Attachment 6 - Site Visit Questions and Answers.pdf

PDF 110 KB Posted

Attached to
Riptide DFAC Kitchen Equipment Recapitalization for Hurlburt Field AFB, FL Federal contract opportunity
Solicitation number
FA441724Q0140
Issued by
Department of the Air Force Special Operations Command

About this file

This document appears to be a set of Questions and Answers related to a site visit for the "Riptide DFAC Kitchen Equipment Recapitalization" solicitation (FA441724Q0140) issued by the Department of the Air Force Special Operations Command. The key details are:

The site visit questions cover details about the existing kitchen equipment, such as the swing direction of the doors, the type of gas used (natural gas, no propane), and the electrical configuration of certain units. The questions also address installation requirements, including the preferred installation time of after 7pm and the government's willingness to accommodate the contractor's preferred placement of two items. The responses indicate the government will handle certain electrical work, such as providing receptacles and reconnecting hardwired equipment, to support the installation of the new equipment.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Site Visit Ques�ons and Answers

Rip�de DFAC Kitchen Equipment Recapitaliza�on

RFQ No. FA441724Q0140

• Which way do the doors swing on the exis�ng units that have doors?

o All doors swing to the right. The double Vulcan ovens open in the middle and doors swing to each side.

• Of the units that use gas, are all units run off natural gas?

o Yes, all units run off of natural gas.

• Are there any units that run off propane?

o No units run off propane.

• Is third shi� installa�on required?

o Ideally, installa�on would be a�er 1900. If this is not possible, with enough advanced coordina�on, we may be able to close for a day or adjust meal periods.

• During the site visit, the end user men�oned they would like item #1 and #2 would like them beside themselves. Will CE change the plugs so that we can accommodate this?

o We could ask CE to do this but it’s not necessary for us to get the equipment and con�nue to have it staged as is.

• Items #13 and #15 are currently hard wired. Will CE disconnect and provide a receptacle for the new equipment if applicable?

o Item #15 is not hard wired and there is already a work order in progress for CE to do all work required to the building to accommodate item #13.

• Will CE reconnect (Hardwire) the new equipment or is this in our scope?

o Yes. CE will reconnect the Hardwire.

• Item #16 (Listed as x2). Verify spec is for solid door.

o The spec is for a solid door, but the contractor said they’d provide a quote for one that include a glass door as well.