STORMWATER POLLUTION PREVENTION PLAN
POST 4
JOINT BASE CHARLESTON (NAVAL WEAPONS STATION)
GOOSE CREEK, SC
JULY 2017
TABLE OF CONTENTS
NARRATIVE
PLANNED EROSION AND SEDIMENTATION CONTROL PRACTICES
MAINTENANCE PLAN
320-C Midland Parkway Summerville, SC 29485
SWPPP NARRATIVE:
The project site is located at Joint Base Charleston, entering the Naval Weapons Station in Goose Creek, South Carolina. The entry control facility area is along Perimeter Road, North of
Remount Road. The site consists of an existing vehicle processing area, to remain, with a new active vehicle barrier, overwatch structure, and associated supporting infrastructure.
Total area site disturbance is slightly under one acre. According to the USDA Soil Survey, the soils found at the site consist of Bonneau loamy sand as well as borrow pit material. Bonneau loamy sand conforms within hydrologic soil group “B” (moderately well drained), and borrow pit soils are assumed to be hydrologic soil group “D” (poorly drained).
The nearest receiving water body (RWB) for storm water discharge is Filbin Creek, which ultimately reaches the Cooper River. The Filbin Creek tributary is approximately 3878’ South of the project site. Storm water is then conveyed approximately 6000’ downstream to the Cooper
River, a coastal receiving Water (CRW) which is classified as Freshwater (FW) per SCDHEC.
Best Management Practices for Sediment and Erosion Control are in place for this project to protect existing conditions, and the construction will not contribute to any impairments. To limit the sediment discharge from the site, temporary silt fence will be installed along the edges of earthwork, demolition, and construction disturbance. A construction staging area, enclosed with silt fence with gravel construction entrances, shall prevent construction vehicle tracking.
Once construction has been completed, all disturbed areas shall be sodded or seeded with grass in accordance with the plans, specifications, and following direction. Upon stabilization of grassed area, sediment control measures shall be removed and all sediment and debris must be removed from the area of work.
The proposed site disturbance requires consideration of the Energy Independence and
Security Act of 2007 (EISA) provision requirements to the greatest extent technically feasible.
The attached NOI package for Automatic Coverage should be completed/signed by the prime contractor (serving as "project Owner/Operator”) & submitted to JB CHS MS4 Office (JB
CHS 628 CES/CEIE; C Wannamaker. For additional information, refer to the design drawings, Erosion & Sedimentation Control Practices and Maintenance Plans within this package.
REFERENCES:
SCDHEC Stormwater Management Best Management Practices Handbook Energy Independence and Security Act (EISA) 2007: Section 438
320-C Midland Parkway
PLANNED EROSION AND SEDIMENTATION CONTROL PRACTICES
1. SEDIMENT (SILT) FENCE –
Silt fence will be provided along specified edges of the project site as shown in the drawings. The silt fence will limit the amount of eroded material leaving the site until a vegetative cover is established.
2. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXITS –
Gravel entrance pads, as detailed, will be installed as shown on the plans to provide a buffer to cut down on material leaving the construction staging area where vehicles leave the work area. The contractor will be responsible for cleaning and adding stone if an excessive amount of mud or debris accumulates.
3. LAND GRADING
The grading plan has been developed with consideration of what areas need to be graded, when the work will start and stop, the degree and length of finished slopes, where borrow will be needed and where excess material will be wasted. The contractor will coordinate grading operations while utilizing the erosion and sedimentation control measures set forth in the plans.
4. CONCRETE TRUCK WASHOUT
Temporary concrete washout facilities should be located a minimum of 50 feet from storm drain inlets, open drainage facilities, and watercourses, unless determined infeasible by the
Engineer. Each facility should be located away from construction traffic or access areas to prevent disturbance or tracking. Install a sign adjacent to each washout facility to inform concrete equipment operators to utilize the proper facilities.
MAINTENANCE PLAN
SCDHEC Standard Notes:
1. Stabilization measures shall be initiated as soon as practicable in portions of the site where construction activities have temporarily or permanently ceased, but in no case more fourteen (14) days after work has ceased, except as stated below.
• Where stabilization by the 14th day is precluded by snow cover or frozen ground conditions stabilization measures must be initiated as soon as practicable.
• Where construction activity on a portion of the site is temporarily ceased, and earth-disturbing activities will be resumed within 14 days, temporary stabilization measures do not have to be initiated on that portion of the site.
2. All sediment and erosion control devices shall be inspected once every calendar week. If periodic inspection or other information indicates that a bmp has been inappropriately, or incorrectly, the permittee must address the necessary replacement or modification required to correct the bmp within 48 hours of identification.
3. Provide silt fence and/or other control devices, as may be required, to control soil erosion during utility construction. All disturbed areas shall be cleaned, graded and stabilized with grassing immediately after the utility installation. Fill, cover, and temporary seeding at the end of each day are recommended. If water is encountered while trenching, the water should be filtered to remove any sediments. Do not pump the filtered water into waters of the state.
4. All erosion control devices shall be properly maintained during all phases of construction until the completion of all construction activities and all disturbed areas have been stabilized. Additional control devices may be required during construction in order to control erosion and/or offsite sedimentation. All temporary control devices shall be removed once construction is complete and the site is stabilized.
5. The contractor must take necessary action to minimize the tracking of mud onto paved roadway(s) from construction areas and the generation of dust. The contractor shall daily remove mud/soil from pavement, as may be required.
6. Litter, construction debris, oils, fuels and building products with significant potential for impact (such as stockpiles of freshly treated lumber) and construction chemicals that could be exposed to storm water must be prevented from becoming a pollutant source in storm water discharges.
7. A copy of the SWPPP, inspections records, and rainfall data must be retained at the construction site or a nearby location easily accessible during normal business hours, from the date of commencement of construction activities to the date that final stabilization is reached.
8. Initiate stabilization measures on any exposed steep slope (3H:1V or greater) where land-disturbing activities have permanently or temporarily ceased, and will not resume for a period of 7 calendar days.
9. Minimize soil compaction and, unless infeasible, preserve topsoil.
10. Minimize the discharge of pollutants from equipment and vehicle washing, wheel wash water, and other wash waters. Wash waters must be treated in a sediment basin or alternative control that provides equivalent or better treatment prior to discharge;
11. Minimize the discharge of pollutants from dewatering of trenches and excavated areas.
These discharges are to be routed through appropriate BMPs (sediment basin, filter bag, etc.).
12. The following discharges from sites are prohibited:
• Wastewater from washout of concrete, unless managed by an appropriate control;
• Wastewater from washout and cleanout of stucco, paint, form release oils, curing
• Compounds and other construction materials;
• Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance;
• Soaps or solvents used in vehicle and equipment washing.
13. After construction activities begin, inspections must be conducted at a minimum of at least once every calendar week and must be conducted until final stabilization is reached on all areas of the construction site.
14. If existing BMPs need to be modified or if additional BMPs are necessary to comply with the requirements of this permit and/or SC’s water quality standards, implementation must be completed before the next storm event whenever practicable. If implementation before the next storm event is impracticable, the situation must be documented in the
SWPPP and alternative BMPs must be implemented as soon as reasonably possible.
15. A pre-construction conference must be held for each construction site with an approved on-site SWPPP prior to the implementation of construction activities.
320-C Midland Parkway
Additional Erosion Control Maintenance Notes:
1. Install permanent vegetative cover and the long-term erosion protection measures or structures as soon as practical in the development process.
2. Provide for handling the increased runoff caused by changed soil and surface conditions. Use effective means to conserve existing on-site soil including the use of diversion ditches, grassed waterways and storm sewers.
3. Place silt fence barriers at locations shown on plan. Silt barriers shall be maintained in place and in good condition until ground cover is established.
4. All disturbed areas not paved shall be grassed. Use temporary plant cover, mulching, and/or structures to control runoff and protect areas subject to erosion during construction.
5. Contractor shall provide dumpster of sufficient size and number to contain the solid waste generated by the project.
6. Contractor shall frequently remove garbage to maintain a clean construction site and minimize the exposure of waste to storm water.
Project Name
Project Location
Map Prepared By
Date
Applicant
Map Reference
SCALE
Not to scale
PROJECT SITE AREA
JBC, Goose Creek, South Carolina Remount / Perimeter Road
Google Maps 2017
April, 2017 JBC Post 4 AVB
320-C Midland Parkway, Summerville, South Carolina, 29485 843.875.3637
ENGINEERING | ARCHITECTURE
Joint Base Charleston / CEMS
Aerial, Location, and RWB Map
REMOUNT RD.
PE
R
IM
ET
ER
R
D
AutoCAD SHX Text N
Map Prepared By
Date
Applicant
Map Reference
SCALE
Not to scale
JBC, Goose Creek, South Carolina Remount / Perimeter Road
NRCS Database
April, 2017 JBC Post 4 AVB
320-C Midland Parkway, Summerville, South Carolina, 29485 843.875.3637
ENGINEERING | ARCHITECTURE
Joint Base Charleston / CEMS
Soils Map
PROJECT SITE AREA
AutoCAD SHX Text NOTE: SITE AREA IS COMPRISED OF BoB SOILS, CONFORMING TO HYDROLOGIC SOIL GROUP B, AND BORROW PIT SOILS, CONFORMING TO HYDROLOGIC SOIL GROUP D.
Map Prepared By
Date
Applicant
Map Reference
SCALE
Not to scale
JBC, Goose Creek, South Carolina Remount / Perimeter Road
Quad / Topo Mapping
April, 2017 JBC Post 4 AVB
320-C Midland Parkway, Summerville, South Carolina, 29485 843.875.3637
ENGINEERING | ARCHITECTURE
Joint Base Charleston / CEMS
PROJECT SITE
AREA
B O
L L A
R D
S C
O S
C O
X
SWMU 62SWMU 62
SWMU 62
X
X
X
X
X
X
H
H
H
H
H
H
A B C
D S
G
B
Y
D R
W
C H
K
B
Y
A P P R O V E D
B Y
D A
T E
D A
T E
D A
T E
D A
T E
F O
R
J O
I N
T
B
A S
E
C
H A
R L
E S
T O
N
J O
I N
T
B
A S
E
C
H A
R L E
S T
O N
AI
R
MO
BI
LIT
Y
CO
MM
AN
D
DE
PA
RT
ME
NT
O
F
DE
FE
NS
E W
E A
P O
S
T A
T I O
N
S
O U
H
C
A R
O L I N
A
DRAWING SIZE: ANSI D (22"x34")
PROJECT NO.
RECORD DRAWING DATE
SHEET
IF SHEET IS LESS THAN 22"x34" (ANSI D) IT IS A REDUCED PRINT, SCALE ACCORDINGLY.
OF
320-C Midland Parkway, Summerville, SC, 29485
ENGINEERING | ARCHITECTURE
CEMS Project No: 15154C Project Manager: C. Hinson
300 N. 3rd St., Suite 110, Wilmington, NC, 28401
843.875.3637
252.649.0334
G
E W
BAIR AS
IN628TH
IRA D
MANCOM
MO
IT Y
BIL
IRA D
MANCOM
MO
IT Y
BIL
D K
V
R E
P A
I R
T
I V
E
V
E H
I C
L E
R
R I E
R
P
O S
T
DKGV 13-2150
07-21-2017
D R
A W
I N
G
R
E V
I S
I O
N S
R E
V
D E
S C
R I P
T I O
N P
R E
P
B
Y D
A T
E A
P P
R D
N
SCALE: NOT TO SCALE
OVERALL CIVIL GRADING, DRAINAGE, SEDIMENT & EROSION CONTROL PLAN
E M
E M
J R
C
R W
P
R W
P
O V
E R
A L
L
C
I V
A
D I N
G
D
R A
I N
A G
E
S E
D I M
E N
O
S I O
N
C
O N
T R
O
P
A
N
CG101
NO WORK IN THIS AREA
SHEET NOT INCLUDED
AutoCAD SHX Text A/C
AutoCAD SHX Text A/C
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 43.2x
AutoCAD SHX Text x
AutoCAD SHX Text 41.4
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text 42.3
AutoCAD SHX Text x
AutoCAD SHX Text 42.3
AutoCAD SHX Text 42.8
AutoCAD SHX Text x
A/E SEAL
ELEC.
TRANSFORMER
SWMU 62SWMU 62
SWMU 62
M A
T C
H L
I N
E
A
R E
A
A
M A
T C
H L
I N
E
A
R E
A
B
M A
T C
H L
I N
E
A
R E
A
A
M A
T C
H L
I N
E
A
R E
A
B
INSTALLATION RESTORATION AREA:
"LANDFILL SITE AT 1ST STREET AND AVENUE A-B",
DESIGNATED SWMU 62 PER EXISTING RESOURCE
CONSERVATION AND RECOVERY ACT PERMIT.
SOIL AND GROUNDWATER CONTAMINATION EXIST
IN THIS AREA. REFER TO DRAWING C-501 FOR LAND
DISTURBANCE ENVIRONMENTAL REQUIREMENTS.
TOTAL PROJECT
DISTURBANCE LIMITS: 42,750 SF (0.98 AC.)
PLACE SOD ON SHOULDER FROM EDGE
OF PAVEMENT TO LIMIT OF WORK
(APPROX. 5000 SF) AS SHOWN,
SEE DETAIL DRAWING C-505
PLACE SOD ON SHOULDER FROM EDGE
OF PAVEMENT TO LIMIT OF WORK
(APPROX. 5000 SF) AS SHOWN,
SEE DETAIL DRAWING C-505
D S
D R
C H
K
B
Y
A P P R O V E D
B Y
D A
T E
D A
T E
D A
T E
D A
T E
F O
R
J O
I N
T
B
A S
E
C
H A
R L
E S
T O
N
J O
I N
T
B
A S
E
C
H A
R L E
S T
O N
AI
R
MO
BI
LIT
Y
CO
MM
AN
D
DE
PA
RT
ME
NT
O
F
DE
FE
NS
E W
E A
P O
A
T I O
N
S
O U
R
O L I N
A
DRAWING SIZE: ANSI D (22"x34")
PROJECT NO.
RECORD DRAWING DATE
SHEET
IF SHEET IS LESS THAN 22"x34" (ANSI D) IT IS A REDUCED PRINT, SCALE ACCORDINGLY.
OF
320-C Midland Parkway, Summerville, SC, 29485
ENGINEERING | ARCHITECTURE
CEMS Project No: 15154C Project Manager: C. Hinson
300 N. 3rd St., Suite 110, Wilmington, NC, 28401
843.875.3637
252.649.0334
G
E W
BAIR AS
IN628TH
IRA D
MANCOM
MO
IT Y
BIL
IRA D
MANCOM
MO
IT Y
BIL
D K
R E
P A
T
I V
E
V
E H
I C
R
R I E
R
P
O S
T
DKGV 13-2150
07-21-2017
D R
A W
I N
G
R
E V
I S
I O
N S
R E
V
D E
S C
R I P
T I O
N P
R E
P
B
Y D
A T
E A
P P
R D
E M
E M
J R
C
R W
P
R W
P
CG102
CIVIL GRADING, DRAINAGE, SEDIMENT & EROSION CONTROL PLAN AREA A
SCALE: 1" = 30'
LEGEND:
EDGE OF ASPHALT
EDGE OF CONCRETE / STRUCTURE
CONTOUR
UNDERGROUND COMMUNICATION LINE
UNDERGROUND ELECTRICAL
STORM DRAIN LINE
TREE LINE
WATER VALVE
COMMUNICATION STRUCTURE
STORM DRAIN INLET
FENCE LINE
WATER LINE
X X X
BOLLARD
MONITORING WELL
SMWU
HANDHOLE
TELECOM STRUCTURE
LIGHT POLE
EXISTING
WETLANDS
NEW
C I V
A
D I N
G
D
R A
I N
A G
E
S
E D
I M
E N
T
E
R O
S I O
N
C
O N
T R
A
N
A
R E
A
A
SILT FENCE
DISTURBANCE LIMITS
1. THE CONTRACTOR SHALL ADHERE TO JBC INSTALLATION ACCESS, DIG
PERMIT, AND UTILITY FLAGGING COORDINATION PROCEDURES. PROVIDE
ADEQUATE NOTICE TO RELEVANT PARTIES PRIOR TO COMMENCEMENT
OF EXCAVATION OF DEMOLITION. OBTAIN COPY OF APPROVED EROSION
CONTROL PERMIT AND OTHER GRADING AND LAND DISTURBANCE
PERMITS REQUIRED BY JBCHS, NWS.
2. SEE C-501 FOR ALL ADDITIONAL ENVIRONMENTAL REQUIREMENTS FOR
JOINT BASE CHARLESTON WEAPONS (INCLUDING GROUNDWATER
MONITORING WELLS, INVESTIGATIVE-DERIVED WASTE, DEWATERING /
CONTAMINATED GROUNDWATER, AND CONTAMINATED SOIL AND
DISPOSAL).
3. ALL DEMOLITION DEBRIS SHALL BE HAULED OFFSITE AND DISPOSED OF
TO AN APPROVED FACILITY LICENSED AND PERMITTED TO ACCEPT LIKE
MATERIALS, AND FACILITY TO HAVE A STATE APPROVED EROSION
CONTROL PLAN IN PLACE.
4. CONTRACTOR TO VERIFY EXISTING UTILITIES, MATERIALS, SIZES AND
LOCATIONS, 1,000 LF IN ADVANCE, AND NOTIFY THE ENGINEER OF
RECORD OF ANY DISCREPANCIES BEFORE ORDERING MATERIALS.
5. CONTRACTOR TO COORDINATE LOCATION/MARKING OF EXISTING SITE
UTILITIES IN AREAS WHERE WORK IS CONDUCTED. THE CONTRACTOR
SHALL ADJUST THE GRADE OF PIPE WORK UP OR DOWN, OR SIDE TO SIDE
TO MISS EXISTING UTILITIES AT NO COST TO THE GOVERNMENT AS
DIRECTED BY THE FIELD ENGINEER.
6. CONTRACTOR SHALL FIELD ADJUST MANHOLE RIMS, FIRE HYDRANTS,
VALVES AND APPURTENANCES TO MATCH FINISHED GROUND
ELEVATIONS.
7. CONTRACTOR SHALL TAKE PRECAUTIONS TO AVOID DAMAGE TO TREES
AND THEIR ROOT SYSTEMS.
8. REFER TO DRAWING C-501 FOR STANDARD SEDIMENT AND EROSION
CONTROL ORDER OF OPERATIONS AND ADDITIONAL INFORMATION. ALL
DISTURBED AREAS TO BE GRASS SEEDED PER INSTALLATION
REQUIREMENTS AFTER ACTIVITY HAS BEEN COMPLETED. UPON
COMPLETION OF WORK, RESTORE AREA TO MATCH EXISTING
CONDITIONS.
9. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE WORKMANLIKE
REPAIR OF ANY DAMAGE DONE TO ANY NEW AND EXISTING SITE ITEMS IN
THE EXECUTION OF HIS WORK UNDER THIS SECTION.
GENERAL NOTES:
N
GRAPHIC SCALE
0 30' 60'
SCALE: 1" = 30'
30'
PAVEMENT (SEE CIVIL SITE PLANS)
SOD
AutoCAD SHX Text
TX
AutoCAD SHX Text M
AutoCAD SHX Text
TX
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 43.2x
AutoCAD SHX Text x
AutoCAD SHX Text 41.4
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text 42.3
AutoCAD SHX Text x
AutoCAD SHX Text 42.3
AutoCAD SHX Text 42.8
AutoCAD SHX Text x
AutoCAD SHX Text
A/E SEAL
AutoCAD SHX Text W
AutoCAD SHX Text C
AutoCAD SHX Text M
AutoCAD SHX Text H
AutoCAD SHX Text
TX
S C
O S
C O
X
X
X
X
X
X
X
X
X
X
DROP INLET
RIM: 34.28'
INV OUT: 30.73'
BUILDING
BUILDING 3209
BUILDING 3206
ELEC.
TRANSFORMER
ELEC. METER
PANEL
BACK FLOW PREVENTER
X
X
X
X
M A
T C
H L
I N
E
A
R E
A
A
M A
T C
H L
I N
E
A
R E
A
B
M A
T C
H L
I N
E
A
R E
A
A
M A
T C
H L
I N
E
A
R E
A
B
M A
T C
H L
I N
E
A
R E
A
B
M A
T C
H L
I N
E
A
R E
A
C
M A
T C
H L
I N
E
A
R E
A
B
M A
T C
H L
I N
E
A
R E
A
C
PLACE 25' OF SDR 21 (8") PVC
OUTLET DRAIN AT MINIMUM 2%
SLOPE. REFER TO DETAIL
DRAWINGS C-503 AND C-505.
TOTAL PROJECT
DISTURBANCE LIMITS: 42,750 SF (0.98 AC.)
D S
D R
C H
K
B
Y
A P P R O V E D
B Y
D A
T E
D A
T E
D A
T E
D A
T E
F O
R
J O
I N
T
B
A S
E
C
H A
R L
E S
T O
N
J O
I N
T
B
A S
E
C
H A
R L E
S T
O N
AI
R
MO
BI
LIT
Y
CO
MM
AN
D
DE
PA
RT
ME
NT
O
F
DE
FE
NS
E W
E A
P O
A
T I O
N
S
O U
R
O L I N
A
DRAWING SIZE: ANSI D (22"x34")
PROJECT NO.
RECORD DRAWING DATE
SHEET
IF SHEET IS LESS THAN 22"x34" (ANSI D) IT IS A REDUCED PRINT, SCALE ACCORDINGLY.
OF
320-C Midland Parkway, Summerville, SC, 29485
ENGINEERING | ARCHITECTURE
CEMS Project No: 15154C Project Manager: C. Hinson
300 N. 3rd St., Suite 110, Wilmington, NC, 28401
843.875.3637
252.649.0334
G
E W
BAIR AS
IN628TH
IRA D
MANCOM
MO
IT Y
BIL
IRA D
MANCOM
MO
IT Y
BIL
D K
R E
P A
T
I V
E
V
E H
I C
R
R I E
R
P
O S
T
DKGV 13-2150
07-21-2017
D R
A W
I N
G
R
E V
I S
I O
N S
R E
V
D E
S C
R I P
T I O
N P
R E
P
B
Y D
A T
E A
P P
R D
E M
E M
J R
C
R W
P
R W
P
CG103
C I V
A
D I N
G
D
R A
I N
A G
E
S
E D
I M
E N
T
E
R O
S I O
N
C
O N
T R
A
N
A
R E
A
B
CIVIL GRADING, DRAINAGE, SEDIMENT & EROSION CONTROL PLAN AREA B
SCALE: 1" = 30'
SILT FENCE
LEGEND:
EDGE OF ASPHALT
EDGE OF CONCRETE / STRUCTURE
CONTOUR
UNDERGROUND COMMUNICATION LINE
UNDERGROUND ELECTRICAL
STORM DRAIN LINE
TREE LINE
WATER VALVE
COMMUNICATION STRUCTURE
STORM DRAIN INLET
FENCE LINE
WATER LINE
X X X
BOLLARD
MONITORING WELL
HANDHOLE
TELECOM STRUCTURE
LIGHT POLE
EXISTING NEW
DISTURBANCE LIMITS
SEWER LINE
1. THE CONTRACTOR SHALL ADHERE TO JBC INSTALLATION ACCESS, DIG
PERMIT, AND UTILITY FLAGGING COORDINATION PROCEDURES. PROVIDE
ADEQUATE NOTICE TO RELEVANT PARTIES PRIOR TO COMMENCEMENT
OF EXCAVATION OF DEMOLITION. OBTAIN COPY OF APPROVED EROSION
CONTROL PERMIT AND OTHER GRADING AND LAND DISTURBANCE
PERMITS REQUIRED BY JBCHS, NWS.
2. SEE C-501 FOR ALL ADDITIONAL ENVIRONMENTAL REQUIREMENTS FOR
JOINT BASE CHARLESTON WEAPONS (INCLUDING GROUNDWATER
MONITORING WELLS, INVESTIGATIVE-DERIVED WASTE, DEWATERING /
CONTAMINATED GROUNDWATER, AND CONTAMINATED SOIL AND
DISPOSAL).
3. ALL DEMOLITION DEBRIS SHALL BE HAULED OFFSITE AND DISPOSED OF
TO AN APPROVED FACILITY LICENSED AND PERMITTED TO ACCEPT LIKE
MATERIALS, AND FACILITY TO HAVE A STATE APPROVED EROSION
CONTROL PLAN IN PLACE.
4. CONTRACTOR TO VERIFY EXISTING UTILITIES, MATERIALS, SIZES AND
LOCATIONS, AND NOTIFY THE ENGINEER OF RECORD OF ANY
DISCREPANCIES BEFORE ORDERING MATERIALS.
5. CONTRACTOR TO COORDINATE LOCATION/MARKING OF EXISTING SITE
UTILITIES IN AREAS WHERE WORK IS CONDUCTED. THE CONTRACTOR
SHALL ADJUST THE GRADE OF PIPE WORK UP OR DOWN, OR SIDE TO SIDE
TO MISS EXISTING UTILITIES AT NO COST TO THE GOVERNMENT AS
DIRECTED BY THE FIELD ENGINEER.
6. CONTRACTOR SHALL FIELD ADJUST MANHOLE RIMS, FIRE HYDRANTS,
VALVES AND APPURTENANCES TO MATCH FINISHED GROUND
ELEVATIONS.
7. CONTRACTOR SHALL TAKE PRECAUTIONS TO AVOID DAMAGE TO TREES
AND THEIR ROOT SYSTEMS.
8. REFER TO DRAWING C-501 FOR STANDARD SEDIMENT AND EROSION
CONTROL ORDER OF OPERATIONS AND ADDITIONAL INFORMATION. ALL
DISTURBED AREAS TO BE GRASSED PER INSTALLATION REQUIREMENTS
AFTER TRENCHING ACTIVITY HAS BEEN COMPLETED. UPON COMPLETION
OF WORK, RESTORE AREA TO MATCH EXISTING CONDITIONS.
9. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE WORKMANLIKE
REPAIR OF ANY DAMAGE DONE TO ANY NEW AND EXISTING SITE ITEMS IN
THE EXECUTION OF HIS WORK UNDER THIS SECTION.
N
GRAPHIC SCALE
0 30' 60'
SCALE: 1" = 30'
30'
GENERAL NOTES:
AutoCAD SHX Text A/C
AutoCAD SHX Text A/C
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text
EM
AutoCAD SHX Text
TX
AutoCAD SHX Text
TX
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text
WESTERN PARKING LOT
AutoCAD SHX Text
EASTERN PARKING LOT
AutoCAD SHX Text
A/E SEAL
AutoCAD SHX Text W
AutoCAD SHX Text C
AutoCAD SHX Text M
AutoCAD SHX Text H
TX
D
D R
C H
K
B
Y
A P P R O V E D
B Y
D A
T E
D A
T E
D A
T E
D A
T E
F O
R
J O
I N
T
B
A S
E
C
H A
R L
E S
T O
N
J O
I N
T
B
A S
E
C
H A
R L E
S T
O N
AI
R
MO
BI
LIT
Y
CO
MM
AN
D
DE
PA
RT
ME
NT
O
F
DE
FE
NS
E W
E A
P O
A
T I O
N
S
O U
R
O L I N
A
DRAWING SIZE: ANSI D (22"x34")
PROJECT NO.
RECORD DRAWING DATE
SHEET
IF SHEET IS LESS THAN 22"x34" (ANSI D) IT IS A REDUCED PRINT, SCALE ACCORDINGLY.
OF
320-C Midland Parkway, Summerville, SC, 29485
ENGINEERING | ARCHITECTURE
CEMS Project No: 15154C Project Manager: C. Hinson
300 N. 3rd St., Suite 110, Wilmington, NC, 28401
843.875.3637
252.649.0334
G
E W
BAIR AS
IN628TH
IRA D
MANCOM
MO
IT Y
BIL
IRA D
MANCOM
MO
IT Y
BIL
D K
R E
P A
T
I V
E
V
E H
I C
R
R I E
R
P
O S
T
DKGV 13-2150
07-21-2017
D R
A W
I N
G
R
E V
I S
I O
N S
R E
V
D E
S C
R I P
T I O
N P
R E
P
B
Y D
A T
E A
P P
R D
N
E M
E M
J R
C
R W
P
R W
P
S T
A G
I N
G
A
R E
A
A
U
L
R
O U
T E
CG104
MATERIAL LAYDOWN, STAGING & WORK TRAILER LOCATION
DISTURBANCE LIMITS: 7,000 SF MAX
(APPROXIMATELY 175'x40', ENCLOSE WITH SILT FENCING)
RESTORE TO MATCH EXISTING CONDITIONS DURING
PROJECT CLOSEOUT
HAUL ROUTE, INBOUND AND OUTBOUND
CONSTRUCTION TRAFFIC
LEGEND:
NEW
SILT FENCE
DISTURBANCE LIMITS
PROVIDE DEDICATED ENTRY AND EXIT GRAVEL
CONSTRUCTION ENTRANCES, SEE DRAWING C-502
STAGING AREA AND HAUL ROUTE
SCALE: NOT TO SCALE
PROVIDE CONCRETE WASHOUT AREA,
SEE DRAWING C-501
1. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN
PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR
PERMANENTLY CEASED, BUT IN NO CASE MORE FOURTEEN (14) DAYS AFTER WORK
HAS CEASED, EXCEPT AS STATED BELOW.
· WHERE STABILIZATION BY THE 14TH DAY IS PRECLUDED BY SNOW COVER OR
FROZEN GROUND CONDITIONS STABILIZATION MEASURES MUST BE INITIATED AS
SOON AS PRACTICABLE.
· WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY
CEASED, AND EARTH-DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 14
DAYS, TEMPORARY STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON
THAT PORTION OF THE SITE.
2. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY
CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATION INDICATES THAT
A BMP HAS BEEN INAPPROPRIATELY, OR INCORRECTLY, THE PERMITTEE MUST
ADDRESS THE NECESSARY REPLACEMENT OR MODIFICATION REQUIRED TO CORRECT
THE BMP WITHIN 48 HOURS OF IDENTIFICATION.
3. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO
CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS
SHALL BE CLEANED, GRADED AND STABILIZED WITH GRASSING IMMEDIATELY AFTER
THE UTILITY INSTALLATION. FILL, COVER, AND TEMPORARY SEEDING AT THE END OF
EACH DAY ARE RECOMMENDED. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE
WATER SHOULD BE FILTERED TO REMOVE ANY SEDIMENTS BEFORE BEING PUMPED
BACK INTO THE WATERS OF THE STATE.
4. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL
PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION
ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL
CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO
CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL
DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS
STABILIZED.
5. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF
MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE GENERATION
OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS
MAY BE REQUIRED.
6. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS AND BUILDING PRODUCTS WITH
SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED
LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM
WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM
WATER DISCHARGES.
7. A COPY OF THE SWPPP, INSPECTIONS RECORDS, AND RAINFALL DATA MUST BE
RETAINED AT THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILY ACCESSIBLE
DURING NORMAL BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OF
CONSTRUCTION ACTIVITIES TO THE DATE THAT FINAL STABILIZATION IS REACHED.
8. INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR
GREATER) WHERE LAND-DISTURBING ACTIVITIES HAVE PERMANENTLY OR
TEMPORARILY CEASED, AND WILL NOT RESUME FOR A PERIOD OF 7 CALENDAR DAYS.
9. MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL.
10. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING,
WHEEL WASH WATER, AND OTHER WASH WATERS. WASH WATERS MUST BE TREATED
IN A SEDIMENT BASIN OR ALTERNATIVE CONTROL THAT PROVIDES EQUIVALENT OR
BETTER TREATMENT PRIOR TO DISCHARGE;
11. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND
EXCAVATED AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGH APPROPRIATE
BMPS (SEDIMENT BASIN, FILTER BAG, ETC.).
12. THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED:
· WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN
APPROPRIATE CONTROL;
· WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM
RELEASE OILS, CURING
· COMPOUNDS AND OTHER CONSTRUCTION MATERIALS;
· FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT
OPERATION AND
· MAINTENANCE; AND
· SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING.
13. AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A
MINIMUM OF AT LEAST ONCE EVERY CALENDAR WEEK AND MUST BE CONDUCTED
UNTIL FINAL STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION SITE.
14. IF EXISTING BMPS NEED TO BE MODIFIED OR IF ADDITIONAL BMPS ARE NECESSARY TO
COMPLY WITH THE REQUIREMENTS OF THIS PERMIT AND/OR SC’S WATER QUALITY
STANDARDS, IMPLEMENTATION MUST BE COMPLETED BEFORE THE NEXT STORM
EVENT WHENEVER PRACTICABLE. IF IMPLEMENTATION BEFORE THE NEXT STORM
EVENT IS IMPRACTICABLE, THE SITUATION MUST BE DOCUMENTED IN THE SWPPP AND
ALTERNATIVE BMPS MUST BE IMPLEMENTED AS SOON AS REASONABLY POSSIBLE.
15. A PRE-CONSTRUCTION CONFERENCE MUST BE HELD FOR EACH CONSTRUCTION SITE
WITH AN APPROVED ON-SITE SWPPP PRIOR TO THE IMPLEMENTATION OF
CONSTRUCTION ACTIVITIES. FOR NON-LINEAR PROJECTS THAT DISTURB 10 ACRES OR
MORE THIS CONFERENCE MUST BE HELD ON-SITE UNLESS THE DEPARTMENT HAS
APPROVED OTHERWISE.
SCDHEC STANDARD NOTES:
ENVIRONMENTAL REQUIREMENTS FOR JOINT BASE CHARLESTON:
1. GROUNDWATER MONITORING WELLS
SEVERAL MONITORING WELLS ARE LOCATED NEAR OR WITHIN THE PROPOSED PROJECT AREA AT JOINT BASE
CHARLESTON WEAPONS (JBCHS WEAPONS). EVERY EFFORT SHOULD BE MADE TO PROTECT THE INTEGRITY OF THESE
MONITORING WELLS, AS THEY ARE CURRENTLY BEING USED TO MONITOR THE EFFECTIVENESS OF REMEDIATION
EFFORTS. SEE SITE MAPS PROVIDED FOR WELL LOCATIONS.
ANY WELLS DAMAGED OR DESTROYED DURING THE PROJECT MUST BE REPAIRED OR REPLACED. COORDINATION FOR
PROPER ABANDONMENT AND RE-INSTALLATION SHOULD BE WITH THE RESTORATION PROGRAM MANAGER (RPM), MR.
HAYES PATTERSON AT 843-963-2708 (HAYES.PATTERSON@US.AF.MIL) AND SOUTH CAROLINA DEPARTMENT OF HEALTH
AND ENVIRONMENTAL (SCDHEC) BUREAU OF LAND AND WASTE MANAGEMENT, EITHER THE DIVISION OF WASTE
MANAGEMENT, DEPARTMENT OF DEFENSE CORRECTIVE ACTION OR THE UNDERGROUND STORAGE TANK MANAGEMENT
DIVISION, CORRECTIVE ACTION SECTION, DEPENDING ON THE TYPE OF WELL. NOTE THAT SUCH COORDINATION IS NOT
WITH THE SCDHEC BUREAU OF WATER. WELL REPAIR, ABANDONMENT AND REPLACEMENT ARE THE RESPONSIBILITY OF
THE CONTRACTOR.
IF A WELL IS ABANDONED AND RE-INSTALLED A REGISTERED LAND SURVEYOR MUST SURVEY THE GROUND SURFACE, TOP OF CASING, AND TOP OF CONCRETE WELL PAD, AND PROVIDE THIS INFORMATION TO THE JBCHS WEAPONS RPM.
VERTICAL ELEVATIONS NEED TO BE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM 1988 (NAVD 88), U.S.
SURVEY FEET AND HORIZONTAL LOCATIONS (NORTHINGS AND EASTINGS) SHOULD BE REFERENCED TO UNIVERSAL
TRANSVERSE MERCATOR COORDINATES ZONE 17 NORTH.
ADDITIONALLY, A SC-CERTIFIED WELL DRILLER MUST BE USED FOR ALL WELLS THAT ARE ABANDONED OR RE-INSTALLED, AND A SCDHEC FORM 1903 (WATER WELL RECORD FORM) MUST BE PREPARED BY THE WELL DRILLER AND SUBMITTED TO
THE PROPER SCDHEC SECTION ABOVE (I.E. NOT THE BUREAU OF WATER) AND A COPY TO THE JBCHS WEAPONS RPM. IF
NECESSARY, ANY RE-INSTALLED MONITORING WELL(S) MUST BE PROPERLY DEVELOPED BY PUMPING UNTIL
GROUNDWATER IS CLEAR OF VISIBLE SEDIMENTS AND FIELD PARAMETER MEASUREMENTS ARE STABILIZED (PH VARIES
TO WITHIN 0.1 STANDARD UNITS, SPECIFIC CONDUCTIVITY VARIES TO WITHIN 10%, AND TEMPERATURE IS CONSTANT FOR
AT LEAST THREE CONSECUTIVE MEASUREMENTS). ALL FIELD DOCUMENTATION, INCLUDING THE DEVELOPMENT LOGS
AND WATER WELL RECORD FORMS, MUST BE PROVIDED TO THE JBCHS WEAPONS RPM.
2. CONTAMINATED SOIL
SOIL AT THE PROPOSED SITE IS CONTAMINATED. THE QUANTITY OF SOIL TO BE REMOVED FROM THE SITE HAS YET TO BE
DETERMINED. ANY SOIL TO BE REMOVED FROM THE SITE SHOULD BE EXCAVATED, CONTAINED IN 55-GALLON DRUMS OR
PLASTIC-LINED ROLL-OFF BINS, COVERED, LABELED WITH HOLD PENDING ANALYSIS STICKERS, AND STORED ON BASE
UNTIL THE SOIL HAS BEEN SAMPLED AND CHARACTERIZED. A COMPOSITE SOIL SAMPLE SHOULD BE COLLECTED FROM
EVERY ROLL-OFF BIN (OR ONE COMPOSITE SAMPLE FROM EVERY FIVE 55-GALLON DRUMS) AND ANALYZED FOR VOCS BY
METHOD 8260B AND TCLP METALS. ONCE CHARACTERIZED, THE APPROPRIATE LABEL(S) SHOULD BE PLACED ON THE
STORAGE CONTAINERS. ANY SOIL EXCAVATED AT THE SITE SHOULD BE PROPERLY DISPOSED OFF-BASE AND MUST BE
COORDINATED THROUGH MR. TOMMY HARDIN AT 843-963-2727. AFTER THE DATA IS EVALUATED, THE WASTE HAS BEEN
CHARACTERIZED, AND A WASTE STREAM CHARACTERIZATION PROCESS DOCUMENT (WSCPD) FOR CONTRACTORS HAS
BEEN PREPARED, THE WSCPD FORM MUST BE SIGNED BY MR. HAYES PATTERSON AT 843-963-2708
(HAYES.PATTERSON@US.AF.MIL) AND ALL THE INFORMATION MUST BE PROVIDED TO MR. TOMMY HARDIN AT
843-963-2727), WELL IN ADVANCE OF SHIPMENT AND PRIOR TO DISPOSAL. MR. HARDIN OR MR. PATTERSON WILL PROVIDE
THE CONTRACTOR A WASTE STREAM CHARACTERIZATION PROCESS DOCUMENT FORM. MR. HARDIN MUST SIGN THE
WASTE MANIFEST PRIOR TO OFF-BASE TRANSPORTATION AND DISPOSAL. THE SAME DISPOSAL PROCEDURES AND
COORDINATION MUST BE ADHERED TO FOR CONTAMINATED GROUNDWATER AS FOR CONTAMINATED SOIL.
2. COASTAL SEEDING SPECIFICATIONS
3. EROSION CONTROL PLAN
1. GENERAL
A. INSTALL PERMANENT VEGETATIVE COVER AND THE LONG-TERM EROSION PROTECTION MEASURES OR
STRUCTURES AS SOON AS PRACTICAL IN THE DEVELOPMENT PROCESS.
B. PROVIDE FOR HANDLING THE INCREASED RUNOFF CAUSED BY CHANGED SOIL AND SURFACE
CONDITIONS. USE EFFECTIVE MEANS TO CONSERVE EXISTING ON-SITE SOIL INCLUDING THE USE OF
DIVERSION DITCHES, GRASSED WATERWAYS AND STORM SEWERS.
C. PLACE SILT FENCE BARRIERS AT LOCATIONS SHOWN ON PLAN. SILT BARRIERS SHALL BE MAINTAINED IN
PLACE AND IN GOOD CONDITION UNTIL GROUND COVER IS ESTABLISHED.
D. ALL DISTURBED AREAS NOT PAVED SHALL BE GRASSED. USE TEMPORARY PLANT COVER, MULCHING, AND/OR STRUCTURES TO CONTROL RUNOFF AND PROTECT AREAS SUBJECT TO EROSION DURING
CONSTRUCTION.
E. CONTRACTOR SHALL PROVIDE DUMPSTER OF SUFFICIENT SIZE AND NUMBER TO CONTAIN THE SOLID
WASTE GENERATED BY THE PROJECT.
F. CONTRACTOR SHALL FREQUENTLY REMOVE GARBAGE TO MAINTAIN A CLEAN CONSTRUCTION SITE AND
MINIMIZE THE EXPOSURE OF WASTE TO STORM WATER.
PERMANENT SEEDING:
“COOL SEASON”: PLANTED BETWEEN 1 SEPTEMBER AND FEBRUARY 28
SPECIES RATE
HULLED BERMUDA 44 LBS./AC.
UNHULLED BERMUDA 44 LBS./AC.
CENTIPEDE 22 LBS./AC.
“WARM SEASON”: PLANTED BETWEEN 1 MARCH AND 15 AUGUST
SPECIES RATE
SERICEA LESPEDEZA (CLAY SOILS) 44 LBS./AC.
WEEPING LOVE GRASS (SANDY SOILS) 44 LBS./AC.
CENTIPEDE 22 LBS./AC.
TEMPORARY SEEDING:
RECOMMENDED “COOL SEASON” ONLY: PLANTED BETWEEN 1 SEPTEMBER AND 3 MARCH
SPECIES RATE
RYE GRAIN 56 LBS./AC.
RYEGRASS 50 LBS./AC.
A. ALL AREAS WHICH ARE DISTURBED BY THE CONTRACTOR SHALL BE SEEDED.
B. WHEN THE PIPE TRENCH APPROACHES A STREAM, INSTALL A CHECK DAM OR DO NOT
COMPLETELY EXCAVATE THE TRENCH UNTIL PIPE INSTALLATION WILL IMMEDIATELY
FOLLOW TO PREVENT UNOBSTRUCTED FLOW FROM THE TRENCH TO THE STREAM.
C. PROVIDE A DOUBLE ROW OF SILT FENCE IN ALL AREAS WHERE A 50' BUFFER CAN'T BE
MAINTAINED BETWEEN THE DISTURBED AREA AND THE WETLANDS. A 10' BUFFER SHALL
BE LEFT WITH THE WETLANDS AND SILT FENCE.
SEDIMENT AND EROSION CONTROL NOTES
D S
D R
C H
K
B
Y
A P P R O V E D
B Y
D A
T E
D A
T E
D A
T E
D A
T E
F O
R
J O
I N
T
B
A S
E
C
H A
R L
E S
T O
N
J O
I N
T
B
A S
E
C
H A
R L E
S T
O N
AI
R
MO
BI
LIT
Y
CO
MM
AN
D
DE
PA
RT
ME
NT
O
F
DE
FE
NS
E W
E A
P O
A
T I O
N
S
O U
R
O L I N
A
DRAWING SIZE: ANSI D (22"x34")
PROJECT NO.
RECORD DRAWING DATE
SHEET
IF SHEET IS LESS THAN 22"x34" (ANSI D) IT IS A REDUCED PRINT, SCALE ACCORDINGLY.
OF
320-C Midland Parkway, Summerville, SC, 29485
ENGINEERING | ARCHITECTURE
CEMS Project No: 15154C Project Manager: C. Hinson
300 N. 3rd St., Suite 110, Wilmington, NC, 28401
843.875.3637
252.649.0334
G
E W
BAIR AS
IN628TH
IRA D
MANCOM
MO
IT Y
BIL
IRA D
MANCOM
MO
IT Y
BIL
D K
R E
P A
T
I V
E
V
E H
I C
R
R I E
R
P
O S
T
DKGV 13-2150
07-21-2017
D R
A W
I N
G
R
E V
I S
I O
N S
R E
V
D E
S C
R I P
T I O
N P
R E
P
B
Y D
A T
E A
P P
R D
E M
E M
J R
C
R W
P
R W
P
C I V
T
A I L
S
C-501
1. CONCRETE TRUCKS SHOULD NOT TYPICALLY BE WASHED ON SITE. HOWEVER, IF THIS DOES NEED TO OCCUR THE
FOLLOWING BMPS SHOULD BE USED.
2. TEMPORARY CONCRETE WASHOUT FACILITIES SHOULD BE LOCATED A MINIMUM OF 50 FEET FROM STORM DRAIN
INLETS, OPEN DRAINAGE FACILITIES, AND WATERCOURSES, UNLESS DETERMINED INFEASIBLE BY THE ENGINEER OR
CRM. EACH FACILITY SHOULD BE LOCATED AWAY FROM CONSTRUCTION TRAFFIC OR ACCESS AREAS TO PREVENT
DISTURBANCE OR TRACKING.
3. INSTALL A SIGN ADJACENT TO EACH WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT OPERATORS TO UTILIZE
THE PROPER FACILITIES.
4. TEMPORARY CONCRETE WASHOUT FACILITIES SHOULD BE CONSTRUCTED ABOVE GRADE OR BELOW GRADE AT THE
OPTION OF THE CONTRACTOR. TEMPORARY CONCRETE WASHOUT FACILITIES SHOULD BE CONSTRUCTED AND
MAINTAINED IN SUFFICIENT QUANTITY AND SIZE TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY
WASHOUT OPERATIONS.
5. TEMPORARY WASHOUT FACILITIES SHOULD HAVE A TEMPORARY PIT OR BERMED AREAS OF SUFFICIENT VOLUME TO
COMPLETELY CONTAIN ALL LIQUID AND WASTE CONCRETE MATERIALS GENERATED DURING WASHOUT
PROCEDURES.
6. PERFORM WASHOUT OF CONCRETE MIXER TRUCKS IN DESIGNATED AREAS ONLY. WASHOUT MAY BE COLLECTED IN
AN IMPERMEABLE BAG FOR DISPOSAL. SEE ALSO CONCRETE TRUCK WASHOUT.
7. ONCE CONCRETE WASTES ARE WASHED INTO THE DESIGNATED AREA AND ALLOWED TO HARDEN, THE CONCRETE
SHOULD BE BROKEN UP, REMOVED, AND DISPOSED OF PER SOLID WASTE MANAGEMENT.
WASHOUT INSTALLATION NOTES:
1. THE ENGINEER OR CRM SHOULD MONITOR ON SITE CONCRETE WASTE STORAGE AND DISPOSAL PROCEDURES AT
LEAST WEEKLY.
2. THE ENGINEER OR CRM SHOULD MONITOR CONCRETE WORKING TASKS, SUCH AS SAW CUTTING, CORING, GRINDING
AND GROOVING DAILY TO ENSURE PROPER METHODS ARE EMPLOYED.
3. TEMPORARY CONCRETE WASHOUT FACILITIES SHOULD BE MAINTAINED TO PROVIDE ADEQUATE HOLDING CAPACITY
WITH A MINIMUM FREEBOARD OF 4-INCHES FOR ABOVE GRADE FACILITIES AND 12-INCHES FOR BELOW GRADE
FACILITIES. MAINTAINING TEMPORARY CONCRETE WASHOUT FACILITIES SHOULD INCLUDE REMOVING AND
DISPOSING OF HARDENED CONCRETE AND RETURNING THE FACILITIES TO A FUNCTIONAL CONDITION.
4. EXISTING FACILITIES SHOULD BE CLEANED, OR NEW FACILITIES SHOULD BE CONSTRUCTED AND READY FOR USE
ONCE THE WASHOUT IS 75% FULL.
5. TEMPORARY CONCRETE WASHOUT FACILITIES SHOULD BE INSPECTED FOR DAMAGE (I.E., TEARS IN PVC LINER, MISSING SANDBAGS, ETC.). DAMAGED FACILITIES SHOULD BE REPAIRED IMMEDIATELY.
WASHOUT MAINTENANCE NOTES:
CONCRETE WASHOUT AREA
SCALE: NOT TO SCALE
AutoCAD SHX Text
A/E SEAL
AutoCAD SHX Text 10'
AutoCAD SHX Text 15'
AutoCAD SHX Text %%uABOVE GRADE (PLAN VIEW)
AutoCAD SHX Text %%uSECTION B-B
AutoCAD SHX Text
STAKE (TYP.)
AutoCAD SHX Text TWO-STACKED 2 x 12 ROUGH WOOD FRAME
AutoCAD SHX Text
10 MIL PLASTIC LINING
AutoCAD SHX Text
10 MIL PLASTIC LINING
AutoCAD SHX Text
WOOD FRAME SECURELY FASTENED WITH TWO STAKES
AutoCAD SHX Text B
AutoCAD SHX Text B
NOTE: OR SIMILAR BASED ON THE SCDHEC BMP GUIDEBOOK
SCALE: NOT TO SCALE
SILT FENCE INSTALLATION
SCALE: NOT TO SCALE
FLAT BOTTOM TRENCH DETAIL
M
A
X
I
M
U
M
A
C
I
FILTER FABRIC
BACKFILL TRENCH WITH
COMPACTED EARTH
COMPACTED EARTH
COMPACTED EARTH
FILTER FABRIC
6"
6"
24" (MINIMUM)
24" (MINIMUM)
6"
R
U
N
O
F
F
RUNOFF
RUNOFF
18-IN. TO 24-IN.
BURY FABRIC
USE EITHER FLAT-BOTTOM OR
V-BOTTOM TRENCH SEE DETAILS
FILTER
FABRIC
BURY FILTER FABRIC AT LEAST 12"
1.25 LB./LINEAR FT.
STEEL POSTS
HEAVY DUTY
PLASTIC TIE FOR
STEEL POSTS
(RESTRICT TO
TOP 8-INCHES
OF FABRIC)
18" - 24"
SILT FENCE - GENERAL NOTES
1. DO NOT PLACE SILT FENCE ACROSS CHANNELS OR IN OTHER AREAS SUBJECT
TO CONCENTRATED FLOWS. SILT FENCE SHOULD NOT BE USED AS A VELOCITY
CONTROL BMP. CONCENTRATED FLOWS ARE ANY FLOWS GREATER THAN 0.5
CFS.
2. MAXIMUM SHEET OR OVERLAND FLOW PATH LENGTH TO THE SILT FENCE SHALL
BE 100-FEET.
3. MAXIMUM SLOPE STEEPNESS (NORMAL [PERPENDICULAR] TO THE FENCE LINE)
SHALL BE 2:1.
4. SILT FENCE JOINTS, WHEN NECESSARY, SHALL BE COMPLETED BY ONE OF THE
FOLLOWING OPTIONS: WRAP EACH FABRIC TOGETHER AT A SUPPORT POST
WITH BOTH ENDS FASTENED TO THE POST, WITH A 1-FOOT MINIMUM OVERLAP;
- OVERLAP SILT FENCE BY INSTALLING 3-FEET PASSED THE SUPPORT POST TO
WHICH THE NEW SILT FENCE ROLL IS ATTACHED. ATTACH OLD ROLL TO NEW
ROLL WITH HEAVY-DUTY PLASTIC TIES; OR,
- OVERLAP ENTIRE WIDTH OF EACH SILT FENCE ROLL FROM ONE SUPPORT POST
TO THE NEXT SUPPORT POST.
5. ATTACH FILTER FABRIC TO THE STEEL POSTS USING HEAVY-DUTY PLASTIC TIES
THAT ARE EVENLY SPACED WITHIN THE TOP 8-INCHES OF THE FABRIC.
4. INSTALL THE SILT FENCE PERPENDICULAR TO THE DIRECTION OF THE
STORMWATER FLOW AND PLACE THE SILT FENCE THE PROPER DISTANCE FROM
THE TOE OF STEEP SLOPES TO PROVIDE SEDIMENT STORAGE AND ACCESS FOR
MAINTENANCE AND CLEANOUT.
5. INSTALL SILT FENCE CHECKS (TIE-BACKS) EVERY 50-100 FEET, DEPENDENT ON
SLOPE, ALONG SILT FENCE THAT IS INSTALLED WITH SLOPE AND WHERE
CONCENTRATED FLOWS ARE EXPECTED OR ARE DOCUMENTED ALONG THE
PROPOSED/INSTALLED SILT FENCE.
HEAVY DUTY PLASTIC TIES
FILTER FABRIC
HEAVY DUTY PLASTIC TIES
PLAN SYMBOL
SILT FENCE - POST REQUIREMENTS
1. SILT FENCE POSTS MUST BE 48-INCH LONG STEEL POSTS THAT MEET, AT A
MINIMUM, THE FOLLOWING PHYSICAL CHARACTERISTICS.
- COMPOSED OF A HIGH STRENGTH STEEL WITH A MINIMUM YIELD STRENGTH OF
50,000 PSI.
- INCLUDE A STANDARD "T" SECTION WITH A NOMINAL FACE WIDTH OF
1.38-INCHES AND A NOMINAL "T" LENGTH OF 1.48-INCHES.
- WEIGH 1.25 POUNDS PER FOOT (± 8%)
2. POSTS SHALL BE EQUIPPED WITH PROJECTIONS TO AID IN FASTENING OF FILTER
FABRIC.
3. STEEL POSTS MAY NEED TO HAVE A METAL SOIL STABILIZATION PLATE WELDED
NEAR THE BOTTOM WHEN INSTALLED ALONG STEEP SLOPES OR INSTALLED IN
LOOSE SOILS. THE PLATE SHOULD HAVE A MINIMUM CROSS SECTION OF
17-SQUARE INCHES AND BE COMPOSED OF 15 GAUGE STEEL, AT A MINIMUM. THE
METAL SOIL STABILIZATION PLATE SHOULD BE COMPLETELY BURIED.
4. INSTALL POSTS TO A MINIMUM OF 24-INCHES. A MINIMUM HEIGHT OF 1- TO 2-
INCHES ABOVE THE FABRIC SHALL BE MAINTAINED, AND A MAXIMUM HEIGHT OF
3 FEET SHALL BE MAINTAINED ABOVE THE GROUND.
5. POST SPACING SHALL BE AT A MAXIMUM OF 6-FEET ON CENTER.
SILT FENCE - FABRIC REQUIREMENTS
1. SILT FENCE MUST BE COMPOSED OF WOVEN GEOTEXTILE FILTER FABRIC THAT
CONSISTS OF THE FOLLOWING REQUIREMENTS:
- COMPOSED OF FIBERS CONSISTING OF LONG CHAIN SYNTHETIC POLYMERS OF
AT LEAST 85% BY WEIGHT OF POLYOLEFINS, POLYESTERS, OR POLYAMIDES
THAT ARE FORMED INTO A NETWORK SUCH THAT THE FILAMENTS OR YARNS
RETAIN DIMENSIONAL STABILITY RELATIVE TO EACH OTHER;
- FREE OF ANY TREATMENT OR COATING WHICH MIGHT ADVERSELY ALTER ITS
PHYSICAL PROPERTIES AFTER INSTALLATION;
- FREE OF ANY DEFECTS OR FLAWS THAT SIGNIFICANTLY AFFECT ITS PHYSICAL
AND/OR FILTERING PROPERTIES; AND,
- HAVE A MINIMUM WIDTH OF 36-INCHES.
2. USE ONLY FABRIC APPEARING ON SC DOT'S QUALIFIED PRODUCTS LISTING
(QPL), APPROVAL SHEET #34, MEETING THE REQUIREMENTS OF THE MOST
CURRENT EDITION OF THE SC DOT STANDARD SPECIFICATIONS FOR HIGHWAY
CONSTRUCTION.
3. 12-INCHES OF THE FABRIC SHOULD BE PLACED WITHIN EXCAVATED TRENCH
AND TOED IN WHEN THE TRENCH IS BACKFILLED.
4. FILTER FABRIC SHALL BE PURCHASED IN CONTINUOUS ROLLS AND CUT TO
THE LENGTH OF THE BARRIER TO AVOID JOINTS.
5. FILTER FABRIC SHALL BE INSTALLED AT A MINIMUM OF 24-INCHES ABOVE THE
GROUND.
1. THE KEY TO FUNCTIONAL SILT FENCE IS WEEKLY INSPECTIONS, ROUTINE
MAINTENANCE, AND REGULAR SEDIMENT REMOVAL.
2. REGULAR INSPECTIONS OF SILT FENCE SHALL BE CONDUCTED ONCE EVERY
CALENDAR WEEK AND, AS RECOMMENDED, WITHIN 24-HOURS AFTER EACH
RAINFALL EVEN THAT PRODUCES 1/2-INCH OR MORE OF PRECIPITATION.
3. ATTENTION TO SEDIMENT ACCUMULATIONS ALONG THE SILT FENCE IS
EXTREMELY IMPORTANT. ACCUMULATED SEDIMENT SHOULD BE CONTINUALLY
MONITORED AND REMOVED WHEN NECESSARY.
4. REMOVE ACCUMULATED SEDIMENT WHEN IT REACHES 1/3 THE HEIGHT OF THE
SILT FENCE.
5. REMOVED SEDIMENT SHALL BE PLACED IN STOCKPILE STORAGE AREAS OR
SPREAD THINLY ACROSS DISTURBED AREA. STABILIZE THE REMOVED SEDIMENT
AFTER IT IS RELOCATED.
6. CHECK FOR AREAS WHERE STORMWATER RUNOFF HAS ERODED A CHANNEL
BENEATH THE SILT FENCE, OR WHERE THE FENCE HAS SAGGED OR COLLAPSED
DUE TO RUNOFF OVERTOPPING THE SILT FENCE. INSTALL CHECKS/TIE-BACKS
AND/OR REINSTALL SILT FENCE, AS NECESSARY.
7. CHECK FOR TEARS WITHIN THE SILT FENCE, AREAS WHERE SILT FENCE HAS
BEGUN TO DECOMPOSE, AND FOR ANY OTHER CIRCUMSTANCE THAT MAY
RENDER THE SILT FENCE INEFFECTIVE. REMOVED DAMAGED SILT FENCE AND
REINSTALL NEW SILT FENCE IMMEDIATELY.
8. SILT FENCE SHOULD BE REMOVED WITHIN 30 DAYS AFTER FINAL STABILIZATION
IS ACHIEVED AND ONCE IT IS REMOVED, THE RESULTING DISTURBED AREA SHALL
BE PERMANENTLY
STABILIZED.
SILT FENCE - INSPECTION & MAINTENANCE
SCALE: NOT TO SCALE
V-SHAPED TRENCH DETAIL
D S
D R
C H
K
B
Y
A P P R O V E D
B Y
D A
T E
D A
T E
D A
T E
D A
T E
F O
R
J O
I N
T
B
A S
E
C
H A
R L
E S
T O
N
J O
I N
T
B
A S
E
C
H A
R L E
S T
O N
AI
R
MO
BI
LIT
Y
CO
MM
AN
D
DE
PA
RT
ME
NT
O
F
DE
FE
NS
E W
E A
P O
A
T I O
N
S
O U
R
O L I N
A
DRAWING SIZE: ANSI D (22"x34")
PROJECT NO.
RECORD DRAWING DATE
SHEET
IF SHEET IS LESS THAN 22"x34" (ANSI D) IT IS A REDUCED PRINT, SCALE ACCORDINGLY.
OF
320-C Midland Parkway, Summerville, SC, 29485
ENGINEERING | ARCHITECTURE
CEMS Project No: 15154C Project Manager: C. Hinson
300 N. 3rd St., Suite 110, Wilmington, NC, 28401
843.875.3637
252.649.0334
G
E W
BAIR AS
IN628TH
IRA D
MANCOM
MO
IT Y
BIL
IRA D
MANCOM
MO
IT Y
BIL
D K
R E
P A
T
I V
E
V
E H
I C
R
R I E
R
P
O S
T
DKGV 13-2150
07-21-2017
D R
A W
I N
G
R
E V
I S
I O
N S
R E
V
D E
S C
R I P
T I O
N P
R E
P
B
Y D
A T
E A
P P
R D
E M
E M
J R
C
R W
P
R W
P
C I V
T
A I L
S
C-502
SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION: LIST OF QUALIFIED PROVIDERS
OF SILT FENCING / LOW FLOW DROP INLET PROTECTION GEOTEXTILE FABRICS
COASTAL SITE SUPPLY, INC.
P O BOX 60988
NORTH CHARLESTON, SC 29419
877-744-9747
FAX: 843-744-9750
ATTN: BILLY DENSON
PROTECH ENVIRONMENTAL SUPPLY
1500 CONTINENTAL BLVD., SUITE C/F
CHARLOTTE, NC 28273
(704)676-9788
FAX: (704)676-9791
ATTN: MITCH PERKINS
WILLACOOCHEE INDUSTRIAL FABRICS
P. O. BOX 599
HIGHWAY 82 WEST
WILLACOOCHEE, GA 31650
(912) 534-5757
FAX: (912) 534-5533
PROPEX, INC.
P O BOX 22788
6025 LEE HIGHWAY, SUITE 425
CHATTANOOGA, TN 37422
(800)621-1273
FAX: (423)899-7619
WWW.GEOTEXTILE.COM
ACF ENVIRONMENTAL
2831 CARDWELL ROAD
RICHMOND, VA 23234
(800)448-3636
FAX: (804)743-7779
WWW.ACFENVIRONMENTAL.COM
DDD EROSION CONTROL, INC.
P O BOX 694
1383 INDUSTRIAL DRIVE
ASHBURN, GA 31714
(229) 567-0751
FAX: (229) 567-0752
EMAIL: DDDEROSION@WINDSTREAM.NET
WWW.3DEROSION.COM
ATTN: DON DAVIS
BELTON INDUSTRIES, INC.
PO BOX 127 (2) STYLE 941
BELTON, SC 29627 (3) STYLE 945
(864) 338-5711
ATTN: MR. DAVID GALLOWAY
THRACE-LINQ
2550 WEST FIFTH NORTH ST.
SUMMERVILLE, SC 29483-9699
(803) 875-8280
(800) 445-4675
CONSTRUCTION FABRICS & SUPPLY
1603 JAMES P. ROGERS DRIVE
VALDOSTA, GEORGIA 31601
(229) 244-0004
ATTN: ANGIE ANDERSON OR
JEFF COPPAGE
HANES GEOCOMPONENTS
10800 S. COMMERCE BLVD. #9
SUITE L, CHARLOTTE, NC 28273
(704)588-7626
FAX: (704)588-7972
ATTN: KEITH GREGORY
WWW.HANESGEO.COM
SCALE: NOT TO SCALE
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT
CONSTRUCTION ENTRANCE - GENERAL NOTES
CONSTRUCTION ENTRANCE - INSPECTION & MAINTENANCE
1. STABILIZED CONSTRUCTION ENTRANCES SHOULD BE USED
AT ALL POINTS WHERE TRAFFIC WILL EGRESS/INGRESS A
CONSTRUCTION SITE ONTO A PUBLIC ROAD OR ANY
IMPERVIOUS SURFACES, SUCH AS PARKING LOTS.
2. INSTALL A NON-WOVEN GEOTEXTILE FABRIC PRIOR TO
PLACING ANY STONE.
3. INSTALL A CULVERT PIPE ACROSS THE ENTRANCE WHEN
NEEDED TO PROVIDE POSITIVE DRAINAGE.
4. THE ENTRANCE SHALL CONSIST OF 2-INCH TO 3-INCH D50
STONE PLACED AT A MINIMUM DEPTH OF 6-INCHES.
5. MINIMUM DIMENSIONS OF THE ENTRANCE SHALL BE
15-FEET WIDE BY 20-FEET LONG, AND MAY BE MODIFIED AS
NECESSARY TO ACCOMMODATE SITE CONSTRAINTS.
6. THE EDGES OF THE ENTRANCE SHALL BE TAPERED OUT
TOWARDS THE ROAD TO PREVENT TRACKING AT THE EDGE
OF THE ENTRANCE.
7. DIVERT ALL SURFACE RUNOFF AND DRAINAGE FROM THE
STONE PAD TO A SEDIMENT TRAP OR BASIN OR OTHER
SEDIMENT TRAPPING STRUCTURE.
8. LIMESTONE MAY NOT BE USED FOR THE STONE PAD.
1. THE KEY TO FUNCTIONAL CONSTRUCTION ENTRANCES IS WEEKLY
INSPECTIONS, ROUTINE MAINTENANCE, AND REGULAR SEDIMENT
REMOVAL.
2. REGULAR INSPECTIONS OF CONSTRUCTION ENTRANCES SHALL BE
CONDUCTED ONCE EVERY CALENDAR WEEK AND, AS RECOMMENDED,
WITHIN 24-HOURS AFTER EACH RAINFALL EVEN THAT PRODUCES
1/2-INCH OR MORE OF PRECIPITATION.
3. DURING REGULAR INSPECTIONS, CHECK FOR MUD AND SEDIMENT
BUILDUP AND PAD INTEGRITY. INSPECTION FREQUENCIES MAY NEED TO
BE MORE FREQUENT DURING LONG PERIODS OF WET WEATHER.
4. RESHAPE THE STONE PAD AS NECESSARY FOR DRAINAGE AND RUNOFF
CONTROL.
5. WASH OR REPLACE STONES AS NEEDED AND AS DIRECTED BY SITE
INSPECTOR. THE STONE IN THE ENTRANCE SHOULD BE WASHED OR
REPLACED WHENEVER THE ENTRANCE FAILS TO REDUCE THE AMOUNT
OF MUD BEING CARRIED OFF-SITE BY VEHICLES. FREQUENT WASHING
WILL EXTEND THE USEFUL LIFE OF STONE PAD.
6. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED
ONTO ADJACENT IMPERVIOUS SURFACES BY BRUSHING OR SWEEPING.
FLUSHING SHOULD ONLY BE USED WHEN THE WATER CAN BE
DISCHARGED TO A SEDIMENT TRAP OR BASIN.
7. DURING MAINTENANCE ACTIVITIES, ANY BROKEN PAVEMENT SHOULD BE
REPAIRED IMMEDIATELY.
8. CONSTRUCTION ENTRANCES SHOULD BE REMOVED AFTER THE SITE
HAS REACHED FINAL STABILIZATION. PERMANENT VEGETATION SHOULD
REPLACE AREAS FROM WHICH CONSTRUCTION ENTRANCES HAVE BEEN
REMOVED, UNLESS AREA WILL BE CONVERTED TO AN IMPERVIOUS
SURFACE TO SERVE POST-CONSTRUCTION.
6" MIN.
N
N
UNDERLYING NON-WOVEN GEOTEXTILE FABRIC
ROCK PAD THICKNESS
ROCK PAD WIDTH
ROCK PAD LENGTH
ROCK PAD STONE SIZE
6 INCHES
24 FEET
D50 = 2-3 INCHES
20 FEET
AVERAGE STONE DIAMETER OF
2"-3" WITH A 6" MINIMUM DEPTH
SIZE
SPECIFICATION
AutoCAD SHX Text
SF
AutoCAD SHX Text
SF
D R
C H
K
B
Y
A P P R O V E D
B Y
D A
T E
D A
T E
D A
T E
D A
T E
F O
R
J O
I N
T
B
A S
E
C
H A
R L
E S
T O
N
J O
I N
T
B
A S
E
C
H A
R L E
S T
O N
AI
R
MO
BI
LIT
Y
CO
MM
AN
D
DE
PA
RT
ME
NT
O
F
DE
FE
NS
E W
E A
P O
A
T I O
N
S
O U
R
O L I N
A
DRAWING SIZE: ANSI D (22"x34")
PROJECT NO.
RECORD DRAWING DATE
SHEET
IF SHEET IS LESS THAN 22"x34" (ANSI D) IT IS A REDUCED PRINT, SCALE ACCORDINGLY.
OF
320-C Midland Parkway, Summerville, SC, 29485
ENGINEERING | ARCHITECTURE
CEMS Project No: 15154C Project Manager: C. Hinson
300 N. 3rd St., Suite 110, Wilmington, NC, 28401
843.875.3637
252.649.0334
G
E W
BAIR AS
IN628TH
IRA D
MANCOM
MO
IT Y
BIL
IRA D
MANCOM
MO
IT Y
BIL
D K
R E
P A
T
I V
E
V
E H
I C
R
R I E
R
P
O S
T
DKGV 13-2150
07-21-2017
D R
A W
I N
G
R
E V
I S
I O
N S
R E
V
D E
S C
R I P
T I O
N P
R E
P
B
Y D
A T
E A
P P
R D
E M
E M
J R
C
R W
P
R W
P
C I V
T
A I L
S
C-503
CONCRETE CURB
NOT TO SCALE
PAVEMENT REPLACEMENT DETAIL
SCALE: NOT TO SCALE
DITCH LINE
UTILITY (IF APPLICABLE)
FULL-DEPTH
SAW CUT
SELECTIVE BACKFILL
TAMPED IN 6" LAYERS
TO 95% COMPACTION
PER ASTM D-1557
FINISH GRADE
COMPACTED EARTH
CONCRETE WALK
TOOLED EDGES
SLOPE
2% MAXIMUM
5' WIDTH
V A
R I E
S
5'
CONTRACTION JOINTS
50' MAX. SPACING BETWEEN EXPANSION JOINTS
1/4" EXP. JT.
ASPHALT
SCALE: NOT TO SCALE
XXXXX X X X
CONCRETE SIDEWALK DETAIL
TYPICAL SIDEWALK SECTION
1. ALL SIDEWALKS SHALL BE 4" THICK.
2. CONTRACTION JOINTS SHALL BE 1" DEEP AND EDGED WITH 1/8" RADIUS.
3. EXPANSION MATERIAL 1/2" THICK SHALL BE REQUIRED WHERE SIDEWALK ABUTS
CONCRETE STRUCTURE.
4. CONTRACTION JOINTS SHALL BE SPACED AT 5'-0"
5. SIDEWALKS TO LIGHT BROOM FINISH
6. ALL JOINTS AND EDGES TO BE TOOLED.
7. SIDEWALKS TO BRUSHED AND TOOLED.
1"
PRIME COAT
SCALE: NOT TO SCALE
MINIMUM PAVEMENT SECTION
12" COMPACTED
SUBGRADE 95%
ASTM D-1557
8" STONE BASE
(SCDOT SPEC 305)
3.0" ASPHALTIC CONC.
SURFACE COURSE, APPLY IN 2
(1
") LIFTS (SCDOT SPEC 402)
SCALE: NOT TO SCALE
6x6-W2.0xW2.0 WWF
3/8" DIA. PAN HEAD
MACHINE SCREW W/HEX
NUT & WASHERS
FIBER OR PVC WASHER
SIGN
2'-0"
GALVANIZED 3 LB/FT "U"
CHANNELED POST, PAINTED
JBC DARK BRONZE STD.
SCDOT MINIMUM
REQUIREMENTS FOR
BREAK-AWAY INSTALLATION
M
I N
I M
U
Q
U I R
E D
T
T O
M
O
F
S
I G
N
SIGN PLACEMENT AND ATTACHMENT
SCALE: NOT TO SCALE
PLACE 1
" SURFACE COURSE
OVERLAY AT MILLED
TRANSITION AREA
SEE PAVEMENT
SECTION DETAIL
EXISTING
PAVEMENT
8"
PIPE ZONE
2" MIN.
12" MIN.
6"
MATERIAL
GRANULAR
COMPACTED
CLASS 2 OR 3 BACKFILL TO BE PLACED
IN LAYERS 8" MAX COMPACTED DEPTH
COMPACTED TO A DENSITY REQUIRED
BY SPECIFICATIONS.
CROSS SECTION
SCALE: NOT TO SCALE
STORM PIPE BEDDING
32"
AutoCAD SHX Text
A/E SEAL
AutoCAD SHX Text 16"
AutoCAD SHX Text 6"
AutoCAD SHX Text
CONCRETE CURB
AutoCAD SHX Text
CONCRETE PAVEMENT
AutoCAD SHX Text
6" APPROX.
2'
D R
C H
K
B
Y
A P P R O V E D
B Y
D A
T E
D A
T E
D A
T E
D A
T E
F O
R
J O
I N
T
B
A S
E
C
H A
R L
E S
T O
N
J O
I N
T
B
A S
E
C
H A
R L E
S T
O N
AI
R
MO
BI
LIT
Y
CO
MM
AN
D
DE
PA
RT
ME
NT
O
F
DE
FE
NS
E W
E A
P O
A
T I O
N
S
O U
R
O L I N
A
DRAWING SIZE: ANSI D (22"x34")
PROJECT NO.
RECORD DRAWING DATE
SHEET
IF SHEET IS LESS THAN 22"x34" (ANSI D) IT IS A REDUCED PRINT, SCALE ACCORDINGLY.
OF
320-C Midland Parkway, Summerville, SC, 29485
ENGINEERING | ARCHITECTURE
CEMS Project No: 15154C Project Manager: C. Hinson
300 N. 3rd St., Suite 110, Wilmington, NC, 28401
843.875.3637
252.649.0334
G
E W
BAIR AS
IN628TH
IRA D
MANCOM
MO
IT Y
BIL
IRA D
MANCOM
MO
IT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.