Solicitation Amendment 1 - FA441724R0004-0001.pdf

PDF 524 KB Posted

Attached to
Civil Works IDIQ 2024 - Hurlburt Field, FL
Solicitation number
FA441724CivilWorks
Issued by

About this file

This document is an amendment to a solicitation (FA441724R0004) for a Civil Works IDIQ contract at Hurlburt Field, Florida. The amendment updates the bid guarantee clause, includes revised drawings and a revised bid schedule, and makes other minor administrative changes.

The underlying solicitation is for an Indefinite Delivery/Indefinite Quantity (IDIQ) construction contract with a guaranteed minimum of $25,000 and a maximum ceiling of $26,000,000 over the life of the contract. The work is a 100% small business set-aside under NAICS code 237310. The first task order, which will be awarded concurrently with the basic contract, is for a "Repair Sewer Lines, Basin #2" project, with an estimated value between $250,000 and $500,000. A site visit for this seed project is scheduled for March 20, 2024.

View the file

Other files

File Type Posted
01 22 00 Method of Payment - REV 2- 23 APR 24.pdf PDF
REVISED-23 APR 24 -Contract Price Bid Schedule - CLIN 0078D-0081D CHANGES.xlsx XLSX spreadsheet
Att 2 - Contract Price Bid Schedule REV 2 - 18Apr24.xlsx XLSX spreadsheet
Att 2 - Contract Price Bid Schedule REV 2 - 18Apr24.xlsx XLSX spreadsheet
Amendment 2 - FA441724R00040002 RELEASED.pdf PDF
Att 1 - 01 22 00 Method of Payment - REV1 - 18 APR 24.pdf PDF
2024 Civil Works Questions 18 Apr 24 (2).docx DOCX document
Sewer Basin - SEED Project Photos.pdf PDF
2024 Civil Works Questions 18 Apr 24.docx DOCX document
Attachment 13 - Section L Instructions to Offerors - Revised 8 Apr 24.docx DOCX document
Attachment 04 - Contract Price Bid Schedule - REVISED 3 APR 24.xlsx XLSX spreadsheet
2024 Civil Works Questions 03 Apr 24.docx DOCX document
Attachment 02 - Drawings Repair Sewer Lines Basin 2 FY24-C101.pdf PDF
Attachment 03 - Drawings Repair Sewer Lines Basin 2 FY24-C102.pdf PDF
Attachment 01 - Section L Instructions to Offerors UPDATED 03Apr24.docx DOCX document
CP1139009 Site Utility Map - CIvil Works Seed Project.pdf PDF
Sign In Sheet - Civil Works-Seed Project Site Visit - 20 Mar 24.pdf PDF
Site Visit - REMINDERS- 20 Mar 24.pdf PDF
CIVIL WORKS IDIQ AND SEED PROJECT - Questions and Responses - 11 Mar 24.docx DOCX document
Attachment 12 - AF Form 3064 Contract Progress Schedule - Sample.xlsx XLSX spreadsheet
Solicitation - FA441724R0004 - 4 Mar 24.pdf PDF
Attachment 4 - SEED Project- Repair Sewer Lines Basin 2 SOW.docx DOCX document
Attachment 9 - Wage Determination NO- FL20240179- Highway.pdf PDF
Attachment 2 - Civil Works Specifications 1 Jan 2024- 343 Pages.pdf PDF
Attachment 6 - SEED Project- Repair Sewer Lines Basin 2 Map.pdf PDF
Attachment 14 - Section M Evaluation Factors for Award.docx DOCX document
Attachment 3 - SEED Project Repair Sewer Lines Basin 2 Site Visit - 4 Mar 24.docx DOCX document
Attachment 13 - Section L Instructions to Offerors.docx DOCX document
Attachment 10 - Past Performance Questionnaire (PPQs) - Template - 4 Mar 24.pdf PDF
Attachment 5 - SEED Project- Repair Sewer Lines Basin 2 Drawings.pdf PDF
Attachment 7 - SEED Project- Repair Sewer Lines Basin 2- WTA.pdf PDF
Attachment 11 - Financial Questionnaire - 4 mar 24.docx DOCX document
Attachment 1 - Contract Price Bid Schedule.xlsx XLSX spreadsheet
Attachment 8 - Wage Determination NO- FL20240127 -Heavy.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section A - Solicitation/Contract Form

The following changes have been made:

INFORMATION FROM TO

Construction Project Location Hurlburt Field, FL

Section J - List of Attachments

Miscellaneous text in this section has been modified to:

Attachment 01 - Section L Instructions to Offerors UPDATED 03Apr24

Attachment 02 - Drawings, Repair Sewer Lines, Basin 2, FY24-C101

Attachment 03 - Drawings, Repair Sewer Lines, Basin 2, FY24-C102

Attachment 04 - Contract Price Bid Schedule - REVISED 3 APR 24

Section L - Instructions, Conditions, & Notices to Offerors or Quoters

The following clauses were modified:

52.228-1Bid Guarantee.Sep 1996 hereby reads as follows:

As prescribed in , insert a provision or clause substantially as follows:28.101-2

BID GUARANTEE (SEPT 1996)

Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.(a)

The bidder shall furnish a bid guarantee in the form of a firm commitment, bid bond supported by good and sufficient surety or sureties (b) e.g., acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds-

To unsuccessful bidders as soon as practicable after the opening of bids; and(1)

To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), (2) as required by the bid as accepted.

The amount of the bid guarantee shall be percent of the bid price or $ , whichever is less.(c) 20 3M

If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all (d) contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and (e) the bid guarantee is available to offset the difference.

(End of clause)

FA441724R00040001

FA441724R00040001

IDCode:
Page: 1
Pages: 3
AmendNo: 0001
EffDate: 02 Apr 2024
ReqNo:
ProjNo: FA441724CivilWorks
IssCode: FA4417
AdmCode:
IssuedBy: FA4417 1 SOCONS LGC

350 TULLY ST BLDG 90339, CP 850 884 7602

HURLBURT FIELD, FL 32544-5810

UNITED STATES

REBECCA ROHRS, Email: rebecca.rohrs@us.af.mil Telephone: 850-884-7690 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA441724R0004
SolDate: 04 Mar 2024
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G - Contract Administration Data
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: This amendment serves to update verbiage in Clause 52.228-1 and Section L. This amendment also includes updated drawings and an updated bid schedule.

Any changes other than those referenced above are generated by the contract writing system, are administrative in nature, and do not change the terms and conditions of this solicitation. All other terms and conditions remain unchanged.

ContNameTitle:
CoNameTitle: Tina Kneip
ContDate:
CODate: 04 Apr 2024