5-_Material_Submittal.pdf

PDF 223 KB Posted

Attached to
C17 Runway Reconstruction
Solicitation number
FA4418-15-R-0013
Issued by

About this file

5- Material Submittal Form

View the file

Other files

File Type Posted
Amendment_0001.pdf PDF
Q A_Answers_for_NAAF.docx DOCX document
Pre-proposal_Record_of_Attendance.pdf PDF
Pre-proposal_Meeting_Minutes.pdf PDF
3-_WAGE_DETERMINATION.pdf PDF
2_-_Combined_Drawing_Set.pdf PDF
0-FA4418-15-R-0013_Solicitation.pdf PDF
1-_Combined_Specification.pdf PDF
6-_COSPP.pdf PDF
4-_Green_Procurement.pdf PDF
7-_Design_Narrative.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER

SBML 11-1056

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

1 01 11 00, Para 1.5.1, "Utility Outage Requests" 5

2 01 11 00, Para 1.5.1, "Utility Connection Requests" 5

3 01 14 00, Para 1.4.1.1, "List of Contact Personnel"; G 5

4 01 32 17.00 20, Para 1.5, "Qualifications"; G 5

01 32 17.00 20, Para 1.3, "Baseline Network Analysis Schedule"; G

01 32 17.00 20, Para 1.7.1, "Monthly Network Analysis";

G

7 01 32 17.00 20, Para 1.7.2, "As-Built Schedule"; G 5

8 01 33 00, Para 1.8, "Submittal Register"; G 5

9 01 35 13, Para 3.1.2, "Heavy Equipment and Vehicle List" 5

10 01 35 13, Para 3.1.2, "Existing Conditions Survey" 5

01 35 13, Para 3.1.2, "Construction Operations Plan"

12 01 35 13, Para 3.1.2, "Safety Plan" 5

13 01 35 13, Para 3.1.2, "Schedule of Work" 5

01 35 23, Para 1.4, "Safety Plan Compliance Document

(SPCD)"; G

01 35 26, Para 1.6, "Accident Prevention Plan

(APP)"; G

16 01 35 26, Para 1.7, "Activity Hazard Analysis (AHA)"; G 5

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

SD

-0 1 P

RE

CO

NS

TR

UC

TI

ON

SU

BM

IT

TA

LS

SD

-0

2 S

HO

P

DR

AW

IN

GS

SD

-0

3 P

RO

DU

CT

D

AT

A

OT

HE

RS

A

S

SP

EC

IF

IE

D

SD

-0

6 T

ES

T

RE

PO

RT

S

SD

-1

1 C

LO

SE

OU

T

SU

BM

IT

TA

LS

REQUIRED

SUBMISSION

DATE

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

SD

-0

4 S

AM

PL

ES

SD

-0

5 D

ES

IG

N

DA

TA

SD

-0

7 C

ER

TI

FI

CA

TE

S

SD

-0

8 M

AN

UF

AC

TU

RE

R' S

IN

ST

RU

CT

IO

NS

PROJECT TITLE

REPAIR C17 LANDING ZONE

SOLICITATION/CONTRACT NO.

REMARKSDATE RECEIVED

IN CONTRACTING

DATE

TO

CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW UP

SCHEDULE OF MATERIAL SUBMITTALS

SD

-1

0 O

PE

RA

TI

ON

M

AI

NT

EN

AN

CE

DA

TA

SD

-0

9 M

AN

UF

AC

TU

RE

R' S

FI

EL

D

RE

PO

RT

S

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP.

(b) Prior to Final Inspection.

(c) Prior to Use.

(d) As Required.

SBML 11-1056

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

SD

-0 1 P

RE

CO

NS

TR

UC

IT

TA

LS

SD

-0

2 S

HO

P

DR

AW

IN

GS

SD

-0

3 P

RO

DU

CT

D

AT

A

OT

HE

RS

A

S

SP

EC

IF

IE

D

SD

-0

6 T

ES

T

RE

PO

RT

S

SD

-1

1 C

LO

SE

OU

T

SU

BM

IT

TA

LS

REQUIRED

SUBMISSION

DATE

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

SD

-0

4 S

AM

PL

ES

SD

-0

5 D

ES

IG

N

DA

TA

SD

-0

7 C

ER

TI

FI

CA

TE

S

SD

-0

8 M

AN

UF

AC

TU

RE

R' S

IN

ST

RU

CT

IO

NS

PROJECT TITLE

REPAIR C17 LANDING ZONE

SOLICITATION/CONTRACT NO.

REMARKSDATE RECEIVED

IN CONTRACTING

DATE

TO

CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW UP

SCHEDULE OF MATERIAL SUBMITTALS

SD

-1

0 O

PE

RA

TI

ON

M

AI

NT

EN

SD

-0

9 M

AN

UF

AC

TU

RE

R' S

FI

EL

D

RE

PO

RT

S

01 35 26, Para 3.1.1, "Hazardous Communication

(HAZCOM)"; G

01 35 26, Para 3.1.1, "JBC- AB Transient Organization Hazardous Material Inventory Form"; G

19 01 35 26, Para 1.11, "Notifications and Reports" 5

20 01 35 26, Para 1.11.2, "Accident Reports"; G 5

01 35 26, Para 1.8, "Confined Space Entry Permit"

22 01 35 26, Para 1.8, "Hot work permit" 5

23 01 35 26, Para 1.15, "Energized work permit" 5

24 01 35 26, Para 1.11.3, "Certificate of Compliance" 5

01 45 00.00 10, Para 3.2, "Contractor Quality Control (CQC) Plan"; G

26 01 50 00, Para 1.3, "Construction site plan"; G 5

27 01 50 00, Para 3.4.1, "Traffic control plan"; G 5

28 01 50 00, Para 1.4, "Backflow preventers"; G 5

01 50 00, Para 2.2.4, "Backflow Preventer Tests";

G

30 01 50 00, Para 1.4.1, "Backflow Tester"; G 5

31 01 50 00, Para 1.4, "Backflow Preventers" 5

32 01 50 10, Para 1.4.1, "Safety Data Sheet (SDS)" 5

33 01 50 10, Para 1.8, "Affirmative Procurement" 5

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP.

(b) Prior to Final Inspection.

SBML 11-1056

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

SD

-0 1 P

RE

CO

NS

TR

UC

IT

TA

LS

SD

-0

2 S

HO

P

DR

AW

IN

GS

SD

-0

3 P

RO

DU

CT

D

AT

A

OT

HE

RS

A

S

SP

EC

IF

IE

D

SD

-0

6 T

ES

T

RE

PO

RT

S

SD

-1

1 C

LO

SE

OU

T

SU

BM

IT

TA

LS

REQUIRED

SUBMISSION

DATE

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

SD

-0

4 S

AM

PL

ES

SD

-0

5 D

ES

IG

N

DA

TA

SD

-0

7 C

ER

TI

FI

CA

TE

S

SD

-0

8 M

AN

UF

AC

TU

RE

R' S

IN

ST

RU

CT

IO

NS

PROJECT TITLE

REPAIR C17 LANDING ZONE

SOLICITATION/CONTRACT NO.

REMARKSDATE RECEIVED

IN CONTRACTING

DATE

TO

CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW UP

SCHEDULE OF MATERIAL SUBMITTALS

SD

-1

0 O

PE

RA

TI

ON

M

AI

NT

EN

SD

-0

9 M

AN

UF

AC

TU

RE

R' S

FI

EL

D

RE

PO

RT

S

34 01 50 10, Para 1.3, "Recycling Report" 5

01 54 00, Para 1.5.2.1, "Affirmative Procurement Reporting Form"; G

01 57 20, Para 1.3.3, "Construction Waste Management Plan"; G

37 01 57 50, Para 1.7.1, "Preconstruction Survey"; G 5

38 01 57 50, Para 1.8.3, "Regulatory Notifications"; G 5

01 57 50, Para 1.5, "Environmental Protection Plan"; G

40 01 57 50, Para 1.6, "Dirt and Dust Control Plan"; G 5

41 01 57 50, Para 3.9.2, "Disposal Requirements" 5

01 57 50, Para 1.8.4, "Erosion and Sediment Control Inspection Reports"

01 57 50, Para 3.4, "Erosion and Sediment Control Inspection Reports"

44 01 57 50, Para 1.8.5, "Solid Waste Disposal Report"; G 5

01 57 50, Para 1.8.2, "Contractor 40 CFR employee training records";

G

01 57 50, Para 3.4.2, "Storm Water Pollution Prevention Plan compliance notebook";

G

01 57 50, Para 1.8, "Waste Determination Documentation"

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP.

(b) Prior to Final Inspection.

SBML 11-1056

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

SD

-0 1 P

RE

CO

NS

TR

UC

IT

TA

LS

SD

-0

2 S

HO

P

DR

AW

IN

GS

SD

-0

3 P

RO

DU

CT

D

AT

A

OT

HE

RS

A

S

SP

EC

IF

IE

D

SD

-0

6 T

ES

T

RE

PO

RT

S

SD

-1

1 C

LO

SE

OU

T

SU

BM

IT

TA

LS

REQUIRED

SUBMISSION

DATE

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

SD

-0

4 S

AM

PL

ES

SD

-0

5 D

ES

IG

N

DA

TA

SD

-0

7 C

ER

TI

FI

CA

TE

S

SD

-0

8 M

AN

UF

AC

TU

RE

R' S

IN

ST

RU

CT

IO

NS

PROJECT TITLE

REPAIR C17 LANDING ZONE

SOLICITATION/CONTRACT NO.

REMARKSDATE RECEIVED

IN CONTRACTING

DATE

TO

CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW UP

SCHEDULE OF MATERIAL SUBMITTALS

SD

-1

0 O

PE

RA

TI

ON

M

AI

NT

EN

SD

-0

9 M

AN

UF

AC

TU

RE

R' S

FI

EL

D

RE

PO

RT

S

01 57 50, Para 3.7.2, "Waste Determination Documentation"

01 57 50, Para 1.8.1, "Disposal Documentation for Hazardous and Regulated Waste"

01 57 50, Para 1.8.2, "Contractor 40 CFR Employee Training Records"

51 01 57 50, Para 1.7.2, "Solid Waste Disposal Permit" 5

52 01 57 50, Para 1.8.5, "Solid Waste Disposal Report" 5

01 57 50, Para 3.7.2, "Hazardous Waste/Debris Management"

54 01 57 50, Para 1.8.3, "Regulatory Notifications" 5

55 01 62 35, Para 1.7, "Biobased Products"; G 5

56 01 78 02.00 20, Para 2.1, "Record Drawings"; G 5

57 01 78 02.00 20, Para 2.2, "Record GIS Data"; G 5

58 01 78 02.00 20, Para 2.3, "Record Product Data"; G 5

59 02 41 00, Para 1.1, "Existing Conditions"; G 5

60 02 41 00, Para 1.2.1, "Demolition Plan"; G 5

61 02 41 00, Para 1.6, "Notification"; G 5

62 03 30 53, Para 1.4, "Installation Drawings"; G 5

63 03 30 53, Para 2.2.3.1, "Air- Entraining Admixture" 5

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP.

(b) Prior to Final Inspection.

SBML 11-1056

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

SD

-0 1 P

RE

CO

NS

TR

UC

IT

TA

LS

SD

-0

2 S

HO

P

DR

AW

IN

GS

SD

-0

3 P

RO

DU

CT

D

AT

A

OT

HE

RS

A

S

SP

EC

IF

IE

D

SD

-0

6 T

ES

T

RE

PO

RT

S

SD

-1

1 C

LO

SE

OU

T

SU

BM

IT

TA

LS

REQUIRED

SUBMISSION

DATE

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

SD

-0

4 S

AM

PL

ES

SD

-0

5 D

ES

IG

N

DA

TA

SD

-0

7 C

ER

TI

FI

CA

TE

S

SD

-0

8 M

AN

UF

AC

TU

RE

R' S

IN

ST

RU

CT

IO

NS

PROJECT TITLE

REPAIR C17 LANDING ZONE

SOLICITATION/CONTRACT NO.

REMARKSDATE RECEIVED

IN CONTRACTING

DATE

TO

CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW UP

SCHEDULE OF MATERIAL SUBMITTALS

SD

-1

0 O

PE

RA

TI

ON

M

AI

NT

EN

SD

-0

9 M

AN

UF

AC

TU

RE

R' S

FI

EL

D

RE

PO

RT

S

03 30 53, Para 2.2.3.2, "Water-Reducing or Retarding Admixture"

65 03 30 53, Para 2.2.9, "Curing Materials" 5

66 03 30 53, Para 2.2.6, "Expansion Joint Filler Strips

03 30 53, Para 3.1.3.3, "Batching and Mixing Equipment"

03 30 53, Para 3.2, "Conveying and Placing Concrete"

69 03 30 53, Para 2.2.7, "Formwork" 5

70 03 30 53, Para 2.3, "Mix Design Data"; G 5

71 03 30 53, Para 2.3, "Ready- Mix Concrete" 5

03 30 53, Para 2.2.5, "Mechanical Reinforcing Bar Connectors"

73 03 30 53, Para 2.2.2, "Aggregates" 5

03 30 53, Para 2.1.3, "Concrete Mixture Proportions"; G

03 30 53, Para 3.8.3, "Compressive Strength Testing"; G

76 03 30 53, Para 3.8.3, "Slump"; G 5

77 03 30 53, Para 3.8.3, "Air Content" 5

78 03 30 53, Para 2.2.4, "Water" 5

79 03 30 53, Para 2.2.1, "Cementitious Materials" 5

80 03 30 53, Para 2.2.1.2, "Pozzolan" 5

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP.

(b) Prior to Final Inspection.

SBML 11-1056

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

SD

-0 1 P

RE

CO

NS

TR

UC

IT

TA

LS

SD

-0

2 S

HO

P

DR

AW

IN

GS

SD

-0

3 P

RO

DU

CT

D

AT

A

OT

HE

RS

A

S

SP

EC

IF

IE

D

SD

-0

6 T

ES

T

RE

PO

RT

S

SD

-1

1 C

LO

SE

OU

T

SU

BM

IT

TA

LS

REQUIRED

SUBMISSION

DATE

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

SD

-0

4 S

AM

PL

ES

SD

-0

5 D

ES

IG

N

DA

TA

SD

-0

7 C

ER

TI

FI

CA

TE

S

SD

-0

8 M

AN

UF

AC

TU

RE

R' S

IN

ST

RU

CT

IO

NS

PROJECT TITLE

REPAIR C17 LANDING ZONE

SOLICITATION/CONTRACT NO.

REMARKSDATE RECEIVED

IN CONTRACTING

DATE

TO

CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW UP

SCHEDULE OF MATERIAL SUBMITTALS

SD

-1

0 O

PE

RA

TI

ON

M

AI

NT

EN

SD

-0

9 M

AN

UF

AC

TU

RE

R' S

FI

EL

D

RE

PO

RT

S

81 03 30 53, Para 2.2.2, "Aggregates" 5

82 03 30 53, Para 2.3, "Delivery Tickets" 5

26 56 20.00 10, Para 2.1, "Lighting and Visual Navigation Aids"

84 26 56 20.00 10, Para 1.3.5, "As-Built Drawings" 5

85 26 56 20.00 10, Para 2.2, "Materials and Equipment" 5

86 26 56 20.00 10, Para 1.3.3, "Protection Plan" 5

87 26 56 20.00 10, Para 3.26, "Training" 5

88 26 56 20.00 10, Para 3.26, "Special Tools" 5

89 26 56 20.00 10, Para 3.26, "List of Parts" 5

90 26 56 20.00 10, Para 3.26, "Maintenance and Repair" 5

91 26 56 20.00 10, Para 3.29, "Posted Instructions" 5

92 26 56 20.00 10, Para 3.24, "Field Quality Control" 5

93 26 56 20.00 10, Para 3.24.3, "Visual Inspection" 5

94 26 56 20.00 10, Para 1.3.2, "Qualifications" 5

95 26 56 20.00 10, Para 2.2, "Materials and Equipment" 5

26 56 20.00 10, Para 3.26, "Operation and Maintenance Procedures"

97 31 00 00, Para 3.4, "Shoring"; G 5

98 31 00 00, Para 1.4.2, "Dewatering Work Plan"; G 5

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP.

(b) Prior to Final Inspection.

SBML 11-1056

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

SD

-0 1 P

RE

CO

NS

TR

UC

IT

TA

LS

SD

-0

2 S

HO

P

DR

AW

IN

GS

SD

-0

3 P

RO

DU

CT

D

AT

A

OT

HE

RS

A

S

SP

EC

IF

IE

D

SD

-0

6 T

ES

T

RE

PO

RT

S

SD

-1

1 C

LO

SE

OU

T

SU

BM

IT

TA

LS

REQUIRED

SUBMISSION

DATE

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

SD

-0

4 S

AM

PL

ES

SD

-0

5 D

ES

IG

N

DA

TA

SD

-0

7 C

ER

TI

FI

CA

TE

S

SD

-0

8 M

AN

UF

AC

TU

RE

R' S

IN

ST

RU

CT

IO

NS

PROJECT TITLE

REPAIR C17 LANDING ZONE

SOLICITATION/CONTRACT NO.

REMARKSDATE RECEIVED

IN CONTRACTING

DATE

TO

CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW UP

SCHEDULE OF MATERIAL SUBMITTALS

SD

-1

0 O

PE

RA

TI

ON

M

AI

NT

EN

SD

-0

9 M

AN

UF

AC

TU

RE

R' S

FI

EL

D

RE

PO

RT

S

31 00 00, Para 3.7, "Utilization of Excavated Materials"; G

100 31 00 00, Para 3.14, "Testing" 5

101 31 00 00, Para 3.14, "Testing" 5

102 32 01 19, Para 3.1, "Equipment" 5

103 32 01 19, Para 1.3.1, "Materials"; G 2

32 01 19, Para 1.3.1, "Certified copies of the test reports"; G

105 32 01 26.71, Para 2.1, "Equipment"; G 5

106 32 01 26.71, Para 3.2.1, "Procedures"; G 5

107 32 11 23, Para 2.1, "Plant

108 32 11 23, Para 1.4, "Sampling and Testing"; G 5

109 32 11 23, Para 1.4.2.4, "Field Density Tests"; G 5

110 32 12 10, Para 3.7, "Sampling and Testing" 5

111 32 12 15.13, Para 1.4, "Placement Plan"; G 5

112 32 12 15.13, Para 2.3, "Mix Design"; G 5

32 12 15.13, Para 3.1, "Contractor Quality Control";

G

114 32 12 15.13, Para 2.2, "Asphalt Cement Binder" 2

115 32 12 15.13, Para 2.1, "Aggregates" 2

116 32 12 15.13, Para 2.1, "Aggregates"; G 5

117 32 12 15.13, Para 3.1.3.10, "QC Monitoring" 5

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP.

(b) Prior to Final Inspection.

SBML 11-1056

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

SD

-0 1 P

RE

CO

NS

TR

UC

IT

TA

LS

SD

-0

2 S

HO

P

DR

AW

IN

GS

SD

-0

3 P

RO

DU

CT

D

AT

A

OT

HE

RS

A

S

SP

EC

IF

IE

D

SD

-0

6 T

ES

T

RE

PO

RT

S

SD

-1

1 C

LO

SE

OU

T

SU

BM

IT

TA

LS

REQUIRED

SUBMISSION

DATE

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

SD

-0

4 S

AM

PL

ES

SD

-0

5 D

ES

IG

N

DA

TA

SD

-0

7 C

ER

TI

FI

CA

TE

S

SD

-0

8 M

AN

UF

AC

TU

RE

R' S

IN

ST

RU

CT

IO

NS

PROJECT TITLE

REPAIR C17 LANDING ZONE

SOLICITATION/CONTRACT NO.

REMARKSDATE RECEIVED

IN CONTRACTING

DATE

TO

CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW UP

SCHEDULE OF MATERIAL SUBMITTALS

SD

-1

0 O

PE

RA

TI

ON

M

AI

NT

EN

SD

-0

9 M

AN

UF

AC

TU

RE

R' S

FI

EL

D

RE

PO

RT

S

118 32 12 15.13, Para 2.2, "Asphalt Cement Binder"; G 5

119 32 12 15.13, Para 3.7, "Testing Laboratory" 5

120 32 13 11, Para 2.1, "Equipment" 5

121 32 13 11, Para 3.1.2, "Proposed Techniques"; G 5

122 32 13 11, Para 2.8.1, "Dowels"; G 5

123 32 13 11, Para 2.8.2, "Dowel Bar Assemblies"; G 5

124 32 13 11, Para 2.12.2, "Proportioning Studies"; G 5

125 32 13 11, Para 1.3.4, "Sampling and Testing"; G 5

32 13 11, Para 1.5.1, "Contractor Quality Control Staff"; G

127 32 13 11, Para 1.5.3, "Laboratory Accreditation"; G 5

32 13 11, Para 2.1, "NRMCA Certificate of Conformance";

G

129 32 13 11, Para 1.5.3, "Commercial Laboratory"; G 5

130 32 13 73, Para 1.2, "Equipment" 5

131 32 13 73, Para 3.1.1, "Manufacturer's Instructions" 5

132 32 13 73, Para 2.1, "Compression Seals"; G 2

133 32 13 73, Para 1.2.3, "Test Requirements" 5

134 32 17 24.00 10, Para 1.2, "Equipment"; G 5

135 32 17 24.00 10, Para 1.4.1, "Qualifications" 5

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP.

(b) Prior to Final Inspection.

SBML 11-1056

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

SD

-0 1 P

RE

CO

NS

TR

UC

IT

TA

LS

SD

-0

2 S

HO

P

DR

AW

IN

GS

SD

-0

3 P

RO

DU

CT

D

AT

A

OT

HE

RS

A

S

SP

EC

IF

IE

D

SD

-0

6 T

ES

T

RE

PO

RT

S

SD

-1

1 C

LO

SE

OU

T

SU

BM

IT

TA

LS

REQUIRED

SUBMISSION

DATE

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

SD

-0

4 S

AM

PL

ES

SD

-0

5 D

ES

IG

N

DA

TA

SD

-0

7 C

ER

TI

FI

CA

TE

S

SD

-0

8 M

AN

UF

AC

TU

RE

R' S

IN

ST

RU

CT

IO

NS

PROJECT TITLE

REPAIR C17 LANDING ZONE

SOLICITATION/CONTRACT NO.

REMARKSDATE RECEIVED

IN CONTRACTING

DATE

TO

CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW UP

SCHEDULE OF MATERIAL SUBMITTALS

SD

-1

0 O

PE

RA

TI

ON

M

AI

NT

EN

SD

-0

9 M

AN

UF

AC

TU

RE

R' S

FI

EL

D

RE

PO

RT

S

32 17 24.00 10, Para 2.3, "Manufacturer's Certified Test Reports"

137 32 92 19, Para 2.5.3, "Wood cellulose fiber mulch" 5

138 32 92 19, Para 2.4, "Fertilizer" 5

139 32 92 19, Para 2.2.3, "Topsoil composition tests" 5

140 32 92 19, Para 2.1, "seed" 5

141 32 92 23, Para 2.4, "Fertilizer" 5

142 32 92 23, Para 2.1, "sods" 5

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP.

(b) Prior to Final Inspection.