This is a Statement of Work (SOW) for water sampling and analysis services to be performed by Analytical Services for the Hurlburt Field Bioenvironmental Engineering Office, dated 20 May 2026.

The contractor shall provide comprehensive drinking water sampling and analysis services at Hurlburt Field, Florida, to support the 1st Special Operations Medical Group. All work must comply with federal Safe Drinking Water Act requirements, Florida Administrative Code (F.A.C.) Rules 62-550 and 62-560, and Department of Defense Instruction 4715.6. The contractor must utilize a Florida Department of Health (FDOH) certified laboratory meeting F.A.C. 64E-1 and National Environmental Laboratory Accreditation Conference (NELAC) standards with certifications in drinking water analysis (unregulated and regulated contaminants, microbiology, inorganic and synthetic organic contaminants, radiochemistry), non-potable water analysis, and Safe Drinking Water Act compliance testing. Key sampling requirements include: monthly total coliform testing using method SM9223; quarterly water quality sampling (alkalinity, bicarbonate alkalinity, carbonate alkalinity, chloride, sodium, sulfate, temperature, pH, calcium, magnesium, potassium, total dissolved solids); annual nitrate and nitrite sampling (April-June); annual fluoride surveillance (5 samples in April); annual trihalomethane and haloacetic acid sampling (July-September); biweekly marine water sampling for fecal coliform and Enterococci (February-October); and triennial compliance sampling for volatile organic contaminants, synthetic organic contaminants, primary and secondary inorganic contaminants, radionuclides, and lead/copper tap samples.

The contractor must provide all sampling supplies, maintain emergency response capacity within 2 hours of notification, and maintain emergency/short-notice funding at 200% of previous year baseline usage. Analytical results with quality assurance/quality control documentation must be delivered within 10 days of analysis completion. The contractor shall immediately notify the Bioenvironmental Engineering office of critical parameters (pH outside 6.5-8.5, chlorine residual outside 0.2-4.0, total coliform positive results within 2 hours, fluoride levels outside 0.6-2.0 mg/L within 48 hours). Contractor personnel must maintain neat appearance, wear visible identification badges, and the contractor must maintain area cleanliness. Work is not required on federal holidays, and a designated Contract Manager must be identified to the Contracting Officer prior to performance initiation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) for Water Sampling between

Analytical Services & the Hurlburt Field Bioenvironmental Engineering Office Date 20 May 2026

1. Scope of Work. The objective of this contract is to support the 1st Special Operations Medical Group (1 SOMDG) by providing services to collect and analyze drinking water samples on Hurlburt Field, Florida.

1.1 Description of Service. The contractor shall provide all parts, labor, materials, supplies, equipment, transportation, and services necessary to collect drinking water samples on Hurlburt Field, transport them to the contract laboratory, and analyze such samples, including resampling. Services must conform to all, most current, applicable federal regulations and Florida Administrative Codes (F.A.C.). This work is required in accordance with (IAW) Safe Drinking Water Act; Rule 62-550, F.A.C.; Drinking Water Standards; Rule 62-560, F.A.C.;

Requirements for Public Water System that are out of Compliance and Department of Defense Instruction 4715.6, and Environmental Compliance. All sampling technicians will follow all applicable Department of Environmental Protection (DEP) Standard Operating Procedures.

1.2 Specific Tasks.

1.2.1. Location of Work and Testing Interval. The contractor shall collect and analyze all samples at specified locations determined by installation Bioenvironmental Engineering (BE) and testing intervals within Specific Tasks 1.2.3- 1.2.13. Changes in location or testing frequency may be modified as necessary by the (BE) office after coordination with the Hurlburt Field Contracting Officer.

1.2.2. Laboratory Certification. All analysis must be accomplished by a Florida Department of Health (FDOH) certified lab that has complied with F.A.C. 64E-1, and National Environmental Laboratory Accreditation Conference (NELAC) Standards for the examination of environmental samples in the following categories:

1.2.2.1. Drinking Water: Group I Unregulated Contaminants, Group II

Unregulated Contaminants, Microbiology, Other Regulated Contaminants, Primary Inorganic Contaminants, Secondary Inorganic Contaminants, Radiochemistry, Synthetic Organic Contaminants.

1.2.2.2. Non-Potable Water: General Chemistry, Metals, Microbiology, Pesticides-Herbicides, PCBs, Volatile Organics, Solid and Chemical Materials, Extractable Organics, Solid and Chemical Materials-Metals, Solid and Chemical Materials-Pesticides-Herbicides-PCBs, Solid and Chemical Materials-Volatile Organics.

1.2.2.3. Safe Drinking Water Act (SDWA)- Microbiology, Primary Inorganic, Secondary Inorganic, Synthetic Organic Contaminants, Other Regulated Contaminants; CWA – Microbiology, Metals, General Chemistry, Volatile organics; RCRA/CERCLA – Metals, General Chemistry, Volatile Organics, Extractable Organics, Pesticides- Herbicides-PCBs.

1.2.2.4. The contractor shall provide the base BE office with the lab certification on an initial and annual basis.

1.3 Total Coliform. BE will collect samples from each well and the designated sites during the appropriate week IAW 62-550.518, Microbiological Monitoring Requirements and the FDEP Revised Total Coliform Rule. BE shall transport the sample to the contracted lab for analysis. These samples shall be analyzed for total coliform (MMO-MUG) using method

SM9223.

1.3.1.1. Water Quality Sampling. BE will collect samples from each well, in accordance with Northwest Florida Water Management District (NWFWMD) requirements, from each well during the first two weeks of January, April, July, and October and send them to the contracted lab to be analyzed using the corresponding method in parentheses:

alkalinity as CaCO3, (SM2320B), bicarbonate alkalinity ( SM4500- C02D), carbonate alkalinity ( SM4500-C02D), chloride (SM4500 CL E), sodium (EPA 200.7), sulfate (EPA 375.2), field temperature (EPA 170.1), pH (EPA 150.1), calcium (EPA 200.7), magnesium ( EPA 200.7), potassium( EPA 200.7), total dissolved solids (SM2540C).

Under EPA rules, pH and chlorine have an instantaneous hold time (<15 minutes) and cannot be shipped to a contract lab for compliance analysis.

1.3.2. Nitrate and Nitrite Sampling. The contractor shall collect and analyze samples annually, between the months of April and June, from each well after treatment as required by Rule 62-550.512, F.A.C., Nitrate and Nitrite Monitoring Requirements. The contractor shall analyze such samples using Nitrate-Nitrite Nitrogen method EPA 353.2 and EPA 354.1.

1.3.3. Fluoride Surveillance. The contractor shall collect and analyze 5 drinking water fluoride samples annually, during the month of April, using an EPA-approved compliance method (e.g., EPA 300.0 or SM 4500-F C), from specified locations determined by BE.

1.3.4. Total Trihalomethanes (TTHMs)/Haloacetic Acids 5 (HAA5). IAW Rule 62- 550.514, F.A.C., Monitoring Requirements for Disinfectant Residuals and Disinfection Byproducts, the contractor shall collect samples from the designated Stage 2 DBP compliance sites on an annual basis. Sampling must be scheduled during the warmest month of the year (typically July, August, or September) and coordinated in advance with the base BE office. Samples shall be analyzed using EPA Method 524.2 for TTHM and EPA Method 552.2 (or other FDEP-approved equivalent methods) for HAA5. The contractor must strictly adhere to all specified procedures, sample preservation protocols, and holding times.

1.3.5. Natural Bathing Areas. The contractor shall collect and analyze (2) marine water samples from the Hurlburt Field Soundside Beach area for fecal coliform and Enterococci analysis. Sampling shall occur every other week and be collected on Monday or Tuesday during the recreational bathing season from February through October, in compliance with F.A.C. 64E-9 and FDEP guidelines. Positive results should be reported to BE immediately.

1.3.6. Triennial Compliance Sampling. The contractor shall conduct all required triennial drinking water compliance sampling and analysis. Required Parameters & Methods: Sampling shall be conducted in accordance with Rule 62-550, F.A.C., and Hurlburt Field’s SAM Plan. This includes collection and analysis for:

1.3.6.1. Volatile Organic Contaminants (VOCs) (EPA Method 524.2)

1.3.6.2. Synthetic Organic Contaminants (SOCs) (Two quarterly samples collected at least 60 days apart, using EPA Methods 504.1/525.2 or equivalent)

1.3.6.3. Primary Inorganic Contaminants (Inorganic Methods IAW Rule 62- 550.310(1), F.A.C.)

1.3.6.4. Secondary Inorganic Contaminants (Methods IAW Rule 62-550.520, F.A.C.)

1.3.6.5. Radionuclides (Gross Alpha, Radium 226/228, Uranium) (EPA Method 900.0 or equivalent) or as required by the state of Florida.

1.3.6.6. Lead and Copper Tap Sampling (Collection of thirty (30) first-draw tap samples from the established pool of targeted sites, analyzed using EPA Method 200.8/200.9)

1.3.7. Additional Florida State Drinking Water Contaminant Monitoring. If additional monitoring requirements are added under Rule 62-550, F.A.C., modifications to the contract will be made by the Hurlburt Field Contracting Officer. Monitoring these contaminants shall be done on the months, years, and locations listed in this document.

1.3.8. Emergency/Short Notice Sampling.

1.3.8.1. Response and Regulatory Requirements: The contractor shall be available within two (2) hours of notification to collect and analyze samples in accordance with (IAW) Rule 62-550.518, Microbiological Monitoring Requirements, and the FDEP Revised Total Coliform Rule for Hurlburt Field during emergency and short-notice events.

1.3.8.2. Base Coordination and Sample Custody: BE retains the option to collect samples for all emergencies, including but not limited to water line breaks. To support this option, the contractor shall supply BE with pre-prepared, certified-clean sample collection kits (including sterile bottles, preservatives, chain-of-custody forms, and coolers) in advance. In instances where BE conducts the sampling, the contractor shall arrive at the BE office to pick up the collected samples within two (2) hours of notification.

The contractor is strictly responsible for ensuring that sample transport and subsequent laboratory analyses do not exceed maximum allowable hold times. All samples collected under this section must be analyzed by the contractor's FDOH-certified laboratory.

1.3.8.3. Emergency Capacity and Fund Allocation: The contractor shall maintain an emergency/short-notice sampling capacity and fund allocation of at least 200% of the previous year's baseline usage.

This increased capacity is required to ensure sufficient funding and laboratory resources are available for emergency sampling events (such as post-hurricane recovery operations) throughout the entire period of performance.

1.3.8.4. Expenditure and Usage Tracking: To ensure accurate contract funding management, the contractor shall submit a monthly Emergency Sampling Usage Report to the BE office. This report shall detail: (1) the date, location, and reason for each emergency/short-notice event, (2) the types and quantities of analyses performed, (3) the cost per event, and (4) the running total of funds drawn and remaining in the emergency allocation.

This report will be reconciled with BE's internal outage and water quality log to proactively manage funding levels.

1.3.9. Natural Disasters. BE will perform sampling during the recovery phase of a natural disaster up until which time the contractor is able to perform the sampling themselves.

1.3.10. Sampling Supplies. The Contractor shall supply BE with the necessary sampling media that will be used to conduct monthly Total Coliform and Quarterly Water Sampling.

1.4 Notification Procedures.

1.4.1. The contractor shall immediately notify the BE office at (850) 881-1822 during normal duty hours (0700-1600), or the BE On-Call representative at (850) 496-5942 after hours, if the pH level is below 6.5 or above 8.5, or the chlorine residual is below 0.2 or above 4.0 and arrange for them to meet at the location where the pH or chlorine residual was low or high. Utilities personnel shall verify the levels, flush the system, and the contractor shall re-measure after the appropriate amount of time until the pH and chlorine are within acceptable levels.

1.4.2. The contractor shall notify BE within two hours if analysis of the drinking water sample is positive for total coliform. The contractor shall collect additional samples within 24 hours of analytical results IAW 62-550.518, Microbiological Monitoring Requirements and IAW with EPA’s Ground Water Rule.

1.4.3. The contractor shall notify BE within 48 hours if the fluoride concentrations exceed 2.0 mg/L or go below 0.6 mg/L.

1.5 Reports. The contractor shall provide BE, Utilities, and Civil Engineering Environmental section (CEAN) with copies of all analytical results, chains of custody and quality assurance/quality control (QA/QC) reports within 10 days of analysis completion on state approved forms. The contractor shall also send copies of the analytical results to the Florida Department of Environmental Protection (FDEP) within the first ten days following the month in which the sample results were received in accordance with 62-550, F.A.C.

2. Services Summary.

2.1 Services. The services requirements are summarized into performance outcomes that relate directly to mission essential items. The performance thresholds describe the minimum acceptable levels of service required for each requirement. The thresholds are critical to mission success and acceptable (satisfactory) performance.

Performance Objective SOW Paragraph Performance Threshold Method of Surveillance

FDOH Lab Certification 1.2.2 Compliance; certifications provided initially and annually. Inspection by COR

Emergency Response Time

1.2.11.1 / 1.2.11.2

Contractor arrives on-site or picks up samples within 2 hours of notification.

Periodic Monitoring / Log Review

Analytical Reporting Turnaround 1.4

Deliver QA/QC reports and analytical results within 10 days of analysis completion.

Inspection of reports

Urgent Notifications 1.3.1 / 1.3.2

Immediate notification for critical water quality parameters; 2 hours for positive coliform.

Direct observation and log reconciliation

Triennial Compliance Sampling 1.2.9

VOC, SOC, Inorganic, Secondary, Rads, and Pb/Cu samples collected and analyzed.

Inspection of FDEP-submitted results

3. Government Furnished Property, Supplies and Services. NOT APPLICABLE (N/A)

4. General Information.

4.1. Contract Manager: The Contractor shall designate a Contract Manager and alternate in writing to the Contracting Officer (CO) no later than the pre-performance conference and anytime changes are made. The Contractor shall provide to the CO the names and phone numbers of the Contract Manager for business hours. The Contractor shall also provide to the CO the names and phone numbers of Contractor POCs for after business hours including nights, weekends, and holidays. This information will be kept updated by the Contractor whenever personnel changes occur. The Contract Manager or alternate shall have full authority to act for the Contractor on all contract matters relating to the daily operation of this contract.

4.2. Contractor Personnel: Contractor personnel shall present a neat appearance. Contractor vehicles and sample coolers shall be routinely cleaned to prevent the contamination of sample jars. Contractor personnel shall be easily recognizable while on the installation in conjunction with this contract. This shall be accomplished through the wear of distinctive clothing, overcoats, or hats, bearing the company name or logo. The coloring or design of the items selected should be that identifies personnel easily and quickly for reasons of safety and personal protection. The government may restrict the employment under the contract of any Contractor employee or prospective Contractor employee, who is identified as a potential threat to the health, safety, security, general wellbeing, or operational mission of the installation and its population.

4.2.1. Contractor personnel shall wear appropriate identification badges on the outer clothing on the front of the body between the neck and waist so that the badge is always visible.

4.3. Area Cleanliness. The contractor shall maintain the location of work in a neat and orderly manner. The contractor shall clean up any spillage or other debris generated by its operations at these locations.

4.4. Federal Holidays. The contractor shall not normally be required to work during recognized holidays. The base recognizes the following holidays on the dates indicated:

New Year's Day, January 1 or the Friday preceding or Monday following Martin Luther King's Birthday, 3rd Monday in January President's Day, 3rd Monday in February Memorial Day, last Monday in May Juneteenth, 19 June Independence Day, July 4 or the Friday preceding or Monday following Labor Day, first Monday in September Columbus Day, 2nd Monday in October Veterans Day, November 11 or the Friday preceding or Monday following Thanksgiving Day, 4th Thursday in November Christmas Day, December 25 or the Friday proceeding or Monday following

4.4.1. If the Federal Holiday falls on a Saturday, the preceding Friday shall be recognized as a day of no work. Should the holiday fall on a Sunday, the recognized day shall be the following Monday.

2. Services Summary.
3. Government Furnished Property, Supplies and Services. NOT APPLICABLE (N/A)