Attachment_1_Combined_Specifications_dated_6_April_2018.pdf

PDF 3 MB Posted

Attached to
Repair Taxiway 06/24, NAAF
Solicitation number
FA441818R0015
Issued by

About this file

Attachment 1 Combined Specifications dated 6 April 2018 for Solicitation FA441819R0007 Repair Runway 0624 NAAF

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair Runway 06/24 at

North Auxiliary Airfield North, South Carolina Orangeburg County

Specifications

April 6, 2018 Final Design

Project Manager: Patrick Buhler, P.E.

patrickb@adcengineering.com JBC Project No. SBML 12-1110 ADC Project No. 15297.10

1083552405C Typewritten Text Attachment 1 FA441819R0007

Repai r Runway 06/ 24 Apr i l 6, 2018 JBC Pr oj ect No. SBML 12- 1110 Fi nal Desi gn

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15 LI ST OF DRAWI NGS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRI CTI ONS

01 30 00 ADMI NI STRATI VE REQUI REMENTS

01 32 16. 00 20 PROJECT SCHEDULE AND PROGRESS DOCUMENTATI ON

01 33 00 SUBMI TTAL PROCEDURES

01 35 13 SPECI AL PROJECT PROCEDURES

01 35 23 OPERATI ONAL SAFETY ON AI RFI ELDS DURI NG CONSTRUCTI ON

01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 00. 10 20 QUALI TY CONTROL FOR MI NOR CONSTRUCTI ON

01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS

01 50 10 ENVIRONMENTAL

01 54 00 GREEN PROCUREMENT

01 57 20 WASTE MANAGEMENT

01 57 50 TEMPORARY ENVI RONMENTAL CONTROLS

01 78 02. 00 20 PROJECT RECORD DOCUMENTS

01 78 23 OPERATI ON AND MAI NTENANCE DATA

DI VI SI ON 03 - CONCRETE

03 30 53 MI SCELLANEOUS CAST- I N- PLACE CONCRETE

DI VI SI ON 26 - ELECTRI CAL

26 56 20. 00 10 AI RFI ELD AND HELI PORT LI GHTI NG AND VI SUAL NAVI GATI ON AI DS

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 01 16. 17 COLD MI LLI NG OF BI TUMI NOUS PAVEMENTS

32 01 17. 16 SEALI NG OF CRACKS I N BI TUMI NOUS PAVEMENTS

32 01 19 FI ELD MOLDED SEALANTS FOR SEALI NG JOI NTS I N RI GI D

PAVEMENTS

32 01 26. 71 GROOVI NG FOR AI RFI ELD PAVEMENTS

32 11 23 GRADED- CRUSHED AGGREGATE BASE COURSE

32 12 10 BI TUMI NOUS TACK

32 12 15. 13 HOT- MI X ASPHALT AI RFI ELD PAVI NG

32 17 24. 00 10 PAVEMENT MARKI NGS

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 1

DOCUMENT 00 01 15

LI ST OF DRAWI NGS

02/11

PART 1 GENERAL

1. 1 SUMMARY

Thi s sect i on l i s t s t he dr awi ngs f or t he pr oj ect pur suant t o cont r act c l ause " DFARS 252. 236- 7001, Cont r act Dr awi ngs, Maps and Speci f i cat i ons. "

1. 2 CONTRACT DRAWI NGS

Cont r act dr awi ngs ar e as f ol l ows:

SHEET TITLE ISSUED

G001 TI TLE SHEET 04/06/2018

G200 CONSTRUCTI ON SAFETY PHASI NG PLAN ( CSPP) 04/06/2018

G201 CSPP - PARTI AL AI RSPACE I MAGI NARY SURFACES 04/06/2018

G202 CSPP - NOTES 04/06/2018

G203 CSPP - DROP ZONES 04/06/2108

C001 CI VI L ABBREVI ATI ONS & GENERAL NOTES 04/06/2018

C101 EXI STI NG SI TE & DEMOLI TI ON PLAN - AREA 1 04/06/2018

C102 EXI STI NG SI TE & DEMOLI TI ON PLAN - AREA 2 04/06/2018

C103 EXI STI NG SI TE & DEMOLI TI ON PLAN - AREA 3 04/06/2018

C104 EXI STI NG SI TE & DEMOLI TI ON PLAN - AREA 4 04/06/2018

C105 EXI STI NG SI TE & DEMOLI TI ON PLAN - AREA 5 04/06/2018

C106 EXI STI NG SI TE & DEMOLI TI ON PLAN - AREA 6 04/06/2018

C201 SI TE PLAN / MARKI NG PLAN - AREA 1 04/06/2108

C202 SI TE PLAN / MARKI NG PLAN - AREA 2 04/06/2018

C203 SI TE PLAN / MARKI NG PLAN - AREA 3 04/06/2018

C204 SI TE PLAN / MARKI NG PLAN - AREA 4 04/06/2018

C205 SI TE PLAN / MARKI NG PLAN - AREA 5 04/06/2018

DOCUMENT 00 01 15 Page 1

SHEET TITLE ISSUED

C206 SI TE PLAN / MARKI NG PLAN - AREA 6 04/06/2018

C210 RWY 06/ 24 GROOVI NG PLAN - OVERALL 04/06/2018

C225 MARKI NG DETAI LS - RWY 06/ 24 04/06/2018

C301 GRADI NG PLAN - AREA 1 04/06/2018

C302 GRADI NG PLAN - AREA 2 04/06/2018

C303 GRADI NG PLAN - AREA 3 04/06/2018

C304 GRADI NG PLAN - AREA 4 04/06/2018

C305 GRADI NG PLAN - AEAA 5 04/06/2018

C306 GRADI NG PLAN - AREA 6 04/06/2018

C321 CROSS SECTI ONS 04/06/2018

C322 CROSS SECTI ONS 04/06/2018

C323 CROSS SECTI ONS 04/06/2018

C324 CROSS SECTI ONS 04/06/2018

C325 CROSS SECTI ONS 04/06/2018

C326 CROSS SECTI ONS 04/06/2018

C327 CROSS SECTI ONS 04/06/2018

C328 CROSS SECTI ONS 04/06/2018

C329 CROSS SECTI ONS 04/06/2018

C330 CROSS SECTI ONS 04/06/2018

C331 CROSS SECTI ONS 04/06/2018

C332 CROSS SECTI ONS 04/06/2018

C333 CROSS SECTI ONS 04/06/2018

C334 CROSS SECTI ONS 04/06/2018

C335 CROSS SECTI ONS 04/06/2018

C336 CROSS SECTI ONS 04/06/2018

C337 CROSS SECTI ONS 04/06/2018

DOCUMENT 00 01 15 Page 2

SHEET TITLE ISSUED

C620 PAVI NG SECTI ONS 04/06/2018

C700 EROSI ON CONTROL PLAN - OVERALL AI RFI ELD 04/06/2018

C740 EROSI ON CONTROL DETAI LS 04/06/2018

E000 ELECTRI CAL LEGEND & ABBREVI ATI ONS 04/06/2018

E001 ELECTRI CAL NOTES 04/06/2018

E101 ELECTRI CAL DEMOLI TI ON PLAN - AREA 1 04/06/2018

E102 ELECTRI CAL DEMOLI TI ON PLAN - AREA 2 04/06/2018

E103 ELECTRI CAL DEMOLI TI ON PLAN - AREA 3 04/06/2018

E104 ELECTRI CAL DEMOLI TI ON PLAN - AREA 4 04/06/2018

E105 ELECTRI CAL DEMOLI TI ON PLAN - AREA 5 04/06/2018

E106 ELECTRI CAL DEMOLI TI ON PLAN - AREA 6 04/06/2018

E201 ELECTRI CAL LAYOUT PLAN - AREA 1 04/06/2018

E202 ELECTRI CAL LAYOUT PLAN - AREA 2 04/06/2018

E203 ELECTRI CAL LAYOUT PLAN - AREA 3 04/06/2018

E204 ELECTRI CAL LAYOUT PLAN - AREA 4 04/06/2018

E205 ELECTRI CAL LAYOUT PLAN - AREA 5 04/06/2018

E206 ELECTRI CAL LAYOUT PLAN - AREA 6 04/06/2018

E301 ELECTRI CAL CI RCUI TI NG PLAN - AREA 1 04/06/2018

E302 ELECTRI CAL CI RCUI TI NG PLAN - AREA 2 04/06/2018

E303 ELECTRI CAL CI RCUI TI NG PLAN - AREA 3 04/06/2018

E304 ELECTRI CAL CI RCUI TI NG PLAN - AREA 4 04/06/2018

E305 ELECTRI CAL CI RCUI TI NG PLAN - AREA 5 04/06/2018

E306 ELECTRI CAL CI RCUI TI NG PLAN - AREA 6 04/06/2018

E307 ELECTRI CAL CI RCUI TI NG PLAN - AREA 04/06/2018

E401 FI XTURE DETAI LS I N ASPHALT 04/06/2018

E402 FI XTURE DETAI LS I N ASPHALT OVERLAY 04/06/2018

DOCUMENT 00 01 15 Page 3

SHEET TITLE ISSUED

E403 GENERAL ELECTRI CAL DETAI LS 04/06/2018

E404 GENERAL ELECTRI CAL DETAI LS 04/06/2018

E405 GENERAL ELECTRI CAL DETAI LS 04/06/2018

E406 SI GN DETI ALS 04/06/2018

E407 SI GN DETAI LS 04/06/2018

E408 VAULT DETAI LS 04/06/2018

E409 RUNWAY 06/ 24 OVERT / COVERT LI GHT LAYOUT

DETAILS

04/06/2018

E410 OVERALL RUNWAY 06/ 24 LANDI NG ZONE LI GHTI NG

CONFIGURATION

04/06/2018

E411 RUNWAY 06/ 24 AMP- 3 OVERT LI GHTI NG

CONFIGURATION

04/06/2018

E412 RUNWAY 06/ 24 AMP- 3 COVERT LI GHTI NG

CONFIGURATION

04/06/2018

- - End of Document - -

DOCUMENT 00 01 15 Page 4

JBCGS SECTI ON 01 11 00

SUMMARY OF WORK

06/15

PART 1 GENERAL

1. 1 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Utility Out age Request s; G

Road Cl osur e Request s; G

Ai r For ce Wor k Cl ear ance Per mi t ; G

1. 2 WORK COVERED BY CONTRACT DOCUMENTS

I n t he event of conf l i c t or i nconsi st ency bet ween any of t he bel ow descr i bed por t i ons of t he cont r act , pr ecedence shal l be gi ven i n t he f ol l owi ng or der :

a. Any por t i ons of t he pr oposal or f i nal desi gn ( f or desi gn/ bui l d cont r act s) whi ch exceed t he r equi r ement s of t he solicitation.

b. Any por t i on of t he pr oposal whi ch exceeds t he f i nal desi gn.

c. Any por t i on of t he f i nal desi gn whi ch exceeds t he pr oposal . Wher e por t i ons wi t hi n ei t her t he pr oposal or t he f i nal desi gn conf l i c t , t he por t i on t hat most exceeds t he r equi r ement s of t he sol i c i t at i on has pr ecedence.

d. The r equi r ement s of t he sol i c i t at i on, i n t he f ol l owi ng descendi ng or der of pr ecedence:

( i ) St andar d For m 1442, Pr i ce Schedul e, and Davi s Bacon wage r at es.

( i i ) Par t 1 - Cont r act Cl auses.

( i i i ) Par t 2 - Gener al Requi r ement s.

( i v) Par t 3 - St at ement of Wor k/ Pr oj ect Pr ogr am Requi r ement s.

( v) Par t 6 - At t achment s ( excl udi ng Concept Dr awi ngs) .

( v i ) Par t 5 - Pr escr i pt i ve Speci f i cat i ons, excl usi ve of per f or mance speci f i cat i ons.

( v i i ) Par t 4 - Mi ni mum Mat er i al s, Engi neer i ng and Const r uct i on

SECTI ON 01 11 00 Page 1

Requi r ement s, excl usi ve of pr escr i pt i ve speci f i cat i ons.

( v i i i ) Par t 6 - At t achment s ( i ncl udi ng Concept Dr awi ngs) .

1. 2. 1 Pr oj ect Descr i pt i on

Thi s pr oj ect consi st s of t he mi l l and over l ay of Runway 06/ 24 at NAAF, i ncl udi ng shoul der s. The pr oj ect al so i ncl udes r epl aci ng al l l i ght i ng, f i x t ur es, s i gnage, and new bi - di r ect i onal AMP- 3 si mul at ed l andi ng zone lighting.

The wor k wi l l i nc l ude r est r i pi ng of t he 8003 f oot r unway, pl us t he 1000 f oot di spl aced t hr eshol d pavement s. Mar ki ngs wi l l al so i ncl ude si mul at ed Landi ng Zone mar ki ngs.

1. 2. 2 Location

The wor k shal l be l ocat ed at Nor t h Auxi l i ar y Ai r f i el d i n Nor t h, Sout h Car ol i na, as i ndi cat ed on dr awi ngs. The exact l ocat i on wi l l be shown by t he Cont r act i ng Of f i cer .

1. 3 EXI STI NG WORK

I n addi t i on t o " FAR 52. 236- 9, Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s" :

a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.

b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.

1. 4 ON- SI TE PERMI TS

Obt ai n a wor k c l ear ance/ di ggi ng per mi t pr i or t o st ar t of excavat i on. The Cont r act or i s r esponsi bl e f or mar ki ng and ver i f y i ng al l ut i l i t i es. Ver i f y t he el evat i ons of exi st i ng pi pi ng, ut i l i t i es, and any t ype of under gr ound or encased obst r uct i on not i ndi cat ed t o be speci f i ed or r emoved but i ndi cat ed or di scover ed i n l ocat i ons t o be t r aver sed by pi pi ng, duct s, and ot her wor k t o be conduct ed or i nst al l ed. Ver i f y el evat i ons bef or e i nst al l i ng new wor k c l oser t han near est manhol e or ot her st r uct ur e at whi ch an adj ust ment i n gr ade can be made.

1. 4. 1 Notifications

Not i f y t he Cont r act i ng Of f i cer at l east 72 hour s pr i or t o st ar t i ng excavat i on wor k.

1. 4. 2 Out age Request s

Ut i l i t y out ages and r oad cl osur es r equi r ed dur i ng t he pr osecut i on of wor k shal l be ar r anged f or t he conveni ence of t he Gover nment . Ut i l i t y out ages and connect i ons shal l be schedul ed out s i de r egul ar wor ki ng hour s. Ut i l i t y out age, and r oad cl osur e r equest s shal l be submi t t ed t o t he Cont r act i ng Of f i cer f or coor di nat i on and Gover nment appr oval at l east 21 days pr i or t o

SECTI ON 01 11 00 Page 2 t he desi r ed out age or c l osur e dat e. Request s shal l c l ear l y i dent i f y t he need f or t he out age or c l osur e, t he r equest ed dat e( s) f or t he out age or c l osur e, t he expect ed l engt h of t he out age or c l osur e and pr oposed backup dates.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

Not used.

- - End of Sect i on - -

SECTI ON 01 11 00 Page 3

JBCGS SECTI ON 01 14 00

WORK RESTRI CTI ONS

06/15

PART 1 GENERAL

1. 1 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Li st of Cont act Per sonnel ; G

1. 2 CONTRACTOR ACCESS AND USE OF PREMI SES

1. 2. 1 Act i v i t y Regul at i ons

I t shoul d be r ecogni zed t hat r equi r ement s f or secur i t y and base access var i es bet ween var i ous l ocat i ons wi t hi n Joi nt Base Char l est on. I t i s i ncumbent on t he Cont r act or t o ascer t ai n t he cur r ent secur i t y and base access r equi r ement s appr opr i at e t o t he pr oj ect l ocat i on and i ncor por at e t he cost , i f any, f or compl i ance t o sai d r equi r ement s i nt o Cont r act or ' s pr oposal . Lack of knowl edge of cur r ent r equi r ement s does not const i t ut e a basi s f or an adj ust ment t o t he cont r act . Shoul d r equi r ement s change dur i ng t he const r uct i on t i mef r ame, Cont r act or may be el i gi bl e, subj ect t o document at i on accept abl e t o t he Gover nment , f or an adj ust ment t o t he contract.

Ensur e t hat al l Cont r act or per sonnel empl oyed on Joi nt Base Char l est on become f ami l i ar wi t h and obey I nst al l at i on r egul at i ons i ncl udi ng saf et y, f i r e, t r af f i c and secur i t y r egul at i ons. Keep wi t hi n t he l i mi t s of t he wor k and avenues of i ngr ess and egr ess. Wear har d hat s i n desi gnat ed ar eas. Do not ent er any r est r i c t ed ar eas unl ess r equi r ed t o do so and unt i l c l ear ed f or such ent r y. Mar k Cont r act or equi pment f or i dent i f i cat i on.

1. 2. 1. 1 Subcont r act or s and Per sonnel Cont act s

Pr ovi de a l i s t of cont act per sonnel of t he Cont r act or and subcont r act or s i ncl udi ng addr esses and t el ephone number s f or use i n t he event of an emer gency. As changes occur and addi t i onal i nf or mat i on becomes avai l abl e, cor r ect and change t he i nf or mat i on cont ai ned i n pr evi ous l i s t s.

1. 2. 1. 2 I dent i f i cat i on Badges and I nst al l at i on Access

I dent i f i cat i on badges, i f r equi r ed, may be f ur ni shed wi t hout char ge under cer t ai n c i r cumst ances. Conf i r m secur i t y r equi r ement s wi t h t he Cont r act i ng Of f i cer . Appl i cat i on f or and use of badges wi l l be as di r ect ed. Fur ni sh a compl et ed EMPLOYMENT ELI GI BI LI TY VERI FI CATI ON ( DHS FORM I - 9) f or m f or al l per sonnel r equest i ng badges. Thi s f or m i s avai l abl e at ht t p: / / www. usci s. gov/ f i l es/ f or m/ I - 9_I FR_02- 02- 09. pdf . I mmedi at el y r epor t i nst ances of l ost or st ol en badges t o t he Cont r act i ng Of f i cer .

SECTI ON 01 14 00 Page 1

1. 2. 1. 3 Tobacco Use Pol i cy

Tobacco use i s pr ohi bi t ed wi t hi n and out s i de of al l bui l di ngs on i nst al l at i on, except i n desi gnat ed Tobacco Use ar eas. Thi s appl i es t o exi st i ng bui l di ngs, bui l di ngs under const r uct i on and bui l di ngs under r enovat i on. Di scar di ng t obacco mat er i al s ot her t han i nt o desi gnat ed t obacco r ecept acl es i s consi der ed l i t t er i ng and i s subj ect t o f i nes. The Cont r act i ng Of f i cer wi l l i dent i f y desi gnat ed Tobacco Use ar eas.

1. 2. 2 Wor ki ng Hour s

Regul ar wor ki ng hour s must consi st of a 9 hour per i od , bet ween 7 a. m. and 7 p. m. , Tuesday t hr ough Sat ur day excl udi ng Gover nment hol i days.

No wor k wi l l be al l owed on Mondays.

1. 2. 3 Wor k Out si de Regul ar Hour s

Wor k out s i de r egul ar wor ki ng hour s r equi r es Cont r act i ng Of f i cer appr oval .

Make appl i cat i on 15 cal endar days pr i or t o such wor k t o al l ow ar r angement s t o be made by t he Gover nment f or i nspect i ng t he wor k i n pr ogr ess, gi v i ng t he speci f i c dat es, hour s, l ocat i on, t ype of wor k t o be per f or med, cont r act number and pr oj ect t i t l e. Based on t he j ust i f i cat i on pr ovi ded, t he Cont r act i ng Of f i cer may appr ove wor k out s i de r egul ar hour s. Dur i ng per i ods of dar kness, t he di f f er ent par t s of t he wor k must be l i ght ed i n a manner appr oved by t he Cont r act i ng Of f i cer .

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

Not Used

SECTI ON 01 14 00 Page 2

JBCGS SECTI ON 01 30 00

ADMI NI STRATI VE REQUI REMENTS

06/15

PART 1 GENERAL

1. 1 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Resume f or t he pr oposed Super i nt endent ; G

1. 2 MI NI MUM I NSURANCE REQUI REMENTS

Pr ocur e and mai nt ai n dur i ng t he ent i r e per i od of per f or mance under t hi s cont r act t he f ol l owi ng mi ni mum i nsur ance cover age:

a. Compr ehensi ve gener al l i abi l i t y : $500, 000 per occur r ence

b. Aut omobi l e l i abi l i t y : $200, 000 per per son, $500, 000 per occur r ence f or bodi l y i nj ur y, $20, 000 per occur r ence f or pr oper t y damage

c. Wor kmen' s compensat i on as r equi r ed by Feder al and St at e wor ker s ' compensat i on and occupat i onal di sease l aws.

d. Empl oyer ' s l i abi l i t y cover age of $100, 000, except i n St at es wher e wor ker s compensat i on may not be wr i t t en by pr i vat e car r i er s.

e. Ot her s as r equi r ed by St at e l aw.

1. 3 SUPERVISION

1. 3. 1 Mi ni mum Communi cat i on Requi r ement s

Have at l east one qual i f i ed super i nt endent capabl e of r eadi ng, wr i t i ng, and conver si ng f l uent l y i n t he Engl i sh l anguage, on t he j ob- si t e dur i ng wor ki ng hour s. I n addi t i on, i f a Qual i t y Cont r ol ( QC) r epr esent at i ve i s r equi r ed on t he cont r act , t hen t hat i ndi v i dual must al so have f l uent Engl i sh communi cat i on ski l l s .

1. 3. 2 Super i nt endent Qual i f i cat i ons

Super i nt endent must have a mi ni mum of 10 year s exper i ence i n const r uct i on wi t h at l east 5 of t hose year s as a super i nt endent on pr oj ect s s i mi l ar i n s i ze, scope and compl exi t y t o t hi s pr oj ect . The pr oj ect super i nt endent i s subj ect t o r emoval by t he Cont r act i ng Of f i cer f or non- compl i ance wi t h r equi r ement s speci f i ed i n t he cont r act and f or f ai l ur e t o manage t he

SECTI ON 01 30 00 Page 1 pr oj ect t o ensur e t i mel y compl et i on. Fur t her mor e, t he Cont r act i ng Of f i cer may i ssue an or der st oppi ng wor k on al l or par t of t he wor k unt i l sat i sf act or y cor r ect i ve act i on has been t aken. No par t of t he t i me l ost due t o such st op wor k or der s shal l be made t he subj ect of a c l ai m f or ext ensi on of t i me f or excess cost s or damages by t he cont r act or .

Appr oval of t he pr oj ect super i nt endent i s r equi r ed pr i or t o t he st ar t of const r uct i on. Pr ovi de a r esume f or t he pr oposed super i nt endent descr i bi ng t hei r exper i ence wi t h r ef er ences and qual i f i cat i ons t o t he cont r act i ng of f i cer f or appr oval . The cont r act i ng of f i cer r eser ves t he r i ght t o i nt er v i ew t he pr oposed pr oj ect super i nt endent at any t i me i n or der t o ver i f y t he submi t t ed qual i f i cat i ons.

1. 4 PRECONSTRUCTION CONFERENCE

Af t er awar d of t he cont r act but pr i or t o commencement of any wor k at t he s i t e, meet wi t h t he Cont r act i ng Of f i cer t o di scuss and devel op a mut ual under st andi ng r el at i ve t o t he admi ni st r at i on of t he cont r act and saf et y pr ogr am, pr epar at i on of t he schedul e of pr i ces, shop dr awi ngs, and ot her submi t t al s, schedul i ng pr ogr ammi ng, pr osecut i on of t he wor k, and cl ear expect at i ons of t he " I nt er i m DD For m 1354" Submi t t al . Maj or subcont r act or s who wi l l engage i n t he wor k must al so at t end.

1. 5 AVAI LABI LI TY OF CADD DRAWI NG FI LES

Af t er awar d and upon r equest , t he el ect r oni c " Comput er - Ai ded Dr af t i ng and Desi gn ( CADD) " dr awi ng f i l es wi l l onl y be made avai l abl e t o t he Cont r act or f or use i n pr epar at i on of const r uct i on dr awi ngs and dat a r el at ed t o t he r ef er enced cont r act subj ect t o t he f ol l owi ng t er ms and condi t i ons.

Dat a cont ai ned on t hese el ect r oni c f i l es shal l not be used f or any pur pose ot her t han as a conveni ence i n t he pr epar at i on of const r uct i on dr awi ngs and dat a f or t he r ef er enced pr oj ect . Any ot her use or r euse shal l be at t he sol e r i sk of t he Cont r act or and wi t hout l i abi l i t y or l egal exposur e t o t he Gover nment . The Cont r act or shal l make no c l ai m and wai ves t o t he f ul l est ext ent per mi t t ed by l aw, any c l ai m or cause of act i on of any nat ur e agai nst t he Gover nment , i t s agent s or sub consul t ant s t hat may ar i se out of or i n connect i on wi t h t he use of t hese el ect r oni c f i l es. The Cont r act or shal l , t o t he f ul l est ext ent per mi t t ed by l aw, i ndemni f y and hol d t he Gover nment har ml ess agai nst al l damages, l i abi l i t i es or cost s, i ncl udi ng r easonabl e at t or ney' s f ees and def ense cost s, ar i s i ng out of or r esul t i ng f r om t he use of t hese el ect r oni c f i l es.

These el ect r oni c CADD dr awi ng f i l es ar e not const r uct i on document s.

Di f f er ences may exi st bet ween t he CADD f i l es and t he cor r espondi ng const r uct i on document s. The Gover nment makes no r epr esent at i on r egar di ng t he accur acy or compl et eness of t he el ect r oni c CADD f i l es, nor does i t make r epr esent at i on t o t he compat i bi l i t y of t hese f i l es wi t h t he Cont r act or s har dwar e or sof t war e. I n t he event t hat a conf l i c t ar i ses bet ween s i gned and seal ed const r uct i on document s pr epar ed by t he Gover nment and t he f ur ni shed CADD f i l es, t he s i gned and seal ed const r uct i on document s shal l gover n. The Cont r act or i s r esponsi bl e f or det er mi ni ng i f any conf l i c t exi st s. Use of t hese CADD f i l es does not r el i eve t he Cont r act or of dut y t o f ul l y compl y wi t h t he cont r act document s, i ncl udi ng and wi t hout l i mi t at i on, t he need t o check, conf i r m and coor di nat e t he wor k of al l cont r act or s f or t he pr oj ect .

I f t he Cont r act or uses, dupl i cat es and/ or modi f i es t hese el ect r oni c CADD f i l es f or use i n pr oduci ng const r uct i on dr awi ngs and dat a r el at ed t o t hi s

SECTI ON 01 30 00 Page 2 cont r act , al l pr evi ous i ndi c i a of owner shi p ( seal s, l ogos, s i gnat ur es, i ni t i al s and dat es) shal l be r emoved.

1. 6 ELECTRONI C MAI L ( E- MAI L) ADDRESS

The Cont r act or shal l est abl i sh and mai nt ai n el ect r oni c mai l ( e- mai l ) capabi l i t y al ong wi t h t he capabi l i t y t o open var i ous el ect r oni c at t achment s i n Mi cr osof t , Adobe Acr obat , and ot her s i mi l ar f or mat s. Wi t hi n 10 days af t er cont r act awar d, t he Cont r act or shal l pr ovi de t he Cont r act i ng Of f i cer a s i ngl e ( onl y one) e- mai l addr ess f or el ect r oni c communi cat i ons f r om t he Cont r act i ng Of f i cer r el at ed t o t hi s cont r act i ncl udi ng, but not l i mi t ed t o cont r act document s, i nvoi ce i nf or mat i on, r equest f or pr oposal s, and ot her cor r espondence. The Cont r act i ng Of f i cer may al so use emai l t o not i f y t he Cont r act or of base access condi t i ons when emer gency condi t i ons war r ant , such as hur r i canes or t er r or i st t hr eat s, et c. . Mul t i pl e emai l addr esses wi l l not al l owed.

I t i s t he Cont r act or ' s r esponsi bi l i t y t o make t i mel y di st r i but i on of al l Cont r act i ng Of f i cer i ni t i at ed e- mai l wi t h i t s own or gani zat i on i ncl udi ng f i el d of f i ce( s) . The Cont r act or shal l pr ompt l y not i f y t he Cont r act i ng Of f i cer , i n wr i t i ng, of any changes t o t hi s emai l addr ess.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

Not Used

SECTI ON 01 30 00 Page 3

SECTI ON 01 32 16. 00 20

PROJECT SCHEDULE AND PROGRESS DOCUMENTATI ON

11/09

PART 1 GENERAL

Pur suant t o Cont r act Cl ause " FAR 52. 236- 15, Schedul es f or Const r uct i on Cont r act s, " a Pr oj ect Schedul e as descr i bed bel ow shal l be pr epar ed.

Schedul i ng of const r uct i on shal l be t he r esponsi bi l i t y of t he Cont r act or .

Cont r act or management per sonnel act i vel y par t i c i pat e i n t he devel opment of t he pr oj ect schedul e. Cont r act or management per sonnel shal l coor di nat e c l osel y wi t h Cont r act i ng Of f i cer / Gal l ey Management / CENMP i n t he mai nt enance of t he schedul e. Subcont r act or s and suppl i er s wor k i ng on t he pr oj ect shal l al so cont r i but e i n devel opi ng and mai nt ai ni ng an accur at e schedul e. The appr oved schedul e shal l be used t o measur e t he pr ogr ess of wor k, t o ai d i n eval uat i ng t i me ext ensi ons, and t o pr ovi de t he basi s of al l pr ogr ess payments.

1. 1 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Qualifications ; G

Baseline Pr oj ect Schedul e; G, CENMP

I ni t i al Cont r act Pr ogr ess Repor t ( AF I MT 3065) ; G, CENMP

I ni t i al Cont r act Pr ogr ess Schedul e ( AF I MT 3064) ; G, CENMP

SD- 07 Cer t i f i cat es

Monthly Pr oj ect Schedul e Updat es; G, CENMP

Mont hl y Cont r act Pr ogr ess Repor t s ( AF I MT 3065) ; G

Mont hl y Cont r act Pr ogr ess Schedul es ( AF I MT 3064) ; G

1. 2 QUALIFICATIONS

The Cont r act or shal l desi gnat e an aut hor i zed r epr esent at i ve r esponsi bl e f or pr epar i ng and mai nt ai ni ng t he pr oj ect schedul e f or t hi s cont r act . Thi s i ndi v i dual shal l have pr epar ed and mai nt ai ned at l east 3 pr evi ous schedul es of s i mi l ar s i ze, scope and compl exi t y t o t hi s cont r act . A r esume out l i ni ng t he i ndi v i dual ' s qual i f i cat i ons shal l be submi t t ed f or accept ance by t he Cont r act i ng Of f i cer .

SECTI ON 01 32 16. 00 20 Page 1

1. 3 PROJECT SCHEDULE

1. 3. 1 Basi s f or Payment

The Pr oj ect Schedul e shal l be t he basi s f or measur i ng Cont r act or pr ogr ess.

Lack of an appr oved updat ed pr oj ect schedul e may r esul t i n an i nabi l i t y of t he Cont r act i ng Of f i cer t o eval uat e t he Cont r act or ' s pr ogr ess f or t he pur poses of payment . The Basel i ne Pr oj ect Schedul e shal l be submi t t ed f or appr oval wi t hi n 30 cal endar days af t er t he Not i ce t o Pr oceed ( NTP) has been acknowl edged. Accept ance of an er r or f r ee cur r ent Pr oj ect Schedul e i s a condi t i on pr ecedent t o pr ocessi ng any Cont r act or ' s pay r equest except bond payment s. I n t he cases wher e Pr oj ect Schedul e r evi s i ons have been di r ect ed by t he Cont r act i ng Of f i cer and t hose r evi s i ons have not been i ncl uded i n t he Pr oj ect Schedul e, t he Cont r act i ng Of f i cer may hol d r et ai nage up t o t he maxi mum amount al l owed by t he cont r act , each payment per i od, unt i l t he r evi s i ons have been made.

Revi ew comment s made by t he Gover nment on t he Cont r act or ’ s schedul e( s) wi l l not r el i eve t he Cont r act or f r om compl i ance wi t h t he r equi r ement s of t he Cont r act Document s. The Cont r act or i s r esponsi bl e f or schedul i ng, sequenci ng and pr osecut i ng wor k t o compl y wi t h t he r equi r ement s of t he Cont r act Document s. Gover nment accept ance ext ends onl y t o t he act i v i t i es of t he Cont r act or ’ s schedul e t hat t he Gover nment has been assi gned r esponsi bi l i t y and agr ees i t i s r esponsi bl e. Comment s of f er ed on ot her par t s of t he schedul e, t o whi ch t he Cont r act or i s assi gned r esponsi bi l i t y , ar e of f er ed as a cour t esy and ar e not condi t i ons of Gover nment accept ance;

but ar e f or t he gener al conf or mance wi t h est abl i shed i ndust r y schedul i ng concepts.

1. 3. 2 Schedul e For mat

1. 3. 2. 1 Use of t he Cr i t i cal Pat h Met hod

The Cont r act or shal l use t he cr i t i cal pat h met hod ( CPM) and t he Pr ecedence Di agr am Met hod ( PDM) t o schedul e and cont r ol pr oj ect act i v i t i es.

1. 3. 2. 2 Schedul i ng Sof t war e

Pr oj ect schedul es shal l be pr epar ed and mai nt ai ned usi ng a commer ci al l y avai l abl e schedul i ng sof t war e pr ogr am capabl e of pr ovi di ng al l r equi r ement s of t hi s speci f i cat i on. Manual met hods used t o pr oduce any r equi r ed i nf or mat i on shal l r equi r e pr i or appr oval by t he Cont r act i ng Of f i cer .

1. 3. 2. 3 Level of Det ai l Requi r ed

The Pr oj ect Schedul e shal l i ncl ude an appr opr i at e l evel of det ai l t o appr opr i at el y r ef l ect t he compl exi t y of wor k and t o c l ear l y show al l const r uct i on act i v i t i es pl anned f or t he pr oj ect as wel l as al l ot her act i v i t i es whi ch coul d i mpact pr oj ect compl et i on i f del ayed, i ncl udi ng but not l i mi t ed t o; submi t t al s, gover nment r evi ew per i ods, envi r onment al per mi t t i ng, mat er i al / equi pment del i ver y, ut i l i t y out ages, ant i c i pat ed weat her del ays, i nspect i on, t est i ng, and cl oseout act i v i t i es. Gover nment and Cont r act or on- si t e wor k act i v i t i es shal l be dr i ven by cal endar s t hat r ef l ect Sat ur days, Sundays and al l Feder al Hol i days as non- wor k days.

Act i v i t i es on t he cr i t i cal pat h shal l be c l ear l y i ndi cat ed. Separ at e act i v i t i es shal l be cr eat ed f or each Phase, Ar ea, Fl oor Level and Locat i on t he act i v i t y i s occur r i ng. On- si t e const r uct i on act i v i t i es wi t h ant i c i pat ed dur at i ons i n excess of 20 wor ki ng days shal l be br oken i nt o mul t i pl e act i v i t i es. Tasks r el at ed t o pr ocur ement of l ong l ead mat er i al s or

SECTI ON 01 32 16. 00 20 Page 2 equi pment ( pr ocur ement cycl es of over 90 days) shal l be i ncl uded as separ at e act i v i t i es.

At a mi ni mum, each act i v i t y shal l i ncl ude t he f ol l owi ng i nf or mat i on:

a. Act i v i t y I D

b. Act i v i t y Descr i pt i on

c. Or i gi nal Dur at i on i n Wor k Days

d. Ear l y St ar t Dat e

e. Ear l y Fi ni sh Dat e f . Lat e St ar t Dat e

g. Lat e Fi ni sh Dat e

h. Tot al Fl oat i . Bi d I t em j . Per cent Compl et e

Al l act i v i t i es shal l be i dent i f i ed i n t he Pr oj ect Schedul e by t he Bi d I t em t o whi ch t he act i v i t y bel ongs. An act i v i t y shal l not cont ai n wor k i n mor e t han one bi d i t em.

k. Feat ur e of Wor k

Al l act i v i t i es shal l be i dent i f i ed i n t he Pr oj ect Schedul e accor di ng t o t he Cont r act or desi gnat ed Def i nabl e Feat ur e of Wor k t o whi ch t he act i v i t y bel ongs. An act i v i t y shal l not cont ai n wor k i n mor e t han one f eat ur e of wor k.

l . Responsi bi l i t y

Al l act i v i t i es shal l be i dent i f i ed i n t he Pr oj ect Schedul e accor di ng t o t he par t y r esponsi bl e f or accompl i shi ng t he wor k encompassed by t he act i v i t y. Responsi bi l i t y i ncl udes, but i s not l i mi t ed t o, t he subcont r act i ng f i r m, cont r act or wor k f or ce, or gover nment agency per f or mi ng a gi ven t ask. Act i v i t i es shal l not be assi gned t o mor e t han one r esponsi bl e par t y i n t he Pr oj ect Schedule.

Pr oj ect St ar t Dat e Mi l est one: The Cont r act or shal l i ncl ude as t he f i r st act i v i t y on t he schedul e a st ar t mi l est one t i t l ed " Cont r act Awar d" , whi ch shal l have a Mandat or y St ar t const r ai nt equal t o t he Cont r act Awar d Dat e.

Pr oj ect ed Compl et i on Mi l est one: The Cont r act or shal l i ncl ude an unconst r ai ned f i ni sh mi l est one on t he schedul e t i t l ed " Pr oj ect ed Compl et i on" , i ndi cat i ng t he poi nt i n t i me at whi ch t he pr oj ect i s compl et e and r eady f or i t s i nt ended use. Thi s mi l est one shal l have t he Cont r act Compl et i on Dat e ( CCD) as i t s onl y successor .

Cont r act Compl et i on Dat e ( CCD) Mi l est one: The Cont r act or shal l i ncl ude as t he l ast act i v i t y on t he schedul e a f i ni sh mi l est one t i t l ed " Cont r act Compl et i on ( CCD) " , whi ch shal l have a Mandat or y Fi ni sh const r ai nt equal t o

SECTI ON 01 32 16. 00 20 Page 3 t he Cont r act Compl et i on Dat e. The onl y pr edecessor t o t he Cont r act Compl et i on Dat e Mi l est one shal l be t he Pr oj ect ed Compl et i on mi l est one.

Wi t h t he except i on of t he Cont r act Awar d and Cont r act Compl et i on Dat e ( CCD) mi l est one act i v i t i es, no act i v i t y shal l be open- ended; each act i v i t y shal l have pr edecessor and successor t i es. Once an act i v i t y exi st s on t he appr oved schedul e, i t shal l not be del et ed or r enamed t o change t he scope of t he act i v i t y, nor shal l i t be r emoved f r om t he schedul e l ogi c wi t hout appr oval f r om t he Cont r act i ng Of f i cer .

Dat e/ t i me const r ai nt ( s) and/ or l ags, ot her t han t hose r equi r ed by t he cont r act , shal l not be al l owed unl ess accept ed by t he Cont r act i ng Of f i cer .

1. 3. 2. 4 Submi t t al s and Pr ocedur es

Submi t pr oj ect schedul e and updat es i n har d copy and on el ect r oni c medi a accept abl e t o t he Cont r act i ng Of f i cer . Submi t t al s shal l be under st ood t o be t he Cont r act or ' s cer t i f i cat i on t hat t he submi t t ed schedul e meet s al l r equi r ement s of t he Cont r act document s, r epr esent s t he Cont r act or ' s pl an on how t he wor k shal l be accompl i shed, and accur at el y r ef l ect s t he wor k t hat has been accompl i shed and how i t was sequenced ( as- bui l t l ogi c) .

Act ual st ar t and Fi ni sh dat es shal l not be aut omat i cal l y updat ed by def aul t mechani sms t hat may be i ncl uded i n t he CPM schedul i ng sof t war e syst em.

Act ual St ar t and Fi ni sh dat es shal l mat ch t hose dat es f r om t he Cont r act or Qual i t y Cont r ol Repor t s. Updat i ng of t he per cent compl et e and t he r emai ni ng dur at i on of any act i v i t y shal l be i ndependent f unct i ons. Pr ogr am f eat ur es whi ch cal cul at e one of t hese par amet er s f r om t he ot her shal l be di sabl ed.

1. 3. 3 PROJECT SCHEDULE UPDATES

The Pr oj ect Schedul e shal l be kept cur r ent , r ef l ect i ng act ual act i v i t y pr ogr ess and pl an f or compl et i ng t he r emai ni ng wor k. Cont r act or and Gover nment r epr esent at i ves shal l meet at mont hl y i nt er val s t o r evi ew and agr ee on t he i nf or mat i on pr esent ed i n t he updat ed pr oj ect schedul e. Updat ed Pr oj ect Schedul es shal l al so be submi t t ed f or Gover nment appr oval i n conj unct i on wi t h any Cont r act or r equest s f or addi t i onal t i me. Submi t copi es of pur chase or der s and conf i r mat i on of del i ver y dat es as di r ect ed by t he Cont r act i ng Of f i cer .

1. 3. 3. 1 Nar r at i ve Repor t

Each updat ed pr oj ect schedul e shal l be accompani ed by a nar r at i ve r epor t i dent i f y i ng and j ust i f y i ng:

a. pr ogr ess made i n each ar ea of t he pr oj ect ;

b. t he cur r ent Cr i t i cal Pat h;

c. dat e/ t i me const r ai nt ( s) , ot her t han t hose r equi r ed by t he contract;

d. changes i n t he f ol l owi ng:

i . added or del et ed act i v i t i es;

i i . or i gi nal and r emai ni ng dur at i ons f or act i v i t i es whi ch have not st ar t ed;

i i i . l ogi c;

i v . mi l est ones;

SECTI ON 01 32 16. 00 20 Page 4

v. pl anned sequence of oper at i ons;

v i . cr i t i cal pat h.

e. pendi ng i t ems and st at us t her eof , i ncl udi ng per mi t s, changes or der s, and t i me ext ensi ons;

f . s t at us of Cont r act Compl et i on Dat e and i nt er i m mi l est ones;

g. cur r ent and ant i c i pat ed del ays ( descr i be cause of del ay and cor r ect i ve act i ons) ;

h. descr i pt i on of cur r ent and f ut ur e schedul e pr obl em ar eas.

Each ent r y i n t he nar r at i ve r epor t must c i t e t he r espect i ve Act i v i t y I D and Act i v i t y Descr i pt i on, t he dat e and r eason f or t he change, and descr i pt i on of t he change.

1. 4 PROGRESS DOCUMENTATI ON

1. 4. 1 Cont r act Pr ogr ess Repor t s

Pr i or t o commencement of wor k, submi t t he I ni t i al Cont r act Pr ogr ess Repor t ( AF I MT 3065) . The number of l i ne i t ems on t he Cont r act Pr ogr ess Schedul e shal l appr opr i at el y r ef l ect t he compl exi t y of t he wor k, phasi ng r equi r ement s and ot her pr oj ect const r ai nt s. At a mi ni mum, t he Cont r act Pr ogr ess Repor t shal l i ncl ude a l i ne i t em f or each Def i nabl e Feat ur e of Wor k i dent i f i ed i n t he appr oved Qual i t y Cont r ol Pl an. Once t he I ni t i al Cont r act Pr ogr ess Repor t has been appr oved by t he Cont r act i ng Of f i cer , submi t updat ed Mont hl y Cont r act Pr ogr ess Repor t s ( AF I MT 3065) f or Gover nment appr oval f or t he dur at i on of t he cont r act .

1. 4. 2 Cont r act Pr ogr ess Schedul es

Pr i or t o commencement of wor k, submi t t he I ni t i al Cont r act Pr ogr ess Schedul e ( AF I MT 3064) . Wor k el ement s shal l be i dent i cal t o t he el ement s l i s t ed on t he Cont r act Pr ogr ess Repor t ( AF I MT 3065) and t he over al l pr ogr ess schedul e shal l r ef l ect t he mor e det ai l ed Pr oj ect Schedul e. Once t he I ni t i al Cont r act Pr ogr ess Schedul e has been appr oved by t he Cont r act i ng Of f i cer , submi t updat ed Mont hl y Cont r act Pr ogr ess Schedul es ( AF I MT 3064) f or Gover nment appr oval f or t he dur at i on of t he cont r act .

1. 4. 3 3- WEEK LOOK AHEAD SCHEDULE

The Cont r act or shal l pr epar e and i ssue a 3- Week Look Ahead schedul e t o pr ovi de a mor e det ai l ed day- t o- day pl an of upcomi ng wor k i dent i f i ed on t he Pr oj ect Schedul e. The wor k pl ans shal l cover t he pl anned wor k f or t he cur r ent and f ol l owi ng t wo- week per i od and shal l i ncl ude upcomi ng out ages, c l osur es, pr epar at or y meet i ngs, and i ni t i al meet i ngs. I dent i f y cr i t i cal pat h act i v i t i es on t he Thr ee- Week Look Ahead Schedul e. Thr ee har d copi es and one el ect r oni c f i l e of t he 3- Week Look Ahead Schedul e shal l be del i ver ed t o t he Cont r act i ng Of f i cer no l at er t han 9 a. m. each Monday and r evi ewed dur i ng t he CQC Coor di nat i on Meet i ngs.

1. 5 ANTI CI PATED WEATHER LOST WORK DAYS

Use t he Nat i onal Oceani c and At mospher i c Admi ni st r at i on' s ( NOAA) hi st or i cal mont hl y aver ages f or days wi t h pr eci pi t at i on, usi ng a nomi nal 30- year , gr eat er t han 2. 5 mm 0. 10 i nch amount par amet er , as i ndi cat ed on t he St at i on Repor t f or t he NOAA l ocat i on c l osest t o t he pr oj ect s i t e as t he basi s f or

SECTI ON 01 32 16. 00 20 Page 5 est abl i shi ng a " Weat her Cal endar " showi ng t he number of ant i c i pat ed non- wor kdays f or each mont h due t o adver se weat her , i n addi t i on t o Sat ur days, Sundays and al l Feder al Hol i days as non- wor k days.

MONTHLY ANTI CI PATED ADVERSE WEATHER DELAYS

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

7 6 6 5 5 7 8 7 5 5 4 6

Assi gn t he Weat her Cal endar t o any act i v i t y t hat coul d be i mpact ed by adver se weat her . The Cont r act i ng Of f i cer wi l l i ssue a modi f i cat i on i n accor dance wi t h t he cont r act c l auses, gi v i ng t he Cont r act or a t i me ext ensi on f or t he di f f er ence of days bet ween t he ant i c i pat ed and act ual adver se weat her del ay i f t he number of act ual adver se weat her del ay days exceeds t he number of days ant i c i pat ed f or t he mont h i n whi ch t he del ay occur s and t he adver se weat her del ayed act i v i t i es ar e cr i t i cal t o cont r act coml et i on. A l ost wor kday due t o weat her condi t i ons i s def i ned as a day i n whi ch t he Cont r act or cannot wor k at l east 50 per cent of t he day on t he i mpact ed act i v i t y.

1. 6 CORRESPONDENCE AND TEST REPORTS:

Al l cor r espondence ( e. g. , l et t er s, Request s f or I nf or mat i on ( RFI s) , e- mai l s, meet i ng mi nut e i t ems, Pr oduct i on and QC Dai l y Repor t s, mat er i al del i ver y t i cket s, phot ogr aphs, et c. ) shal l r ef er ence Schedul e Act i v i t i es t hat ar e bei ng addr essed. Al l t est r epor t s ( e. g. , concr et e, soi l compact i on, wel d, pr essur e, et c. ) shal l r ef er ence Schedul e Act i v i t i es t hat ar e bei ng addr essed.

1. 7 ADDI TI ONAL SCHEDULI NG REQUI REMENTS

Any r ef er ences t o addi t i onal schedul i ng r equi r ement s, i ncl udi ng syst ems t o be i nspect ed, t est ed and commi ssi oned, t hat ar e l ocat ed t hr oughout t he r emai nder of t he Cont r act Document s, ar e subj ect t o al l r equi r ement s of t hi s sect i on.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

3. 1 OWNERSHI P OF FLOAT

Fl oat avai l abl e i n t he schedul e, at any t i me, shal l not be consi der ed f or t he excl usi ve use of ei t her t he Gover nment or t he Cont r act or .

3. 2 CONTRACT MODI FI CATI ON

Submi t a Ti me I mpact Anal ysi s ( TI A) wi t h each cost and t i me pr oposal f or a pr oposed change cl ear l y i l l ust r at i ng t he i nf l uence of each change or del ay on t he Cont r act Compl et i on Dat e ( CCD) or mi l est ones. TI As shal l be i n bot h nar r at i ve and schedul e f or m demonst r at i ng t he del ay i mpact . The TI A shal l i dent i f y t he pr edecessor s t o new act i v i t i es and demonst r at e i mpact s t o successor act i v i t i es. The TI A shal l show al l act i v i t y pr ogr ess as of t he dat e of t he pr oposal . I f t he i mpact t o t he schedul e occur s pr i or t o t he pr oposal submi ssi on, t he TI A schedul e shal l be updat ed t o show al l act i v i t y

SECTI ON 01 32 16. 00 20 Page 6 pr ogr ess as of t he t i me of t he i mpact . I f t he pr oposed change does not i mpact t he CCD, a TI A shal l not be r equi r ed.

SECTI ON 01 32 16. 00 20 Page 7

JBCGS SECTI ON 01 33 00

SUBMI TTAL PROCEDURES

05/11

PART 1 GENERAL

1. 1 DEFINITIONS

1. 1. 1 Submi t t al Descr i pt i ons ( SD)

Submi t t al s r equi r ement s ar e speci f i ed i n t he t echni cal sect i ons.

Submi t t al s ar e i dent i f i ed by Submi t t al Descr i pt i on ( SD) number s and t i t l es as f ol l ows:

SD- 01 Pr econst r uct i on Submi t t al s

Submi t t al s whi ch ar e r equi r ed pr i or t o st ar t of const r uct i on ( wor k) .

Cer t i f i cat es of i nsur ance

Sur et y bonds

Li st of pr oposed Subcont r act or s

Li st of pr oposed pr oduct s

Pr oj ect Schedul e

Cont r act pr ogr ess schedul e

Submi t t al r egi st er

Schedul e of pr i ces

Heal t h and saf et y pl an

Wor k pl an

Qual i t y Cont r ol ( QC) pl an

Envi r onment al pr ot ect i on pl an

SD- 02 Shop Dr awi ngs

Dr awi ngs, di agr ams and schedul es speci f i cal l y pr epar ed t o i l l ust r at e some por t i on of t he wor k.

Di agr ams and i nst r uct i ons f r om a manuf act ur er or f abr i cat or f or use i n pr oduci ng t he pr oduct and as ai ds t o t he Cont r act or f or i nt egr at i ng t he pr oduct or syst em i nt o t he pr oj ect .

Dr awi ngs pr epar ed by or f or t he Cont r act or t o show how mul t i pl e syst ems and i nt er di sci pl i nar y wor k wi l l be coor di nat ed.

SD- 03 Pr oduct Dat a

Cat al og cut s, i l l ust r at i ons, schedul es, di agr ams, per f or mance char t s, SECTI ON 01 33 00 Page 1 i nst r uct i ons and br ochur es i l l ust r at i ng s i ze, physi cal appear ance and ot her char act er i st i cs of mat er i al s, syst ems or equi pment f or some por t i on of t he wor k.

Sampl es of war r ant y l anguage when t he cont r act r equi r es ext ended pr oduct war r ant i es.

SD- 04 Sampl es

Fabr i cat ed or unf abr i cat ed physi cal exampl es of mat er i al s, equi pment or wor kmanshi p t hat i l l ust r at e f unct i onal and aest het i c char act er i st i cs of a mat er i al or pr oduct and est abl i sh st andar ds by whi ch t he wor k can be judged.

Col or sampl es f r om t he manuf act ur er ' s st andar d l i ne ( or cust om col or sampl es i f speci f i ed) t o be used i n sel ect i ng or appr ovi ng col or s f or t he pr oj ect .

Fi el d sampl es and mock- ups const r uct ed on t he pr oj ect s i t e est abl i sh st andar ds by whi ch t he ensur i ng wor k can be j udged. I ncl udes assembl i es or por t i ons of assembl i es whi ch ar e t o be i ncor por at ed i nt o t he pr oj ect and t hose whi ch wi l l be r emoved at concl usi on of t he wor k.

SD- 06 Test Repor t s

Repor t s i gned by aut hor i zed of f i c i al of t est i ng l abor at or y t hat a mat er i al , pr oduct or syst em i dent i cal t o t he mat er i al , pr oduct or syst em t o be pr ovi ded has been t est ed i n accor d wi t h speci f i ed r equi r ement s. Unl ess speci f i ed i n anot her sect i on, t est i ng must have been wi t hi n t hr ee year s of dat e of cont r act awar d f or t he pr oj ect .

Repor t whi ch i nc l udes f i ndi ngs of a t est r equi r ed t o be per f or med by t he Cont r act or on an act ual por t i on of t he wor k or pr ot ot ype pr epar ed f or t he pr oj ect bef or e shi pment t o j ob s i t e.

Repor t whi ch i nc l udes f i ndi ng of a t est made at t he j ob s i t e or on sampl e t aken f r om t he j ob s i t e, on por t i on of wor k dur i ng or af t er installation.

I nvest i gat i on r epor t s.

Dai l y l ogs and checkl i st s.

Fi nal accept ance t est and oper at i onal t est pr ocedur e.

SD- 07 Cer t i f i cat es

St at ement s pr i nt ed on t he manuf act ur er ' s l et t er head and si gned by r esponsi bl e of f i c i al s of manuf act ur er of pr oduct , syst em or mat er i al at t est i ng t hat t he pr oduct , syst em, or mat er i al meet s speci f i cat i on r equi r ement s. Must be dat ed af t er awar d of pr oj ect cont r act and cl ear l y name t he pr oj ect .

Document r equi r ed of Cont r act or , or of a manuf act ur er , suppl i er , i nst al l er or Subcont r act or t hr ough Cont r act or . The document pur pose i s t o f ur t her pr omot e t he or der l y pr ogr essi on of a por t i on of t he wor k by document i ng pr ocedur es, accept abi l i t y of met hods, or per sonnel qualifications.

SECTI ON 01 33 00 Page 2

Conf i ned space ent r y per mi t s.

Text of post ed oper at i ng i nst r uct i ons.

SD- 10 Oper at i on and Mai nt enance Dat a

Dat a t hat i s f ur ni shed by t he manuf act ur er , or t he syst em pr ovi der , t o t he equi pment oper at i ng and mai nt enance per sonnel , i ncl udi ng manuf act ur er ' s hel p and pr oduct l i ne document at i on necessar y t o mai nt ai n and i nst al l equi pment . Thi s dat a i s needed by oper at i ng and mai nt enance per sonnel f or t he saf e and ef f i c i ent oper at i on, mai nt enance and r epai r of t he i t em.

Thi s dat a i s i nt ended t o be i ncor por at ed i n an oper at i ons and mai nt enance manual or cont r ol syst em.

SD- 11 Cl oseout Submi t t al s

Document at i on t o r ecor d compl i ance wi t h t echni cal or admi ni st r at i ve r equi r ement s or t o est abl i sh an admi ni st r at i ve mechani sm.

Speci al r equi r ement s necessar y t o pr oper l y c l ose out a const r uct i on cont r act . For exampl e, Recor d Dr awi ngs and as- bui l t dr awi ngs. Al so, submi t t al r equi r ement s necessar y t o pr oper l y c l ose out a maj or phase of const r uct i on on a mul t i - phase cont r act .

I nt er i m " DD For m 1354" wi t h cost br eakout f or al l asset s 30 days pr i or t o f aci l i t y t ur nover .

1. 1. 2 Appr ovi ng Aut hor i t y

Of f i ce or desi gnat ed per son aut hor i zed t o appr ove submi t t al .

1. 1. 3 Work

As used i n t hi s sect i on, on- and of f - s i t e const r uct i on r equi r ed by cont r act document s, i ncl udi ng l abor necessar y t o pr oduce submi t t al s except t hose SD- 01 Pr e- Const r uct i on submi t t al s not ed above, const r uct i on, mat er i al s, pr oduct s, equi pment , and syst ems i ncor por at ed or t o be i ncor por at ed i n such construction.

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h t hi s sect i on.

SD- 01 Pr econst r uct i on Submi t t al s

Submi t t al Regi st er ; G

1. 3 PREPARATION

1. 3. 1 Tr ansmi t t al For m

Tr ansmi t each submi t t al , except sampl e i nst al l at i ons and sampl e panel s t o of f i ce of appr ovi ng aut hor i t y. Tr ansmi t submi t t al s wi t h t r ansmi t t al f or m

SECTI ON 01 33 00 Page 3 pr escr i bed by Cont r act i ng Of f i cer and st andar d f or pr oj ect . On t he t r ansmi t t al f or m i dent i f y Cont r act or , i ndi cat e dat e of submi t t al , and i ncl ude i nf or mat i on pr escr i bed by t r ansmi t t al f or m and r equi r ed i n par agr aph " I DENTI FYI NG SUBMI TTALS" . Pr ocess t r ansmi t t al f or ms t o r ecor d act i ons r egar di ng sampl e i nst al l at i ons.

1. 3. 2 I dent i f y i ng Submi t t al s

When submi t t al s ar e pr ovi ded by a Subcont r act or , t he Pr i me Cont r act or i s t o pr epar e, r evi ew and st amp wi t h Cont r act or ' s appr oval al l speci f i ed submi t t al s pr i or t o submi t t i ng f or Gover nment appr oval .

I dent i f y submi t t al s, except sampl e i nst al l at i ons and sampl e panel s, wi t h t he f ol l owi ng i nf or mat i on per manent l y adher ed t o or not ed on each separ at e component of each submi t t al and not ed…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.