C_-_Service_Call_Data_-_Real_Property.xlsx

XLSX spreadsheet 51 KB Posted

Attached to
NPTU Facility Maintenance
Solicitation number
FA441819RA011
Issued by

About this file

Attachment C to PWS- Service Call Data Real Property

View the file

Other files

File Type Posted
REVISED_Questions_and_Answers_40_and_41.pdf PDF
NPTU_FAC_MX_Pricing_Worksheet_REVISED_05_FEB_19.pdf PDF
NPTFCH~3.PDF PDF
FA441819RA011_-_Questions_and_Answers.pdf PDF
NPTFCH~2.PDF PDF
H1MB10~1.PDF PDF
NPTF_Charleston_OMSI_Manual_Part_IV_Cover_and_TOC.pdf PDF
Inspection_Checklist.docx DOCX document
NPTF_Charleston_OMSI_Manual_Part_IV_Section_4_HVAC.pdf PDF
NPTU_FAC_MX_Pricing_Worksheet_8_Jan_19.doc DOC document
G7LPV0~1.PDF PDF
Site_Visit_Attendance__Redacted.pdf PDF
WD_2015-4427_Rev_10_12_26_2018.pdf PDF
PPQ_NPTU_Facility_Maintenance.pdf PDF
FA441819RA011_Facility_Mx_Site-Visit_Agenda.pdf PDF
NPTU_Facility_Maintenance_Site_Visit.pdf PDF
G_-_Points_of_Demarcation.docx DOCX document
NPTU_PWS__20_Dec_2018.pdf PDF
E_-_Facility_Inventory_-_RP_&_Non-RP.xlsx XLSX spreadsheet
Appendix_J_-_Engineering_Technical_Advisory_Legionellos_Mitigation_Actions.docx DOCX document
A_-_Real_Prop_Equip_Inventory.xlsx XLSX spreadsheet
NPTU_FAC_MX_Pricing_Worksheet_8_Jan_19.pdf PDF
REVISED_Solicitation_-_FA441819RA011_NPTU_Facility_Maintenance.pdf PDF
H_-_Backflow_Preventer_Inventory.xlsx XLSX spreadsheet
D_-_Service_Call__Data_-_Non-Real.xlsx XLSX spreadsheet
PPQ_NPTU_Facility_Maintenance.pdf PDF
Appendix_L_-_Contractor_Special_Conditions_05JUN18.pdf PDF
I_-__Electrical_Substation_Inventory.xlsx XLSX spreadsheet
B_-_Equip_Inventory_-_NR_Property.xlsx XLSX spreadsheet
Appendix_K_-_Contractor_Base_Security_and_Access.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover

Issue IDCreatedPriorityFacilityDescriptionCommentsLabor Hours
124755/25/16 9:21URGENT2406BLDG 2406 WG A ROM 105/106 - DOUBLE SINK CLOG1.00
126656/6/16 15:10ROUTINE2314Emergency lights are failing. rooms 113 and 108A10/11/17 - Outage scheduled 10/13/17 - 8/30 Will be addressed with 1st deck lighting outages
126856/7/16 13:02ROUTINE3544Gutters on one side of the building not attached.Boss contractor never gave adequate response to the problem. CE took care of the cleaning and resetting the gutters.0.00
126866/7/16 13:46ROUTINE339External A/C inop for portion of the bldg/left side7/20/17 - Proposal submitted on 7/10 - Mark & Mike K said that the the unit would not be replaced at this time and to close W/O - Proposal submitted to replace unit -
127466/10/16 9:46ROUTINE3546BLDG 3546, REPLACE PIPE RACK & WALKTHROUGH DOORPer Pete, warehouse operater, he has no idea who wanted the pipe rack replaced or why, it was purchased by him in 2015 and is in good condition - there is no issues with the door when inspected by Pete with Bacik employee present - no work to complete
127476/10/16 9:51ROUTINE2314BLDG 2314, TSHOOT & RPR TEMP. ISSUES IN COMMAND OFFICER'S COMPLEX1.50
127556/10/16 15:00ROUTINE2314BLDG 2314, 2ND DECK MALE STUDENT HEAD - 3 CLOGGED URINALSclean drains with drain cleaner.6.00
127736/13/16 13:51URGENT339BLDG 339, ROOM 7 - ALL THE LIGHTS ARE INOP. BULBS ARE GOOD SO IT'S EITHER A PROBLEM WITH THE SWITCH, THE CIRCUIT OR ALL OF THE LIGHT BALLASTS WENT OUT AT ONCE.1.00
127746/13/16 13:54URGENT2314BLDG 2314, SOUTH EAST EXIT DOUBLE DOORS - STUCK CLOSED. SAFETY PUSH BAR IS NOT ENGAGINGDoor repaired, adjust striker plate1.50
128186/15/16 9:57ROUTINE2314B2314, DIESEL ROOM, NEEDS COVER OVER BELTS
128366/15/16 14:10ROUTINE2314BLDG 2314 RM 126 - REPLACE BALLASTS, 4 LIGHTS BROKEN, & 1 LIGHT FIXTURE HANFING FROM CEILINGReplace ballast, 4 broken lenses, secure one fixture1.50
128396/15/16 14:15URGENT2413BLDG 2413 AIR HANDLER UNITS NOT DRAINING PROPERLY, AHU ROOMS 1,2, &3 CONSTANT WATER FLOW1.00
129016/17/16 12:18ROUTINE23142314 - Room 28 O - repair ballast that burned up (fire dept did respond)2.50
129616/21/16 13:00URGENT2314B2314, RSA EXHAUST FAN INOP1.00
129626/21/16 13:04ROUTINE2314B2314, RM 116, MISSING LIGHT COVER1.00
129646/21/16 14:13ROUTINE2314B2314, RM201 H, replace MO cube light switchReplace bulb0.30
129656/21/16 14:16ROUTINE2314B2314, rms 201 & 212, replace light ballast (1) each9/1/17 completed - See W/O 9300 - complete under that number - 7/10/17 - Talked to second deck floor manager and was assured that all bad bulbs replaced before ballast requested
129666/21/16 14:18ROUTINE2314B2314, RM 201E, replace thermostat and protective coverReplace thermostat and cover.2.00
129676/21/16 14:21ROUTINE2314B2314, RM 318, emergency light inopWork was completed under a proposal. for repair.
129686/21/16 14:24ROUTINE2314B2314, RM 201, scuttlebutt has loose head1.00
129696/21/16 14:26ROUTINE2314B2314, RM 215, leaking faucet in male headreplace sink spout2.00
129706/21/16 14:30ROUTINE2314B2314, quarterdeck, #2 door brokenDisassemble closure, replace screws and lubricate.2.00
129726/21/16 14:32ROUTINE2314B2314, troubleshoot climate CAC air systemCorrect DDC Controller6.00
130456/27/16 14:04ROUTINE2314SECOND FLOOR MENS RESTROOM; 2 INOP URINALSReset seal and retighten units.3.00
130466/27/16 14:05URGENT2312PIER; DIESAL FUEL LINE LEAKINGRework fittings and seal threads.4.00
130756/27/16 16:48ROUTINE2314NPTU - BACKFLOW PREVENTER - WILKINS MODEL #07142, 1-1/2", SERIAL #75191 - CLEAN, INSPECT AND REPAIR AS NECESSARY6/20/17 - Notes as posted by T Mayberry on 6/ 16/17 - see test results provided 5/18/15 and proposal dated 5/26/15
130766/27/16 16:53ROUTINE2314NPTU - BACKFLOW PREVENTER - WILKINS MODEL #07142, 2-1/2", SERIAL #75194 - CLEAN, INSPECT AND REPAIR AS NECESSARY.6/20/17 - Notes as posted by T Mayberry on 6/ 16/17 - see test results provided 5/18/15 and proposal dated 5/26/15
130776/27/16 16:57ROUTINE2314NPTU - BACKFLOW PREVENTER - WILKINS MODEL #07142, 2-12, SERIAL #75195 - CLEAN, INSPECT AND REPAIR AS NECESSARY6/20/17 - Notes as posted by T Mayberry on 6/ 16/17 - see test results provided 5/18/15 and proposal dated 5/26/15
130786/27/16 17:01ROUTINE2314NPTU - BACKFLOW PREVENTER - WILKINS MODEL # 07142, 2-1/2", SERIAL #75193 - CLEAN, INSPECT, AND REPAIR AS NECESSARY6/20/17 - Notes as posted by T Mayberry on 6/ 16/17 - see test results provided 5/18/15 and proposal dated 5/26/15
130796/27/16 17:06ROUTINE2314NPTU - BACKFLOW PREVENTER - WILKINS MODEL # 07142, 2-1/2", SERIAL #75192 - CLEAN, INSPECT AND REPAIR AS NECESSARY6/20/17 - Notes as posted by T Mayberry on 6/ 16/17 - see test results provided 5/18/15 and proposal dated 5/26/15
130806/27/16 17:16ROUTINE2314NPTU - BACKFLOW PREVENTERS - FLOMATIC MODEL #PP2, 2-1/2, SERIAL #E5715 - CLEAN INSPECT AND REPAIR AS NECESSARY6/20/17 - Notes as posted by T Mayberry on 6/ 16/17 - see test results provided 5/18/15 and proposal dated 5/26/15
130816/27/16 17:22ROUTINE2314NPTU - BACKFLOW PREVENTORS - AMES MODEL # PP2, 2-1/2", SERIAL #QA-1954 - CLEAN, INSPECT AND REPAIR AS NECESSARY6/20/17 - Notes as posted by T Mayberry on 6/ 16/17 - see test results provided 5/18/15 and proposal dated 5/26/15
130826/27/16 17:27ROUTINE2314NPTU - BACKFLOW PREVENTERS - FLOMATIC MODEL #RP2, 4", SERIAL #D0199 - CLEAN, INSPECT, AND REPAIR AS NECESSARY6/20/17 - Notes as posted by T Mayberry on 6/ 16/17 - see test results provided 5/18/15 and proposal dated 5/26/15
130836/27/16 17:34ROUTINE2314NPTU - BACKFLOW PREVENTER - WATTS MODEL #009, 2-1/2", SERIAL #33764 - CLEAN, INSPECT AND REPAIR AS NECESSARY.6/20/17 - Notes as posted by T Mayberry on 6/ 16/17 - see test results provided 5/18/15 and proposal dated 5/26/15
130846/27/16 17:38ROUTINE2314NPTU - BACKFLOW PREVENTER - MODEL #009, 1-1/3", SERIAL #282 - CLEAN, INSPECT AND REPAIR AS NECESSARY6/20/17 - Notes as posted by T Mayberry on 6/ 16/17 - see test results provided 5/18/15 and proposal dated 5/26/15
130856/27/16 17:41ROUTINE2314NPTU - BACKFLOW PREVENTER - FLOMATIC MODEL #RPZ, 2-1/2", SERIAL #E57131 - CLEAN, INSPECT AND REPAIR AS NECESSARY6/20/17 - Notes as posted by T Mayberry on 6/ 16/17 - see test results provided 5/18/15 and proposal dated 5/26/15
133167/12/16 14:33ROUTINE2314BLDG 2314 ROOMS 317 & 319 ELECTRICAL OUTLETS INOPRepaired, found breaker tripped.2.00
133177/12/16 14:36ROUTINE2314BLDG 2314 RSA AREA OVERHEAD LIGHTS INOP, CPW EVAPORATOR/ENCLOSURE AREA4/15/17 - Completed - replaced bulbs and ballast2.00
133197/12/16 14:39ROUTINE2314BLDG 2314 RSA SOUTH DOOR, SECURE PUSH BARInstall locktite on screws that secure door.
2.00
133207/12/16 14:41ROUTINE2314BLDG 2314 RSA NORTH DOOR REPLACE WEATHER STRIPPINGReplace weather stripping.3.00
133247/12/16 14:50ROUTINE2314BLDG 2314 OUTSIDE RM 102 EXIT DOOR HANGING BY WIRESSecure fixture1.00
133257/12/16 15:17ROUTINE2314BLDG 2314 635 IDE AREA, 5 EMERGENCY LIGHTS INOP12/1/2016 - completed during Saturday outage3.00
133267/12/16 15:18ROUTINE3546BLDG 3546 REPLACE LIGHT BULBSCompleted - bulbs replaced - man lift rented6.00
133287/13/16 8:17ROUTINE2314BLDG 2314 REPLACE EMERGENCY LIGHTS RM 3110This repair is also covered under W/O 18047 -- 6/7/17- proposal submitted for 3rd deck only at this time - waiting for response (Closing and using WO 18047 for this repair.)
133297/13/16 8:20ROUTINE2314BLDG 2314 REPLACE EMERGENCY LIGHTS RM 311This repair is also covered under W/O 18047 -- 6/7/17- proposal submitted for 3rd deck only at this time - waiting for response (Closing and using WO 18047 for this repair.)
133307/13/16 8:22ROUTINE2314BLDG 2314 REPLACE EMERGENCY LIGHTS RM 314AThis repair is also covered under W/O 18047 -- 6/7/17- proposal submitted for 3rd deck only at this time - waiting for response (Closing and using WO 18047 for this repair.)
133317/13/16 8:26ROUTINE2314BLDG 2314 REPLACE EMERGENCY LIGHTS RM 341AThis repair is also covered under W/O 18047 -- 6/7/17- proposal submitted for 3rd deck only at this time - waiting for response (Closing and using WO 18047 for this repair.)
133327/13/16 8:28ROUTINE2314BLDG 2314 REPLACE EMERGENCY LIGHTS RM 319This repair is also covered under W/O 18047 -- 6/7/17- proposal submitted for 3rd deck only at this time - waiting for response (Closing and using WO 18047 for this repair.)
133337/13/16 8:30ROUTINE635BLDG 635 IDE AREA BALLASTS INOP4.00
133347/13/16 8:32ROUTINE2314BLDG 2314 ROOM 102 POWER OUTLETS INOPERABLE12/1/17- Completed - it has been determined that outlet was abandoned in place - current drawing shows out let but no breaker number - panel schedule shows breaker 32 from post 1A was recommissioned to room 123 cameras - 11/18/17 - Replaced outlet, still not working - drawing shows out let but does not list breaker feeding it - was it abandoned it place? --------- SAME AS W/O 13334 - 5/22/17 outage was requested but not received1.00
133357/13/16 8:35ROUTINE2314BLDG 2314 REPLACE EMERGENCY LIGHTS RM 317This repair is also covered under W/O 18047 -- 6/7/17- proposal submitted for 3rd deck only at this time - waiting for response (Closing and using WO 18047 for this repair.)
133367/13/16 8:37ROUTINE2314BLDG 2314 REPLACE EMERGENCY LIGHTS RM 341This repair is also covered under W/O 18047 -- 6/7/17- proposal submitted for 3rd deck only at this time - waiting for response (Closing and using WO 18047 for this repair.)
133377/13/16 8:39ROUTINE2314BLDG 2314 REPLACE EMERGENCY LIGHTS RM 339This repair is also covered under W/O 18047 -- 6/7/17- proposal submitted for 3rd deck only at this time - waiting for response (Closing and using WO 18047 for this repair.)
133387/13/16 8:41ROUTINE2314BLDG 2314 REPLACE EMERGENCY LIGHTS RM 334This repair is also covered under W/O 18047 -- 6/7/17- proposal submited for 3rd deck only at this time - waiting for response (Closing and using WO 18047 for this repair.)
134377/20/16 9:16ROUTINE2314BLDG 2214 3RD DECK MALE HEAD URINAL LEAKINGunclogged urinal3.00
134447/20/16 13:14ROUTINE3544BLDG 3544 GUTTERS FALLING OFFRepaired completed by CE
134457/20/16 13:16ROUTINE3546BLDG 3546 GUTTERS FALLING OFFRepair completed by CE
135967/29/16 11:49URGENT2314Ventilation system down6/30/17 - completed building system operational8.00
137928/9/16 9:57ROUTINE2314B2314, # 3 air handler, troubleshoot and repairFound pneumatic control line disconnected , this cause VAV not to function properly, system restored.7.00
138248/10/16 14:25ROUTINE2314BLDG 2314, 1ST DECK MALE HEAD - HAVE A CRACKED/BROKEN TOILET THAT NEEDS REPLACINGRemove and replace toilet.6.00
138398/11/16 12:48ROUTINE2314Rear of bldg 2314 sink leaking from drain0.50
138798/15/16 15:25ROUTINE2314Bldg 2314 coordinate power outageElectrical issues satisfied through power outages.6.00
139178/17/16 12:48ROUTINE2312BLDG 2312 - HEATER IS NOT WORKINGCompleted - 9/16/16 - thermostat was replaced1.50
140808/29/16 10:21URGENT2314LOW PADS SHOWING ERROR MESSAGES AND CAN'T CLEAR.9/20/17 - Replaced colestating filters and cleaned coils5.00
140818/29/16 10:22URGENT2314RSA; DAMPER EXHAUST FAN 1 INOP3.00
140828/29/16 10:24URGENT2314RSA; ON THE ROOF THE CHILL WATER VALVES AND GAUGES HAVE SEVERE RUST AND ARE DEGRADED.Water valves cleaned and painted, gauges replaced.4.00
140838/29/16 10:25URGENT2314RSA; DAMPER AIR HANDLER 4 IS DAMAGED.Completed under W/O 14171. Repaired on W/O 14171 - same W/O just worded different
141499/6/16 9:35URGENT1596BLDG YC1596 HVAC UNIT INOPnon-real property
141719/7/16 10:03ROUTINE2314air damper inop air damper stuck in the open mid position6/20/17 - as reported by T Mayberry on 6/16/17 - Damper inside unit was corroded - outage was scheduled and the damper was disassembled, cleaned, and painted5.00
141729/7/16 10:14ROUTINE2314OUTLET BACKFLOW INOP
141739/7/16 10:23ROUTINE2314RSA IN HAVAC SYSTEM NEED TO BE REPLACEDComplete - system replacement - not repairs - Beyond scope of PWS 6/20/17 - Notes from t Mayberry from 6/16/17 - This appears to be a project request and is beyond the scope of repairs and maintenance - and yes it does need replacement
141839/8/16 7:48ROUTINE2314BLDG 2314 CRU #2 HIGH PRESSURE WARNING LIGHT ON10/5/17 Completed - Carolina chiller installed new condenser fan motor - 9/20/17 Tenative date for Carolina Chiller to complete repair is 9/26/17 - Needs condensor fan motor and capacitor installed -Same as 17855 ------- 7/10/17 - Proposal excepted and work scheduled to start 7/17/178.00
141849/8/16 7:48ROUTINE2314BLDG 2314 CRU4 TROUBLE LIGHT ALARM FLASHINGFire Alarm contract.
143139/15/16 9:11ROUTINE2314B2314, subway restaurant, breaker keeps trippingNo problem found1.00
143319/16/16 13:35ROUTINE2312B2312, seal substation enclosures6/20/17 - this was done, verified with Glen Giger during substation maintenance. Due to age and wear of the equipment seals were coming off again
143329/16/16 13:37ROUTINE2312B2312, repair rusted out substation fence post
144839/27/16 14:37ROUTINE2314BLDG 2314 SHUT OFF NORTH ELEC FEEDER SO THEY CAN PUT DOWN CONTAINERS/FEEDERS18.8 K not performed by contractor.
144849/27/16 14:44ROUTINE2314BLDG 2314 EXTERIOR LIGHTS INOP
145149/29/16 9:19ROUTINE2314BLDG 2314 3RD DECK MALE HEAD DOOR STALL 2, TOILET CLOGGEDDuplicated ticket.
145199/29/16 14:38ROUTINE2314B2314, 1st deck male head has 2 urinals and 3 toilets inopPoor performance due to worn valves. Replaced flush valves tested for performance. Return to service.4.00
145209/29/16 14:40ROUTINE2314B2314, commanding officer's head has a clogged urinalPlung toilet, clogged removed.1.00
145219/29/16 14:43ROUTINE2314B2314, post 1 security room door push bar brokenRe install fastener that fell out.1.00
145229/29/16 14:53ROUTINE2312B2312, post 9, A/C inopWork order canceled...work completed by Government.
1465610/12/16 13:14URGENT420North pier lighting inop11/17 - nort pier lighting is being replaced as part of the milcon work with LED lighting - Deck dept said not to repair ---- 5/22/17 - requested lighting survey on 5/16/170.00
1492510/21/16 11:35URGENT2314BLDG 2314 - RPR SOUTH DOOR, BAR WILL NOT LATCH/CLOSEthis repair was completed before W/O issued - safety and security issue1.00
1492610/21/16 13:07URGENTB8433B2314, post 2 valve stuck in open position5/25/17 - ask about this and was told fire hydrant by post 2 and that it is stuck in the open position. - Per appendix A definitions and acronyms - facilities - excludes the following - fire hydrants
1546311/18/16 10:54URGENT23142314 - Post 6 and Post 9 AC units not coolingWork order canceled...work completed by Government
1560611/28/16 16:05URGENT23142314 - 3 sinks in Subway are cloggedStrainer removed and found plastic bag in drain pipe. Bag removed free flow n drains at this time.3.00
1562111/29/16 14:44ROUTINE2701Anchor trailers and 1 temporary power pull outside of bldg 2701Not within scope of contract.
1594112/21/16 15:11ROUTINE2314BLDG 2314 STAIRWELLS - RPR/RPL EMERGENCY LIGHT, DO NOT WORK WHEN ELECTRICITY GOES OUT3.00
1595212/27/16 13:48ROUTINE2314BLDG 2314 2D FLOOR FEMALE RESTROOM - RPR LEAK UNDER SINK1.00
159841/9/17 9:14ROUTINE2314rm 112 bad ballast10/11/17 - Outage scheduled 10/13/17 - 8/30 Will be addressed with 1st deck lighting outages Need scheduled outage to repair - worked on emergency lighting during last outages2.50
159851/9/17 9:17ROUTINE2314Rm 201 3 bad ballast9/1 Replaced Ballasts. 8/22 - Outage for second deck scheduled for 9/1 7/10/17 - Talked to second deck floor manager and was assured that all bad bulbs replaced before ballast requested -Need scheduled outage to repair - worked on emergency lighting during last outages1.75
159861/9/17 9:18ROUTINE2314Rm 212 has 2 bad ballast9/1 Replaced Ballast. 8/22 - Outage for second deck scheduled for 9/1 7/10/17 - Talked to second deck floor manager and was assured that all bad bulbs replaced before ballast requested -Need scheduled outage to repair - worked on emergency lighting during last outages1.25
159871/9/17 9:19ROUTINE2314Rm 311 bad ballast1.00
159881/9/17 9:21ROUTINE2314Rm 315 has 2 bad ballast7/31/17 --- This was closed 7/11/17 -missing from this issue -------------------------------7/11/17 - 15988 Room 315 doesn't need any work. We removed the bulbs.

V/R, Detreick ETNC Saulsbury

794-56670.00
159901/9/17 9:23ROUTINE2314Rm 331 bad ballast1.00
160461/9/17 15:56ROUTINE2314BLDG 2314 - 1st Deck Male Head Handicap Stall is Clogged1.50
160471/9/17 15:57ROUTINE2314BLDG 2314 - 1st Passage way lighting cover above vending machine is crackedInstall new lens. Subway.1.00
160481/9/17 15:58ROUTINE2314BLDG 2314 - 2nd Deck Student head (RM 215) urinal is clogged3.00
160491/9/17 16:00ROUTINE2314BLDG 2314 - North East 3rd deck stairwell lighting cover is cracked7/28/17 - the orignal W/O for single lens is complete - 4 additional lenes in place for total of 5 installed - ballance to be completed - 5/26/17 - There are (9) lamp lenses cracked in the stairwells - (9) lenses were ordered today from Eck Supply - Not a factory stock item / 4 to 6 weeks to receive -3.00
160511/9/17 16:03ROUTINE2314BLDG 2314 - 3rd Deck Head stall is cloggedCleared clog1.50
160521/9/17 16:04ROUTINE2314BLDG 2314 - 3rd Deck Head handicap stall is leaking between wall and toiletFlush valve leaking, repaired1.50
160531/9/17 16:06ROUTINE2314BLDG 2314 - 1st deck passage way emergency light outside RM 106 does not work1.50
160541/9/17 16:08ROUTINE2314BLDG 2314 - 1st deck male head sink door does not shut properlyadjust door hinges.0.50
160551/9/17 16:09ROUTINE2314BLDG 2314 - 1st deck female head emergency light does not work1.00
160561/9/17 16:10ROUTINE2314BLDG 2314 - 2 emergency exit signs do not work in the RSA3.00
160571/9/17 16:12ROUTINE2314BLDG 2314 - Rm 126 (5) Lighting Ballast do not workReplaced 8 bulbs, 6 ballast4.00
160581/9/17 16:16ROUTINE2314BLDG 2314 - RM 126 (3) Light covers are broken3/14/17 New Cover on site, needs installed - (4) needed - Unable to locate lamp covers - Having a lighting supply researching for replacements - May need to replace entire fixture if unavaible Completed - replace 5 lens total - original W/O was for 3 lens2.00
160591/9/17 16:19ROUTINE2314BLDG 2314 - RM 126 Emergency light does not work1.50
160601/9/17 16:27ROUTINE2314BLDG 2314 - RM 108 Emergency Exit sign does not work (on the ECC side)12/4/17 - Completed - new light installed - 10/11/17 - Outage scheduled 10/13/17 - 8/30 Will be addressed with 1st deck lighting outages1.00
160611/9/17 16:28ROUTINE2314BLDG 2314 - RM 105 there is a leak in the ceilingMop sink location on deck 2 above has people not using correctly and overflowing and spilling water on floor causing intrusion on deck 11.00
160621/9/17 16:30ROUTINE2314BLDG 2314 - RM 341A There is water leaking into a lightAntenna mounting above ceiling leaking. Removed and resealed area.1.00
160631/9/17 16:36ROUTINE2314BLDG 2314 - 3rd Deck there is a leak in the ceiling outside Rm 303No, leak found after several inspections during rain. Tile replaced and is consider complete.1.00
160641/10/17 7:26ROUTINE2314BLDG 2314 - RSA South door control air solenoid is leakingInspection has started but no repair work - Mr. Hurps has current wiring drawing -1/24/17 - Unit has self repaired - No work was done by Bacik0.00
160651/10/17 7:28ROUTINE2314BLDG 2314 - RSA Emergency Lights do not workInstalled new light.0.75
160661/10/17 7:46ROUTINE2314BLDG 2314 - Outlet number P-7/35 in RM 115 does not work11/18/17 - Completed - Need scheduled outage to repair - worked on emergency lighting during last outages1.00
160671/10/17 7:48ROUTINE2314BLDG 2314 - Evaporator Enclosure emergency light does not workContractor did not meet require time for repair4.00
160681/10/17 7:51ROUTINE2314BLDG 2314 - Evaporator enclosure overhead light ballast does not workCompleted - replaced bulbs and ballast
1.50
160701/10/17 7:54ROUTINE2314BLDG 2314 - RM 102 Electrical outlet does not work12/1/17- Completed - it has been determined that outlet was abandoned in place - current drawing shows out let but no breaker number - panel schedule shows breaker 32 from post 1A was recommissioned to room 123 cameras - 11/18/17 - Replaced outlet, still not working - drawing shows out let but does not list breaker feeding it - was it abandoned it place? --------- SAME AS W/O 13334 - 5/22/17 outage was requested but not received1.00
161781/19/17 8:12ROUTINE2314BLDG 2314 3RD DECK MENS URINAL CLOGGED1.00
161791/19/17 8:13URGENT2314NPTU BLDG 2314 FIRE ALARM TRANSMITTER NO POWERThis is a repeat W/O - see 17896 Closed this one out. B Hawk
162401/23/17 8:54ROUTINE2312BLDG 2312 PIER, EMERGENCY DESIL ENGINE DOESN'T SECURE WHEN POWER IS RESTORED11/17 - new circuit board received - need to schedule installation - 10/22/17 - Asco transfer switch circuit board was found to be bad and replacement board was ordered 10/22/17 -----8/30 - Preliminary testing completed indicate that the problem is the transfer switch not the generator. Contacted manufacturer to discuss findings and determine best course of action. Additional testing requires normal power on the transfer switch. Will discuss with NPTU OPS and determine if testing can be accomplished during substation startup after PM. Will repair during August 2017 substation maintenance transfer switch in station 1 is bad, disabled #1 and place generator back into auto mode
163831/30/17 13:02ROUTINE339339 - several emergency lights inop (safety write up 2017-2)7/10/17 - 6 emg. Lites needed & 2 exit lites - this was counted out several mounths back, recount will be made - 5/22/17 - 3rd deck emergency lighting can not be addressed untill 3rd deck lighting repairs have been completed.
163861/30/17 13:49ROUTINE2314BLDG 2314 SUBWAY - FLOOR DRAIN CLOGGEDAs a last resort the drain auger was run into the floor drain under the wash sink across from the head and auger never made it past the trap. Auger tip came back up with what appears to be clay on it. Auger was then run into the cleanout and again it stopped short of running clear and came back out with what appears to be clay. At this time other options are being looked into and need to be considered to return the drain to operation. With joint cooperation between CE, Mark Ford and Bacik Group - A pipe liner company came in to view system with a camera, drain had so much trash in it that they were unable to pass into pipe. CE brought on their equipment and tried to clear with no success. Roto Rooter came in and was able to clear drain and run camera into system. At that time it was discovered that the grease trap was full. Trap was drained. Trap filled back up. CE returned and it was found that the trap to the sanitary sewer line was clogged and needs replaced - Repair of the trap drain line needs to be completed before internal system can be evaluated. - This work was taken over by CE and Cadell to repair the grease trap drain line to the sewer - new work order issued to oversee Roto Rooter complete new drain line for sink and Pee trap under W/O 16711.2.00
167112/17/17 9:43ROUTINE2314BLDG 2314 SUBWAY FRONT OF BLDG, ASSIST/CLEAR OUT FLOOR DRAIN2.00
168663/2/17 11:02URGENT2314t5 transfer buzzing loud sign of arching inside panelCompleted - new transformer was installed by Gatch
29.00
168683/2/17 11:04URGENTnorth peirfuel piping is leaking bottome of fuel piping is rusted8/22 Proposal submitted is now more than 30 days old and is no longer valid. Close issue due to Govt inaction 6/20/17 piping repair proposal was submitted 6/12/17 - 6/5/17 - received quote from 1 contractor, quote sent to Bacik office for formal submital - Second contractor declined to quote -0.00
170133/13/17 11:42URGENT2314Diesel Generator oscillating - power needed for maintenanceReplace filters on unit.5.00
170253/14/17 10:38ROUTINE2314BLDG 2314 SUBWAY AREA - SINK LEAKING FROM THE DRAIN TRAPSink drain clog cleaned with sub contractor Roto Rooter.2.00
170623/15/17 11:43URGENT2314Bldg. 2314 Flag light pole has broken in half and wires are exposedThis was covered under warranty Per Tex Cap and repaired by Tex Cap
170903/16/17 14:44URGENT2314NPTU BLDG 2314 FUEL TANK FOR EMEGENCY GENERATOR NEEDS TO BE CLEANED. AND FUEL NEEDS TO BE FILTEREDCompleted - Due to entry delays I can not give you the cost of this service untill supplier submitts corrected invoice48.00
171853/28/17 9:58ROUTINE2312BLDG 2312 PIER X SOUTH, FORWARD SHORT POWER BUNKER OPEN LENS IS MISSING10/30/17 - Bunker needs to opened to install lighted switch - 5/25/17 - Replacement lighted switch on hand - waiting for August substation maintenance
172173/30/17 14:53ROUTINE2314NPTU BLDG 2314 - RM 201 BAD BALLAST9/1/17 completed -8/22 - Outage for second deck scheduled for 9/1 7/10/17 - Talked to second deck floor manager and was assured that all bad bulbs replaced before ballast requested -5/22/17 - Outage required to repair1.00
172193/30/17 14:54ROUTINE2314NPTU BLDG 2314 RM 212 BAD BALLAST9/1/17 completed - 8/30 - Outage scheduled for 9/1. 7/10/17 - Talked to second deck floor manager and was assured that all bad bulbs replaced before ballast requested -5/22/17 - Outage required to repair1.00
172213/30/17 14:57ROUTINE2314NPTU BLDG 2314 3RD DECK MALE RESTROOM 4TH URINAL LEAKING AND TOILET CLOGGEDUnclog toilet, replace flush valve3.00
172223/30/17 14:59ROUTINE2314NPTU BLDG 2314 RM 212L FAUCET LEAKINGCompleted - New stems installed, hot & cold - back flow rebuilt with new components - cold water would not flow when feeder valve open , feeder valve was clogged, tapped line to break debris free to allow water to flow - Components needed for repair ordered - Main line valve for faucet is 12 ft. up in janitor closet on deck below, area to small to get proper size ladder into or set up. More investigation needed to complete repair5.00
172233/30/17 15:55ROUTINE2314NPTU BLDG 2314 2ND AHU CW REG HELD UP BY ZIP TIESCanceled - No work completed - unit is to be replaced during TSB revamp -
172243/30/17 16:02ROUTINE2314NPTU - 2314 - BAD BALLAST IN EMERGENCY COMMAND CENTER10/11/17 - Outage scheduled 10/13/17 - 8/30 Will be addressed with 1st deck lighting outages. 5/22/17 - Outage required to repair
173594/10/17 9:13URGENT420BLDG 420 OPERATE BREAKERS TO SHIFT POWER13800 volts is service by CE

I had to call Glen Giger to verify this info.

This work is complete though because it was needed so that substation 1 could be serviced

174344/13/17 16:15ROUTINE2314B2314, 3rd deck has 13 broken light diffusers (covers)6/2/17 - New lenses were installed5.00
175144/20/17 9:49ROUTINE2314BLDG 2314 SINK LEAKING FROM P-TRAP
175154/20/17 9:49ROUTINE2314BLDG 2314 2ND DECK FEMALE HEAD BROKEN FLUSHOMETER< LOL
175204/20/17 15:47URGENT2314electrical problem on 3rd deckBacik spent 3 hours for Drawings/hang locks, remove locks
Gatch had a total of 160 hours...phase two not required. All test passed.160.00
175734/24/17 10:29URGENT2314NPTU - 2314 - 1ST DECK MALE HEAD SINK CLOGGEDClog was past sink p-trap

Clog was cleared

1.00
175744/24/17 10:32URGENT2314NPTU - 2314 - 3RD DECK MALE HEAD TOILET CLOGGED1.50
175754/24/17 10:34ROUTINE2314NPTU - 2314 - 1ST DECK HEAD HANDICAP TOILET CLOGGED< LOL
175764/24/17 10:36URGENT2314NPTU - 2314 - 2ND DECK WATER FOUNTAIN NOT COOLING< LOL
176464/27/17 14:25URGENT2314BLDG 2314 - RPR ISOLATION VALVE IN SUBWAY FOR ICE MACHINE
176715/1/17 14:19ROUTINE2314BLDG 2314 REPLACE DOOR HINDGES ON ENTRY DOORS06-20-17 obtain WAF, Remove old wedges, extract broken screws, adjust thread on exit doors 10 hinges replaced. 06-21-17 same as above on entry doors.8.75
176985/2/17 14:06ROUTINE339NPTU - 339 - WIRES ON BACK SIDE OF BLDG PULLED AWAY FROM GROUND. REQUEST THEY BE PLACED INSIDE CONDUIT OR SECURED.5/22/17 - have not been to the site to review
178015/10/17 8:06ROUTINE2314Site parking lighting12/21/17 site parking lot lights were replaced with LED lights under milcon project - 8/30 - Proposal submitted 8/11. 6/2/17 received, need to validate if bulbs or ballasts -0.00
178025/10/17 8:19ROUTINE2314RSA EF-2 BOLTS5/19/17 - Bacik went to complete task and fastners were gone - Task was 2 screws were laying on RSA roof near exhaust fan, screws needed to have radioligical tested before disposal - Basic inquied with RSA tech and it was explained that because of the requirement it was taken care or0.00
178035/10/17 8:23ROUTINE2314RSA ROOF FALL ARREST SYS4.00
178055/10/17 8:25ROUTINE2314RSA PERSONNEL DOOR6/21/17 in contact with Strybuc, seal supplier, they have Amesbury part numbers - Amesbury has minimum order of 25,000 ft - needed small quanity supplier -
178095/10/17 8:28ROUTINE2314RSA ROOF HANDRAILContractors completed work. Apply sealant to various areas, replace rusted bolts and nuts etc.33.50
178135/10/17 8:31ROUTINE2314N.PIER PUMP HOUSE EMERG LIGHT5/24/17 - (2) New led emergency / exit light combos installed -3.50
178165/10/17 8:34ROUTINE2314POST 2 AC1.00
178215/10/17 8:41ROUTINE2314TSB EXTERIOR LIGHTING12/21/17 - have started repair to areas that can be accessed with a ladder - 11/17 - NTP received - need to schedule work ---- 8/30 - Estimate has been prepared and submitted on 8/11. 6/20/17 - 6/2 survey was received - 5/22/17 (duplicate to 14484 ) from original WO 9/27/16. Review W/O and requested current lighting survey of lights not working on 5/16/17
178225/10/17 8:43ROUTINE2314IDE LIGHTS2.00
178245/10/17 8:46ROUTINE2341BBLDG 2341B AC11/2/17 Completed - carolina chillers completed the work - bacik group installed new thermostats and locking cover boxes 11/15/17 -- 10/30/17 - Carolina Chillers will be out 10/31/17 & 11/1/17 to complete repairs -----5/25/17 - researching more cost effective company to charge temp offce trailer units -
TS&R HVAC UNITS.(Chief Reid's comments) 5/10/1716.00
178255/10/17 8:59ROUTINE2314SUBWAY LIGHT COVER0.00
178265/10/17 9:02ROUTINE2314TSB 305 EMERG LIGHTRepaired under w/o 18340 - all 3rd deck emergency lighting repaired - 7/10/17 - - started replacement on 6/30/17 - Part of the current replacement proposal to replace all non working 3rd decl emg. Lights - 5/17/17- untill 3rd deck lighting is corrected we can not replace emergency lighting -
178275/10/17 9:05ROUTINE2314RSA VENTWork completed within 30 day period. In compliance with PWS.5.00
178285/10/17 9:08ROUTINE2314S.PIER PB-1 HANDLERemove handle. Drill out broken mounting screws, replace with stainless screws. Seal with silicone1.50
178295/10/17 9:12ROUTINE2314RSA ROOF CABLE WAY5/19/17 - Mandex , Robert McNeil said that the flrx conduit that has pulled out of the bottom of camera 17 mount pipe is their repair work, - Robert McNeil, 843-607-8551 - rmcneil@mandex.com0.00
178305/10/17 9:14ROUTINE3546THESE STRUCTURAL ITEMS NEED TO BE LOOKED AT TO INSURE THEY ARE STILL ADEQUATE AND THEY PROBABLY NEED TO BE PRESERVED (PAINTED, ETC).8/30 - Please close or reassign this ticket. The issue was actually carpenter bees in the roof rafters. Work was assigned to the pest control contractor.3.00
178315/10/17 9:16ROUTINE2314TSB 117 LEAK IN OVERHEAD5/22/17 - Source of leak could not be located - tile was dry - best guess is that the source of the leak was caused by water penetration from the 2ed deck CRU's when drain pans were overflowing - Deck Dept. said they would replace the ceiling tile and to leave it be -1.50
178325/10/17 9:21ROUTINE2314SOUTH PIER LIGHTING12/21/17 In prior months NTP was received - have collected drawings - parts ordered - need to schedule --- 11/17 Lighting survey received - need to order ballasts and schedule work 8/30 - Proposal submitted 8/11 based on lighting survey received. 6/2/17 Survey was received - 5/19/17 - requested lighting survey as to which lights are out - requested at 5/16/17 deck dept meeting. CHANGE OUT BULB/FIXTURES AS NEEDED TO RESTORE LIGHTING
178445/11/17 8:41ROUTINE2314B2314, replace A/C breakersClean, prime and paint ac box.2.00
178455/11/17 8:48ROUTINE420B420 (North Pier), emergency generator fuel piping corroded on undersideThis is a repeat work order. Original WO is # 16868 from 3/2/17
178465/11/17 8:54ROUTINE339B339, (SE corner)Emergency door difficult to open,Reassembled Frame Jam...applied additional fasteners...removed pins...removed rust and debris...lubricated...adjusted door closer5.00
178475/11/17 9:00ROUTINE2314B2314, Air dryer RM, reattach conduit and junction box overhead6/20/17 - We surveyed the repair area and unsure how to safely access the point of repair . It is on the ceiling and the original work had to have been done with the room empty - 5/19/17 inspected area, need to secure materials for repair
178485/11/17 9:03ROUTINE2314B2314, Replace corroded LPAC breakers7/31/17 - was submitted closed 7/20/17 - 7/20/17 - Boxes cleaned and painted per CE - 7/10/17 - Material on site - trying to schedule time to complete - 6/13/17 - PER CE - boxes to be cleaned of surface rust, primed and preserved with rust stop coating4.00
178555/11/17 10:39ROUTINE2314BLDG 2314 COMPUTER ROOM UNIT 2 SHOWING ALARM CONDITION FOR ALARM CIRCUIT SHOWING HIGH PRESSURE10/5/17 Completed - Carolina chiller installed new condenser fan motor - 9/20/17 Tenative date for Carolina Chiller to complete repair is 9/26/17 - Needs condensor fan motor and capacitor installed - Same as W/O 14183 ----------- 6/20/17 - Orignal Proposal was submitted 5/17/17 - waiting on NTP/revisions - 5/19/2017 - proposal received from Carolina Chillers and submitted CE on 5/17/178.00
178665/12/17 13:27ROUTINE94840BLDG 94840 VERIFY STATUS OF CONDUCTORS UNDER ACCESS PANELS BY N. PIER FUEL STORAGE TANK FOR THE FIRE ALARM TRANSMITTER6/22/17 - informed that this is no longer an issue and request can be closed - request to engineering was never fulfilled - request was verbal0.00
178965/16/17 12:34ROUTINE2314Repair wiring to transmitter in front of TSP10/25/17 - Completed - --- 9/19/17- It has been found that the power as listed on drawings and panel schedule feeding transmitter are incorrect. Need Gatch to modify their quote to trace power out to the junction box for transmitter and resubmitt proposal- 8/22 - NTP received. Work is scheduled for second week in Sept 7/31/17 - Have proposal from Gatch to run new conduit and power to transmitter - Bacik Reviewing and writing proposal - 6/26/17 - Still waiting for direction after informing deck dept. of compromised conduit. 6/13/17 - Wiring was validated - conduit under ground appears to be compromised - 6/7/17 EHS has approved plan to validate wiring after completing hand over hand conduit tracing --5/31/17 - traced conduit and talked with Master Cheif and we have a plan to start work when time permits --5/25/17 - See W/O 16179, orignal W/O - requested wiring & panel schedules for power feed to all transmitters - traced conduit - will request WAF to open box to verify for power & verify run - orignal proposal was submitted 1/27/17 -5/19/17 - New proposal will need to be submitted - original was submitted when pole was in old location-60.00
179365/18/17 15:13ROUTINE2314NPTU 2314 #1 AND #2 LOW PAC - REPLACE CONDENSATE DRAIN VALVES8/22 Condensate Valves have been repaired and monitored for function. They are operating properly 7/31/17 - Repair parts for condensate automatic drain received in - need to install - 7/10/17 - contacted supplier on 7/7/17 to order repair parts, no answer or return call - will contact again - 6/20/17 - Contacted second supplier for pricing, no responce - First supplier quoted parts that were not requested, requested requote and received nothing - 5/31/17 - Inspected exsiting units - contacted distribuitor for parts pricing for 1 rebuild kit - still waiting for heater pricing - need price for cracked poly globe. 1 unit works- 1 unit needs rebuilt, major components are servicable - 5/25/17 - did not receive a request for this - just seen - have talked to deck dept on direction they would like to have, need to review for parts needs8.00
179805/22/17 15:06ROUTINE2314BLDG 2314 OUTSIDE ROOM 117 CEILING TILE NEEDS REPLACING, HAS PA SYSTEM ATTACHED TO IT5/22/17 - Completed - PA speaker has warped ceiling tile and forcing grid rails apart - tied rails togather and wire support to hold speaker weight off tile - tile was not replaced at direction of deck works control officer - it was explained to me that the tiles would be replaced by deck personal0.75
180205/30/17 15:30ROUTINE2314Inspect VAV shut or set to heat mode on 635 side of the training area 2nd deck of TSB6/2/17 - Completed - inspection of VAV's here and command area - increased volume of airflow at 2ed deck AHU/VFD - adjust airflow thru ducting1.50
180425/31/17 9:46ROUTINE2314B2314, CHILL WATER VALVES IN 1ST, 2ND AND 3RD DECK AIR HANDLER ROOMS REQUIRE SMALL VALVE MAINTENANCE6/26/17 - completed small valve maintenance per small valve maintenance work sheet received from deck dept.2.00
180455/31/17 10:39ROUTINE2314B2314, THE EYE WASH STATION TAGS IN BLDG 2314 1ST DECK DIESEL ROOM ARE OUT OF SPEC5/31/17 - The eye wash was not out of spec - the manufacture recommends a monthly inspection for vessel integrity. The solution manufacture recommends changing the solution every 6 months - both criteria have been meet according to the tag - To eliminate any future misunderstanding Bacik has opted to put all tank type eye wash station on the same weekly PM inspection as the fixed location pressure fed eye washes.1.00
180475/31/17 10:41ROUTINE2314B2314, EXIT SIGNS ON THE 1ST, 2ND AND 3RD DECK OF BLDG 2314 HAVE A LAMPING DEFICEIENCY AND REQUIRE EITHER RELAMPING OR EXIT SIGN ERPLACEMENT12/2/17 - Emergency lighting was worked on 2ed deck & 1st deck passageways - only areas not worked were 1 deck rooms and inaccessable offices on 2ed deck - all other e-lighting was replaced ----- 10/13/17 - Work was completed on 10/13/17 on 1st deck completing some of the issues - nest scheduled out is 11/3/17 --- 10/11/17 - Outage scheduled 10/13/17 -1st deck only - 9/1/17 - 2ed deck only - outage was granted and work was started - personal emergency took 1 person from job, only couple lights were completed - need second outage scheduled - 8/22 - Outage for second deck scheduled for 9/1 7/28/17 - 3rd deck completed at this time - Multiple requests have been submitted for emergency lighting on each deck - the W/O tickets need to be separated by deck - More tickets for same task does not get them done faster -- 6/20/17 - Have proposal turned in for 3rd deck only at this time - no survey has been completed to revise original proposal for 1st & 2ed deck - exceeded original repair proposal - 6/2/17 - outage will be required - I have already been talking with OPS about scheduling outages - reviewed hallways on 3rd deck to start count of units needed48.00
180495/31/17 10:47ROUTINE2314B2314, THE LAN DROP HOUSING BEHIND THE COMPUTER IN ROOM 305 IS NOT ATTACHED TO THE WALLThis is not Bacik work, Mandex took care of the camera 17 conduit, this is the same line of work.

PWS appendix A line G under Facilities exclusions.

180515/31/17 11:18ROUTINE2314B2314, THE LOCK HASP IN THE CHAPLAINS OFFICE ROOM 128 NEEDS TO BE REMOVED6/8/17 - went to remove and Chaplin removed the 3 screws himself and took hasp off - He said that he turned in W/O several weeks prior and no one showed up -0.00
180525/31/17 11:22ROUTINE2314B2314, THE EXIT SIGN IN THE 1ST DECK VENDING AREA BY SUBWAY IS MISSING A FASTENER AND NEEDS TO BE REPLACED6/12/17- Completed, install 1 8-32 x 3/4 screw with nut -1.00
180565/31/17 13:06ROUTINE2314B2314, IN ROOM 340, TERMINAL BOX WIRES ARE NOT SECURELY ATTACHED TO THE CEILINGCompleted 5/22/17 - Tony Chamberlain - 2 hollow wall anchors, 6" unistrut &

1.5" unistrut clamp, $10.00 - 4 hours 1 hr schedule room access 2 hours obtaining WAF 1 hours to complete, clean up and close WAF

4.00
180575/31/17 13:08ROUTINE2314B2314, REPLACE EMERGENCY LIGHTS IN ROOM 112 AND 112F10/13/17 Completed ----10/11/17 - Outage scheduled 10/13/17 - 8/30 Will be addressed with 1st deck lighting outages. 6/2/17 - outage will be required - I have already been talking with OPS about scheduling outages1.00
180585/31/17 13:11ROUTINE2314B2314, ROOM 319 REQUIRES A LIGHT FIXTURE BALLAST TO BE REPLACED1.00
180605/31/17 13:24ROUTINE2314B2314, THE RSA SOUTH GARAGE DOOR HAS BEEN INTERMITTENTLY TRIPPING THE MOTOR CONTROL CIRCUIT. REQUEST TROUBLESHOOTING AND REPAIR OF THE MOTOR OPERATOR/SYSTEM8/3/17- North door was door with trouble - blatter seal not operating - installed new solenoid and coil - 7/18/17 - attempted to install - could not due to RSA personal working in area - 7/14/17 - New solenoid valve onsite - need to install - 6/2/17 - we will contact RSA personal to gain full information as to how often and exact y what is the problem - a local outage will be needed7.50
180615/31/17 13:30ROUTINE2314B2314, SIX LIGHT FIXTURES IN THE RSA REQUIRE REPAIR, 3 IN RSA CHEM ROOM (R03), 1 IN THE RSA CONTROL ROOM AND 2 IN THE WASTE PACK ROOM (R07). THE CONNECTION POINT FOR THE FLOURESCENT BULBS ARE EITHER DAMAGED/BROKEN OR MISSING9/20/17 - work was started but unable to complete - fixtures need additional work, need rewired to work with LED replacement lamps as discussed with area manager - Manager ordered lamps - need scheduled RSA outage to complete - 8/30 - No change. 7/31/17 - Orignal Data missing - reposted - 6/2/17 - we have been in touch with RAS personal about 2 weeks ago requesting bulb type installed so that the correct tube ends are ordered - still trying to obtain information
180625/31/17 13:35ROUTINE2314B2314, CEILING TILE FRAME IN ROOM 204A IS BROKENCompleted 5/25/17 - Tony Chamberlain - re-A-line ceiling tile grid - .5

hours - $0.0

0.50
180645/31/17 13:40ROUTINE2314B2314, IN ROOM 212-L THERE IS A LEAKING FAUCET THAT NEEDS REPAIRThis was completed under order W/O 17222 on 4/27/17

2 new faucet stems and 1 new vacuum breaker kit Duplicate WO

180655/31/17 13:43ROUTINE2314B2314, THE AIR DIFFUSERS FOR THE VENTILATION ARE BROKEN IN THE FOLLOWING ROOMS OF BLDG 2314 AND REQUIRE REPLACEMENT; ROOM 212F, 212G, 212H, 212I, 212J AND 212N12/21/17 - purchased difusers and installed 1 to verify, need to install balance -10/16/17 Reissued under W/O 19790 -- 7/10/17 - the center sections of the difusers apear to have been removed to improve airflow - have not been able to locate replacement centers - have identified small disusers that can be screwed to exsiting unit and can not be snapped out - 6/14/17 -see 9299 & 10350- repeated W/O
180665/31/17 13:46ROUTINE2314B2314, IN ROOM 305 THERE IS A LOCKER WITH A BROKEN HANDLE THAT NEEDS REPAIRAdjusted latch to original config.0.75
180675/31/17 13:49ROUTINE2314B2314, LIGHT FIXTURES IN ROOM 108, 108A, 108B AND 108C HAVE BROKEN BALLAST THE NEED TO BE REPLACED10/11/17 - Outage scheduled 10/13/17 - 7/31/17 - Orignal Data missing - reposted -7/14/17 - bulbs verified need outage - 6/2/17 - have bulbs been tried in the fixtures to verify that the ballasts need replaced
180685/31/17 13:52ROUTINE2314B2314, TWO LIGHT FIXTURES IN ROOM 112 HAVE BROKEN BALLASTS AND NEED TO BE REPLACED10/13/17 - Completed --- 10/11/17 - Outage scheduled 10/13/17 - 8/22 Outage will be scheduled when 2nd deck elec outages are completed. 7/31/17 - Orignal Data missing - reposted - 7/14/17 - bulbs verified need outage -6/2/17 - have bulbs been tried in the fixtures to verify that the ballasts need replaced1.50
180695/31/17 13:54ROUTINE2314B2314, REPLACE THE BROKEN FLOOR TILES IN ROOM 11211/17 - have written report in hand - need to schedule - 7/10/17 - Verbal report that asbestos free but NR requested that we provide written procedure to proceed - 6/2/17 - has the report come back from the asbestos testing? We will need to locate tiles that are close in type and color
180705/31/17 13:57ROUTINE3546B3546, THE GUTTER BY THE ROLL UP DOOR IS SEPERATING FROM THE BUILDING DUE TO A BRACKET BREAKING LOOSE FROM THE GUTTER. BRACKET NEEDS REPLACING8/30 - see 18402 7/10/17 - inspected site on 6/30/17 - proposal in process for equipment rental for cleaning gutters and repairing bracket6/2/17 - need to view defiency so that we can proceed
181416/8/17 9:21ROUTINE339BLDG 339 - BACK WALL HAS 2 LIGHT SWITCHES THAT ARE CONNECTED TO THE ELECTRICAL POLE, THEY REQUEST THE SWITCHES BE REMOVED10/30/17 - it has been noted before that the knife switches are no empty and feed something inside the building and are still live ---- 6/14/17 * - need to schedule with CE first to bring power down - Need to schedule w/M. Ford
181696/9/17 7:18ROUTINE2314BLDG 2314 RM 112F - The emergency light in room 112F does not work10/13/17 - completed --- 10/11/17 - Outage scheduled 10/13/17 - 8/30 Will be addressed with 1st deck lighting outages. 6/14/17 * Outage needed - Will be part of larger proposal to repair 1st & 2ed deck emergency and exit lighting, On going repair1.00
181706/9/17 7:20ROUTINE2314BLDG 2314 - RPR OUTER DOOR FOR BLDG THEY DO NOT CLOSE ALL THE WAYCompleted 6/8/17 *- drill and tap frame to use larger socket head bolts - adjusted doors and latches as needed to allow closing and latching on 3 sets of double doors9.00
181716/9/17 7:21ROUTINE2314BLDG 2314 RM 105 - RPL MISSING FLOR TILE11/17 - have written report in hand - need to schedule -7/10/17 - Verbal report that asbestos free but NR requested that we provide written procedure to proceed - 6/22/17 - reports returned - no asbestos - did not see reports - NR ask for written process on removal and replacement of tiles now
181726/9/17 7:22ROUTINE2314BLDG 2314 - RPR WALL BY ROOM 115Fill dry wall, sand , prime and paint two coats.5.45
Totals (3-year period)698.25
Annual Sub Totals232.75
Estimated Cost to Maintain New Bldgs.: Estimated 10% Per Building (2701, 2626 & 2711) for Service Calls and Materials (1-year period)69.83
Annual Total (Real Property)302.58
Add note at bottom of this page and delete the data tab, but keep origianl

Appendix C - Serice Call Historical Workload Data - Real Property

&P

FOR OFFICAL USE ONLY

Data

Desc. Bldg# Location

Desc.Bldg#Trade
RECURRING MAINTENANCE REPR43WS-HVAC
INST GROUNDING STRAP ON FENCE43WS-ELEC
RPR ELEC RECEPTA LE FROM43WS-ELEC
RPL BAD HEATING ELEMENT HVAC43WS-HVAC
RPL WINDOW IN ELECTRICAL RM43WS-STRUCT
ADJUST EXTERIOR FENCING43WS-STRUCT
RPL BALLASTS IN SEVERAL LIGHTS43WS-ELEC
PERFORM SITE PREP FOR SLAB43WS-STRUCT
RPL WINDOW IN ELECTRICAL RM43WS-STRUCT
RECONSTRUCT N2 DEWAR PAD43WS-STRUCT
ASS'T RECONSTUCT N2 DEWAR PAD43WS-HEAVY
RECURRING MAINTENANCE REPR339WS-HVAC
NPTU SURVEYS/INSPECTIONS339csu
RPR EXHAUST BELT ON HVAC UNIT339WS-HVAC
RPR AC IN MAIN BAY AREA339WS-HVAC
CORRECT ELEC. DEFICIENCIES339WS ELEC
TROUBLESHOOT & RPR HVAC UNITS339WS-HVAC
RPR/RPL REGULAR & CYPHER LOCKS339WS-LOCKS
INVEST/RPR NO POWER339WS-ELEC
COMPLETE INSTALLATION OF HVAC339WS-HVAC
RPR HVAC & REROUTE DRAIN LINE339WS-HVAC
RPR HVAC FOR BREAKROOM339WS-HVAC
RPR HVAC FOR MAIN BAY AREA339WS-HVAC
TROUBLESHOOT & RPR LOST PHASE339WS-ELEC
POWER OUTAGE339WS-ELEC
PERFORM PM/CM-SUBSTATION 3420csu
PM/CM PEIR XRAY NORTH420csu
PM/CM PIER XRAY NORTH420csu
CONNECT/DISCONNECT SHORE POWER420WS-ELEC
TROUBLESHOOT GROUND FAULT420WS-ELEC
PERFORM SWITCHING F/1070 BARGE420ELECTRIC
RESET BREAKER FOR 1070 BARGE420WS-ELEC
SECURE REFURBISH FACILITY420WS-STRUCT
DISCONNECT SHIPYARD COMPRESSOR420WS-ELEC
DISCONNECT FREEZE SEAL TRAILER420ELECTRIC
RESTORE POWER TO 1070 BARGE420WS-ELEC
SECURE & RESTORE POWER420WS-ELEC
SWAP BREAKER IN SUB STA #3420WS-ELEC
SEC PWR TO FWD BUNKER420WS-ELEC
PERFORM SWITCHING FOR IX516420WS-ELEC
SEC PWR TO FWD BUNKER420WS-ELEC
RESET TRIPPED BREAKER420WS-ELEC
RESET TRIPPED BREAKER420WS-ELEC
SECURE PWR TO FREEZE PROTECTON420WS-ELEC
RESTORE POWER TO MTS 635420WS-ELEC
TROUBLESHOOT ELECT PROBLEMS420WS-ELEC
PERFORM SWITCHING FOR OUTAGE420WS-ELEC
RESTORE POWER TO HIGH PAK420WS-ELEC
SECURE PWR TO MTS 635 BUNKER420WS-ELEC
RPR PIPE HANGERS ON NORTH PIER420WS-STRUCT
RMV LOCK FROM BREAKER420WS-ELEC
SANITIZED 2 BACKFLOW PREVENTER420WS-UTIL
RPR STARBOARD SHOREPWR BREAKER420WS-ELEC
SHOOT 4 STUDS INTO PIER420WS-STRUCT
RPR SHOREPOWER BREAKER420WS-ELEC
RESTORE POWER TO HPAC420WS-ELEC
RPR LEAKING BACKFLOW PREVENTER420WS-UTIL
RPL HOSE PIER RISER TO REEL420WS-STRUCT
RPL BROKEN ELECTRIC CONDUIT420WS-ELEC
CLOSE BREAKER TR1420WS-ELEC
RPR SHORE POWER CABLE420WS-ELEC
RPR BATTERY ON GENERATOR420WS-ELEC
RPR SHOOT STUDS TO MOUNT MID420WS-STRUCT
RPL FUEL LINES SUPPORTS420WS-STRUCT
RPR/RPL CLEAT GROUND WIRES420WS-ELEC
RPR GATE LATCH SECURITY POST#8420WS-STRUCT
RPR CRASH BAR AT GATE NORTHPIE420WS-STRUCT
RPL DEAD BATTERY NORTH PIER420WS-ELEC
BREAKER OPERATIONS SUBSTATION3420WS-ELEC
RPR INOP PRESSURE GAUGE420WS-STRUCT
RPR 1070 BARGE BREAKER420WS-ELEC
RPL LEAKING BACKFLOW PREVENTER420WS-UTIL
CUT POWER TO YC1070 BARGE420WS-ELEC
RPR CIRCUIT BREAKER420WS-ELEC
SANITIZE POTABLE WATER HOSES420WS-UTIL
RPR HOLE IN SHORE POWER BUNKER420WS-STRUCT
SECURE - RESTORE PWR TO IX516420WS-ELEC
ASSIST DISCONNECT HIGH PACK420WS-ELEC
RELAMP EXTERIOR LIGHT420WS ELEC
ASSIST CONTRACT W/AIR COMPRESS420WS-STRUCT
RESTORE POWER TO 1070 BARGE420WS-ELEC
RPR POWER TO 10-70 BARGE420WS-ELEC
RPL BROKEN PLASTIC COVER420WS-HVAC
SECURE POWER TO 1070 BARGE420WS-ELEC
INSTALL A 90 DEGREE ELBOW420WS-STRUCT