Atch_8_-_Submittal_Register _B169.pdf
PDF 1 MB Posted
- Attached to
- Repair Base Operations/Command Post, Bldg 169 at JB CHS-AB Federal contract opportunity
- Solicitation number
- FA4418-16-R-0018
About this file
Atch 8 Submittal Register B169
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 35 PAGES
Base Ops/Cmd Post, Building 169
01 11 00 SD-01 Preconstruction Submittals GUtility Outage Requests GRoad Closure Requests GAir Force Work Clearance Permit GContractor's Proposed Laydown
Area Plan 01 14 00 SD-01 Preconstruction Submittals
1.2.1.1 GList of Contact Personnel
01 30 00 SD-01 Preconstruction Submittals
1.2 GView Location Map
1.3 GProgress and Completion
Pictures GResume for Superintendent
01 32 16.00 20 SD-01 Preconstruction Submittals
1.2 GQualifications
1.3.1 GBaseline Project Schedule
1.4.1 GInitial Contract Progress Report
(AF IMT 3065)
1.4.2 GInitial Contract Progress
Schedule (AF IMT 3064) SD-07 Certificates
GMonthly Project Schedule Update GBi-Weekly Contract Progress
Reports (AF IMT 3065)
1.4.2 GMonthly Contract Progress
Schedule (AF IMT 3064)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
1026394526C Typewritten Text
FA4418-17-R-0001
1026394526C Typewritten Text
1026394526C Typewritten Text
1026394526C Typewritten Text
1026394526C Typewritten Text
1026394526C Typewritten Text Atch 8
1026394526C Typewritten Text 27 May 16
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 35 PAGES
01 33 00 SD-01 Preconstruction Submittals
1.7 GSubmittal register
01 35 26 SD-01 Preconstruction Submittals
1.6 GAccident Prevention Plan (APP)
1.7 GActivity Hazard Analysis (AHA)
1.6.1 GCrane Critical Lift Plan
1.5.1.2 GCrane Operators
SD-06 Test Reports 1.11Notifications and Reports
1.11.2 GAccident Reports
1.11.3Crane Reports
SD-07 Certificates 1.8Confined Space Entry Permit 1.8Hot work permit
License Certificates 01 45 00 SD-01 Preconstruction Submittals
1.6.1 GConstruction Quality Control (QC)
Plan
01 45 35 SD-07 Certificates
1.5 GSpecial Inspector
1.4 GSpecial Inspection Quality
Control Plan 01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
01 50 10 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 35 PAGES
01 50 10 1.4.1 GMaterial Safety Data Sheet
(MSDS)
SD-06 Test Reports
1.8 GMonthly Green Procurement
Report
1.8 GAnnual Green Procurement
Report
1.3 GMonthly Recycling Report
GAnnual Recycling Report 01 54 00 SD-03 Product Data
GAffirmative Procurement Reporting Form
GProposed environmentally preferred products.
01 57 20 SD-01 Preconstruction Submittals GConstruction Waste Management
Plan 01 57 50 SD-01 Preconstruction Submittals
1.7.1 GPreconstruction Survey
1.7.6 GRegulatory Notifications
1.5 GEnvironmental Protection Plan
1.6 GDirt and Dust Control Plan
SD-06 Test Reports 3.9.2Disposal Requirements 1.7.7Erosion and Sediment Control
Inspection Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 35 PAGES
01 57 50 3.4Erosion and Sediment Control Inspection Reports
Storm Water Inspection Reports for General Permit
1.7.8 GSolid Waste Disposal Report
SD-07 Certificates
1.7.5 GContractor 40 CFR employee
training records
SD-11 Closeout Submittals
3.4.2 GStorm Water Pollution Prevention
Plan compliance notebook 1.7.3Waste Determination
Documentation 1.7.4Disposal Documentation for
Hazardous and Regulated Waste 1.7.5Contractor 40 CFR Employee
Training Records 1.7.2Solid Waste Disposal Permit 1.7.8Solid Waste Disposal Report
Hazardous Waste/Debris Management
01 78 00 SD-03 Product Data
1.5.1 GWarranty Management Plan
1.5.4 GWarranty Tags
1.4Spare Parts Data
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 35 PAGES
01 78 00 1.5.1Instructions SD-10 Operation and Maintenance Data
3.7Operation and Maintenance Manuals
Condition Monitoring (Predictive Testing
Inspection Posted Instructions
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
GRecord Drawings As-Built Record of Equipment and Materials
Final Approved Shop Drawings Construction Contract Specifications
GInterim DD Form 1354 GChecklist for DD Form 1354
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
GDeconstruction Plan 1.10Existing Conditions
SD-07 Certificates
1.6 GNotification
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 35 PAGES
02 41 00 3.2.2Receipts 06 41 16.00 10 SD-02 Shop Drawings
2.10 GShop Drawings
3.1 GInstallation
SD-03 Product Data
2.1 GWood Materials
2.10.8.3 GFinish Schedule
GCabinet Harware GAdhesives and Sealants
SD-04 Samples
2.3 GPlastic Laminates
SD-07 Certificates
1.4 GQuality Assurance
3.1 GLaminate Clad Casework
06 61 16 SD-02 Shop Drawings GDetail Drawings
3.1 GInstallation
SD-03 Product Data
2.1 GSolid polymer material
1.4.1 GQualifications
2.3 GFabrications
SD-04 Samples
2.1 GMaterial
2.3.4 GCountertops
SD-06 Test Reports
2.1 GSolid polymer material
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 35 PAGES
06 61 16 SD-07 Certificates
2.3 GFabrications
1.4.1 GQualifications
SD-10 Operation and Maintenance Data
3.2 GClean-up
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 GPrimers
2.3 GBond breakers
2.4 GBackstops
SD-07 Certificates
3.3.6 GSealant
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.4 GFrames
2.4 GFrames
2.2Accessories
SD-03 Product Data
2.1 GDoors
2.4 GFrames
2.2 GAccessories
08 14 00 SD-02 Shop Drawings
2.1 GDoors
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 35 PAGES
08 14 00 2.1 GDoors 2.2Accessories 1.4warranty
SD-04 Samples 2.1Doors
2.3.6.2 GDoor finish colors
08 42 29.43 SD-01 Preconstruction Submittals GSample Warranty GListing of Product Installations
SD-02 Shop Drawings GSliding Automatic Entrances
SD-03 Product Data GManufacturer's Catalog Data
SD-04 Samples GFinish and Color Samples
SD-08 Manufacturer’s Instructions GSubmit detailed instructions for installation, adjustments, cleaning and maintenance
SD-10 Operation and Maintenance Data
GImpact Rated Sliding Automatic Entrance Doors
08 43 13 SD-01 Preconstruction Submittals GSample Warranty GListing of Product Installations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 35 PAGES
08 43 13 GInstaller Qualifications GManufacturer Qualifications
SD-02 Shop Drawings GInstallation Drawings GFabrication Drawings
SD-03 Product Data GManufacturer's Catalog Data
SD-04 Samples GFinish and Color Samples
SD-06 Test Reports GCertified Test Reports
SD-07 Certificates
3.4 GManufacturer's Product Warranty
08 71 00 SD-02 Shop Drawings
1.3 GHardware schedule
2.3.5 GKeying system
SD-03 Product Data
2.3 GHardware items
SD-08 Manufacturer’s Instructions
3.1 GInstallation
SD-10 Operation and Maintenance Data
1.3 GHardware Schedule
SD-11 Closeout Submittals
1.4 GKey Bitting
08 81 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 35 PAGES
08 81 00 Installation SD-03 Product Data
1.6.1 GInsulating Glass
1.3 GGlazing Accessories
SD-07 Certificates 1.6.1Insulating Glass
Impact Rated Glass Safety Glass
SD-08 Manufacturer’s Instructions 2.3Setting and sealing materials 3.2Glass setting
09 22 00 SD-02 Shop Drawings
2.1 GMetal support systems
09 29 00 SD-03 Product Data
2.1.3 GCementitious backer units
GGlass Mat Water-Resistant Gypsum Tile Backing Board
2.1.2 GWater-Resistant Gypsum
Backing Board
2.1.1 GGypsum Board
2.1.7 GAccessories
SD-07 Certificates
2.1 GAsbestos Free Materials
SD-08 Manufacturer’s Instructions GMaterial Safety Data Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 35 PAGES
09 29 00 SD-10 Operation and Maintenance Data
GManufacturer maintenance instructions
3.7Waste Management 09 30 00 SD-02 Shop Drawings
1.3 GDetail Drawings
SD-03 Product Data
GTile
2.2 GSetting-Bed
2.4 GMortar, Grout, and Adhesive
SD-04 Samples GTile GAccessories
2.4 GGrout
SD-07 Certificates
GTile
2.4 GMortar, Grout, and Adhesive
09 51 00 SD-02 Shop Drawings 1.2Approved Detail Drawings
SD-03 Product Data Acoustical Ceiling Systems
SD-04 Samples 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 35 PAGES
09 51 00 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles
09 65 00 SD-02 Shop Drawings
2.8 GResilient Flooring and
Accessories SD-03 Product Data
2.8 GResilient Flooring and
Accessories
2.4Adhesives SD-04 Samples
2.8 GResilient Flooring and
Accessories
SD-06 Test Reports
3.3 GMoisture, Alkalinity and Bond
Tests SD-08 Manufacturer’s Instructions
3.2 GSurface Preparation
3.1 GInstallation
SD-10 Operation and Maintenance Data
2.8 GResilient Flooring and
Accessories
SD-11 Closeout Submittals LEED Documentation
09 68 00 SD-02 Shop Drawings
3.4 GInstallation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 35 PAGES
09 68 00 2.4 GMoldings SD-03 Product Data
GCarpet
3.1 GSurface Preparation
3.4 GInstallation
SD-04 Samples GCarpet
2.4 GMoldings
SD-06 Test Reports
3.2 GMoisture and Alkalinity Tests
SD-07 Certificates
GCarpet
1.4 GRegulatory Requirements
SD-10 Operation and Maintenance Data
GCarpet
3.5 GCleaning and Protection
Maintenance Service 09 83 13 SD-02 Shop Drawings
2.1 GApproved Detail Drawings
SD-03 Product Data
3.2Installation
2.1 GAcoustical Wall Panels
SD-04 Samples
2.1 GAcoustical Wall Panels
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 35 PAGES
09 83 13 2.1Acoustical Wall Panels 09 90 00 SD-02 Shop Drawings
3.10Piping identification 3.10stencil
SD-03 Product Data
2.1 GCoating
2.1Manufacturer's Technical Data
Sheets Sealant
SD-04 Samples
1.9 GColor
SD-07 Certificates 1.3Applicator's qualifications
1.4.1.2 GQualification Testing
SD-08 Manufacturer’s Instructions Application instructions
3.6.2Mixing 1.7.2Manufacturer's Material Safety
Data Sheets SD-10 Operation and Maintenance Data
2.1 GCoatings:
10 21 13 SD-02 Shop Drawings
1.2 GFabrication Drawings
3.1 GInstallation Drawings
3.2 GInstallation Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 35 PAGES
10 21 13 SD-03 Product Data
1.2 GCleaning and Maintenance
Instructions
2.1.1 GAnchoring Devices and
Fasteners
2.1.3 GHardware and Fittings
GBrackets
2.1.4 GDoor Hardware
2.4 GPilaster Shoes
SD-04 Samples
2.6 GColors and Finishes
SD-07 Certificates
1.6 GWarranty
10 28 13 SD-03 Product Data
2.1.2 GFinishes
2.2 GAccessory Items
SD-04 Samples
2.1.2 GFinishes
2.2 GAccessory Items
SD-07 Certificates 2.2Accessory Items
21 13 00.00 40 SD-01 Preconstruction Submittals
1.2 GRecord of Existing Conditions
SD-02 Shop Drawings
2.2.3 GSupporting Elements
2.2.4 GFire-Department Connections
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 35 PAGES
21 13 00.00 40 2.2.7.1 GFire Alarm System
2.2.6 GSprinkler Heads
2.2.7 GValves
SD-03 Product Data
2.2.1 GUnderground Piping Materials
2.2.2 GAboveground Piping Materials
2.2.7 GValves
2.2.4 GFire-Department Connections
2.2.5 GRiser Alarm Equipment
2.2.6 GSprinkler Heads
2.3 GMaterials
2.2.3 GSupporting Elements
2.1 GEquipment and Performance
Data SD-05 Design Data
Part 2 GDesign Analysis and Calculations SD-06 Test Reports
3.3.6 GPressure Tests
3.3.3 GSystem Operating Tests
3.3.3 GAir Tests
3.3.3 GValve-Operating Tests
3.3.3 GDrainage Tests
22 00 00 SD-03 Product Data
2.4 GFixtures
2.4.1 GFlush Valve Water Closets
2.4.2 GFlush Valve Urinals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 35 PAGES
22 00 00 2.4.4 GWall Hung Lavatories
2.4.5 GCountertop Lavatories
2.4.6 GKitchen Sinks
3.6.1Plumbing System
SD-06 Test Reports 3.6Tests, Flushing and Disinfection
GTest of Backflow Prevention Assemblies
SD-07 Certificates 1.3Materials and Equipment
SD-10 Operation and Maintenance Data
3.6.1 GPlumbing System
23 00 00 SD-02 Shop Drawings
1.4.5 GDetail Drawings
SD-03 Product Data
2.9.1.2Insulated Nonmetallic Flexible Duct Runouts
2.9.1.2Duct Connectors
2.9.2 GDuct Access Doors
2.9.3Fire Dampers
2.9.4 GManual Balancing Dampers
2.9.8Sound Attenuation Equipment 2.9.9.1Diffusers 2.9.9.2Registers and Grilles 2.9.10Louvers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 35 PAGES
23 00 00 2.9.11Air Vents, Penthouses, and Goosenecks
2.10.1.1Centrifugal Fans 2.10.1.2In-Line Centrifugal Fans 2.10.1.3Ceiling Exhaust Fans
2.11 GAir Handling Units
2.12.1.1 GVariable Volume, Single Duct
Terminal Units
2.12.1.3 GReheat Units
2.12.2Unit Ventilators 1.4.6Test Procedures
1.2.1.2 GDiagrams
SD-06 Test Reports
3.13 GPerformance Tests
3.11 GDamper Acceptance Test
SD-07 Certificates 1.4.1Bolts 1.4.3Ozone Depleting Substances
SD-08 Manufacturer’s Instructions 3.3Manufacturer's Installation
Instructions 3.15.2Operation and Maintenance
Training SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 35 PAGES
23 00 00 3.15.1 GOperation and Maintenance Manuals
2.9.3 GFire Dampers
2.9.4 GManual Balancing Dampers
2.10.1.1 GCentrifugal Fans
2.10.1.2 GIn-Line Centrifugal Fans
2.10.1.3 GCeiling Exhaust Fans
2.11 GAir Handling Units
2.12.1.1 GVariable Volume, Single Duct
Terminal Units
2.12.1.3 GReheat Units
2.12.2 GUnit Ventilators
23 05 15 SD-01 Preconstruction Submittals
1.2 GMaterial, Equipment, and Fixture
Lists SD-02 Shop Drawings
1.2 GRecord Drawings
1.2 GCoordination Drawings
SD-03 Product Data
2.2 GPipe and Fittings
2.3 GPiping Specialties
2.4 GValves
2.5 GMiscellaneous Materials
2.6 GSupporting Elements
1.2 GEquipment Foundation Data
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 35 PAGES
23 05 15 1.2 GManufacturer's Standard Color Charts
SD-05 Design Data
2.2 GPipe and Fittings
2.3 GPiping Specialties
2.4 GValves
SD-06 Test Reports
3.1 GHydrostatic Tests
3.1 GAir Tests
3.1 GValve-Operating Tests
3.1 GSystem Operation Tests
SD-07 Certificates
1.4.2 GRecord of Satisfactory Field
Operation
1.2 GRecords of Existing Conditions
SD-10 Operation and Maintenance Data
3.12 GOperation and Maintenance
Manuals
23 05 48.00 40 SD-02 Shop Drawings
1.2 GInstallation Drawings
1.2 GOutline Drawings
SD-03 Product Data
1.2 GEquipment and Performance
Data
2.2.8 GIsolators
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 35 PAGES
23 05 48.00 40 SD-06 Test Reports
2.4 GType of Isolator
2.4 GType of Base
2.4 GAllowable Deflection
2.4 GMeasured Deflection
23 05 93 SD-02 Shop Drawings
1.3.3 GTAB Schematic Drawings and
Report Forms SD-03 Product Data
1.3 GEquipment and Performance
Data
GTAB Related HVAC Submittals SD-06 Test Reports
3.3.5 GCompleted Pre-Final DALT
Report
3.3.8 GCertified Final DALT Report
SD-07 Certificates
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
GDALT and TAB Submittal and Work Schedule
GTAB Pre-Field Engineering Report
3.3.2 GAdvance Notice Of Pre-Final Dalt
Field Work
23 07 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 35 PAGES
23 07 00 3.2.2.4 GMICA Plates 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems
SD-03 Product Data
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
SD-04 Samples
2.2.1.3 GThermal Insulation
3.1.1 GDisplay Samples
SD-08 Manufacturer’s Instructions
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
23 09 23.13 20 SD-02 Shop Drawings
1.4.1.1 GControl System Drawings Title
Sheet
1.4.1.2 GList of I/O Points
1.4.1.3 GControl System Components List
1.4.1.4 GControl System Schematics
1.4.1.5 GHVAC Equipment Electrical
Ladder Diagrams
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 35 PAGES
23 09 23.13 20 1.4.1.6 GComponent Wiring Diagrams
1.4.1.7 GTerminal Strip Diagrams
1.4.1.8 GBACnet Communication
Architecture Schematic SD-03 Product Data
2.1.2 GDirect Digital Controllers
2.1.2.12 GBACnet Gateways
GBACnet Discovery Tool GBACnet Operator Workstation
Software GBACnet Operator Workstation
2.2 GSensors and Input Hardware
2.3 GOutput Hardware
2.4.2 GSurge and Transient Protection
2.6 GIndicators
2.5.1 GDuct smoke detectors
2.7 GVariable Frequency (Motor)
Drives SD-05 Design Data
3.4.2 GPerformance Verification Testing
Plan
3.4.4 GPre-Performance Verification
Testing Checklist
SD-06 Test Reports
3.4.11 GPerformance Verification Testing
Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 35 PAGES
23 09 23.13 20 SD-07 Certificates
1.6.6 GContractor's Qualifications
SD-09 Manufacturer’s Field Reports
3.4.1 GPre-PVT Checklist
SD-10 Operation and Maintenance Data
1.4 GBACnet Direct Digital Control
Systems
3.3 GControls System Operators
Manuals
2.7.2 GVFD Service Manuals
SD-11 Closeout Submittals
3.5.1 GTraining Documentation
23 64 26 SD-03 Product Data
2.2.2.4 GGrooved Mechanical
Connections For Steel
2.3.3 GGrooved Mechanical
Connections For Copper
GCalibrated Balancing Valves
2.4.5 GAutomatic Flow Control Valves
2.4.6Pump Discharge Valve
GWater Temperature Regulating Valves
Water Pressure Reducing Valve 2.4.7Pressure Relief Valve
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 35 PAGES
23 64 26 2.4.8Combination Pressure and Temperature Relief Valves
2.5.9 GExpansion Joints
2.6 GPumps
2.5.3Combination Strainer and Pump
Suction Diffuser 2.7Expansion Tanks 2.8Air Separator Tanks
2.9 GWater Treatment Systems
SD-06 Test Reports 3.1.1.3Piping Welds NDE Report
3.4.2 GPressure Tests Reports
GCondenser Water Quality Test Reports
GOne-Year Inspection Report For Cooling Water
SD-07 Certificates 3.1.1.1Employer's Record Documents
(For Welding) 3.1.1.2Welding Procedures and
Qualifications Piping for High-Pressure Compressed-Air Systems
Fittings Unions Flanges
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 35 PAGES
23 64 26 Gaskets Bolting
SD-08 Manufacturer’s Instructions
3.5 GLesson plan for the Instruction
Course SD-10 Operation and Maintenance Data
2.9 GWater Treatment Systems
GCalibrated Balancing Valves
2.4.5 GAutomatic Flow Control Valves
2.4.6 GPump Discharge Valve
GWater Temperature Regulating Valves
GWater Pressure Reducing Valve
2.4.7 GPressure Relief Valve
2.4.8 GCombination Pressure and
Temperature Relief Valves
2.5.9 GExpansion Joints
2.6 GPumps
2.5.3 GCombination Strainer and Pump
Suction Diffuser
2.7 GExpansion Tanks
2.8 GAir Separator Tanks
23 81 23.00 20 SD-03 Product Data
2.1 GComputer room air conditioning
units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 35 PAGES
23 81 23.00 20 2.3.2 GSpace temperature control system drawings
2.1.4Filters 1.4Refrigerants
SD-06 Test Reports
2.6.2 GCRACU Production Schedule
and Factory Test Schedule
2.6.1 GManufacturer's Factory Test
Plans
2.6.5 GFactory Test Reports
3.4.2 GField Test Schedule
3.4.1 GManufacturer's Field Test Plans
3.4.6 GField Test Reports
2.1.2Aquatic Toxicity
SD-07 Certificates
2.2 GCertificate of Specification
Compliance
3.4.3 GCredentials of the Manufacturer's
Field Test Representative SD-08 Manufacturer’s Instructions
3.2.2Installation Manual for Each Type of CRACU
SD-10 Operation and Maintenance Data
2.1 GComputer Room Air Conditioning
Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 35 PAGES
26 05 00.00 40 SD-01 Preconstruction Submittals
2.1 GMaterial, Equipment, and Fixture
Lists SD-03 Product Data
2.1.1 GConduits and Raceways
2.1.3 GWire and Cable
3.2.1.8 GSplices and Connectors
2.1.4 GSwitches
2.1.6 GOutlets, Outlet Boxes, and Pull
Boxes
2.1.8 GCircuit Breakers
2.1.9 GLamps and Lighting Fixtures
SD-06 Test Reports 3.3Continuity Test 3.3Phase-Rotation Tests 3.3Insulation Resistance Test
SD-07 Certificates
1.4 GCertification
SD-08 Manufacturer’s Instructions Part 2Manufacturer's Instructions
26 05 48.00 10 SD-02 Shop Drawings 3.2Lighting Fixtures in Buildings 1.3Equipment Requirements
SD-03 Product Data
3.2 GLighting Fixtures in Buildings
1.3 GEquipment Requirements
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 35 PAGES
26 05 48.00 10 1.2.4 GContractor Designed Bracing 26 08 00 SD-06 Test Reports
3.1 GAcceptance tests and inspections
SD-07 Certificates
1.4.1 GQualifications
1.4.3 GAcceptance test and inspections
procedure 26 09 23.00 40 SD-03 Product Data
2.1Photoconductive Control Devices
2.7 GLighting Contactor
GTime Switch GPhotocell Switch
2.10 GOccupancy Sensors
SD-06 Test Reports
3.2System Operation Tests SD-10 Operation and Maintenance Data
2.1 GLighting Control System, Data
Package 5
26 20 00 SD-02 Shop Drawings
2.12 GPanelboards
2.22 GWireways
SD-03 Product Data
2.11 GReceptacles
2.12.2 GCircuit breakers
2.9 GSwitches
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 35 PAGES
26 20 00 2.13 GEnclosed circuit breakers GMotor controllers GCATV outlets GGrounding Busbar GSurge protective devices
SD-06 Test Reports
3.5.2 G600-volt wiring test
3.5.3 GGrounding system test
SD-07 Certificates
2.10 GFuses
SD-10 Operation and Maintenance Data
1.5.1 GElectrical Systems
26 24 16.00 40 SD-02 Shop Drawings
GDetail Drawings GOutline Drawings
SD-03 Product Data
1.3 GPanelboards
2.1.2Directory Card and Holder
Filtered Panelboards SD-06 Test Reports
3.2Continuity Tests
3.2 GInsulation Tests
SD-07 Certificates
1.4 GStatements
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 35 PAGES
26 24 16.00 40 1.3 GPanelboards 26 51 00 SD-03 Product Data
GFluorescent lighting fixtures GFluorescent electronic ballasts GFluorescent electromagnetic ballasts GFluorescent lamps GDimmer switch GLighting contactor GTime switch
2.4 GPhotocell switch
2.5 GPower hook fixture hangers
2.6 GExit signs
2.7 GEmergency lighting equipment
GCentral emergency system
2.8 GOccupancy sensors
GElectronic dimming ballast GDimming ballast controls GLight Level Sensor
1.6.3.3Energy Efficiency SD-04 Samples
1.6.1 GLighting fixtures
SD-06 Test Reports
3.3Operating test SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 35 PAGES
26 51 00 1.4.1 GLighting Control System 1.8Operational Service
27 10 00 SD-02 Shop Drawings
1.6.1.1 GTelecommunications drawings
1.6.1.2 GTelecommunications Space
Drawings SD-03 Product Data
2.3 GTelecommunications cabling
2.4.5 GPatch panels
2.5 GTelecommunications
outlet/connector assemblies
2.4.2 GEquipment support frame
SD-06 Test Reports
3.5.1 GTelecommunications cabling
testing SD-07 Certificates
1.6.2.1 GTelecommunications Contractor
1.6.2.2 GKey Personnel
1.6.2.3 GManufacturer Qualifications
1.6.3 GTest plan
SD-09 Manufacturer’s Field Reports
2.12.1 GFactory reel tests
SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 35 PAGES
27 10 00 1.10.1 GTelecommunications cabling and pathway system
SD-11 Closeout Submittals
1.10.2 GRecord Documentation
27 51 16 SD-02 Shop Drawings
2.1.4 GDetail Drawings
SD-03 Product Data 1.4Spare Parts
SD-06 Test Reports
3.5 GApproved Test Procedures
3.5Acceptance Tests
SD-07 Certificates 2.2Components
SD-10 Operation and Maintenance Data
2.1 GRadio and Public Address
System
28 05 26.00 40 SD-01 Preconstruction Submittals 3.8.2Grounding Systems
SD-02 Shop Drawings 1.4Record Drawings
SD-03 Product Data Ground Rods
2.2Ground Wires 2.3Connectors and Fasteners 3.7Bonding
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 35 PAGES
28 05 26.00 40 SD-06 Test Reports 3.8.1Bond Resistance Test 3.8.2Ground Resistance Tests
Ground Isolation Test 3.8.4Continuity Isolation Test
SD-08 Manufacturer’s Instructions 3.8.2Grounding Systems
28 31 76.00 00 SD-02 Shop Drawings GAmplifiers GDevice Operation GFinal As-Built Drawings GOperation And Maintenance
(O&M) Manual and Instructions GRiser Diagram GShop Drawing GWiring Diagram
SD-03 Product Data GBattery Charger, Wiring, and
Cable GElectromagnetic Door Holder, Transmitters and Housing GFAS and MNS firmware, FACP and MNS Panel GMonitor Module and Relay
Control and Mini-Module
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 35 PAGES
28 31 76.00 00 GNotification Appliance Circuits (NACs) and NAC Extenders
GSmoke Detectors or Sensors and Heat Detectors or Sensors
GWater Flow Detectors and Tamper Switches
SD-05 Design Data GDesign Data
SD-06 Test Reports GTest Reports
SD-07 Certificates GCertificates
SD-09 Manufacturer’s Field Reports
GManufacturer's Field Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR