Atch_6_-_2007_SCDOT_Specifications,_Paving_IDIQ.pdf
PDF 3 MB Posted
- Attached to
- Base Paving IDIQ - Joint Base Charleston Federal contract opportunity
- Solicitation number
- FA4418-18-R-0019
About this file
Atch 6 - 2007 SCDOT Specifications, Paving IDIQ
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch_9_-_Price_Schedule,_Paving_IDIQ_28_Aug_2018.xls | XLS spreadsheet | |
| Amendment__1,_18-R-0019_Solicitation_Paving_IDIQ.pdf | ||
| Pre-Prop_Conf_Minutes_-_Paving_IDIQ.pdf | ||
| Pre-Prop_Conf_Sign_In_Sheet_Paving_IDIQ.pdf | ||
| Pre-Prop_Conf_Presentation_-_Paving_IDIQ.pptx | PPTX presentation | |
| OfficialGovtQ&AsPreProConfPavingIDIQ_final.docx | DOCX document | |
| Atch_2_-_SOW_Green_Procurement,_Paving_IDIQ.pdf | ||
| FA441818R0019_Solicitation_Paving_IDIQ.pdf | ||
| Atch_7_-_Green_Procurement_Form,_Paving_IDIQ.pdf | ||
| Atch_5_-_SOW_Statement_of_Work_Specs,_Paving_IDIQ.pdf | ||
| Atch_3_-_SOW_Waste_Mgt,_Paving_IDIQ.pdf | ||
| Atch_1_-_SOW_Environmental,_Paving_IDIQ.pdf | ||
| Atch_9_-_Price_Schedule,_Paving_IDIQ.xls | XLS spreadsheet | |
| Atch_8_-_Wage_Det_SC41,_Paving_IDIQ.pdf | ||
| Atch_4_-_SOW_Temp_Environmental_Controls,_Paving_IDIQ.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD
SPECIFICATIONS
FOR
HIGHWAY
CONSTRUCTION
The South Carolina Department of Transportation 2007 Standard Specifications for Highway Construction is hereby approved for application on highway and related construction contracts as referenced in the Contract and the Plans, and applies as noted and amended by those documents.
Approved, D. R. Shealy, P.E.
Director of Construction
I hereby certify that The South Carolina Department of Transportation 2007 Standard Specifications for Highway Construction was prepared under my direct supervision and that I am a duly registered professional engineer under the laws of the State of South Carolina.
G. A. Peck, P.E.
Construction Specifications Engineer
COPIES OF THIS BOOK MAY BE OBTAINED FROM:
South Carolina Department of Transportation
Engineering Publications Office 955 Park Street
Columbia, South Carolina 29201 Telephone 803-737-4533
Fax 803-737-4530 E-mail: engrpubsales@dot.state.sc.us.
http://www.scdot.org/doing/const_man.shtml
All orders must be prepaid. We accept payment by check, US Postal money order, Visa or Mastercard. Shipping and handling are separate from the price of the book. A street address is required for shipping for tracking purposes.
TABLE OF CONTENTS
i
SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION
2007 STANDARD SPECIFICATIONS
FOR HIGHWAY CONSTRUCTION
DIVISION 100
GENERAL PROVISIONS
SECTION 101
DEFINITIONS AND TERMS
101.1 General
101.2 Abbreviations and Acronyms
101.3 Terms and Definitions
101.3.1 General
101.3.2 Acceleration and Deceleration Lanes
101.3.3 (the) Advertisement
101.3.4 Award
101.3.5 Base Course
101.3.6 Bid Proposal
101.3.7 Bidder
101.3.8 Bridge
101.3.9 Calendar Day
101.3.10 Change Order
101.3.11 Channel
101.3.12 (the) Commission
101.3.13 Construction Estimate
101.3.14 (SCDOT) Construction Manual
101.3.15 (the) Contract
101.3.16 Contract Bond
101.3.17 Contract Item (or Pay Item or Bid Item)
101.3.18 Contract Time
101.3.19 Contract Completion Date
101.3.20 (the) Contractor
101.3.21 (the) County
101.3.22 Crossover
101.3.23 Culvert
101.3.24 (the) Department
101.3.25 (the) Designer (of Record)
101.3.26 (the) Director
101.3.27 (the) Engineer
101.3.28 Engineering District
101.3.29 Equipment
101.3.30 Extension
101.3.31 Extra Work
101.3.32 Force Account Work Order
101.3.33 Highway
101.3.34 (the) Inspector
101.3.35 Laboratory
101.3.36 Letting
101.3.37 Lump Sum
101.3.38 Materials
101.3.39 Median
ii
101.3.40 Optimum Moisture Content for Compaction
101.3.41 Parking Lane
101.3.42 Pavement
101.3.43 Pavement Structure
101.3.44 Payment Bond
101.3.45 Performance and Indemnity Bond
101.3.46 (the) Plans (or Design Plans)
101.3.47 Preconstruction Conference
101.3.48 Prequalification
101.3.49 (the) Project
101.3.50 Proposal (or Contract Proposal)
101.3.51 Proposal Guaranty ( or Bid Bond)
101.3.52 Ramp
101.3.53 Right-of-Way
101.3.54 Road
101.3.55 Roadbed
101.3.56 Roadside
101.3.57 Roadway
101.3.58 SC-T-XXX
101.3.59 SC-M-XXX(MMYY)
101.3.60 Shop Plans
101.3.61 Shoulder
101.3.62 Sidewalk
101.3.63 Skew or Skew Angle
101.3.64 (the) Special Provisions
101.3.65 (the) Specifications
101.3.66 Specified Completion Date
101.3.67 (SCDOT) Standard Drawings
101.3.68 (these) Standard Specifications
101.3.69 (the) State
101.3.70 State Highway Engineer
101.3.71 Street
101.3.72 Structure
101.3.73 Subbase
101.3.74 Subcontractor
101.3.75 Subgrade
101.3.76 Substantial Completion of Work
101.3.77 Substructure
101.3.78 Superintendent
101.3.79 Superstructure
101.3.80 Supplemental Specifications
101.3.81 (the) Surety
101.3.82 Temporary Structure
101.3.83 Traffic Lane
101.3.84 Travelway or Traveled Way
101.3.85 Unit Price
101.3.86 (the) Work
101.3.87 Working Drawings
SECTION 102
BIDDING REQUIREMENTS AND CONDITIONS
102.1 Prequalification
102.2 Proposal
102.3 Interpretation of Quantities
102.4 Examination of Plans, Specifications, Work Site, etc
102.5 Electronic Bidding
102.6 Counterproposals
102.7 Qualifying Letters Prohibited
102.8 Irregular Bids
102.9 Proposal Guaranty
iii
102.10 Withdrawal of Bids
102.11 Public Opening of Bids
102.12 Disqualification of Bidders
SECTION 103
AWARD AND EXECUTION OF CONTRACTS
103.1 Consideration of Proposals
103.2 Award of a Contract
103.3 Cancellation of Award
103.4 Return of Proposal Guaranty
103.5 Bond Requirements
103.6 Execution of the Contract
103.7 Failure to Execute the Contract and Provide Bonds and Insurance Certificates
103.8 Contractor’s Liability Insurance
103.9 Deferral and Cancellation of Contract
103.10 Mobilization
103.11 Measurement and Payment
SECTION 104
SCOPE OF WORK
104.1 Intent of Contract
104.2 Alteration of Plans or Character of Work
104.3 Value Engineering
104.4 Extension of the Contract
104.5 Extra Work
104.6 Detours and Haul Roads
104.7 Maintenance and Maintaining Traffic
104.8 Removal and Disposal of Structures and Obstructions
104.9 Rights In and Use of Materials Found on the Work
104.10 Final Cleaning Up
SECTION 105
CONTROL OF WORK
105.1 Authority of the RCE
105.2 The Design Plans, Shop Plans, and Working Drawings
105.3 Conformity with Plans and Specifications
105.4 Coordination of Plans, Specifications, and Special Provisions
105.5 Cooperation by Contractors
105.6 Cooperation with Utilities
105.7 Cooperation between Contractors
105.8 Construction Stakes, Lines, and Grades
105.8.1 Construction Stakes, Lines, and Grades Partially Provided by the Department
105.8.2 Construction Stakes, Lines, and Grades Provided by the Contractor
105.8.3 Construction Stakes, Lines, and Grades Provided by the Contractor for Bridge(s) Only
105.9 Authority and Duties of the RCE's Representatives
105.10 Inspection of the Work
105.11 Removal of Unacceptable and Unauthorized Work
105.12 Load Restriction
105.13 Failure to Maintain Roadway or Structure
105.14 Termination for Convenience
105.15 Acceptance and Final Inspection
105.15.1 Partial Acceptance
105.15.2 Final Acceptance
105.16 Claims for Adjustment and Disputes
105.16.1 General
105.16.2 Delay Claims
105.16.3 Claims for Acceleration
iv
105.16.4 Other Claims
105.16.5 Recoverable Damages
105.16.6 Non-Recoverable Damages
105.16.7 Required Contents of Claims
105.16.8 Required Certification of Claims
105.16.9 Auditing of Claims
105.16.10 Remedies Exclusive
105.17 General Design Features
SECTION 106
CONTROL OF MATERIAL
106.1 Source of Supply and Quality of Materials
106.2 Local Material Sources
106.3 Samples and Tests
106.4 Plant Inspection
106.5 Field Laboratory
106.6 Storage of Materials
106.7 Handling Materials
106.8 Unacceptable Material
106.9 Material Guaranty
106.10 Material Pit Acquisition and Testing
106.11 Source of Production of Iron and Steel Products
SECTION 107
LEGAL RELATIONS AND RESPONSIBILITY TO PUBLIC
107.1 Laws to be Observed
107.2 Permits, Licenses, and Taxes
107.3 Patented Devices, Materials, and Processes
107.4 Restoration of Surfaces Opened by Permit
107.5 Federal Participation
107.6 Sanitary Health and Safety Provisions
107.7 Air Pollution Control
107.8 Quarantine Regulations
107.9 Public Convenience and Safety
107.10 Construction of Bridges Over or Adjacent to Navigable Waters
107.11 Traffic Control
107.12 Measurement and Payment for Traffic Control
107.13 Correcting Low Shoulder Conditions
107.13.1 Identifying Existing Low Shoulders Before the Commencement of Work
107.13.2 Maintenance of Low Shoulder Signs During the Project
107.13.3 Work Related to Existing Low Shoulders
107.13.4 Correction of Low Shoulders Created by Resurfacing
107.14 Railway/Highway Provisions
107.15 Use of Explosives
107.16 Preservation and Restoration of Property, Trees, Monuments, etc
107.17 Forest Protection
107.18 Responsibility for Claims, etc
107.19 Third Party Liability
107.20 Opening of Section of Highway to Traffic
107.21 Contractor's Responsibility for the Work
107.22 Contractor's Responsibility for Utility Property and Services
107.23 Furnishing Right-of-Way
107.24 Personal Liability of Public Officials
107.25 No Waiver of Legal Rights
107.26 Environmental Protection and Water Pollution Control
107.27 Hazardous and/or Toxic Waste
v
SECTION 108
PROSECUTION AND PROGRESS
108.1 Subletting of Contract
108.2 Preconstruction Conference
108.3 Prosecution of the Work
108.4 Limitation of Operation
108.5 Character of Workers, Methods, and Equipment
108.6 Determination and Extension of Contract Time
108.7 Temporary Suspension of Work
108.8 Failure of Contractor to Maintain Satisfactory Progress
108.9 Failure to Complete the Work on Time
108.10 Default and Termination of Contract
SECTION 109
MEASUREMENT AND PAYMENT
109.1 Measurement of Quantities
109.2 Rounding of Quantities for Payment
109.3 Scope of Payment
109.4 Compensation for Underrun or Overrun of Quantities
109.5 Extra Work and Force Account Work
109.6 Eliminated Items
109.7 Partial Payments
109.8 Payment for Material-on-Hand
109.9 Acceptance and Final Payment
109.10 Audit of Contractor’s Records
DIVISION 200
EARTHWORK
SECTION 201
CLEARING AND GRUBBING
201.1 Description
201.2 Materials
201.3 Equipment
201.4 Construction
201.4.1 General
201.4.2 Clearing and Grubbing within Right-of-Way
201.4.3 Clearing and Grubbing within Roadway
201.4.4 Clearing and Grubbing at Bridge Sites
201.4.5 Clearing and Grubbing of Ditches
201.4.6 Removal and Disposal of Clearing and Grubbing Material
201.5 Measurement
201.6 Payment
SECTION 202
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
202.1 Description
202.2 Materials
202.3 Equipment
202.4 Construction
202.4.1 General
202.4.2 Removal and Disposal of Bridges, Culverts, and Other Drainage Structures vi
202.4.3 Removal and Disposal of Pipe and Tile Drains
202.4.4 Removal of Existing Guardrail
202.4.4.1 General
202.4.4.2 Guardrail that Remains the Property of the Department
202.4.4.3 Guardrail that becomes the Property of the Contractor
202.4.5 Removal and Disposal of Pavements, Sidewalks, and Curbs
202.4.6 Removal and Disposal of Underground Storage Tank (UST)
202.5 Measurement
202.6 Payment
SECTION 203
ROADWAY AND DRAINAGE EXCAVATION
203.1 Description
203.1.1 General
203.2 Materials
203.2.1 Classification
203.2.1.1 Site Excavation
203.2.1.2 Unclassified Excavation
203.2.1.3 Muck Excavation
203.2.1.4 Stripping
203.2.1.5 Surplus Material
203.2.1.6 Watercourse and Drainage Ditch Excavation
203.2.1.7 Rock Excavation
203.2.1.8 Borrow Excavation
203.2.1.9 Station Grading
203.3 Equipment
203.4 Construction
203.4.1 General
203.4.2 Excavating Rock
203.4.3 Maintenance of Excavation
203.5 Measurement
203.6 Payment
SECTION 204
STRUCTURE EXCAVATION
204.1 Description
204.2 Materials
204.2.1 Classification
204.2.1.1 General
204.2.1.2 Structure Excavation for Culverts
204.2.1.3 Dry Excavation for Bridges
204.2.1.4 Wet Excavation for Bridges
204.2.1.5 Wet and Dry Excavation for Bridges
204.2.1.6 Rock Excavation for Bridges
204.3 Equipment
204.4 Construction
204.4.1 General
204.4.2 Preparation of Foundations
204.4.3 Cofferdams or Cribs
204.4.3.1 General
204.4.3.2 Construction of Cofferdams or Cribs
204.4.3.3 Removal of Cofferdams or Cribs
204.4.3.4 Foundation Seal
204.4.3.5 Pumping to De-water
204.4.4 Backfill
204.4.5 Temporary and Permanent Shoring Wall
204.4.5.1 General
204.4.5.2 Design
vii
204.4.5.3 Construction of Shoring Walls
204.5 Measurement
204.6 Payment
SECTION 205
EMBANKMENT CONSTRUCTION
205.1 Description
205.2 Materials
205.3 Equipment
205.4 Construction
205.4.1 General
205.4.2 Embankment Over and Around Structures
205.4.3 Rock Embankment
205.4.4 Embankment on Hillsides and Slopes
205.4.5 Embankment over Existing Roadbeds
205.4.6 Embankment Compaction
205.4.7 Maintenance and Stability
205.5 Measurement
SECTION 206
EMBANKMENT IN-PLACE
206.1 Description
206.2 Materials
206.2.1 Hydraulic Construction Material
206.2.2 Hauling-In Construction Material
206.3 Equipment
206.4 Construction
206.4.1 General
206.4.2 Hydraulic Construction
206.4.3 Construction Using Hauled-in Material
206.4.4 Maintenance and Stability
206.5 Measurement
206.6 Payment
SECTION 207
OVERHAUL
207.1 Description
207.2 Materials
207.3 Equipment
207.4 Construction
207.5 Measurement
207.6 Payment
SECTION 208
SUBGRADE
208.1 Description
208.2 Materials
208.3 Equipment
208.4 Construction
208.4.1 General
208.4.2 Protection and Maintenance
208.4.3 Fine Grading
208.5 Measurement
208.6 Payment
viii
SECTION 209
SHOULDERS AND SLOPES
209.1 Description
209.2 Materials
209.3 Equipment
209.4 Construction
209.4.1 General
209.4.2 Maintenance
209.5 Measurement
209.6 Payment
SECTION 210
FLOWABLE FILL
210.1 Description
210.2 Materials
210.3 Equipment
210.4 Construction
210.4.1 Proportioning of Mixture
210.4.2 Preparation and Placement
210.5 Measurement
210.6 Payment
SECTION 211
PROOF ROLLING
211.1 Description
211.2 Materials
211.3 Equipment
211.4 Construction
211.5 Measurement
211.6 Payment
DIVISION 300
BASES AND SUBBASES
SECTION 301
CEMENT MODIFIED SUBBASE
301.1 Description
301.2 Materials
301.2.1 Portland Cement
301.2.2 Water
301.2.3 Soil
301.2.4 Asphalt Material
301.3 Equipment
301.4 Construction
301.4.1 General
301.4.2 Preparation of Roadbed
301.4.3 Pulverization and Scarification
301.4.4 Application of Cement (Road Mix)
301.4.5 Mixing and Processing
ix
301.4.5.1 Method A (Multiple-Pass Traveling Mixing Plant)
301.4.5.2 Method B (Single-Pass Traveling Mixing Plant)
301.4.6 Compacting
301.4.7 Reconstruction
301.4.8 Curing
301.4.9 Construction Joints
301.4.10 Surface Smoothness
301.4.11 Thickness Tolerance of Subbase
301.4.12 Traffic
301.4.13 Maintenance
301.5 Measurement
301.6 Payment
SECTION 302
SOIL-AGGREGATE SUBBASE
302.1 Description
302.2 Materials
302.2.1 Aggregate
302.2.1.1 Crushed Stone
302.2.1.2 Gravel
302.3 Equipment
302.4 Construction
302.4.1 Plac ing, Mixing, and Compacting
302.4.2 Weight Tickets
302.4.3 Maintenance
302.5 Measurement
302.6 Payment
SECTION 303
SAND-CLAY BASE
303.1 Description
303.2 Materials
303.2.1 Sand-Clay
303.2.2 Source of Supply
303.2.3 Asphalt Materials
303.3 Equipment
303.4 Construction
303.4.1 Naturally Proportioned Base Material
303.4.2 Artificially Proportioned Base
303.4.3 Placing Material
303.4.4 Scarifying, Mixing, Re-mixing, Shaping, and Reshaping
303.4.5 Application of Prime Coat
303.4.6 Compaction
303.4.7 Thickness Tolerance of Base Course
303.4.8 Maintenance
303.5 Measurement
303.6 Payment
SECTION 304
COQUINA SHELL BASE
304.1 Description
304.2 Materials
304.2.1 General
304.2.2 Source of Supply
304.2.3 Coquina Shell Base
304.2.4 Asphalt Materials
304.3 Equipment
x
304.4 Construction
304.4.1 Placing of Material
304.4.2 Mixing and Shaping
304.4.3 Compaction
304.4.4 Thickness Tolerance of Base Course
304.4.5 Application of Prime Coat
304.4.6 Maintenance
304.5 Measurement
304.6 Payment
SECTION 305
GRADED AGGREGATE BASE
305.1 Description
305.2 Materials
305.2.1 Macadam Base Course
305.2.2 Marine Limestone Base Course
305.2.3 Recycled Portland Cement Concrete Base Course
305.2.4 Coarse Aggregate
305.2.4.1 General
305.2.4.2 Coarse Aggregate for Macadam Base Course
305.2.4.3 Coarse Aggregate for Marine Limestone Base Course
305.2.4.4 Coarse Aggregate for Recycled Portland Cement Concrete Base Course
305.2.5 Fine Aggregate
305.2.5.1 General
305.2.5.2 Fine Aggregate for Macadam Base Course
305.2.5.3 Fine Aggregate for Marine Limestone Base Course
305.2.5.4 Fine Aggregate for Recycled Portland Cement Concrete Base Course
305.2.5.5 Composite Mixture
305.2.5.6 Asphalt Materials
305.3 Equipment
305.4 Construction
305.4.1 Preparation of Subgrade
305.4.2 Placing of Base Course Material
305.4.3 Compaction, Rolling, and Finishing
305.4.4 Surface Smoothness
305.4.5 Thickness Tolerance of Base Course
305.4.6 Application of Prime Coat
305.4.7 Weight Tickets
305.4.8 Maintenance
305.5 Measurement
305.6 Payment
SECTION 306
CEMENT MODIFIED RECYCLED BASE
306.1 Description
306.2 Materials
306.2.1 Portland Cement
306.2.2 Water
306.2.3 Asphalt Material
306.3 Equipment
306.4 Construction
306.4.1 General
306.4.2 Pulverization and Scarification
306.4.3 Application of Cement
306.4.4 Mixing and Processing
306.4.5 Compaction
306.4.6 Construction Limitations
306.4.7 Weather Limitations
xi
306.4.8 Curing
306.4.9 Construction Joints
306.4.10 Surface Smoothness
306.4.11 Thickness Tolerance of Base Course
306.4.12 Opening to Traffic
306.4.13 Maintenance
306.5 Measurement
306.6 Payment
SECTION 307
CEMENT STABILIZED EARTH BASE
307.1 Description
307.2 Materials
307.2.1 Portland Cement
307.2.2 Water
307.2.3 Soil
307.2.4 Asphalt Material
307.3 Equipment
307.4 Construction
307.4.1 Weather Limitations
307.4.2 Preparation of the Existing Roadbed
307.4.3 Conditioning of Base Course Materials
307.4.4 Mixing and Placing Materials
307.4.4.1 Stationary Plant Method
307.4.4.2 Road Mix Method
307.4.5 Compaction
307.4.6 Construction Joints
307.4.7 Construction Limitations
307.4.8 Reconstruction
307.4.9 Surface Smoothness
307.4.10 Thickness Tolerance of Base Course
307.4.11 Curing Coat
307.4.12 Opening to Traffic
307.4.13 Maintenance
307.5 Measurement
307.6 Payment
SECTION 308
CEMENT STABILIZED AGGREGATE BASE
308.1 Description
308.2 Materials
308.3 Equipment
308.4 Construction
308.5 Measurement
308.6 Payment
SECTION 309
ASPHALT BASE COURSE - TYPE C AND D
309.1 Description
309.2 Materials
309.2.1 Asphalt Binder
309.2.2 Aggregate
309.2.2.1 General
309.2.2.2 Screenings
309.2.3 Composition of Mixture
309.3 Equipment
309.4 Construction
xii
309.4.1 General
309.4.2 Preparation of Subgrade
309.4.3 Thickness Tolerance of Base Course
309.4.4 Application of Tack Coat
309.5 Measurement
309.6 Payment
SECTION 310
ASPHALT BASE COURSE - TYPE A AND B
310.1 Description
310.2 Materials
310.2.1 Asphalt Binder
310.2.2 Aggregates
310.2.3 Additives
310.2.4 Composition of Mixture
310.3 Equipment
310.4 Construction
310.5 Measurement
310.6 Payment
DIVISION 400
ASPHALT PAVEMENTS
SECTION 401
HOT MIXED ASPHALT (HMA) PAVEMENT
401.1 Description
401.2 Materials
401.2.1 Binder and Additives
401.2.1.1 General
401.2.1.2 Liquid Anti-Stripping Agent
401.2.1.3 Hydrated Lime
401.2.2 Aggregates
401.2.2.1 Mineral Aggregates
401.2.2.2 Mineral Filler
401.2.2.3 Fine Aggregates
401.2.2.3.1 Sand
401.2.2.3.2 Screenings
401.2.2.4 Coarse Aggregate
401.2.2.5 Crusher-Run Material
401.2.2.6 Recycled Asphalt Pavement (RAP)
401.2.2.6.1 General
401.2.2.6.2 Stockpile Approval
401.2.2.6.3 Records
401.2.2.6.4 Composition of Recycled Mixture
401.2.2.6.5 Non-Fractionated RAP
401.2.2.6.6 Fractionated RAP
401.2.2.7 Crushed Glass
401.2.2.8 Shingles
401.2.2.8.1 General
401.2.2.8.2 Amount of Shingles in the Mixture
401.2.2.8.3 Shredded Shingles
401.2.2.8.4 Gradation
xiii
401.2.2.8.5 Mix Design
401.2.2.8.6 Extraction
401.2.3 Composition of Mixture
401.2.3.1 Submission of Materials and Job Mix Formula
401.2.3.2 Gradation Test Method
401.2.3.3 Tolerances
401.2.3.4 Moisture Susceptibility
401.2.3.5 Dust to Asphalt Ratio
401.2.3.6 Wash Gradations
401.2.3.7 Aggregate Selection
401.2.3.8 Rutting Susceptibility
401.2.4 Mix and Pavement Samples
401.2.5 Material for Full Depth Patching
401.3 Equipment
401.3.1 General
401.3.2 Mixing Plants
401.3.3 Hydrated Lime Systems
401.3.4 Shingle Blending Equipment
401.3.5 Shingle Storage Area and Silos
401.3.6 Mixing Plants for Recycled Asphalt Pavement (RAP)
401.3.6.1 General
401.3.6.2 Batch Plants for RAP
401.3.6.3 Drum Mixing Plants for RAP
401.3.7 Hauling Equipment
401.3.8 Batch and Truck Scales
401.3.9 Silos for Storage of HMA
401.3.10 Pavers
401.3.11 Rollers
401.3.11.1 General
401.3.11.2 Steel-Wheel Rollers
401.3.11.3 Pneumatic-Tire Rollers
401.3.11.4 Vibratory Rollers
401.3.12 Field Laboratory and Equipment
401.3.13 Cutting Equipment for Milled-In Rumble Strips (MIRS)
401.3.14 Equipment for Milling Existing Asphalt Pavement
401.3.15 Equipment for Planing Existing Asphalt Pavement
401.4 Construction
401.4.1 General
401.4.2 Plant Production
401.4.3 Paving from Multiple Plants
401.4.4 Weather and Surface Temperature Restrictions
401.4.5 Plant Calibration
401.4.5.1 General
401.4.5.2 Batch Plant
401.4.5.3 Drum Mixer Plants
401.4.5.4 Contractors Monitoring Operations
401.4.5.5 Failing Samples
401.4.6 Use of HMA Stored in Silos and Surge Bins
401.4.7 Preparation of Binder
401.4.8 Preparation of Aggregate
401.4.9 Preparation of Mixture
401.4.10 Mixing: Batch, Drum, and Continuous Mix Plants
401.4.11 Blending of Hydrated Lime
401.4.12 Milling Existing Asphalt Pavement
401.4.13 Planing Existing Asphalt Surfaces
401.4.14 Removal of Existing Asphalt Pavement before Patching
401.4.15 Conditioning of Subgrade
401.4.16 Surface Preparation and Leveling
401.4.17 Transportation and Delivery of Mixes
401.4.18 Application of Prime or Tack Coat
401.4.19 Spreading and Finishing
xiv
401.4.20 Compaction (Standard)
401.4.21 Compaction Monitoring
401.4.22 Weak Base or Poor Surface Conditions
401.4.23 Joints
401.4.24 Milled-in Rumble Strips (MIRS)
401.4.25 Requirements for Recycled Asphalt Pavement (RAP)
401.4.26 Protection of Surface
401.4.27 Finished Surface Requirements
401.4.27.1 General
401.4.27.2 Variability
401.4.27.3 Ride Quality
401.4.28 Segregation Identification and Correction
401.4.29 Rideability
401.4.30 Plant Tickets
401.5 Measurement
401.6 Payment
SECTION 402
HMA INTERMEDIATE COURSE
402.1 Description
402.2 Materials
402.2.1 General
402.2.2 Composition of Mixture
402.3 Equipment
402.4 Construction
402.5 Measurement
402.6 Payment
SECTION 403
HMA SURFACE COURSE
403.1 Description
403.2 Materials
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.