Copy of Refuse Questions and Answers.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- Integrated Waste Management FY25 Federal contract opportunity
- Solicitation number
- FA441725Q0010
About this file
This is a Questions and Answers document for a refuse/waste management services contract at Hurlburt Field. The document contains 39 questions and answers covering technical requirements, pricing structure, and proposal submission details.
Key details include: the incumbent was Professional Waste Management, LLC with a previous contract value of $460,383.00. The requirement includes 13 twenty-cubic-yard roll-off containers, with an average of 25 monthly pickups and monthly tonnage ranging from 15-50 tons. The contractor must use Wright Landfill (4 miles from base) for yard debris. Containers must be brown and bear-resistant. Landfill tipping fees will be reimbursed monthly under a separate CLIN structured as a lot amount for each year. Proposals are due March 6, 2025. The contract falls under Executive Order 14026 and Wage Determination 2015-4531 Rev 29. No contractor laydown yard or storage area will be provided on base. Monthly reports are due by the tenth working day of each month.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 Updated PWS Refuse 25 Feb 2025.pdf | ||
| Integrated Waste Management Combo 25Q0010 Amend 2.pdf | ||
| Attachment 2 Amend 2 Instructions to Offerors.pdf | ||
| Attachment 4 Amend 1 Instructions to Offerors.pdf | ||
| Attachment 2 - Updated CLIN Breakout 26 Feb 2025.xlsx | XLSX spreadsheet | |
| Integrated Waste Management Combo 25Q0010 Amend 1.pdf | ||
| Attachment 7 Financial Institution Reference Sheet.pdf | ||
| Attachment 3 Wage Det 2015-4531 Rev 29.pdf | ||
| Attachment 5 Evaluation Criteria.pdf | ||
| Attachment 1 PWS Refuse 18 Sep 2024.pdf | ||
| Attachment 8 FA441725Q0010 Provisions and Clauses.pdf | ||
| Attachment 6 Past Performance Question Info.pdf | ||
| Attachment 2 CLIN Breakout.xlsx | XLSX spreadsheet | |
| Attachment 4 Instructions to Offerors.pdf | ||
| Integrated Waste Management Combo 25Q0010.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Question: | Answer: | |
| 1 | What is the previous contract number? | FA441720P0016 |
| 2 | Who was the incumbent? | Professional Waste Management, LLC |
| 3 | What was the previous award amount? | $460,383.00 |
| 4 | Is it possible to have a site visit? | If one is needed |
| 5 | The bid references 480 prospective placements and 500 estimated tons for roll off construction debris. There is not a count of actual roll offs needed for initial kickoff. the body of the proposed scope of work talks about 100 proposed locations. How many roll off containers are needed in this scope of work? | 13 each (20 cy) |
| 6 | If we have additional 30 yard containers delivered in, can they be stored on the base as empty swap containers? | No |
| 7 | Will the contractor be given a laydown yard/office at Hurlburt for parking or storage of contractor owned equipment, vehicles, office trailer, or other contract specific elements? | No |
| 8 | PWS 1.1.10. Vehicle Weighing states "The Contractor shall submit a monthly report (Para 1.5) that includes weight tickets that reflect the disposed tonnage, disposal date, vehicle type and landfill tipping fee cost. The Contractor shall be reimbursed for tipping fees according to submitted invoices." a. Please confirm that the government will reimburse the actual disposal costs incurred regardless of the Unit Price the contractor bids on Line Item x005. For example, if the contractor collects 250 tons during a given month and the disposal facility charges are $15,000 for that month, the government will reimburse the contractor $15,000 regardless of the Unit Price amount the contractor bid for x005. b. If this is correct, then it seems that the Unit Price for this Line Item for all years should be factored out or extended by the Government for price evaluation purposes. This would avoid a contractor entering an unrealistically low proce for the line item, to keep their price down, when the Government would still be required to reimburse the contractor based upon the submitted disposal invoice. In the 2019 soliciation for these services the government provided a Not To Exceed amounts (plug-in number for all Offerors) for this CLIN for each year so that this Line Item was not manipulated for price evaluation purposes. | Contractor will be reimbursed for tipping fees under the landfill tipping fee CLIN each month. The landfill tipping fee CLIN will be a lot amount for each year. The Government estimates this amount using historical tonage and current landfill tipping fee. |
| 9 | Will the Government please confirm that the contractor should use Wright Landfill for hauling roll-off containers that contain yard debris and vegetation, as directed? a. If yes, can the Government please provide the distance from Hurlburt Field to Wright Landfill? | Yes, 4 miles (Hurlburt Commercial Gate to Wright Landfill) |
| 10 | Will the Government please specify if there are any other types of waste associated with this SOW other than municipal solid waste (MSW), C&D, and yard debris/vegitation. | No other besides whats stated in SOW. |
| 11 | Will the Government please consider adding to Table A2 the quantity, size, and location of permanent roll-off containers for the collection of construction and demolition (C&D), yard debris, and vegetation? For example, the following containers have been permanent/stationary for the past 5 years: -2 each 20 CY containers at Bldg 90423 - 2 each 20 CY containers at Bldg 90053 -1 Each 20 CY container at Bldg 90427 - 1 each 20 CY container at Bldg 91145 - 1 each 20 CY container at Bldg 90639 | Updated PWS with info |
| 12 | Will the Government please confirm the total quantity and size of temporary roll-off containers needed on hand for the scheduled and unscheduled collection of C&D, yard debris, and vegetation? | 13 each (20 cy) |
| 13 | Attachment 1 states that the proposal is due on 5 March 2025, however the Request for Quote states that the proposal is due on 6 March 2025. Can the Government please provide the correct due date? | Proposals are due 6 March 2025, attachment 1 will be corrected. |
| 14 | There does not appear to be an SF 1449 that was issued with the Solicitation. Can the Government please post the SF1449? | An Amendment #1 will be posted with the edit to remove the SF 1449 wording. The Attachment #2 Updated CLIN Breakout will be used for completing the Price |
| 15 | Atachment 1, F states "All documents submitted must be saved in .pdf format", however G. Part I, Item 2 states "Insert proposed unit and extended prices in a separate document broken down by base year…" Does the Government want the price information to be submitted in xlsx pricing spreadsheet, or included in the PDF file? | Revised Attachment 1 posted with edited clarification. |
| 16 | The CLINs provided in PWS Appendix D do not match the CLINs provided in Attachment 2 CLIN breakdown.xlsx. a. Can the Government please provide feedback on which are the correct set of CLINs to price? b. Should offerors create a new spreadsheet containing the CLINs in PWS Appendix D to include in the proposal? c. Should offerors complete Attachment 2 CLIN Breakout to include in the proposal? | Revised PWS posted with corrected CLIN structure. |
| 17 | Does the Government want offerors to provide the Financial Institution Reference Sheet(s) in Proposal Part I - Price? | The Financial Institution Reference sheet was provided as Attachment 7. |
| 18 | PWS 4.5.4 states "The contractor shall prepare an emergency service plan for providing support of these emeregency situations… A finalized emergency service plan approved by the CO and COR shall be finalized thirty (30) days prior to contract award date." a. Does the Government want the emergency service plan to be included in the proposal? b. If the emergency service plan should be included in the proposal, can the Governmentplease identify which Part should contain this information? | Revised PWS has been posted. Revised statement is: "4.5.4. Emergency Service Plan. The contractor shall prepare an emergency service plan for providing support of these emergency situations. A finalized emergency services plan approved by CO and COR shall be submitted and approved thirty (30) days after contract award date." |
| 19 | PWS 4.6.3 states "The contractor shall provide a complete transition plan…" a. Does the Government want the transition plan to be included in the proposal? B. If the transition plan should be included in the proposal, can the Government please identify which part should contain this information? | This effort will not contain a phase in/out period where service overlaps with the incumbent. Any annotation of phase in / phase out is simply speaking to the initial 30 days and final 30 days of the Period of Performance. |
| 20 | Attachment 1 G. Part II, lists information to be contained in the past performacne submission. The list does not include an item j). Can the Government please confirm that this is in error and that there is not any infoation missing? | Revised Attachment 1 posted with edited clarification. |
| 21 | Can the Government please confirm the following: a. Phase in/out is 30 days. B. Phase in/out should be priced in CLIN 0001. | This effort will not contain a phase in/out period where service overlaps with the incumbent. Any annotation of phase in / phase out is simply speaking to the initial 30 days and final 30 days of the Period of Performance. |
| 22 | Do the current containers on post meet Hurlburt bear-resistant standards? | Yes |
| 23 | Will the Government provide the distance from main post to A-20 and A-21? | 11 miles (Hurlburt Commercial Gate to A-20) 8 miles (Hurlburt Commercial Gate to A-21) |
| 24 | Will the government provide the distance from main post to skeet shooting range? | 7 miles (Hurlburt Commercial Gate to Skeet range) |
| 25 | Currently there are 15 each 20 CY containers out on post. Can the Government please provide the number of 20 CY containers that are required for the contract? | 13 each (20 cy) |
| 27 | Do all listed positions that require disclosing include drivers, mechanics, customer service, supervisors, managers, human resources, & Finance? | This will be awarded as a firm fixed price contract, and the Government has not requeted a list of positions. |
| 28 | Please verify that according to the Service Contract Act the following wages apply; solid waste truck driver - 31393 Truck Driver Heavy $22.24 b. Mechanic - 23430 Heavy Equipment Mechanic $29.901 | This effort uses Wage Determination 2015-4531 Rev 29 (Attachment #3). You may contact the APEX Coordinator at flapex.org as a resource on proposal preparation. |
| 29 | Please define health and welfare benefit. Does it apply to this contract and is it in addition to the hourly wage payable to each employee? | This effort uses Wage Determination 2015-4531 Rev 29 (Attachment #3). You may contact the APEX Coordinator at flapex.org as a resource on proposal preparation. |
| 30 | Does this contract fall under Executive Order 14026? | Yes |
| 31 | Are there any restrictions that prohibit the contractor from rotating various trucks to complete the services as required? | No |
| 32 | Can we request the reporing requirement to be provided to the CO by the 15th working day of the month, detailing previous month total costs incurred? | Updated PWS to the tenth working day of the month to give more time |
| 33 | What is the historical frequency of pickup for the roll off containers? | 25 monthly average |
| 34 | For 1.1.8 & 1.4 What are the acceptable colors for dumpsters and roll off containers? | Brown |
| 35 | In 1.5 We may not receive an invoice from the disposal site by the 5th of the month. | Updated PWS to the tenth working day of the month to give more time |
| 36 | Appendix A-A-1 estimates 480 C&D roll off placements. What is the cubic yard size required for roll off containers? What is the maximum # of roll off containers in use during a peak? What is the historical monthly tonnage from the roll off containers? | 20 cy roll off containers, 13 each , monthly tonage range 15-50 |
| 37 | Is it intended that the tipping fees for this contract will be a direct pass through on a monthly bases? | Contractor will be reimbursed for tipping fees under the landfill tipping fee CLIN each month. The landfill tipping fee CLIN will be a lot amount for each year. The Government estimates this amount using historical tonage and current landfill tipping fee. |
| 38 | It appears that the tipping fees are a direct pass through on a monthly basis with the requirement to dump at one of the two approved stations in 1.1.11. For Clin 018 and attachment 2 XX05 is this an intended to be an estimate of the tipping fees for the entire term or a proce per ton for discposal? | Contractor will be reimbursed for tipping fees under the landfill tipping fee CLIN each month. The landfill tipping fee CLIN will be a lot amount for each year. The Government estimates this amount using historical tonage and current landfill tipping fee. |
| 39 | For Attatchment 2. Please provide an explanation of line CLIN XX06. | That CLIN has now been updated on the Attachment 2, and is actually CLIN 0019, Refuse service IAW the PWS for Commissary locations. |