2_-_Combined_Drawing_Set.pdf

PDF 18 MB Posted

Attached to
C17 Runway Reconstruction
Solicitation number
FA4418-15-R-0013
Issued by

About this file

2- Combined Drawing Set

View the file

Other files

File Type Posted
Amendment_0001.pdf PDF
Q A_Answers_for_NAAF.docx DOCX document
Pre-proposal_Record_of_Attendance.pdf PDF
Pre-proposal_Meeting_Minutes.pdf PDF
5-_Material_Submittal.pdf PDF
3-_WAGE_DETERMINATION.pdf PDF
6-_COSPP.pdf PDF
4-_Green_Procurement.pdf PDF
0-FA4418-15-R-0013_Solicitation.pdf PDF
1-_Combined_Specification.pdf PDF
7-_Design_Narrative.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET TITLE ORIGINAL DATE REVISION REVISION DATE

G001 TITLE SHEET 5/8/2015

G100 BASIS OF DESIGN 5/8/2015

G200 CONSTRUCTION SAFETY PHASING PLAN (CSPP) 5/8/2015

G201 CSPP - PARTIAL AIRSPACE IMAGINARY SURFACES 5/8/2015

G202 CSPP - NOTES 5/8/2015

C001 CIVIL ABBREVIATIONS AND GENERAL NOTES 5/8/2015

C101 EXISTING SITE AND DEMOLITION PLAN - AREA 1 5/8/2015

C102 EXISTING SITE AND DEMOLITION PLAN - AREA 2 5/8/2015

C103 EXISTING SITE AND DEMOLITION PLAN - AREA 3 5/8/2015

C201 SITE PLAN - AREA 1 5/8/2015

C202 SITE PLAN - AREA 2 5/8/2015

C203 SITE PLAN - AREA 3 5/8/2015

C210 LANDING ZONE GROOVING PLAN - OVERALL 5/8/2015

C220 MARKING PLAN - LZ 5/8/2015

C221 MARKING PLAN - RWY 6/24 5/8/2015

C225 MARKING DETAILS - RWY 6/24 5/8/2015

C301 GRADING AND STORM DRAINAGE PLAN - AREA 1 5/8/2015

C302 GRADING AND STORM DRAINAGE PLAN - AREA 2 5/8/2015

C303 GRADING AND STORM DRAINAGE PLAN - AREA 3 5/8/2015

C310 LANDING ZONE CENTERLINE PROFILE 5/8/2015

C311 LANDING ZONE CENTERLINE PROFILE 5/8/2015

C320 CROSS SECTIONS 5/8/2015

C321 CROSS SECTIONS 5/8/2015

C322 CROSS SECTIONS 5/8/2015

C323 CROSS SECTIONS 5/8/2015

C620 PAVING SECTIONS 5/8/2015

C621 PAVING DETAILS 5/8/2015

C622 PAVING DETAILS 5/8/2015

C623 PAVING DETAILS 5/8/2015

C630 GRADING AND STORM DRAINAGE DETAILS 5/8/2015

C640 UTILITY DETAILS 5/8/2015

C700 EROSION CONTROL PLAN - OVERALL AIRFIELD 5/8/2015

C701 INITIAL EROSION CONTROL PLAN - AREA 1 5/8/2015

C702 INITIAL EROSION CONTROL PLAN - AREA 2 5/8/2015

C703 INITIAL EROSION CONTROL PLAN - AREA 3 5/8/2015

C711 INTERMEDIATE EROSION CONTROL PLAN - AREA 1 5/8/2015

C712 INTERMEDIATE EROSION CONTROL PLAN - AREA 2 5/8/2015

C713 INTERMEDIATE EROSION CONTROL PLAN - AREA 3 5/8/2015

C721 FINAL EROSION CONTROL PLAN - AREA 1 5/8/2015

C722 FINAL EROSION CONTROL PLAN - AREA 2 5/8/2015

C723 FINAL EROSION CONTROL PLAN - AREA 3 5/8/2015

C740 EROSION CONTROL DETAILS 5/8/2015

E000 ELECTRICAL LEGEND AND ABBREVIATIONS 5/8/2015

E001 ELECTRICAL NOTES 5/8/2015

E101 ELECTRICAL DEMOLITION PLAN - AREA 1 5/8/2015

E102 ELECTRICAL DEMOLITION PLAN - AREA 2 5/8/2015

E103 ELECTRICAL DEMOLITION PLAN - AREA 3 5/8/2015

E104 ELECTRICAL DEMOLITION PLAN - AREA 4 5/8/2015

E201 ELECTRICAL LAYOUT PLAN - AREA 1 5/8/2015

E202 ELECTRICAL LAYOUT PLAN - AREA 2 5/8/2015

E203 ELECTRICAL LAYOUT PLAN - AREA 3 5/8/2015

E204 ELECTRICAL LAYOUT PLAN - AREA 4 5/8/2015

E301 ELECTRICAL CIRCUITING PLAN - AREA 1 5/8/2015

E302 ELECTRICAL CIRCUITING PLAN - AREA 2 5/8/2015

E303 ELECTRICAL CIRCUITING PLAN - AREA 3 5/8/2015

E304 ELECTRICAL CIRCUITING PLAN - AREA 4 5/8/2015

E401 FIXTURE DETAILS IN ASPHALT 5/8/2015

E402 FIXTURE DETAILS IN CONCRETE 5/8/2015

E403 GENERAL ELECTRICAL DETAILS 5/8/2015

E404 GENERAL ELECTRICAL DETAILS 5/8/2015

E405 ELECTRICAL DUCT SECTION DETAILS 5/8/2015

E406 GENERAL ELECTRICAL DETAILS 5/8/2015

E407 HANDHOLE DETAILS 5/8/2015

E408 VISUAL LANDING ZONE MARKER PANEL DETAILS 5/8/2015

E409 SIGN DETAILS 5/8/2015

E410 SIGN DETAILS 5/8/2015

E411 VAULT DETAILS 5/8/2015

E501 OVERALL RUNWAY 5-23 LIGHTING CONFIGURATION 5/8/2015

E502 RUNWAY 5-23 AMP-1 LIGHTING CONFIGURATION 5/8/2015

E503 RUNWAY 5-23 AMP-3 OVERT LIGHTING CONFIGURATION 5/8/2015

E504 RUNWAY 5-23 AMP-3 COVERT LIGHTING CONFIGURATION 5/8/2015

Ite m

Item Description

P re d e ce ss o r

Ite m

D u ra tio n ca le n d a r d a ys

(i n cl u d in g a ve ra g e a d ve rs e w e a th e r d a ys

D a ys fr o m

N T

P to

It e m C o m p le tio n

D a te

Weeks 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

Preparation 1 Notice To Proceed 0 0 2 Preparation & Submittals 1 90 90 3 Construction 2 150 240

Field Work 4 Turf Establishment Period 2 180 270

_G001
_G100
_G200
_G201
_G202
C001
C101
C102
C103
C201
C202
C203
C210
C220
C221
C225
C301
C302
C303
C310
C311
C320
C321
C322
C323
C620
C621
C622
C623
C630
C640
C700
C701
C702
C703
C711
C712
C713
C721
C722
C723
C740
NAAF 100% Final Design

File details come from the government source that posted it. Updated .