Site Visit Questions and Answers HVAC Bldg 91259 dated 21 June 2024.pdf
PDF 41 KB Posted
- Attached to
- Repair HVAC Bldg 91259 Hurlburt Field
- Solicitation number
- FA441724B0002
About this file
This document contains a set of questions and answers from a site visit for the HVAC Repair project at Building 91259 at Hurlburt Field. Key details include:
The project involves repairing the HVAC system in Building 91259. Items addressed in the Q&A include: existing duct-mounted smoke detectors that need to be removed and reinstalled, the ability for one person to serve as superintendent, quality control manager, and site safety officer, confirmation that commissioning is not required but testing and balancing is, clarification that wave guides are not needed for mini-splits, identification of the existing control system vendor, acceptance of duct-mate flanged construction, no fire alarm or fire sprinkler work required beyond reinstalling duct smoke detectors, and confirmation that Trane is the sole source requirement for the air-cooled chiller.
The related federal contract opportunity is Solicitation FA441724B0002 for the Repair HVAC Bldg 91259 project, issued by the Department of the Air Force Special Operations Command.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPAIR HVAC 34TH & 319TH SOS, B91259
SITE VISIT QUESTIONS and RESPONSES
Q1: In each AHU room, the duct-mounted smoke detectors are installed in the coordinating HVAC duct. There are no notes on the drawings concerning duct-mounted smoke detectors. They will have to be removed and replaced when new duct work is installed. If they cannot be installed in the exact same location, will the fire alarm system need to be recertified and retested as part of this project’s scope?
A1: The existing duct smoke detectors are to remain. If the ductwork changes at the smoke detector, the existing duct smoke detectors shall be removed and reinstalled in the new ductwork.
Detectors shall be tested prior to removal and retested after they have been reinstalled.
Q2: Can one person serve as superintendent, quality control manager, and site safety and health officer if they have the experience and training required for each position?
A2: Yes, Super can be QC Manager and Site Safety/Health Officer if he/she has qualifications.
Q3: Is commissioning of HVAC or electrical systems a requirement of this project?
A3: No commissioning is required, however, the systems are to be test and balanced, and operation of the control systems verified.
Q4: At the site visit for Building it was discussed that the mini splits were going to serve the SKIFF area. Will wave guides be required for wall penetrations into the skiff area and if they are required then this will interrupt the communications from the condenser to the wall mount unit. Please confirm if wave guides are required and if they are require will the mins splits be relocated to serve another area in the building.
A4: Wave guides will not be required.
Q5: Is there a controls contractor that currently operates and maintains the existing control systems for building?
A5: The base operates and maintains the existing control system. Systems Specialists Inc. out of Pensacola is the local vendor and control system installer.
Q6: Please confirm that duct-mate flanged construction is acceptable for sheet metal ties ins on the new AHU’s for return air, supply air and outside air?
A6: Yes, duct-mate flanged construction is acceptable provided they are installed per manufacture’s recommendations.
Q7: Will any fire alarm device work be necessary as there are devices in the ACT, and if so provide the fire alarm manufacturer name?
REPAIR HVAC 34TH & 319TH SOS, B91259
SITE VISIT QUESTIONS and RESPONSES
A7: There is no ACT work in this project, therefore no fire alarm work required other than removing and reinstalling duct smoke detectors at the air handling units if the ductwork is being replaced.
Q8: Will the project require the fire sprinkler heads to be replaced or relocated where the ACT is being replaced?
A8: No fire sprinkler head replacement or relocation required.
Q9: Is Trane still the required standard for HVAC chillers in this project?
A9: Yes, Trane is a sole source requirement for the air cooled chiller.