FA441723Q0020 Hurlburt Field Giant Voice System QandA - 28 Jul 23.pdf
PDF 90 KB Posted
- Attached to
- Giant Voice System Upgrade
- Solicitation number
- FA441723Q0020
About this file
This document provides questions and answers regarding a solicitation for a Giant Voice System upgrade at Hurlburt Field Air Force Base in Florida. The solicitation seeks to upgrade the existing Giant Voice emergency notification system to the new APX-4500 radio platform with increased output wattage of 40 watts. Floor plans are provided for the buildings where new equipment will be installed - the Command Post, Alternate Command Post, and Emergency Readiness building. Bids should include replacement of batteries as identified in the statement of work. The proposal response needs only a pricing volume with no separate technical section.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q &A for Giant Voice System Upgrade Hurlburt Field AFB, FL FA441723Q0020
QUESTION #
CONTRACTOR
QUESTION(S)
DOCUMENT
REFERENCE
GOVERNMENT RESPONSE DOCUMENT REFERENCE
1 During the walkthrough attendees were not given the opportunity to view locations for equipment to be installed in Alt
ICC B90228. Can pictures of general equipment installation locations (i.e. counter, desk, antenna placement) be provided as well as pathway
Table 1, Page
9; Para 3.1.17;
& Para 3.1.19;
We will provide locations of the general equipment.
Please note Bldg. 90228 is current undergoing a major construction project that is expected to finish in FY25.
Antenna, radio, cabinet, hardware, cable lines, workstation, etc. will be installed. 1 SOCS Plan is to move workstation when construction starts.
See attachment: Reference File:
Giant Voice Radio Alt Command Post Bldg. 90228
2 As discussed during the walkthrough, will floor plans for
B90208, B90228, & B90056 be provided.
Para 3.1.17 Floor plans for Bldgs. B90208, B90228, & B90056 are provided in the document reference.
See attachments:
BLDG_90056_Emergency Readiness BLDG_90208_Command Post (ICC) BLDG_90228_Alternate CP (ALT ICC)
3 Has the frequency allocation been upgraded to reflect the new
APX-4500 radio and increased
Wattage. What will the output
(wattage) of these new radios be set to. The APX-4500 are generally set to 25W output for this type of project, but usually come from manufacture set at
55W
General Frequency and equipment approvals for the new
APX-4500 radios are currently being worked with the Base Spectrum Managers.
We requested an output wattage of 40 watts.
4 Given that a repeater is a single point of failure for Giant Voice systems, can a design for a single frequency system be offered. This would provide greater flexibility/reliability during emergencies as well as improving day-to-day announcements and maintenance.
This will not increase project costs as the new radios identified are all capable of handling this type of design.
UFC 4-021-01
Para. 3-4.3 &
3-5; SOW
Para1.01
The repeater will be integrated into the GV system RF architecture.
5 It was discussed during the walkthrough that the base was possibly in the process of purchasing new batteries for the existing systems. Should our bids still include cost of replacing batteries identified in
SOW.
Table 1 Yes, the bids are to include the cost of new batteries.
Current GV MX issues should not affect the upgrade project.
6 Please confirm that the proposal response should consist of a
Pricing Volume only and no technical narrative section/or volume is expected?
General
Current as of: 28 Jul 23//MSgt Sangalang//