Attachment 4 - RFIs and Maps.pdf
PDF 5 MB Posted
- Attached to
- Security Access Control System Federal contract opportunity
- Solicitation number
- FA441724Q0267
About this file
This document contains Requests for Information (RFIs) related to the Security Access Control System Replacement project at Hurlburt Field Air Force Base, solicitation number FA441724Q0267.
The RFIs cover details about the project scope, including the requirement to replace 17 existing door locks and 27 card readers, the use of existing wiring and cable trays, the availability of building drawings, and clarification on programming the new Identiv security access system. The project is a new requirement with a completion date of November 2024. Progress payments are not allowed, and the government will provide new Identiv security badges. Contractors must be registered in the System for Award Management (SAM) to be eligible for award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 1 - FA441724Q0267 Security Access Control System.pdf | ||
| Attachment 0 - RFQ FA441724Q0267 Security Access Control System.pdf | ||
| Attachment 1 - FA441724Q0267 Provisions and Clauses.pdf | ||
| Attachment 3 - SCA Wage Determination.pdf | ||
| Attachment 2 - FA441724Q0267 Statement of Work.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requests for Information
505 TRS Access Control System – FA441724Q0267
1. Will there be a site visit? No.
2. Is this solicitation a recompete? No, this is a brand-new requirement.
3. What is the timeframe for this project to be completed? NLT Nov 2024
4. Will additional documentation be provided such as drawings of the building, sketches, etc.? Please see additional pages below.
5. Are Scaled Drawings available, if so please post. Please see additional pages below.
6. Are Ceilings Suspended? Or Hard Lid? Suspended ceilings in 95% of the facility.
7. Is there existing Cable Trays for wiring above ceilings? Yes
8. Can Existing Wiring be utilized? Yes, if compatible with new equipment
9. Is a “UPS” required? If so, What Time/Power Duration is required? No
10. Are “Or Equal” Equipment substitutions allowed? Yes
11. Is “Plenum Wire” acceptable? Yes
12. Is “After Hours Access” for said work, available to contractor at no additional cost to the Gov’t? Yes
13. What is the height of Exterior Cameras? (If any) No camera’s are part of this contract.
14. Please provide/post other “Q & A” requests. Unknown.
15. Please provide a list of equipment to be installed: Please refer to the statement of work for quantities and part numbers.
16. Are there pipe chases between floors? No, all wiring is run through the walls and ceilings.
17. What is the range of the budget for this project, and is it already appropriated?
There is no range or budget for this project as it is a service. Ranges are only given for construction projects.
18. Because of the high cost of the parts can we bill when parts arrive on site, or in the alternative are progress payments allowed? Progress payments are not allowed.
19. How many feet of new wire will have to be run? Zero unless new readers are not capability with current wiring.
20. What kind of cipher lock and quantities are required e.g. X-10 Please refer to the statement of work for quantities and part numbers.
21. In SOW section 1.2.1.3; its states Removal of Seventeen (17) new 8KW and 9 KW
Series Electrified Cylindrical Locks. (PART #9KW37DEU15DS3626) And In SOW
Section 1.2.1.4 Installation of Seventeen (17) new 8KW and 9KW Series Electrified
Cylindrical Locks. (PART #9KW37DEU15DS3626) Question – both SOW sections call out the same part number. Is a correction needed or is it the government’s intention to relocate and reutilize these locks? Old door locks are worn out and being replaced.
22. Do all doors receiving the new 8KW and 9KW Series Electrified Cylindrical Locks, have their face cores drilled already? Yes
23. Are all the door cores receiving the new 8KW and 9KW Series Electrified
Cylindrical Locks solid, hollow or made from a composite? Solid wood.
24. Is it known what are the type of door cores are in place that are receiving the new
8KW and 9KW Series Electrified Cylindrical Locks? Solid wood, hollow core, stave core, particleboard core or steel core? Solid wood doors – CE will pull the old cores to be inserted into the new locks also.
25. In SOW section: 1.2.2.1 Site Assessment: Conduct a thorough site assessment to evaluate the existing Access Control System, confirm the locations of current access control readers requiring replacement. Is this to occur post-award? Yes
26. In SOW section Line item 1.2.2.4 and 1.2.2.6 where the SOW states: Ensure proper wiring connections and integration with the existing Access Control System.
Question, should the bidder include Replacement cabling or has the existing cabling been validated as working and in good condition? Existing cabling works and is in great condition.
27. The SOW section 1.2.2.7 Programming: mentions new Identiv Security Access
System Badges. Are these to be supplied as part of this effort? Yes
28. SOW section Line item 1.2.2.7. Should the statement “Program the Access Control
System to recognize and interface with the new Identiv Scramble pads, SNIB3's, and the RREB board” be interpreted to mean bidders are to provide new SNIB3 and
RREB boards, or is to be interpreted as those parts are existing? Correct – vendor will program the access control system to recognize and interface with the new Identiv
Scramble pads.
29. Can you please verify that every MX panel has been updated with a SNIB3 and RREB boards? Yes, they have been updated.
X
XX
XX
X
X X
X X XXX
X
X
X
DOOR HANDLES
17 NEEDED
X X
X
X
XX
XX
X
X X
X X XXX
X
X
X
X
X
X
X
X
X
X
CARD READERS
27 NEEDED
| RFIs - 505 TRS Access Control System FA441724Q0267 |
| Bldg 90020 Door Handle Replacement 9 Jul 24 |
| Bldg 90020 W-Card Readers 9 Jul 24 |