NPTFCH~3.PDF

PDF 397 KB Posted

Attached to
NPTU Facility Maintenance
Solicitation number
FA441819RA011
Issued by

About this file

OMSI 3

View the file

Other files

File Type Posted
REVISED_Questions_and_Answers_40_and_41.pdf PDF
NPTU_FAC_MX_Pricing_Worksheet_REVISED_05_FEB_19.pdf PDF
Inspection_Checklist.docx DOCX document
FA441819RA011_-_Questions_and_Answers.pdf PDF
NPTFCH~2.PDF PDF
H1MB10~1.PDF PDF
NPTF_Charleston_OMSI_Manual_Part_IV_Cover_and_TOC.pdf PDF
NPTF_Charleston_OMSI_Manual_Part_IV_Section_4_HVAC.pdf PDF
NPTU_FAC_MX_Pricing_Worksheet_8_Jan_19.doc DOC document
G7LPV0~1.PDF PDF
Site_Visit_Attendance__Redacted.pdf PDF
WD_2015-4427_Rev_10_12_26_2018.pdf PDF
PPQ_NPTU_Facility_Maintenance.pdf PDF
FA441819RA011_Facility_Mx_Site-Visit_Agenda.pdf PDF
NPTU_Facility_Maintenance_Site_Visit.pdf PDF
E_-_Facility_Inventory_-_RP_&_Non-RP.xlsx XLSX spreadsheet
Appendix_J_-_Engineering_Technical_Advisory_Legionellos_Mitigation_Actions.docx DOCX document
A_-_Real_Prop_Equip_Inventory.xlsx XLSX spreadsheet
G_-_Points_of_Demarcation.docx DOCX document
C_-_Service_Call_Data_-_Real_Property.xlsx XLSX spreadsheet
NPTU_PWS__20_Dec_2018.pdf PDF
NPTU_FAC_MX_Pricing_Worksheet_8_Jan_19.pdf PDF
REVISED_Solicitation_-_FA441819RA011_NPTU_Facility_Maintenance.pdf PDF
H_-_Backflow_Preventer_Inventory.xlsx XLSX spreadsheet
D_-_Service_Call__Data_-_Non-Real.xlsx XLSX spreadsheet
PPQ_NPTU_Facility_Maintenance.pdf PDF
Appendix_L_-_Contractor_Special_Conditions_05JUN18.pdf PDF
I_-__Electrical_Substation_Inventory.xlsx XLSX spreadsheet
B_-_Equip_Inventory_-_NR_Property.xlsx XLSX spreadsheet
Appendix_K_-_Contractor_Base_Security_and_Access.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Operation and Maintenance Support Information (OMSI) Manual for

SAEP, TSB-2, TSB-2A

Nuclear Power Training Facilities Joint Base Charleston

P099 – P100 Charleston, South Carolina

Part IV – Preventive Maintenance

Section 3.0 Plumbing Volume 3 of 10 April 23, 2018

Prepared for:

Nuclear Power Training Unit

Joint Base Charleston

Prepared by:

Burns & McDonnell

Engineers-Architects-Consultants Kansas City, Missouri

Part IV 3.0 Plumbing OMSI NPTU Charleston 04-23-18 VTC-1 Table of Contents

IV PREVENTIVE MAINTENANCE

Plumbing ..................................................................................................................................... 3.1-1

3.1 SAEP Plumbing ...................................................................................................................... 3.1-1

3.1.1 Preventive Maintenance Plan .......................................................................................... 3.1-1

3.1.2 Preventive Maintenance Checklists ................................................................................ 3.1-4

3.2 TSB-2 Plumbing ..................................................................................................................... 3.2-1

3.2.1 Preventive Maintenance Plan .......................................................................................... 3.2-1

3.2.2 Preventive Maintenance Checklists ................................................................................ 3.2-4

3.3 TSB-2A Plumbing .................................................................................................................. 3.3-1

3.3.1 Preventive Maintenance Plan .......................................................................................... 3.3-1

3.3.2 Preventive Maintenance Checklists ................................................................................ 3.3-7

3.4 TSB Plumbing – RESERVE ................................................................................................... 3.4-1

3.4.1 Preventive Maintenance Plan .......................................................................................... 3.4-1

3.4.2 Preventive Maintenance Checklists ................................................................................ 3.4-1

3.5 Pier Plumbing – RESERVE .................................................................................................... 3.5-1

3.5.1 Preventive Maintenance Plan .......................................................................................... 3.5-1

3.5.2 Preventive Maintenance Checklists ................................................................................ 3.5-1

3.6 Shore Power Boom Plumbing – RESERVE ........................................................................... 3.6-1

3.6.1 Preventive Maintenance Plan .......................................................................................... 3.6-1

3.6.2 Preventive Maintenance Checklists ................................................................................ 3.6-1

3.7 Port Security Barrier Plumbing – RESERVE ......................................................................... 3.7-1

3.7.1 Preventive Maintenance Plan .......................................................................................... 3.7-1

3.7.2 Preventive Maintenance Checklists ................................................................................ 3.7-1

Part IV 3.0 OMSI, Part IV Plumbing 04-23-18 Page IV-3.1-1 NPTU Charleston

Plumbing

3.1 SAEP Plumbing

3.1.1 Preventive Maintenance Plan

This section provides a preventive maintenance (PM) plan using manufacturer’s recommendations, and best engineering practice. The major components of the plumbing system are included. All inspections and preventive maintenance should be performed by qualified maintenance personnel or a qualified contractor.

SAEP MAINTENANCE PLAN

Maintenance Plan Abbreviation Table EWH Electric Water Heater ET Expansion Tank MV Domestic Hot Water Mixing Valve BFP Backflow Preventer

No Equip Maintenance Requirement Title

Reference Frequency Notes

1. EWH-101 Tank inspection / leakage checks

Manuf. Recommendation;

State SSE Commercial Electric Water Heater Manual 317803-00

Monthly

2. EWH-101 Tank flushing Manuf. Recommendation;

State SSE Commercial Electric Water Heater Manual 317803-00

Monthly

3. EWH-101 Visual inspection of associated circulating pumps

Manuf. Recommendation;

Taco Series “00” Installation and Maintenance Manual 102-

Monthly Inspect for leakage and excessive vibration or noise.

4. MV-101 Visual leakage inspection

Engineering Best Practices Leonard Systems Manual Bulletin M-270/370

Monthly

5. MV-101 Temperature setting inspection

Engineering Best Practices Leonard Systems Manual Bulletin M-270/370

Quarterly

04-23-18 Page IV-3.1-2 NPTU Charleston

No Equip Maintenance Requirement Title

Reference Frequency Notes

6. EWH-101 Removal, inspection, and cleaning of heating element assemblies

Manuf. Recommendation;

State SSE Commercial Electric Water Heater Manual 317803-00

Quarterly During periodic cleaning and inspection, if the heating element is scaled, all of the elements should be removed and cleaned. If the tank bottom has any accumulation of sediment it should be cleaned.

7. EWH-101 Removal of tank sediment

Manuf. Recommendation;

State SSE Commercial Electric Water Heater Manual 317803-00

Quarterly - As required

Per schedule or based on monthly inspection. For convenience, sediment removal and element lime scale removal should be performed at the same time.

8. EWH-101 Removal of lime scale

Manuf. Recommendation;

State SSE Commercial Electric Water Heater Manual 317803-00

Quarterly - As required

Per schedule or based on monthly inspection. For convenience, sediment removal and element lime scale removal should be performed at the same time.

9. EWH-101 Removal of other scale and debris

Manuf. Recommendation;

State SSE Commercial Electric Water Heater Manual 317803-00

Quarterly - As required

Per schedule or based on monthly inspection.

10. EWH-101 Temperature-pressure relief valve check and inspection

Manuf. Recommendation;

State SSE Commercial Electric Water Heater Manual 317803-00

Semi-annually

11. ET-101 Tank air and charging air pressure check / adjustment

Manuf. Recommendation;

Amtrol Thermal Expansion Tanks Models ST – T Installation and Operation Instructions

Annually – As required based on system age

Complete system checks including the expansion tank should continue yearly and more frequently as the system ages.

12. MV-101 Inspection of internal parts, clean-out and / re-lubrication

Manuf. Recommendations, Leonard Systems Manual Bulletin M-270/370

Annually First time after 30-60 days of operation, then annually or as needed. MV to be inspected periodically depending on usage and water quality / conditions. If cleaning and re-lubrication does not provide satisfactory temperature control, repair / replacement kits can be easily installed.

04-23-18 Page IV-3.1-3 NPTU Charleston

No Equip Maintenance Requirement Title

Reference Frequency Notes

13. BFP-101 Check Valve inspection and clean-out

Manuf. Recommendation;

Zurn Wilkins 975XL Series;

Wilkins 375 Series Installation and Maintenance Manual

Annually – As required whenever backflow conditions or events occur

After this task, complete scheduled maintenance task No. 15 for clean-out and inspection of BFP relief valve assembly.

14. BFP-101 Relief Valve inspection and clean-out

Manuf. Recommendation;

Zurn Wilkins 975XL Series;

Wilkins 375 Series Installation and Maintenance Manual

Annually After re-assembly place in service and test as per testing procedures to ensure proper operations.

15. BFP-101 BFP Pressure / Leakage Test

Manuf. Recommendation;

Zurn Wilkins 975XL Series;

Wilkins 375 Series Installation and Maintenance Manual

Annually - As required

Performed after clean-out and inspection of BFP assemblies.

16. ET-101 Visual inspection for ET pressure relief valve

Manuf. Recommendation;

Amtrol Thermal Expansion Tanks Models ST – T Installation and Operation Instructions

Every 3 years – As required

At least once every 3 years or if discharge / residue build-up is present, a licensed contractor should inspect the temperature and pressure relief valve and replace if corrosion is evident or the valve does not function.

04-23-18 Page IV-3.1-4 NPTU Charleston

3.1.2 Preventive Maintenance Checklists

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: SAEP

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Tasks No. 1, 2, 3 Electric Water Heater Monthly PM Associated Equipment EWH-101 Frequency: Monthly References: State SSE Commercial Electric Water Heater Manual 317803-00 Special Tools/Parts Needed: Tools, Cleaning Materials, Hose Safety Instructions & Precautions:

De-energize and lockout/tagout equipment as described in the equipment section of Part II.

Identify hazards as detailed in Part I, Section 3 Safety Hazards.

Job Task

Description

1. Perform visual inspection of EWH tank, assemblies, and relief valve.

2. Inspect associated circulating pumps. Check for leakage and excessive vibration or noise.

3. Drain and flush the EWH tank.

4. Conduct visual inspection for lime scale or sediment buildup inside the tank and heating element.

5. Re-fill the water heater.

6. Restore Operations; remove testing / maintenance equipment and place the water heater back in operation. Allow the water heater to complete several heating cycles to ensure proper operation.

04-23-18 Page IV-3.1-5 NPTU Charleston

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: SAEP

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Task No. 4 Mixing Valve Monthly PM Associated Equipment MV-101 Frequency: Monthly References: Leonard Systems Manual Bulletin M-270/370 Special Tools/Parts Needed: Tools, Cleaning Materials Safety Instructions & Precautions:

Identify hazards as detailed in Part I, Section 3 Safety Hazards.

Job Task

Description

1. Perform visual inspection of MV and associated assemblies.

2. Verify there is no leakage, corrosion, build-up, or damage to exterior MV body and assembly.

3. After the initial 30 days or as needed: Inspect, clean-out, and lubricate the MV internal parts.

04-23-18 Page IV-3.1-6 NPTU Charleston

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: SAEP

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Task No. 5 Mixing Valve Quarterly PM Associated Equipment MV-101 Frequency: Quarterly References: Leonard Systems Manual Bulletin M-270/370 Special Tools/Parts Needed: Tools, Cleaning Materials Safety Instructions & Precautions:

Identify hazards as detailed in Part I, Section 3 Safety Hazards.

Job Task

Description

1. Inspect MV temperature setting and ensure proper setpoint adjustment is set.

2. Verify and inspect MV temperature performance during a demand.

04-23-18 Page IV-3.1-7 NPTU Charleston

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: SAEP

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Tasks No. 6, 7, 8, 9 Electric Water Heater Quarterly PM Associated Equipment EWH-101 Frequency: Quarterly References: State SSE Commercial Electric Water Heater Manual 317803-00 Special Tools/Parts Needed: Tools, Cleaning Materials, Hose Safety Instructions & Precautions:

De-energize and lockout/tagout equipment as described in the equipment section of Part II.

Identify hazards as detailed in Part I, Section 3 Safety Hazards.

Job Task

Description

1. Inspect associated circulating pumps. Check for leakage and excessive vibration or noise.

2. Perform removal, inspection, and cleaning of EWH heating element.

3. Remove all tank sediment, dirt, and debris from tank and heating element.

4. Clean-out and remove all lime scale from tank and heating element.

5. Remove all other scaling and build-up from inside the EWH tank. .

6. Re-fill the water heater.

7. Restore Operations; remove testing / maintenance equipment and place the water heater back in

04-23-18 Page IV-3.1-8 NPTU Charleston

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: SAEP

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Task No. 10 Electric Water Heater Semi-Annual PM Associated Equipment EWH-101 Frequency: Semi-Annually References: State SSE Commercial Electric Water Heater Manual 317803-00 Special Tools/Parts Needed: Tools, Cleaning Materials Safety Instructions & Precautions:

Identify hazards as detailed in Part I, Section 3 Safety Hazards.

Job Task

Description

1. Prior to checking relief valve operation; A) Ensure that no one is in front of or around the outlet of the relief valve discharge line. B) Ensure that the water discharge will not cause any property damage, as the relief valve and water may be extremely hot.

2. Inspect relief valve opening and discharge to ensure that there are no blockages.

3. Cycle Temperature-Pressure Relief Valve to verify proper discharge and reseating operation.

4. Verify that the relief valve is able to open, relief, seat closed and operate freely.

5. Inspect for valve leakage at unions or assembly, leak-by, damage or wear at the relief valve.

04-23-18 Page IV-3.1-9 NPTU Charleston

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: SAEP

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Tasks No. 11, 16 Expansion Tank Annual PM Associated Equipment ET-101 Frequency: Annually and as required References: Amtrol Thermal Expansion Tanks

Models ST – T Installation and Operation Instructions Special Tools/Parts Needed: Tools, Cleaning Materials, Gauges Safety Instructions & Precautions:

De-energize and lockout/tagout equipment as described in the equipment section of Part II.

Identify hazards as detailed in Part I, Section 3 Safety Hazards.

Job Task

Description

1. Inspect and verify tank air and charging air pressure. Adjust if needed.

NOTE: Verification of the expansion tank pressures should continue yearly and more frequently as the system ages.

2. Every 3 Years or is there is a build-up of discharge / residue at the Relief Valve:

Inspect and verify operation of the ET temperature - pressure relief valve / safety valve. Replace valve if corrosion is evident or if the valve fails to operate.

04-23-18 Page IV-3.1-10 NPTU Charleston

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: SAEP

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Task No. 12 Mixing Valve Annual PM Associated Equipment MV-101 Frequency: Annually References: Leonard Systems Manual Bulletin M-270/370 Special Tools/Parts Needed: Tools, Cleaning Materials Safety Instructions & Precautions:

Identify hazards as detailed in Part I, Section 3 Safety Hazards.

Job Task

Description

1. Perform visual inspection of internal MV parts.

2. Lubricate, clean-out, and recondition MV internal parts.

3. NOTE: If maintenance inspection, cleaning and re-lubrication does not provide satisfactory temperature control, continue to service via repair / replacement kits.

04-23-18 Page IV-3.1-11 NPTU Charleston

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: SAEP

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Tasks No. 13, 14, 15 Back Flow Preventer Annual PM Associated Equipment BFP-101 Frequency: Annually and whenever backflow conditions or events occur References: Zurn Wilkins 975XL Series - 375 Series Installation and

Maintenance Manual Special Tools/Parts Needed: Tools, Cleaning Materials / Pressure test kit, Gauge Safety Instructions & Precautions:

De-energize and lockout/tagout equipment as described in the equipment section of Part II.

Identify hazards as detailed in Part I, Section 3 Safety Hazards.

Job Task

Description

1. Inspect and clean-out Back Flow Preventer Check Valve. Clean components and flush / remove any debris and blockage.

2. Inspect Back Flow Preventer Check Valve assembly. Check for leakage, damage, wearing on the valve seats, seals, and O-rings. Complete visual inspection.

3. Inspect and clean-out Back Flow Preventer Relief Valve. Clean components and flush / remove any debris and blockage.

4. Inspect Back Flow Preventer Relief Valve assembly. Check for leakage, damage, wearing on the valve diaphragm, seals, and O-rings. Complete visual inspection.

5. Conduct Back Flow Preventer Check Valve #1 Test

6. Conduct Back Flow Preventer Check Valve #2 Test

7. Conduct Back Flow Preventer Shutoff Valve Leakby Test

8. Conduct Back Flow Preventer Operational Test of Pressure Differential Relief Valve

9. Restore Operations; remove testing / maintenance equipment and place Back Flow Preventer

“In-Service” for normal operation as per manufacturer’s operations manual.

04-23-18 Page IV-3.2-1 NPTU Charleston

3.2 TSB-2 Plumbing

3.2.1 Preventive Maintenance Plan

This section provides a preventive maintenance (PM) plan using manufacturer’s recommendations, and best engineering practice. The major components of the plumbing system are included. All inspections and preventive maintenance should be performed by qualified maintenance personnel or a qualified contractor.

TSB-2 MAINTENANCE PLAN

Maintenance Plan Abbreviation Table EWH Electric Water Heater ET Expansion Tank MV Domestic Hot Water Mixing Valve BFP Backflow Preventer RP Recirculation Pump SP Sump Pump AC Air Compressor

Title

Reference Frequency Notes

1. EWH-101,

201, 301

Tank inspection / leakage checks

Manuf. Recommendation;

State SSE Commercial Electric Water Heater Manual 317803-00

Monthly

2. EWH-101,

201, 301

Tank flushing Manuf. Recommendation;

State SSE Commercial Electric Water Heater Manual 317803-00

Monthly

3. EWH-101,

201, 301

Visual inspection of associated circulating pumps

Manuf. Recommendation;

Taco Series “00” Installation and Maintenance Manual 102-

Monthly Inspect for leakage and excessive vibration or noise.

4. MV-101,

201, 301

Visual leakage inspection

Engineering Best Practices Leonard Systems Manual Bulletin M-270/370

Monthly

5. SP-101 Operational check and inspection

Engineering Best Practices Weil Oil Smart Pump Manual IM 213 r.0115

Monthly Operational check includes Weil liquid smart alarm and pump switch testing.

6. SP-101 Maintenance clean-out of pit / grate

Engineering Best Practices Quarterly

04-23-18 Page IV-3.2-2 NPTU Charleston

No Equip Maintenance Requirement Title

Reference Frequency Notes

7. RP-101 Visual inspection of recirculating pump

Manuf. Recommendation;

Taco Series “00” Installation and Maintenance Manual 102-

Quarterly Inspect for leakage and excessive vibration or noise.

8. MV-101,

201, 301

Temperature setting inspection

Engineering Best Practices Leonard Systems Manual Bulletin M-270/370

Quarterly

9. EWH-101,

201, 301

Removal, inspection, and cleaning of heating element assemblies

Manuf. Recommendation;

State SSE Commercial Electric Water Heater Manual 317803-00

Quarterly During periodic cleaning and inspection, if the heating element is scaled, all of the elements should be removed and cleaned. If the tank bottom has any accumulation of sediment, it should be cleaned.

10. EWH-101,

201, 301

Removal of tank sediment

Manuf. Recommendation;

State SSE Commercial Electric Water Heater Manual 317803-00

Quarterly - As required

Per schedule or based on monthly inspection. For convenience, sediment removal and element lime scale removal should be performed at the same time.

11. EWH-101,

201, 301

Removal of lime scale

Manuf. Recommendation;

State SSE Commercial Electric Water Heater Manual 317803-00

Quarterly - As required

Per schedule or based on monthly inspection. For convenience, sediment removal and element lime scale removal should be performed at the same time.

12. EWH-101,

201, 301

Removal of other scale and debris

Manuf. Recommendation;

State SSE Commercial Electric Water Heater Manual 317803-00

Quarterly - As required

Per schedule or based on monthly inspection.

13. EWH-101,

201, 301

Temperature-pressure relief valve check and inspection

Manuf. Recommendation;

State SSE Commercial Electric Water Heater Manual 317803-00

14. ET-101,

201, 301

Tank air and charging air pressure check / adjustment

Manuf. Recommendation;

Amtrol Thermal Expansion Tanks Models ST – T Installation and Operation Instructions

Annually – As required based on system age

Complete system checks including the expansion tank should continue yearly and more frequently as the system ages.

04-23-18 Page IV-3.2-3 NPTU Charleston

No Equip Maintenance Requirement Title

Reference Frequency Notes

15. MV-101,

201, 301

Inspection of internal parts, clean-out and / re-lubrication

Manuf. Recommendations, Leonard Systems Manual Bulletin M-270/370

Annually First time after 30-60 days of operation, then annually or as needed. MV to be inspected periodically depending on usage and water quality / conditions. If cleaning and re-lubrication does not provide satisfactory temperature control, repair / replacement kits can be easily installed.

16. BFP-102 Check Valve inspection and clean-out

Manuf. Recommendation;

Zurn Wilkins 975XL Series;

Wilkins 375 Series Installation and Maintenance Manual

Annually – As required whenever backflow conditions or events occur

After this task, complete scheduled maintenance task No. 19 for clean-out and inspection of BFP relief valve assembly.

17. BFP-102 Relief Valve inspection and clean-out

Manuf. Recommendation;

Zurn Wilkins 975XL Series;

Wilkins 375 Series Installation and Maintenance Manual

Annually After re-assembly place in service and test as per testing procedures to ensure proper operations.

18. BFP-102 BFP Pressure / Leakage Test

Manuf. Recommendation;

Zurn Wilkins 975XL Series;

Wilkins 375 Series Installation and Maintenance Manual

Annually - As required

Performed after clean-out and inspection of BFP assemblies.

19. ET-101,

201, 301

Visual inspection for ET pressure relief valve

Manuf. Recommendation;

Amtrol Thermal Expansion Tanks Models ST – T Installation and Operation Instructions

Every 3 years – As required

At least once every 3 years or if discharge / residue build-up is present, a licensed contractor should inspect the temperature and pressure relief valve and replace if corrosion is evident or the valve does not function.

04-23-18 Page IV-3.2-4 NPTU Charleston

3.2.2 Preventive Maintenance Checklists

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: TSB-2

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Tasks No. 1, 2, 3 Electric Water Heater Monthly PM Associated Equipment EWH-101, 201, 301 Frequency: Monthly References: State SSE Commercial Electric Water Heater Manual 317803-00 Special Tools/Parts Needed: Tools, Cleaning Materials, Hose Safety Instructions & Precautions:

De-energize and lockout/tagout equipment as described in the equipment section of Part II.

Identify hazards as detailed in Part I, Section 3 Safety Hazards.

Job Task

Description

1. Perform visual inspection of EWH tank, assemblies, and relief valve.

2. Inspect associated circulating pumps. Check for leakage and excessive vibration or noise.

3. Drain and flush the EWH tank.

4. Conduct visual inspection for lime scale or sediment buildup inside the tank and heating element.

5. Re-fill the water heater.

04-23-18 Page IV-3.2-5 NPTU Charleston

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: TSB-2

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Task No. 4 Mixing Valve Monthly PM Associated Equipment MV-101, 201, 301 Frequency: Monthly References: Leonard Systems Manual Bulletin M-270/370 Special Tools/Parts Needed: Tools, Cleaning Materials Safety Instructions & Precautions:

Identify hazards as detailed in Part I, Section 3 Safety Hazards.

Job Task

Description

1. Perform visual inspection of MV and associated assemblies.

3. After the initial 30 days or as needed: Inspect, clean-out, and lubricate the MV internal parts.

04-23-18 Page IV-3.2-6 NPTU Charleston

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: TSB-2

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Task No. 5 Sump Pump Monthly PM Associated Equipment Sump Pump SP-101, SP-101(ii) Frequency: Monthly References: Weil Oil Smart Pump Manual IM 213 r.0115, Operational check and inspection, Engineering Best Practices Special Tools/Parts Needed: Cleaning Materials, Inspection light Safety Instructions & Precautions:

Observer proper personal protective equipment (PPE) during operational testing of pump and alarm systems.

Job Task

Description

1. Perform Liquid Smart Alarm Testing: Oil Test and Water Test to verify the proper operation of sensing elements, alarm light indicators, beacon light, and buzzer alarm.

2. Perform Oil Smart Pump Switch Testing: Verifies proper sensors and automated pump on/off operation during testing.

3. Perform Energize / De-energize of the Pump Circuit: Verify that the alarm panel remains energized and operational. It is important that the alarm circuit is independent of the pump to ensure that the alarm will activate if pump circuit fails.

4. NOTE: Test procedures and Oil Smart Control Panel Troubleshooting Guide are included sections within the Weil Oil Smart Pump Manual IM 213 r.0115.

04-23-18 Page IV-3.2-7 NPTU Charleston

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: TSB-2

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Task No. 6 Sump Pump Quarterly PM Associated Equipment Sump Pump SP-101, SP-101(ii) Frequency: Quarterly References: Weil Oil Smart Pump Manual IM 213 r.0115, Operational check and inspection, Engineering Best Practices Special Tools/Parts Needed: Cleaning Materials, Inspection light Safety Instructions & Precautions:

De-energize and lockout/tagout equipment as described in the equipment section of Part II.

Identify hazards as detailed in Part I, Section 3 Safety Hazards.

Job Task

Description

1. Perform Maintenance clean-out of pit / grate areas. Debris, mud or other conductive materials left on the body of the switches will hamper its operation; take effort to clean the switch and pump suction areas.

2. NOTE: Test procedures and Oil Smart Control Panel Troubleshooting Guide are included

04-23-18 Page IV-3.2-8 NPTU Charleston

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: TSB-2

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Task No. 7 Recirculating Pump Quarterly PM Associated Equipment Recirculating Pump RP-101 Frequency: Quarterly References: Manuf. Recommendation; Taco Series “00” Installation and

Maintenance Manual 102-054 Engineering Best Practices

Special Tools/Parts Needed: Cleaning Materials, Inspection light Safety Instructions & Precautions:

De-energize and lockout/tagout equipment as described in the equipment section of Part II.

Identify hazards as detailed in Part I, Section 3 Safety Hazards.

Job Task

Description

1. Perform general inspection for pump leakage and excessive vibration or noise.

2. NOTE: Test procedures safety requirements are detailed per inspection and services listed within Taco Maintenance Manual 102-054

04-23-18 Page IV-3.2-9 NPTU Charleston

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: TSB-2

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Task No. 8 Mixing Valve Quarterly PM Associated Equipment MV-101, 201, 301 Frequency: Quarterly References: Leonard Systems Manual Bulletin M-270/370 Special Tools/Parts Needed: Tools, Cleaning Materials Safety Instructions & Precautions:

Identify hazards as detailed in Part I, Section 3 Safety Hazards.

Job Task

Description

04-23-18 Page IV-3.2-10 NPTU Charleston

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: TSB-2

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Tasks No. 9, 10, 11, Electric Water Heater Quarterly PM

Associated Equipment EWH-101, 201, 301 Frequency: Quarterly References: State SSE Commercial Electric Water Heater Manual 317803-00 Special Tools/Parts Needed: Tools, Cleaning Materials, Hose Safety Instructions & Precautions:

De-energize and lockout/tagout equipment as described in the equipment section of Part II.

Identify hazards as detailed in Part I, Section 3 Safety Hazards.

Job Task

Description

1. Inspect associated circulating pumps. Check for leakage and excessive vibration or noise.

2. Perform removal, inspection, and cleaning of EWH heating element.

3. Remove all tank sediment, dirt, and debris from tank and heating element.

4. Clean-out and remove all lime scale from tank and heating element.

5. Remove all other scaling and build-up from inside the EWH tank. .

6. Re-fill the water heater.

04-23-18 Page IV-3.2-11 NPTU Charleston

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: TSB-2

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Task No. 13 Electric Water Heater Semi-Annual PM Associated Equipment EWH-101, 201, 301 Frequency: Semi-Annually References: State SSE Commercial Electric Water Heater Manual 317803-00 Special Tools/Parts Needed: Tools, Cleaning Materials Safety Instructions & Precautions:

Identify hazards as detailed in Part I, Section 3 Safety Hazards.

Job Task

Description

1. Prior to checking relief valve operation; A) Ensure that no one is in front of or around the outlet of the relief valve discharge line. B) Ensure that the water discharge will not cause any property damage, as the relief valve and water may be extremely hot.

2. Inspect relief valve opening and discharge to ensure that there are no blockages.

3. Cycle Temperature-Pressure Relief Valve to verify proper discharge and reseating operation.

04-23-18 Page IV-3.2-12 NPTU Charleston

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: TSB-2

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Tasks No. 14, 19 Expansion Tank Annual PM Associated Equipment ET-101, 201, 301 Frequency: Annually and as required References: Amtrol Thermal Expansion Tanks

Models ST – T Installation and Operation Instructions Special Tools/Parts Needed: Tools, Cleaning Materials, Gauges Safety Instructions & Precautions:

De-energize and lockout/tagout equipment as described in the equipment section of Part II.

Identify hazards as detailed in Part I, Section 3 Safety Hazards.

Job Task

Description

1. Inspect and verify tank air and charging air pressure. Adjust if needed.

NOTE: Verification of the expansion tank pressures should continue yearly and more frequently as the system ages.

2. Every 3 Years or is there is a build-up of discharge / residue at the Relief Valve:

04-23-18 Page IV-3.2-13 NPTU Charleston

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: TSB-2

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Task No. 15 Mixing Valve Annual PM Associated Equipment MV-101, 201, 301 Frequency: Annually References: Leonard Systems Manual Bulletin M-270/370 Special Tools/Parts Needed: Tools, Cleaning Materials Safety Instructions & Precautions:

Identify hazards as detailed in Part I, Section 3 Safety Hazards.

Job Task

Description

04-23-18 Page IV-3.2-14 NPTU Charleston

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: TSB-2

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Tasks No. 16, 17, 18 Back Flow Preventer Annual PM Associated Equipment BFP-102 Frequency: Annually and whenever backflow conditions or events occur References: Zurn Wilkins 975XL Series - 375 Series Installation and

Maintenance Manual Special Tools/Parts Needed: Tools, Cleaning Materials / Pressure test kit, Gauge Safety Instructions & Precautions:

De-energize and lockout/tagout equipment as described in the equipment section of Part II.

Identify hazards as detailed in Part I, Section 3 Safety Hazards.

Job Task

Description

1. Inspect and clean-out Back Flow Preventer Check Valve. Clean components and flush / remove any debris and blockage.

2. Inspect Back Flow Preventer Check Valve assembly. Check for leakage, damage, wearing on the valve seats, seals, and O-rings. Complete visual inspection.

3. Inspect and clean-out Back Flow Preventer Relief Valve. Clean components and flush / remove any debris and blockage.

4. Inspect Back Flow Preventer Relief Valve assembly. Check for leakage, damage, wearing on the valve diaphragm, seals, and O-rings. Complete visual inspection.

5. Conduct Back Flow Preventer Check Valve #1 Test

6. Conduct Back Flow Preventer Check Valve #2 Test

7. Conduct Back Flow Preventer Shutoff Valve Leakby Test

8. Conduct Back Flow Preventer Operational Test of Pressure Differential Relief Valve

04-23-18 Page IV-3.3-1 NPTU Charleston

3.3 TSB-2A Plumbing

3.3.1 Preventive Maintenance Plan

This section provides a preventive maintenance (PM) plan using manufacturer’s recommendations, and best engineering practice. The major components of the plumbing system are included. All inspections and preventive maintenance should be performed by qualified maintenance personnel or a qualified contractor.

TSB-2A MAINTENANCE PLAN

Maintenance Plan Abbreviation Table EWH Electric Water Heater ET Expansion Tank MV Domestic Hot Water Mixing Valve BFP Backflow Preventer RP Recirculation Pump SP Sump Pump AC Air Compressor

Title

Reference Frequency Notes

1. AC Visual inspection for leaks, dust build up, vibrations

Manuf. Recommendation;

Ingersoll Rand Rotary Screw Air Compressor UP5x UP6x Series Installation, Operation, and Maintenance Manual 80448418 Rev. B

Daily

2. AC Visual inspection of coolant level

Manuf. Recommendation;

Ingersoll Rand Rotary Screw Air Compressor UP5x UP6x Series Installation, Operation, and Maintenance Manual 80448418 Rev. B

Daily

3. AC Visual inspection of pre-filter / air filters

Manuf. Recommendation;

Ingersoll Rand Rotary Screw Air Compressor UP5x UP6x Series

Daily

4. AC Inspection / operation of drain valve

Installation, Operation, and Maintenance Manual 80448418 Rev. B

Daily

5. AC Air Dryer Condensate Drains – Inspection and operation check

Engineering Best Practices Weekly

04-23-18 Page IV-3.3-2 NPTU Charleston

No Equip Maintenance Requirement Title

Reference Frequency Notes

6. EWH-101,

102, 103

Tank inspection / leakage checks

Manuf. Recommendation;

State SSE Commercial Electric Water Heater Manual 317803-00

Monthly

7. EWH-101,

102, 103

Tank flushing Manuf. Recommendation;

State SSE Commercial Electric Water Heater Manual 317803-00

Monthly

8. EWH-101,

102, 103

Visual inspection of associated circulating pumps

Manuf. Recommendation;

Taco Series “00” Installation and Maintenance Manual 102-

Monthly Inspect for leakage and excessive vibration or noise.

9. MV-101,

102, 103, 104, 105, 106, 107, 108, 109

Visual leakage inspection

Engineering Best Practices Leonard Systems Manual Bulletin M-270/370

Monthly

10. SP-101 Operational check and inspection

Engineering Best Practices Weil Oil Smart Pump Manual IM 213 r.0115

Monthly Operational check includes Weil liquid smart alarm and pump switch testing.

11. AC Coolant filter replacement

Manuf. Recommendation;

Ingersoll Rand Rotary Screw Air Compressor UP5x UP6x Series

Initial 150 hours.

Change at first 150 hours, then annually or at each 2000 hours

12. AC Pre-air filter replacement / clean-out

Manuf. Recommendation;

Ingersoll Rand Rotary Screw Air Compressor UP5x UP6x Series

Monthly Each month or each 100 hours

13. AC Cooler inspection and clean-out.

Installation, Operation, and Maintenance Manual 80448418 Rev. B

Monthly Each month or each 100 hours. Remove build-up of matter; Clean by blowing out with air or pressure washing.

14. AC Inspection of Air Dryer refrigerant compressor temperature

Manuf. Recommendation;

Ingersoll Rand Rotary Screw Air Compressor UP5x UP6x Series Installation, Operation, and Maintenance Manual 80448418 Rev. B

Monthly Verify that Air Dryer Refrigerant Compressor Temperature is less than 140 deg F when running.

15. RP-101 Visual inspection of recirculating pump

Manuf. Recommendation;

Taco Series “00” Installation and Maintenance Manual 102-

Quarterly

04-23-18 Page IV-3.3-3 NPTU Charleston

No Equip Maintenance Requirement Title

Reference Frequency Notes

16. SP-101 Maintenance clean-out of pit / grate

Engineering Best Practices Quarterly

17. MV-101,

102, 103, 104, 105, 106, 107, 108, 109

Temperature setting inspection

Engineering Best Practices Leonard Systems Manual Bulletin M-270/370

Quarterly

18. EWH-101,

102, 103

Removal, inspection, and cleaning of heating element assemblies

Manuf. Recommendation;

State SSE Commercial Electric Water Heater Manual 317803-00

Quarterly During periodic cleaning and inspection, if the heating element is scaled, all of the elements should be removed and cleaned. If the tank bottom has any accumulation of sediment, it should be cleaned.

19. EWH-101,

102, 103

Removal of tank sediment

Manuf. Recommendation;

State SSE Commercial Electric Water Heater Manual 317803-00

Quarterly - As required

Per schedule or based on monthly inspection. For convenience, sediment removal and element lime scale removal should be performed at the same time.

20. EWH-101,

102, 103

Removal of lime scale

Manuf. Recommendation;

State SSE Commercial Electric Water Heater Manual 317803-00

Quarterly - As required

Per schedule or based on monthly inspection. For convenience, sediment removal and element lime scale removal should be performed at the same time.

21. EWH-101,

102, 103

Removal of other scale and debris

Manuf. Recommendation;

State SSE Commercial Electric Water Heater Manual 317803-00

Quarterly - As required

Per schedule or based on monthly inspection.

22. AC Analysis of food grade lubricant (Ultra FG) for condition / replacement

Manuf. Recommendation;

AC O&M Manual

Quarterly Quarterly or at each 1000 hours

23. AC Inspection for motors and grease bearings

Manuf. Recommendation;

Ingersoll Rand Rotary Screw Air Compressor UP5x UP6x Series

Quarterly Quarterly or at each 2000 hours

24. AC Inspection and clean-out scavenge screen

Installation, Operation, and Maintenance Manual 80448418 Rev. B

Quarterly Quarterly or at each 2000 hours

25. AC Inspection and replacement of separator cartridge

Manuf. Recommendation;

Ingersoll Rand Rotary

Quarterly Quarterly or at each 2000 hours

04-23-18 Page IV-3.3-4 NPTU Charleston

No Equip Maintenance Requirement Title

Reference Frequency Notes

Screw Air Compressor UP5x UP6x Series

26. AC Replacement of air filter element

Installation, Operation, and Maintenance Manual 80448418 Rev. B

Quarterly Quarterly or at each 2000 hours

27. AC Compressor fluid samples for coolant analysis

Manuf. Recommendation;

Ingersoll Rand Rotary Screw Air Compressor UP5x UP6x Series

Quarterly Quarterly or at each 2000 hours

28. AC Replacement of package pre-filter

Installation, Operation, and Maintenance Manual 80448418 Rev. B

Quarterly Quarterly or at each 2000 hours

29. AC Inspection and maintenance on inlet valve flapper

Manuf. Recommendation;

Ingersoll Rand Rotary Screw Air Compressor UP5x UP6x Series

Quarterly Quarterly or at each 2000 hours

30. AC Inspection and maintenance for drive belts and tension in gas spring

Installation, Operation, and Maintenance Manual 80448418 Rev. B

Quarterly Quarterly or at each 2000 hours

31. AC Inspection and clean-out for Air Dryer Condenser unit condenser fins

Manuf. Recommendation;

Ingersoll Rand Rotary Screw Air Compressor UP5x UP6x Series

Every 4 months

32. AC Air Dryer Compressor power measurements and verification.

Manuf. Recommendation;

Ingersoll Rand Rotary Screw Air Compressor UP5x UP6x Series Installation, Operation, and Maintenance Manual 80448418 Rev. B

Every 4 months

Verify consumption complies with data place specifications

33. EWH-101,

102, 103

Temperature-pressure relief valve check and inspection

Manuf. Recommendation;

State SSE Commercial Electric Water Heater Manual 317803-00

34. ET-101,

102, 103

Tank air and charging air pressure check / adjustment

Manuf. Recommendation;

Amtrol Thermal Expansion Tanks Models ST – T Installation and Operation Instructions

Annually – As required based on system age

Complete system checks including the expansion tank should continue yearly and more frequently as the system ages.

35. MV-101,

102, 103, 104, 105, 106, 107, 108, 109

Inspection of internal parts, clean-out and / re-lubrication

Manuf. Recommendations, Leonard Systems Manual Bulletin M-270/370

Annually First time after 30-60 days of operation, then annually or as needed. MV to be inspected periodically depending on usage and

04-23-18 Page IV-3.3-5 NPTU Charleston

No Equip Maintenance Requirement Title

Reference Frequency Notes water quality / conditions. If cleaning and re-lubrication does not provide satisfactory temperature control, repair / replacement kits can be easily installed.

36. BFP-1,2,3 Check Valve inspection and clean-out

Manuf. Recommendation;

Zurn Wilkins 975XL Series;

Wilkins 375 Series Installation and Maintenance Manual

Annually – As required whenever backflow conditions or events occur

After this task, complete scheduled maintenance task No. 19 for clean-out and inspection of BFP relief valve assembly.

37. BFP-1,2,3 Relief Valve inspection and clean-out

Manuf. Recommendation;

Zurn Wilkins 975XL Series;

Wilkins 375 Series Installation and Maintenance Manual

Annually After re-assembly place in service and test as per testing procedures to ensure proper operations.

38. BFP-1,2,3 BFP Pressure / Leakage Test

Manuf. Recommendation;

Zurn Wilkins 975XL Series;

Wilkins 375 Series Installation and Maintenance Manual

Annually - As required

Performed after clean-out and inspection of BFP assemblies.

39. AC Coolant filter replacement

Manuf. Recommendation;

Ingersoll Rand Rotary Screw Air Compressor UP5x UP6x Series

Annually Change at first 150 hours, then annually or at each 2000 hours

40. AC Air Filter replacement

Installation, Operation, and Maintenance Manual 80448418 Rev. B

Annually – As required

Anytime air filter indicator locks into the red position

41. AC Pressure vessel inspection

Manuf. Recommendation;

Ingersoll Rand Rotary Screw Air Compressor UP5x UP6x Series

Annually – As required

Inspection frequency may be otherwise defined by local or National legislation.

42. AC Inspection and clean-out of Air Dryer Condensate Drains

Installation, Operation, and Maintenance Manual 80448418 Rev. B

Annually

43. AC Air Dryer Condensate Filter Element Replacement

Manuf. Recommendation;

Ingersoll Rand Rotary Screw Air Compressor UP5x UP6x Series

Annually

44. AC Food grade lubricant (Ultra FG) replacement

Installation, Operation, and Maintenance Manual 80448418 Rev. B

Each 6000 hours

Each 6000 hours

04-23-18 Page IV-3.3-6 NPTU Charleston

No Equip Maintenance Requirement Title

Reference Frequency Notes

45. AC Drive belt and gas spring replacement

Manuf. Recommendation;

Ingersoll Rand Rotary Screw Air Compressor UP5x UP6x Series

Every 2 years – As required

Every 2 years or at each 8000 hours

46. AC Inspection and reconditioning for solenoid, pressure valve, and thermostatic valve kits

Installation, Operation, and Maintenance Manual 80448418 Rev. B

Every 2 years – As required

Every 2 years or at each 8000 hours

47. AC Premium Coolant (Ultra) replacement

Manuf. Recommendation;

Ingersoll Rand Rotary Screw Air Compressor UP5x UP6x Series

Every 2 years – As required

Every 2 years or at each 8000 hours, at whichever interval occurs first

48. ET-101,

102, 103

Visual inspection for ET pressure relief valve

Manuf. Recommendation;

Amtrol Thermal Expansion Tanks Models ST – T Installation and Operation Instructions

Every 3 years – As required

At least once every 3 years or if discharge / residue build-up is present, a licensed contractor should inspect the temperature and pressure relief valve and replace if corrosion is evident or the valve does not function.

49. AC Extended-Life premium Coolant (Ultra EL) replacement

Manuf. Recommendation;

Ingersoll Rand Rotary Screw Air Compressor UP5x UP6x Series

Every 3 years – As required

Every 3 years or at each 16000 hours

50. AC Replacement of all hoses

Installation, Operation, and Maintenance Manual 80448418 Rev. B

Every 4 years – As required

Every 4 years or at each 16000 hours

51. AC Motor bearings reconditioning

Manuf. Recommendation;

Ingersoll Rand Rotary Screw Air Compressor UP5x UP6x Series

Every 4 years – As required

Every 4 years or at each 16000 hours, including strip, clean and re-grease motor bearings on motors with grease fittings

52. AC Sealed bearings on motors without grease fittings replacement

Installation, Operation, and Maintenance Manual 80448418 Rev. B

Every 4 years – As required

Every 4 years or at each 16000 hours

53. AC Electrical contactor tips replacement

Manuf. Recommendation;

Ingersoll Rand Rotary Screw Air Compressor UP5x UP6x Series

Every 4 years – As required

Every 4 years or at each 16000 hours

54. AC Separator Tank inspection and cleaning

Installation, Operation, and Maintenance Manual 80448418 Rev. B

Every 6 years – As required

Every 6 years / 16000 hours or as defined by local / national legislation.

04-23-18 Page IV-3.3-7 NPTU Charleston

3.3.2 Preventive Maintenance Checklists

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: TSB-2A

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Tasks No. 1, 2, 3, 4, 5 Air Compressor Daily PM Associated Equipment AC (Air Compressor) Frequency: Daily References: Ingersoll Rand Rotary Screw Air Compressor

UP5x UP6x Series Installation, Operation, and Maintenance Manual 80448418 Rev. B

Special Tools/Parts Needed: Tools, Cleaning Materials, Inspection light Safety Instructions & Precautions:

De-energize and lockout/tagout equipment as described in the equipment section of Part II.

Identify hazards as detailed in Part I, Section 3 Safety Hazards.

Job Task

Description

1. Inspect for leaks, dust, build-up, debris, excessive noise or vibration.

2. Visually inspect coolant level.

3. Inspect conditions of the pre-filter and air filters. Blow clean if needed.

4. Inspect and verify operation of the drain valve. Verify the automatic operation of the air receiver condensate drain.

5. Once per Week – Inspect and verify operation of the Air Dryer Condensate Drains. Verify valve operation and ensure that there is no blockage or leak-by.

04-23-18 Page IV-3.3-8 NPTU Charleston

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: TSB-2A

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Tasks No. 6, 7, 8 Electric Water Heater Monthly PM Associated Equipment EWH-101, 102, 103 Frequency: Monthly References: State SSE Commercial Electric Water Heater Manual 317803-00 Special Tools/Parts Needed: Tools, Cleaning Materials, Hose Safety Instructions & Precautions:

De-energize and lockout/tagout equipment as described in the equipment section of Part II.

Identify hazards as detailed in Part I, Section 3 Safety Hazards.

Job Task

Description

1. Perform visual inspection of EWH tank, assemblies, and relief valve.

2. Inspect associated circulating pumps. Check for leakage and excessive vibration or noise.

3. Drain and flush the EWH tank.

4. Conduct visual inspection for lime scale or sediment buildup inside the tank and heating element.

5. Re-fill the water heater.

04-23-18 Page IV-3.3-9 NPTU Charleston

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: TSB-2A

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Task No. 9 Mixing Valve Monthly PM Associated Equipment MV-101, 102, 103, 104, 105, 106, 107, 108, 109 Frequency: Monthly References: Leonard Systems Manual Bulletin M-270/370 Special Tools/Parts Needed: Tools, Cleaning Materials Safety Instructions & Precautions:

Identify hazards as detailed in Part I, Section 3 Safety Hazards.

Job Task

Description

1. Perform visual inspection of MV and associated assemblies.

3. After the initial 30 days or as needed: Inspect, clean-out, and lubricate the MV internal parts.

04-23-18 Page IV-3.3-10 NPTU Charleston

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: TSB-2A

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Task No. 10 Sump Pump Monthly PM Associated Equipment Sump Pump SP-101 Frequency: Monthly References: Weil Oil Smart Pump Manual IM 213 r.0115, Operational check and inspection, Engineering Best Practices Special Tools/Parts Needed: Cleaning Materials, Inspection light Safety Instructions & Precautions:

Observer proper personal protective equipment (PPE) during operational testing of pump and alarm systems.

Job Task

Description

1. Perform Liquid Smart Alarm Testing: Oil Test and Water Test to verify the proper operation of sensing elements, alarm light indicators, beacon light, and buzzer alarm.

2. Perform Oil Smart Pump Switch Testing: Verifies proper sensors and automated pump on/off operation during testing.

3. Perform Energize / De-energize of the Pump Circuit: Verify that the alarm panel remains energized and operational. It is important that the alarm circuit is independent of the pump to ensure that the alarm will activate if pump circuit fails.

4. NOTE: Test procedures and Oil Smart Control Panel Troubleshooting Guide are included

04-23-18 Page IV-3.3-11 NPTU Charleston

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: TSB-2A

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Tasks No. 11, 12, 13, Air Compressor Monthly PM

Associated Equipment AC (Air Compressor) Frequency: Monthly or at each 100 hours of operation References: Ingersoll Rand Rotary Screw Air Compressor

UP5x UP6x Series Installation, Operation, and Maintenance Manual 80448418 Rev. B

Special Tools/Parts Needed: Tools, Cleaning Materials, Inspection light, Filters Safety Instructions & Precautions:

De-energize and lockout/tagout equipment as described in the equipment section of Part II.

Identify hazards as detailed in Part I, Section 3 Safety Hazards.

Job Task

Description

1. Replace pre-air filter and clean-out / wipe down filter areas.

2. Perform inspection and clean-out of the cooler(s) to remove build-up of foreign matter.

3. Inspect the air dryer refrigerant compressor temperature. Verify that the temperature is less than 140 deg F during operation.

4. NOTE: At the initial 150 hours of runtime, replace Coolant Filter.

04-23-18 Page IV-3.3-12 NPTU Charleston

NUCLEAR POWER OPERATIONAL TRAINING FACILITY (P099 – P100)

GOOSE CREEK, SC

BUILDING: TSB-2A

OPERATOR SERVICING REQUIREMENTS / TASK CARD

Maintenance Task No. 15 Recirculating Pump Quarterly PM Associated Equipment Recirculating Pump RP-101 Frequency: Quarterly References: Manuf. Recommendation; Taco Series “00” Installation and

Maintenance Manual 102-054 Engineering Best Practices

Special Tools/Parts Needed: Cleaning Materials, Inspection light Safety Instructions & Precautions:

De-energize and lockout/tagout equipment as described in the equipment section of Part II.

Identify hazards as detailed in…