee, or lint-free cloth.
04-23-18 Page IV-1.2-4 NPTU Charleston
NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)
GOOSE CREEK, SC
BUILDING: TSB-2
OPERATOR SERVICING REQUIREMENTS / TASK CARD
Maintenance Task No. 3 Interior Door Operator Inspection at Personnel Doors Associated Equipment Blast Protection Personnel Doors Operators (BP PD) Frequency: Semi-Annually References: Interior Door Operator
Brookfield Industries Inc.
NB-500 Main/Sub Door Operator Manual 4th Ed 09/01/15
Special Tools/Parts Needed: Tools, Cleaning Materials, Inspection Light Safety Instructions & Precautions: Whenever performing maintenance or inspections, always disconnect the power source. Wear applicable PPE as required.
CAUTION: Exercise caution when opening and closing doors. Pinch / crush hazard exists. Never force actuated doors while they are under power. Serious bodily injury and damage to equipment can occur WARNING: Shock hazard exists for actuated doors. Exercise caution when inspecting electrical components. Never force actuated doors while they are under power. Serious bodily injury and damage to equipment can occur Job Task
Description
1. Check hardware and assemblies for NB-500, NB-1000, and NB-2000 devices.
2. Inspect for loose hardware or loose bolted devices at operators.
3. Inspect the operator for wear or damage to any of its components Frequency of inspections will
04-23-18 Page IV-1.2-5 NPTU Charleston
NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)
GOOSE CREEK, SC
BUILDING: TSB-2
OPERATOR SERVICING REQUIREMENTS / TASK CARD
Maintenance Task No. 4 Blast Protection Sliding Doors Inspection Associated Equipment Blast Protection Sliding Doors (BP SD) Frequency: Semi-Annually References: Micanan Serial # 277684 PRO-GSD Installation and Instruction
Manual Special Tools/Parts Needed: Tools, Cleaning Materials, Inspection Light, Lubrication Safety Instructions & Precautions: Whenever performing maintenance or inspections, always disconnect the power source. Wear applicable PPE as required.
CAUTION: Exercise caution when opening and closing doors. Pinch / crush hazard exists. Never force actuated doors while they are under power. Serious bodily injury and damage to equipment can occur WARNING: Shock hazard exists for actuated doors. Exercise caution when inspecting electrical components. Never force actuated doors while they are under power. Serious bodily injury and damage to equipment can occur Job Task
Description
1. Verify tightness of all fasteners and set screws.
2. Verify that operator is properly secured.
3. Inspect manual disconnect.
4. Verify tension and condition of V-belt (PRO-SD).
5. Verify oil level of reducer (PRO-GSD).
04-23-18 Page IV-1.2-6 NPTU Charleston
NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)
GOOSE CREEK, SC
BUILDING: TSB-2
OPERATOR SERVICING REQUIREMENTS / TASK CARD
Maintenance Task No. 5 Blast Protection Sliding Doors Annual Service Associated Equipment Blast Protection Sliding Doors (BP SD) Frequency: Annually References: Micanan Serial # 277684 PRO-GSD Installation and Instruction
Manual Special Tools/Parts Needed: Tools, Cleaning Materials, Inspection Light, Lubrication Safety Instructions & Precautions: Whenever performing maintenance or inspections, always disconnect the power source. Wear applicable PPE as required.
CAUTION: Exercise caution when opening and closing doors. Pinch / crush hazard exists. Never force actuated doors while they are under power. Serious bodily injury and damage to equipment can occur WARNING: Shock hazard exists for actuated doors. Exercise caution when inspecting electrical components. Never force actuated doors while they are under power. Serious bodily injury and damage to equipment can occur Job Task
Description
1. Perform a complete service check.
2. Verify that inside of the control box is clean and that grounding wires, terminations, and power terminations do not show signs of corrosion.
3. Verify tightness of all terminal strip screws and electrical connections.
4. Verify power supply, voltage or input terminals during operation.
5. Verify that current consumption of operator corresponds to nameplate information.
04-23-18 Page IV-1.3-1 NPTU Charleston
1.3 TSB-2A Blast Protection
1.3.1 Preventive Maintenance Plan
This section provides a preventive maintenance (PM) plan using manufacturer’s recommendations, and best engineering practice. The major components of the blast protection systems are included. All inspections and preventive maintenance should be performed by qualified maintenance personnel or a qualified contractor.
TSB-2A MAINTENANCE PLAN
Maintenance Plan Abbreviation Table BP INT Blast Protection / Resistance Interiors BP PD Blast Protection Personnel Doors BP SD Blast Protection Sliding Doors
Title
Reference Frequency Notes
1. BP SD Blast Protection Sliding Doors Inspection and Lubrication
Micanan Serial # 277684 PRO-GSD Installation and Instruction Manual
Quarterly
2. BP INT Interior Systems Inspection and Maintenance
Interior Door System Pemko ASSA ABLOY 4301_RL_x
Inspection at Personnel Doors
Interior Door Operator Brookfield Industries Inc.
NB-500 Main/Sub Door Operator Manual 4th Ed 09/01/15
4. BP SD Blast Protection
Inspection
Micanan Serial # 277684 PRO-GSD Installation and Instruction Manual
5. BP SD Blast Protection
Annual Service Check.
Micanan Serial # 277684 PRO-GSD Installation and Instruction Manual
04-23-18 Page IV-1.3-2 NPTU Charleston
1.3.2 Preventive Maintenance Checklists
NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)
GOOSE CREEK, SC
BUILDING: TSB-2A
OPERATOR SERVICING REQUIREMENTS / TASK CARD
Maintenance Task No. 1 Blast Protection Sliding Doors Inspection and Lubrication Associated Equipment Blast Protection Sliding Doors (BP SD) Frequency: Quarterly References: Micanan Serial # 277684 PRO-GSD Installation and Instruction
Manual Special Tools/Parts Needed: Tools, Cleaning Materials, Inspection Light, Lubrication Safety Instructions & Precautions: Whenever performing maintenance or inspections, always disconnect the power source. Wear applicable PPE as required.
CAUTION: Exercise caution when opening and closing doors. Pinch / crush hazard exists. Never force actuated doors while they are under power. Serious bodily injury and damage to equipment can occur WARNING: Shock hazard exists for actuated doors. Exercise caution when inspecting electrical components. Never force actuated doors while they are under power. Serious bodily injury and damage to equipment can occur Job Task
Description
1. Verify door area, including door track, is kept clean. Remove any obstructions that would prevent proper door operation. Inspect door and hardware condition.
2. Check for any excessive slack in chains. If adjustment is required, verify and adjust limit switches if necessary.
3. Verify and adjust clutch and brake (Do not lubricate).
4. Lubricate chains, bearings, and limit shaft.
5. Verify that motor, solenoid, and operator runs smoothly and quietly. Verify carriage runs smoothly on tracks.
04-23-18 Page IV-1.3-3 NPTU Charleston
NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)
GOOSE CREEK, SC
BUILDING: TSB-2A
OPERATOR SERVICING REQUIREMENTS / TASK CARD
Maintenance Task No. 2 Interior Systems Inspection and Maintenance Associated Equipment Blast Protection / Resistance Interiors (BP INT) Frequency: Semi-Annually References: Interior Door System Pemko ASSA ABLOY
4301_RL_x; Door Seal Accessories Special Tools/Parts Needed: Tools, Cleaning Materials, Inspection Light Safety Instructions & Precautions: Whenever performing maintenance or inspections, always disconnect the power source. Wear applicable PPE as required.
CAUTION: Exercise caution when opening and closing doors. Pinch / crush hazard exists. Never force actuated doors while they are under power. Serious bodily injury and damage to equipment can occur WARNING: Shock hazard exists for actuated doors. Exercise caution when inspecting electrical components. Never force actuated doors while they are under power. Serious bodily injury and damage to equipment can occur Job Task
Description
1. Inspect door accessories and seal assemblies for wear or damage. Replace when required.
2. Clean Door Accessories: Pemko’s aluminum products and solid gasket products can be cleaned with a mild soap with warm water. A clean non-abrasive cloth should be used to clean the surface of these products.
3. Remove Excessive Grease: For removing grease, sealant, or other minimal adhesives a mild solvent such as mineral spirits may be used; then clean with mild soap mixed with warm water.
To dry, either allow to air dry or wipe dry with a chamois, squeegee, or lint-free cloth.
4. Clean and insect gasket and weather-strip products:
For sponge gasket and weather-strip products, wipe with a damp cloth.
NOTE: Do not use mineral spirits or other chemical as this may cause the plastic to “melt” or deteriorate.
To dry, either allow to air dry or wipe dry with a chamois, squeegee, or lint-free cloth.
04-23-18 Page IV-1.3-4 NPTU Charleston
NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)
GOOSE CREEK, SC
BUILDING: TSB-2A
OPERATOR SERVICING REQUIREMENTS / TASK CARD
Maintenance Task No. 3 Interior Door Operator Inspection at Personnel Doors Associated Equipment Blast Protection Personnel Doors Operators (BP PD) Frequency: Semi-Annually References: Interior Door Operator
Brookfield Industries Inc.
NB-500 Main/Sub Door Operator Manual 4th Ed 09/01/15
Special Tools/Parts Needed: Tools, Cleaning Materials, Inspection Light Safety Instructions & Precautions: Whenever performing maintenance or inspections, always disconnect the power source. Wear applicable PPE as required.
CAUTION: Exercise caution when opening and closing doors. Pinch / crush hazard exists. Never force actuated doors while they are under power. Serious bodily injury and damage to equipment can occur WARNING: Shock hazard exists for actuated doors. Exercise caution when inspecting electrical components. Never force actuated doors while they are under power. Serious bodily injury and damage to equipment can occur Job Task
Description
1. Check hardware and assemblies for NB-500, NB-1000, and NB-2000 devices.
2. Inspect for loose hardware or loose bolted devices at operators.
3. Inspect the operator for wear or damage to any of its components Frequency of inspections will
04-23-18 Page IV-1.3-5 NPTU Charleston
NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)
GOOSE CREEK, SC
BUILDING: TSB-2A
OPERATOR SERVICING REQUIREMENTS / TASK CARD
Maintenance Task No. 4 Blast Protection Sliding Doors Inspection Associated Equipment Blast Protection Sliding Doors (BP SD) Frequency: Semi-Annually References: Micanan Serial # 277684 PRO-GSD Installation and Instruction
Manual Special Tools/Parts Needed: Tools, Cleaning Materials, Inspection Light, Lubrication Safety Instructions & Precautions: Whenever performing maintenance or inspections, always disconnect the power source. Wear applicable PPE as required.
CAUTION: Exercise caution when opening and closing doors. Pinch / crush hazard exists. Never force actuated doors while they are under power. Serious bodily injury and damage to equipment can occur WARNING: Shock hazard exists for actuated doors. Exercise caution when inspecting electrical components. Never force actuated doors while they are under power. Serious bodily injury and damage to equipment can occur Job Task
Description
1. Verify tightness of all fasteners and set screws.
2. Verify that operator is properly secured.
3. Inspect manual disconnect.
4. Verify tension and condition of V-belt (PRO-SD).
5. Verify oil level of reducer (PRO-GSD).
04-23-18 Page IV-1.3-6 NPTU Charleston
NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)
GOOSE CREEK, SC
BUILDING: TSB-2A
OPERATOR SERVICING REQUIREMENTS / TASK CARD
Maintenance Task No. 5 Blast Protection Sliding Doors Annual Service Associated Equipment Blast Protection Sliding Doors (BP SD) Frequency: Annually References: Micanan Serial # 277684 PRO-GSD Installation and Instruction
Manual Special Tools/Parts Needed: Tools, Cleaning Materials, Inspection Light, Lubrication Safety Instructions & Precautions: Whenever performing maintenance or inspections, always disconnect the power source. Wear applicable PPE as required.
Job Task
Description
1. Perform a complete service check.
2. Verify that inside of the control box is clean and that grounding wires, terminations, and power terminations do not show signs of corrosion.
3. Verify tightness of all terminal strip screws and electrical connections.
4. Verify power supply, voltage or input terminals during operation.
5. Verify that current consumption of operator corresponds to nameplate information.
04-23-18 Page IV-1.4-1 NPTU Charleston
1.4 TSB Blast Protection – RESERVE
1.4.1 Preventive Maintenance Plan
1.4.2 Preventive Maintenance Checklists
04-23-18 Page IV-1.5-1 NPTU Charleston
1.5 Pier Blast Protection – RESERVE
1.5.1 Preventive Maintenance Plan
1.5.2 Preventive Maintenance Checklists
04-23-18 Page IV-1.6-1 NPTU Charleston
1.6 Shore Power Boom Blast Protection – RESERVE
1.6.1 Preventive Maintenance Plan
1.6.2 Preventive Maintenance Checklists
04-23-18 Page IV-1.7-1 NPTU Charleston
1.7 Port Security Barrier Blast Protection – RESERVE
1.7.1 Preventive Maintenance Plan
1.7.2 Preventive Maintenance Checklists
| 1.0 Blast Protection |
| 1.1 SAEP Blast Protection |
| 1.1.1 Preventive Maintenance Plan |
| 1.1.2 Preventive Maintenance Checklists |
| 1.2 TSB-2 Blast Protection |
| 1.2.1 Preventive Maintenance Plan |
| 1.2.2 Preventive Maintenance Checklists |
| 1.3 TSB-2A Blast Protection |
| 1.3.1 Preventive Maintenance Plan |
| 1.3.2 Preventive Maintenance Checklists |
| 1.4 TSB Blast Protection – RESERVE |
| 1.4.1 Preventive Maintenance Plan |
| 1.4.2 Preventive Maintenance Checklists |
| 1.5 Pier Blast Protection – RESERVE |
| 1.5.1 Preventive Maintenance Plan |
| 1.5.2 Preventive Maintenance Checklists |
| 1.6 Shore Power Boom Blast Protection – RESERVE |
| 1.6.1 Preventive Maintenance Plan |
| 1.6.2 Preventive Maintenance Checklists |
| 1.7 Port Security Barrier Blast Protection – RESERVE |
| 1.7.1 Preventive Maintenance Plan |
| 1.7.2 Preventive Maintenance Checklists |
File details come from the government source that posted it.