Appendix G – Points of Demarcation
The Contractor shall be responsible for maintenance and repairs of exterior water lines as follows:
· Water supply lines from the shutoff valve to the building or five feet from the building if no valve exist, will be the responsibility of the Contractor.
· Water supply from the shut off valve or five feet from the building to the source main will be the responsibility of the Base Civil Engineer (BCE).
· If no shut off valve exist, the BCE will assist with isolation and the five foot rule will take effect.
· Contractor is responsible for all (excludes telecommunications) utilities located on pier X-Ray North, X-Ray South, and North Extension from all Real Property sources up to pier connections to Moored Training Ships and or barges.
Responsibility for maintenance and repairs of sewage mains are as follows:
· From the building clean-out to the building or five feet from the building if no clean-out exist, will be the responsibility of the contractor.
· From the clean-out to the sewer main or five feet from the building if no clean-out exist, will the responsibility of the BCE
Responsibility for maintenance and repairs of Low Voltage Lines are as follows:
· High Voltage Lines will end at the primary side of the main distribution breaker(s) and or substations.
· The contractor shall be responsible for the main distribution breaker(s) and all components downstream.