Atch_8_-_Submittal_Register _B169.pdf

PDF 1 MB Posted

Attached to
Repair Base Operations/Command Post, Bldg 169 at JB CHS-AB Federal contract opportunity
Solicitation number
FA4418-16-R-0018
Issued by
Department of the Air Force Air Mobility Command

About this file

Atch 8 Submittal Register B169

View the file

Other files for this federal contract opportunity

Other files attached to Repair Base Operations/Command Post, Bldg 169 at JB CHS-AB, newest first.
File Type Posted
Amendment_0002_-_Crct_CLIN_0003,_B169.pdf PDF
Amendment_0001_-_Adden.__2,_B169.pdf PDF
_2_Qs_&_As,_B169.pdf PDF
Asbuilts,_B169.pdf PDF
_1_Qs_&_As,_B169.pdf PDF
Site_Visit_Brief_Slides_-_B169.pdf PDF
Conf-Site_Visit_Minutes,_B169.pdf PDF
Site_Visit_Attendees_Sign_In_Sheet_-_B169.pdf PDF
Atch_7_-_CLIN_0006_1st_Flr_Furn._-_TWCF_437th_BO_3.pdf PDF
Atch_7_-_CLIN_0004_1st_Flr_Furn._-_Jt_628th _437th_BO_1.pdf PDF
Atch_2_-_Drawings _Bldg_169.pdf PDF
Atch_4_-_Drawing _Roof_Assesment.pdf PDF
Atch_7_-_CLIN_0005_1st_Flr_Furn._-_O M_437th_BO_2.pdf PDF
Atch_12_-_AF_BPAs_Contracts_Furnishings_Info _FF E _B169.pdf PDF
Atch_9 _Green_Procurement _B169.pdf PDF
Atch_5_-_Photos_of_Roof_Sections.pdf PDF
Atch_10_-_WD_SC30_Charleston_Co._8.26.16 _B169.pdf PDF
Solicitation _Rpr_Base_Ops-Cmd_Post _B169.pdf PDF
Atch_7_-_CLIN_0009_2nd_Flr_Furn._-_TWCF_437th_BO_6.pdf PDF
Atch_11_-_List_of_Furnishings_-_Remove _Dispose _B169.pdf PDF
Atch_7_-_CLIN_0007_1st_Flr_Furn._-_TWCF_628th_BO_4.pdf PDF
Atch_1_-_Specifications _Bldg_169.pdf PDF
Atch_3_-_Addendum__1 _Bldg_169.pdf PDF
Atch_6_-_FF E_Interior_Design_Vol_1 2 _B169.pdf PDF
Atch_7_-_CLIN_0008_2nd_Flr_Furn._-_O M_628th_BO_5.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 35 PAGES

Base Ops/Cmd Post, Building 169

01 11 00 SD-01 Preconstruction Submittals GUtility Outage Requests GRoad Closure Requests GAir Force Work Clearance Permit GContractor's Proposed Laydown

Area Plan 01 14 00 SD-01 Preconstruction Submittals

1.2.1.1 GList of Contact Personnel

01 30 00 SD-01 Preconstruction Submittals

1.2 GView Location Map

1.3 GProgress and Completion

Pictures GResume for Superintendent

01 32 16.00 20 SD-01 Preconstruction Submittals

1.2 GQualifications

1.3.1 GBaseline Project Schedule

1.4.1 GInitial Contract Progress Report

(AF IMT 3065)

1.4.2 GInitial Contract Progress

Schedule (AF IMT 3064) SD-07 Certificates

GMonthly Project Schedule Update GBi-Weekly Contract Progress

Reports (AF IMT 3065)

1.4.2 GMonthly Contract Progress

Schedule (AF IMT 3064)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

1026394526C Typewritten Text

FA4418-17-R-0001

1026394526C Typewritten Text

1026394526C Typewritten Text

1026394526C Typewritten Text

1026394526C Typewritten Text

1026394526C Typewritten Text Atch 8

1026394526C Typewritten Text 27 May 16

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 35 PAGES

01 33 00 SD-01 Preconstruction Submittals

1.7 GSubmittal register

01 35 26 SD-01 Preconstruction Submittals

1.6 GAccident Prevention Plan (APP)

1.7 GActivity Hazard Analysis (AHA)

1.6.1 GCrane Critical Lift Plan

1.5.1.2 GCrane Operators

SD-06 Test Reports 1.11Notifications and Reports

1.11.2 GAccident Reports

1.11.3Crane Reports

SD-07 Certificates 1.8Confined Space Entry Permit 1.8Hot work permit

License Certificates 01 45 00 SD-01 Preconstruction Submittals

1.6.1 GConstruction Quality Control (QC)

Plan

01 45 35 SD-07 Certificates

1.5 GSpecial Inspector

1.4 GSpecial Inspection Quality

Control Plan 01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

01 50 10 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 35 PAGES

01 50 10 1.4.1 GMaterial Safety Data Sheet

(MSDS)

SD-06 Test Reports

1.8 GMonthly Green Procurement

Report

1.8 GAnnual Green Procurement

Report

1.3 GMonthly Recycling Report

GAnnual Recycling Report 01 54 00 SD-03 Product Data

GAffirmative Procurement Reporting Form

GProposed environmentally preferred products.

01 57 20 SD-01 Preconstruction Submittals GConstruction Waste Management

Plan 01 57 50 SD-01 Preconstruction Submittals

1.7.1 GPreconstruction Survey

1.7.6 GRegulatory Notifications

1.5 GEnvironmental Protection Plan

1.6 GDirt and Dust Control Plan

SD-06 Test Reports 3.9.2Disposal Requirements 1.7.7Erosion and Sediment Control

Inspection Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 35 PAGES

01 57 50 3.4Erosion and Sediment Control Inspection Reports

Storm Water Inspection Reports for General Permit

1.7.8 GSolid Waste Disposal Report

SD-07 Certificates

1.7.5 GContractor 40 CFR employee

training records

SD-11 Closeout Submittals

3.4.2 GStorm Water Pollution Prevention

Plan compliance notebook 1.7.3Waste Determination

Documentation 1.7.4Disposal Documentation for

Hazardous and Regulated Waste 1.7.5Contractor 40 CFR Employee

Training Records 1.7.2Solid Waste Disposal Permit 1.7.8Solid Waste Disposal Report

Hazardous Waste/Debris Management

01 78 00 SD-03 Product Data

1.5.1 GWarranty Management Plan

1.5.4 GWarranty Tags

1.4Spare Parts Data

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 35 PAGES

01 78 00 1.5.1Instructions SD-10 Operation and Maintenance Data

3.7Operation and Maintenance Manuals

Condition Monitoring (Predictive Testing

Inspection Posted Instructions

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

GRecord Drawings As-Built Record of Equipment and Materials

Final Approved Shop Drawings Construction Contract Specifications

GInterim DD Form 1354 GChecklist for DD Form 1354

02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

GDeconstruction Plan 1.10Existing Conditions

SD-07 Certificates

1.6 GNotification

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 35 PAGES

02 41 00 3.2.2Receipts 06 41 16.00 10 SD-02 Shop Drawings

2.10 GShop Drawings

3.1 GInstallation

SD-03 Product Data

2.1 GWood Materials

2.10.8.3 GFinish Schedule

GCabinet Harware GAdhesives and Sealants

SD-04 Samples

2.3 GPlastic Laminates

SD-07 Certificates

1.4 GQuality Assurance

3.1 GLaminate Clad Casework

06 61 16 SD-02 Shop Drawings GDetail Drawings

3.1 GInstallation

SD-03 Product Data

2.1 GSolid polymer material

1.4.1 GQualifications

2.3 GFabrications

SD-04 Samples

2.1 GMaterial

2.3.4 GCountertops

SD-06 Test Reports

2.1 GSolid polymer material

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 35 PAGES

06 61 16 SD-07 Certificates

2.3 GFabrications

1.4.1 GQualifications

SD-10 Operation and Maintenance Data

3.2 GClean-up

07 92 00 SD-03 Product Data

2.1 GSealants

2.2 GPrimers

2.3 GBond breakers

2.4 GBackstops

SD-07 Certificates

3.3.6 GSealant

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.4 GFrames

2.4 GFrames

2.2Accessories

SD-03 Product Data

2.1 GDoors

2.4 GFrames

2.2 GAccessories

08 14 00 SD-02 Shop Drawings

2.1 GDoors

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 35 PAGES

08 14 00 2.1 GDoors 2.2Accessories 1.4warranty

SD-04 Samples 2.1Doors

2.3.6.2 GDoor finish colors

08 42 29.43 SD-01 Preconstruction Submittals GSample Warranty GListing of Product Installations

SD-02 Shop Drawings GSliding Automatic Entrances

SD-03 Product Data GManufacturer's Catalog Data

SD-04 Samples GFinish and Color Samples

SD-08 Manufacturer’s Instructions GSubmit detailed instructions for installation, adjustments, cleaning and maintenance

SD-10 Operation and Maintenance Data

GImpact Rated Sliding Automatic Entrance Doors

08 43 13 SD-01 Preconstruction Submittals GSample Warranty GListing of Product Installations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 35 PAGES

08 43 13 GInstaller Qualifications GManufacturer Qualifications

SD-02 Shop Drawings GInstallation Drawings GFabrication Drawings

SD-03 Product Data GManufacturer's Catalog Data

SD-04 Samples GFinish and Color Samples

SD-06 Test Reports GCertified Test Reports

SD-07 Certificates

3.4 GManufacturer's Product Warranty

08 71 00 SD-02 Shop Drawings

1.3 GHardware schedule

2.3.5 GKeying system

SD-03 Product Data

2.3 GHardware items

SD-08 Manufacturer’s Instructions

3.1 GInstallation

SD-10 Operation and Maintenance Data

1.3 GHardware Schedule

SD-11 Closeout Submittals

1.4 GKey Bitting

08 81 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 35 PAGES

08 81 00 Installation SD-03 Product Data

1.6.1 GInsulating Glass

1.3 GGlazing Accessories

SD-07 Certificates 1.6.1Insulating Glass

Impact Rated Glass Safety Glass

SD-08 Manufacturer’s Instructions 2.3Setting and sealing materials 3.2Glass setting

09 22 00 SD-02 Shop Drawings

2.1 GMetal support systems

09 29 00 SD-03 Product Data

2.1.3 GCementitious backer units

GGlass Mat Water-Resistant Gypsum Tile Backing Board

2.1.2 GWater-Resistant Gypsum

Backing Board

2.1.1 GGypsum Board

2.1.7 GAccessories

SD-07 Certificates

2.1 GAsbestos Free Materials

SD-08 Manufacturer’s Instructions GMaterial Safety Data Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 35 PAGES

09 29 00 SD-10 Operation and Maintenance Data

GManufacturer maintenance instructions

3.7Waste Management 09 30 00 SD-02 Shop Drawings

1.3 GDetail Drawings

SD-03 Product Data

GTile

2.2 GSetting-Bed

2.4 GMortar, Grout, and Adhesive

SD-04 Samples GTile GAccessories

2.4 GGrout

SD-07 Certificates

GTile

2.4 GMortar, Grout, and Adhesive

09 51 00 SD-02 Shop Drawings 1.2Approved Detail Drawings

SD-03 Product Data Acoustical Ceiling Systems

SD-04 Samples 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 35 PAGES

09 51 00 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles

09 65 00 SD-02 Shop Drawings

2.8 GResilient Flooring and

Accessories SD-03 Product Data

2.8 GResilient Flooring and

Accessories

2.4Adhesives SD-04 Samples

2.8 GResilient Flooring and

Accessories

SD-06 Test Reports

3.3 GMoisture, Alkalinity and Bond

Tests SD-08 Manufacturer’s Instructions

3.2 GSurface Preparation

3.1 GInstallation

SD-10 Operation and Maintenance Data

2.8 GResilient Flooring and

Accessories

SD-11 Closeout Submittals LEED Documentation

09 68 00 SD-02 Shop Drawings

3.4 GInstallation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 35 PAGES

09 68 00 2.4 GMoldings SD-03 Product Data

GCarpet

3.1 GSurface Preparation

3.4 GInstallation

SD-04 Samples GCarpet

2.4 GMoldings

SD-06 Test Reports

3.2 GMoisture and Alkalinity Tests

SD-07 Certificates

GCarpet

1.4 GRegulatory Requirements

SD-10 Operation and Maintenance Data

GCarpet

3.5 GCleaning and Protection

Maintenance Service 09 83 13 SD-02 Shop Drawings

2.1 GApproved Detail Drawings

SD-03 Product Data

3.2Installation

2.1 GAcoustical Wall Panels

SD-04 Samples

2.1 GAcoustical Wall Panels

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 35 PAGES

09 83 13 2.1Acoustical Wall Panels 09 90 00 SD-02 Shop Drawings

3.10Piping identification 3.10stencil

SD-03 Product Data

2.1 GCoating

2.1Manufacturer's Technical Data

Sheets Sealant

SD-04 Samples

1.9 GColor

SD-07 Certificates 1.3Applicator's qualifications

1.4.1.2 GQualification Testing

SD-08 Manufacturer’s Instructions Application instructions

3.6.2Mixing 1.7.2Manufacturer's Material Safety

Data Sheets SD-10 Operation and Maintenance Data

2.1 GCoatings:

10 21 13 SD-02 Shop Drawings

1.2 GFabrication Drawings

3.1 GInstallation Drawings

3.2 GInstallation Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 35 PAGES

10 21 13 SD-03 Product Data

1.2 GCleaning and Maintenance

Instructions

2.1.1 GAnchoring Devices and

Fasteners

2.1.3 GHardware and Fittings

GBrackets

2.1.4 GDoor Hardware

2.4 GPilaster Shoes

SD-04 Samples

2.6 GColors and Finishes

SD-07 Certificates

1.6 GWarranty

10 28 13 SD-03 Product Data

2.1.2 GFinishes

2.2 GAccessory Items

SD-04 Samples

2.1.2 GFinishes

2.2 GAccessory Items

SD-07 Certificates 2.2Accessory Items

21 13 00.00 40 SD-01 Preconstruction Submittals

1.2 GRecord of Existing Conditions

SD-02 Shop Drawings

2.2.3 GSupporting Elements

2.2.4 GFire-Department Connections

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 35 PAGES

21 13 00.00 40 2.2.7.1 GFire Alarm System

2.2.6 GSprinkler Heads

2.2.7 GValves

SD-03 Product Data

2.2.1 GUnderground Piping Materials

2.2.2 GAboveground Piping Materials

2.2.7 GValves

2.2.4 GFire-Department Connections

2.2.5 GRiser Alarm Equipment

2.2.6 GSprinkler Heads

2.3 GMaterials

2.2.3 GSupporting Elements

2.1 GEquipment and Performance

Data SD-05 Design Data

Part 2 GDesign Analysis and Calculations SD-06 Test Reports

3.3.6 GPressure Tests

3.3.3 GSystem Operating Tests

3.3.3 GAir Tests

3.3.3 GValve-Operating Tests

3.3.3 GDrainage Tests

22 00 00 SD-03 Product Data

2.4 GFixtures

2.4.1 GFlush Valve Water Closets

2.4.2 GFlush Valve Urinals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 35 PAGES

22 00 00 2.4.4 GWall Hung Lavatories

2.4.5 GCountertop Lavatories

2.4.6 GKitchen Sinks

3.6.1Plumbing System

SD-06 Test Reports 3.6Tests, Flushing and Disinfection

GTest of Backflow Prevention Assemblies

SD-07 Certificates 1.3Materials and Equipment

SD-10 Operation and Maintenance Data

3.6.1 GPlumbing System

23 00 00 SD-02 Shop Drawings

1.4.5 GDetail Drawings

SD-03 Product Data

2.9.1.2Insulated Nonmetallic Flexible Duct Runouts

2.9.1.2Duct Connectors

2.9.2 GDuct Access Doors

2.9.3Fire Dampers

2.9.4 GManual Balancing Dampers

2.9.8Sound Attenuation Equipment 2.9.9.1Diffusers 2.9.9.2Registers and Grilles 2.9.10Louvers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 35 PAGES

23 00 00 2.9.11Air Vents, Penthouses, and Goosenecks

2.10.1.1Centrifugal Fans 2.10.1.2In-Line Centrifugal Fans 2.10.1.3Ceiling Exhaust Fans

2.11 GAir Handling Units

2.12.1.1 GVariable Volume, Single Duct

Terminal Units

2.12.1.3 GReheat Units

2.12.2Unit Ventilators 1.4.6Test Procedures

1.2.1.2 GDiagrams

SD-06 Test Reports

3.13 GPerformance Tests

3.11 GDamper Acceptance Test

SD-07 Certificates 1.4.1Bolts 1.4.3Ozone Depleting Substances

SD-08 Manufacturer’s Instructions 3.3Manufacturer's Installation

Instructions 3.15.2Operation and Maintenance

Training SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 35 PAGES

23 00 00 3.15.1 GOperation and Maintenance Manuals

2.9.3 GFire Dampers

2.9.4 GManual Balancing Dampers

2.10.1.1 GCentrifugal Fans

2.10.1.2 GIn-Line Centrifugal Fans

2.10.1.3 GCeiling Exhaust Fans

2.11 GAir Handling Units

2.12.1.1 GVariable Volume, Single Duct

Terminal Units

2.12.1.3 GReheat Units

2.12.2 GUnit Ventilators

23 05 15 SD-01 Preconstruction Submittals

1.2 GMaterial, Equipment, and Fixture

Lists SD-02 Shop Drawings

1.2 GRecord Drawings

1.2 GCoordination Drawings

SD-03 Product Data

2.2 GPipe and Fittings

2.3 GPiping Specialties

2.4 GValves

2.5 GMiscellaneous Materials

2.6 GSupporting Elements

1.2 GEquipment Foundation Data

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 35 PAGES

23 05 15 1.2 GManufacturer's Standard Color Charts

SD-05 Design Data

2.2 GPipe and Fittings

2.3 GPiping Specialties

2.4 GValves

SD-06 Test Reports

3.1 GHydrostatic Tests

3.1 GAir Tests

3.1 GValve-Operating Tests

3.1 GSystem Operation Tests

SD-07 Certificates

1.4.2 GRecord of Satisfactory Field

Operation

1.2 GRecords of Existing Conditions

SD-10 Operation and Maintenance Data

3.12 GOperation and Maintenance

Manuals

23 05 48.00 40 SD-02 Shop Drawings

1.2 GInstallation Drawings

1.2 GOutline Drawings

SD-03 Product Data

1.2 GEquipment and Performance

Data

2.2.8 GIsolators

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 35 PAGES

23 05 48.00 40 SD-06 Test Reports

2.4 GType of Isolator

2.4 GType of Base

2.4 GAllowable Deflection

2.4 GMeasured Deflection

23 05 93 SD-02 Shop Drawings

1.3.3 GTAB Schematic Drawings and

Report Forms SD-03 Product Data

1.3 GEquipment and Performance

Data

GTAB Related HVAC Submittals SD-06 Test Reports

3.3.5 GCompleted Pre-Final DALT

Report

3.3.8 GCertified Final DALT Report

SD-07 Certificates

1.5.1 GIndependent TAB Agency and

Personnel Qualifications

GDALT and TAB Submittal and Work Schedule

GTAB Pre-Field Engineering Report

3.3.2 GAdvance Notice Of Pre-Final Dalt

Field Work

23 07 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 35 PAGES

23 07 00 3.2.2.4 GMICA Plates 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems

SD-03 Product Data

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

SD-04 Samples

2.2.1.3 GThermal Insulation

3.1.1 GDisplay Samples

SD-08 Manufacturer’s Instructions

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

23 09 23.13 20 SD-02 Shop Drawings

1.4.1.1 GControl System Drawings Title

Sheet

1.4.1.2 GList of I/O Points

1.4.1.3 GControl System Components List

1.4.1.4 GControl System Schematics

1.4.1.5 GHVAC Equipment Electrical

Ladder Diagrams

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 35 PAGES

23 09 23.13 20 1.4.1.6 GComponent Wiring Diagrams

1.4.1.7 GTerminal Strip Diagrams

1.4.1.8 GBACnet Communication

Architecture Schematic SD-03 Product Data

2.1.2 GDirect Digital Controllers

2.1.2.12 GBACnet Gateways

GBACnet Discovery Tool GBACnet Operator Workstation

Software GBACnet Operator Workstation

2.2 GSensors and Input Hardware

2.3 GOutput Hardware

2.4.2 GSurge and Transient Protection

2.6 GIndicators

2.5.1 GDuct smoke detectors

2.7 GVariable Frequency (Motor)

Drives SD-05 Design Data

3.4.2 GPerformance Verification Testing

Plan

3.4.4 GPre-Performance Verification

Testing Checklist

SD-06 Test Reports

3.4.11 GPerformance Verification Testing

Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 35 PAGES

23 09 23.13 20 SD-07 Certificates

1.6.6 GContractor's Qualifications

SD-09 Manufacturer’s Field Reports

3.4.1 GPre-PVT Checklist

SD-10 Operation and Maintenance Data

1.4 GBACnet Direct Digital Control

Systems

3.3 GControls System Operators

Manuals

2.7.2 GVFD Service Manuals

SD-11 Closeout Submittals

3.5.1 GTraining Documentation

23 64 26 SD-03 Product Data

2.2.2.4 GGrooved Mechanical

Connections For Steel

2.3.3 GGrooved Mechanical

Connections For Copper

GCalibrated Balancing Valves

2.4.5 GAutomatic Flow Control Valves

2.4.6Pump Discharge Valve

GWater Temperature Regulating Valves

Water Pressure Reducing Valve 2.4.7Pressure Relief Valve

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 35 PAGES

23 64 26 2.4.8Combination Pressure and Temperature Relief Valves

2.5.9 GExpansion Joints

2.6 GPumps

2.5.3Combination Strainer and Pump

Suction Diffuser 2.7Expansion Tanks 2.8Air Separator Tanks

2.9 GWater Treatment Systems

SD-06 Test Reports 3.1.1.3Piping Welds NDE Report

3.4.2 GPressure Tests Reports

GCondenser Water Quality Test Reports

GOne-Year Inspection Report For Cooling Water

SD-07 Certificates 3.1.1.1Employer's Record Documents

(For Welding) 3.1.1.2Welding Procedures and

Qualifications Piping for High-Pressure Compressed-Air Systems

Fittings Unions Flanges

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 35 PAGES

23 64 26 Gaskets Bolting

SD-08 Manufacturer’s Instructions

3.5 GLesson plan for the Instruction

Course SD-10 Operation and Maintenance Data

2.9 GWater Treatment Systems

GCalibrated Balancing Valves

2.4.5 GAutomatic Flow Control Valves

2.4.6 GPump Discharge Valve

GWater Temperature Regulating Valves

GWater Pressure Reducing Valve

2.4.7 GPressure Relief Valve

2.4.8 GCombination Pressure and

Temperature Relief Valves

2.5.9 GExpansion Joints

2.6 GPumps

2.5.3 GCombination Strainer and Pump

Suction Diffuser

2.7 GExpansion Tanks

2.8 GAir Separator Tanks

23 81 23.00 20 SD-03 Product Data

2.1 GComputer room air conditioning

units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 35 PAGES

23 81 23.00 20 2.3.2 GSpace temperature control system drawings

2.1.4Filters 1.4Refrigerants

SD-06 Test Reports

2.6.2 GCRACU Production Schedule

and Factory Test Schedule

2.6.1 GManufacturer's Factory Test

Plans

2.6.5 GFactory Test Reports

3.4.2 GField Test Schedule

3.4.1 GManufacturer's Field Test Plans

3.4.6 GField Test Reports

2.1.2Aquatic Toxicity

SD-07 Certificates

2.2 GCertificate of Specification

Compliance

3.4.3 GCredentials of the Manufacturer's

Field Test Representative SD-08 Manufacturer’s Instructions

3.2.2Installation Manual for Each Type of CRACU

SD-10 Operation and Maintenance Data

2.1 GComputer Room Air Conditioning

Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 35 PAGES

26 05 00.00 40 SD-01 Preconstruction Submittals

2.1 GMaterial, Equipment, and Fixture

Lists SD-03 Product Data

2.1.1 GConduits and Raceways

2.1.3 GWire and Cable

3.2.1.8 GSplices and Connectors

2.1.4 GSwitches

2.1.6 GOutlets, Outlet Boxes, and Pull

Boxes

2.1.8 GCircuit Breakers

2.1.9 GLamps and Lighting Fixtures

SD-06 Test Reports 3.3Continuity Test 3.3Phase-Rotation Tests 3.3Insulation Resistance Test

SD-07 Certificates

1.4 GCertification

SD-08 Manufacturer’s Instructions Part 2Manufacturer's Instructions

26 05 48.00 10 SD-02 Shop Drawings 3.2Lighting Fixtures in Buildings 1.3Equipment Requirements

SD-03 Product Data

3.2 GLighting Fixtures in Buildings

1.3 GEquipment Requirements

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 35 PAGES

26 05 48.00 10 1.2.4 GContractor Designed Bracing 26 08 00 SD-06 Test Reports

3.1 GAcceptance tests and inspections

SD-07 Certificates

1.4.1 GQualifications

1.4.3 GAcceptance test and inspections

procedure 26 09 23.00 40 SD-03 Product Data

2.1Photoconductive Control Devices

2.7 GLighting Contactor

GTime Switch GPhotocell Switch

2.10 GOccupancy Sensors

SD-06 Test Reports

3.2System Operation Tests SD-10 Operation and Maintenance Data

2.1 GLighting Control System, Data

Package 5

26 20 00 SD-02 Shop Drawings

2.12 GPanelboards

2.22 GWireways

SD-03 Product Data

2.11 GReceptacles

2.12.2 GCircuit breakers

2.9 GSwitches

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 35 PAGES

26 20 00 2.13 GEnclosed circuit breakers GMotor controllers GCATV outlets GGrounding Busbar GSurge protective devices

SD-06 Test Reports

3.5.2 G600-volt wiring test

3.5.3 GGrounding system test

SD-07 Certificates

2.10 GFuses

SD-10 Operation and Maintenance Data

1.5.1 GElectrical Systems

26 24 16.00 40 SD-02 Shop Drawings

GDetail Drawings GOutline Drawings

SD-03 Product Data

1.3 GPanelboards

2.1.2Directory Card and Holder

Filtered Panelboards SD-06 Test Reports

3.2Continuity Tests

3.2 GInsulation Tests

SD-07 Certificates

1.4 GStatements

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 35 PAGES

26 24 16.00 40 1.3 GPanelboards 26 51 00 SD-03 Product Data

GFluorescent lighting fixtures GFluorescent electronic ballasts GFluorescent electromagnetic ballasts GFluorescent lamps GDimmer switch GLighting contactor GTime switch

2.4 GPhotocell switch

2.5 GPower hook fixture hangers

2.6 GExit signs

2.7 GEmergency lighting equipment

GCentral emergency system

2.8 GOccupancy sensors

GElectronic dimming ballast GDimming ballast controls GLight Level Sensor

1.6.3.3Energy Efficiency SD-04 Samples

1.6.1 GLighting fixtures

SD-06 Test Reports

3.3Operating test SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 35 PAGES

26 51 00 1.4.1 GLighting Control System 1.8Operational Service

27 10 00 SD-02 Shop Drawings

1.6.1.1 GTelecommunications drawings

1.6.1.2 GTelecommunications Space

Drawings SD-03 Product Data

2.3 GTelecommunications cabling

2.4.5 GPatch panels

2.5 GTelecommunications

outlet/connector assemblies

2.4.2 GEquipment support frame

SD-06 Test Reports

3.5.1 GTelecommunications cabling

testing SD-07 Certificates

1.6.2.1 GTelecommunications Contractor

1.6.2.2 GKey Personnel

1.6.2.3 GManufacturer Qualifications

1.6.3 GTest plan

SD-09 Manufacturer’s Field Reports

2.12.1 GFactory reel tests

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 35 PAGES

27 10 00 1.10.1 GTelecommunications cabling and pathway system

SD-11 Closeout Submittals

1.10.2 GRecord Documentation

27 51 16 SD-02 Shop Drawings

2.1.4 GDetail Drawings

SD-03 Product Data 1.4Spare Parts

SD-06 Test Reports

3.5 GApproved Test Procedures

3.5Acceptance Tests

SD-07 Certificates 2.2Components

SD-10 Operation and Maintenance Data

2.1 GRadio and Public Address

System

28 05 26.00 40 SD-01 Preconstruction Submittals 3.8.2Grounding Systems

SD-02 Shop Drawings 1.4Record Drawings

SD-03 Product Data Ground Rods

2.2Ground Wires 2.3Connectors and Fasteners 3.7Bonding

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 35 PAGES

28 05 26.00 40 SD-06 Test Reports 3.8.1Bond Resistance Test 3.8.2Ground Resistance Tests

Ground Isolation Test 3.8.4Continuity Isolation Test

SD-08 Manufacturer’s Instructions 3.8.2Grounding Systems

28 31 76.00 00 SD-02 Shop Drawings GAmplifiers GDevice Operation GFinal As-Built Drawings GOperation And Maintenance

(O&M) Manual and Instructions GRiser Diagram GShop Drawing GWiring Diagram

SD-03 Product Data GBattery Charger, Wiring, and

Cable GElectromagnetic Door Holder, Transmitters and Housing GFAS and MNS firmware, FACP and MNS Panel GMonitor Module and Relay

Control and Mini-Module

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 35 PAGES

28 31 76.00 00 GNotification Appliance Circuits (NACs) and NAC Extenders

GSmoke Detectors or Sensors and Heat Detectors or Sensors

GWater Flow Detectors and Tamper Switches

SD-05 Design Data GDesign Data

SD-06 Test Reports GTest Reports

SD-07 Certificates GCertificates

SD-09 Manufacturer’s Field Reports

GManufacturer's Field Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .