PDF 156 KB Posted
- Attached to
- Repair Base Operations/Command Post, Bldg 169 at JB CHS-AB Federal contract opportunity
- Solicitation number
- FA4418-16-R-0018
About this file
Atch 3 Addendum 1 B169
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum #1
FA4418-17-R-0001
Project: DKFX 14-1042/D
Repair Base Ops/Command Post, Bldg 169
Joint Base Charleston - Air Base, SC
28 September 2016
1. Drawings, Sheet A102, Admin Room 224: All existing fixtures, furnishings and equipment
(FF&E) in this area will be reused by the building occupants after construction is complete.
With the exception of the TV Wall and two wall-mounted flat-screen monitors, the Contractor shall remove, store and reinstall the FF&E, as part of CLIN 0001. The Contractor shall protect the TV Wall and both wall-mounted flat-screen monitors throughout the duration of the contract as part of CLIN 0001.
FF&E to be stored and reinstalled include 34 conference chairs, 1 large conference table, 3 workstations, 4 wall mounted storage cabinets, 2 framed prints, 1 work table, 1 - 25 cf refrigerator, and 2 – 3.5 cf refrigerators.
2. Drawings, Sheet A102, Admin Room 231: All existing fixtures, furnishings and equipment
(FF&E) in this area except the server rack connected/networked to the TV Wall in Room 224 will be removed by the Government prior to construction. The server shall remain de-energized for the duration of the contract. The Contractor shall protect the server throughout the duration of the contract as part of CLIN 0001.
3. Drawings, Sheet A102, Server Room 241: All existing fixtures, furnishings and equipment
(FF&E) in this area (server racks and telephone panels) shall remain in-place, in a de-energized state, for the duration of the contract. The Contractor shall protect this equipment throughout the duration of the contract as part of CLIN 0001.
4. Drawings, Sheet A611, Door Tag 213: Change door material from wood to hollow metal and finish from stain to PNT-6.
5. Exterior Signage Metal Painting: The Contractor shall repaint the frame of the existing exterior building identification sign (approximately 60 square feet) in accordance with
Specification Section 09 90 00 as part of CLIN 0001. New signage is not required.
6. Specification 01 57 50 Temporary Environmental Controls: Storm Water Pollution Prevention Plan
(SWPPP) is not required for this project. Delete paragraph 1.5.d.4. Delete “or as specified in the approved
Construction Stormwater Pollution Prevention Plan (SWPPP)” within paragraph 3.3.3. Delete paragraphs
3.4.1 and 3.4.2.
7. Submittal Register: Delete requirement for Storm Water Pollution Prevention Plan compliance notebook per 01 57 50 paragraph 3.4.2.
8. Specifications Table of Contents: Add Section 23 09 23.13 20 BACnet DIRECT DIGITAL
CONTROL SYSTEMS FOR HVAC to Table of Contents.
- End -