Attachment G to PWS Points of Demarcation

View the file

Other files

File Type Posted
REVISED_Questions_and_Answers_40_and_41.pdf PDF
NPTU_FAC_MX_Pricing_Worksheet_REVISED_05_FEB_19.pdf PDF
NPTF_Charleston_OMSI_Manual_Part_IV_Section_4_HVAC.pdf PDF
NPTU_FAC_MX_Pricing_Worksheet_8_Jan_19.doc DOC document
NPTFCH~3.PDF PDF
FA441819RA011_-_Questions_and_Answers.pdf PDF
NPTFCH~2.PDF PDF
H1MB10~1.PDF PDF
NPTF_Charleston_OMSI_Manual_Part_IV_Cover_and_TOC.pdf PDF
Inspection_Checklist.docx DOCX document
G7LPV0~1.PDF PDF
Site_Visit_Attendance__Redacted.pdf PDF
WD_2015-4427_Rev_10_12_26_2018.pdf PDF
PPQ_NPTU_Facility_Maintenance.pdf PDF
FA441819RA011_Facility_Mx_Site-Visit_Agenda.pdf PDF
NPTU_Facility_Maintenance_Site_Visit.pdf PDF
NPTU_FAC_MX_Pricing_Worksheet_8_Jan_19.pdf PDF
REVISED_Solicitation_-_FA441819RA011_NPTU_Facility_Maintenance.pdf PDF
H_-_Backflow_Preventer_Inventory.xlsx XLSX spreadsheet
D_-_Service_Call__Data_-_Non-Real.xlsx XLSX spreadsheet
PPQ_NPTU_Facility_Maintenance.pdf PDF
Appendix_L_-_Contractor_Special_Conditions_05JUN18.pdf PDF
C_-_Service_Call_Data_-_Real_Property.xlsx XLSX spreadsheet
NPTU_PWS__20_Dec_2018.pdf PDF
E_-_Facility_Inventory_-_RP_&_Non-RP.xlsx XLSX spreadsheet
Appendix_J_-_Engineering_Technical_Advisory_Legionellos_Mitigation_Actions.docx DOCX document
A_-_Real_Prop_Equip_Inventory.xlsx XLSX spreadsheet
I_-__Electrical_Substation_Inventory.xlsx XLSX spreadsheet
B_-_Equip_Inventory_-_NR_Property.xlsx XLSX spreadsheet
Appendix_K_-_Contractor_Base_Security_and_Access.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix G – Points of Demarcation

The Contractor shall be responsible for maintenance and repairs of exterior water lines as follows:

· Water supply lines from the shutoff valve to the building or five feet from the building if no valve exist, will be the responsibility of the Contractor.

· Water supply from the shut off valve or five feet from the building to the source main will be the responsibility of the Base Civil Engineer (BCE).

· If no shut off valve exist, the BCE will assist with isolation and the five foot rule will take effect.

· Contractor is responsible for all (excludes telecommunications) utilities located on pier X-Ray North, X-Ray South, and North Extension from all Real Property sources up to pier connections to Moored Training Ships and or barges.

Responsibility for maintenance and repairs of sewage mains are as follows:

· From the building clean-out to the building or five feet from the building if no clean-out exist, will be the responsibility of the contractor.

· From the clean-out to the sewer main or five feet from the building if no clean-out exist, will the responsibility of the BCE

Responsibility for maintenance and repairs of Low Voltage Lines are as follows:

· High Voltage Lines will end at the primary side of the main distribution breaker(s) and or substations.

· The contractor shall be responsible for the main distribution breaker(s) and all components downstream.