PWS_-_28_OCT_2015.doc

DOC document 331 KB Posted

Attached to
Preventative Maintenance, Inspection and Repair of Overhead/Automatic Doors and Electric Gates
Solicitation number
FA4417-16-T-0003
Issued by

About this file

Performance Work Statement (Oct 2015) - Maintenance Inspection and Repair of Overhead Doors Automatic Doors and Electric Gates (Attachment 1)

View the file

Other files

File Type Posted
FA4417-16-T-0003_-_Site_Visit_Attendees.pdf PDF
FA4417-16-T-0003-0001.pdf PDF
FA4417-16-T-0003_-_Questions.docx DOCX document
FA4417-16-T-0003.pdf PDF
Overhead_Doors_and_Gates_-_Questionnaire.doc DOC document
Wage_Determination_05-3033_Rev.-17.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4417-16-T-0003 Attachment 1

PERFORMANCE WORK STATEMENT

FOR

INSPECTION, MAINTENANCE & REPAIR OF

OVERHEAD DOORS, ELECTRIC VEHICLE GATES, & AUTOMATIC PERSONNEL DOORS

FA4417-16-T-0003

28 October 2015 Hurlburt Field

TABLE OF CONTENTS

1.

DESCRIPTION OF SERVICES

1.1.

ROUTINE SERVICE CALL

1.2.

EMERGENCY SERVICE CALL

1.3.

INSPECTIONS & PREVENTIVE MAINTENANCE

1.4.

COMPETITION FOR PARTS

2.

SERVICE DELIVERY SUMMARY

3.

GOVERNMENT FURNISHED PROPERTY AND SERVICES

3.1.

UTILITIES

3.2.

OTHER SERVICES

4.

GENERAL INFORMATION

4.1.

QUALITY CONTROL

4.2.

QUALITY ASSURANCE

4.3.

HOURS OF OPERATION

4.4.

FEDERAL HOLIDAYS

4.5.

REPORTING PROCEDURES

4.5.1.

TECHINCAL DIRECTION

4.6.

ENVIRONMENTAL CONCERNS

4.7.

EMPHASIS ON GOVERNMENT AUTHORIZED REPRESENTATIVE

4.8.

SMOKING

4.9.

CONTRACTOR/EMPLOYEE BASE PASS AND IDENTIFICATION, SPECIAL CLEARANCES, AND VEHICLE PASSES 4.9.1.

THE CONTRACTOR EMPLOYEE LIST

4.9.2.

FLIGHT-LINE ACCESS

4.9.2.1

DRIVERS

4.9.2.2

VEHICLES

5.

APPENDICES

APPENDIX A:

Estimated Workload Data

APPENDIX B:

List of Overhead Doors

APPENDIX C:

List of Electric Vehicle Gates

APPENDIX D:

List of Automatic Personnel Doors

APPENDIX E:

Deliverables

1. DESCRIPTION OF SERVICES: The contractor shall provide management, services, tools, supplies, and equipment, to perform inspections, maintenance and repair services for overhead roll-up doors, electric vehicle gates, specified base-wide gates, and automatic sliding personnel doors at Hurlburt Field, Florida in a manner that will ensure continuous and safe operation of the doors and gates listed in the Appendices. Doors and gates shall be in a good and safe working condition after repairs are made. The contractor shall provide adequate communication such that the Authorized Government Representative (AGR) will be able to reach him/her within two (2) hours between the hours of 0700 CST and 1600 CST on work days and within four (4) hours for emergency calls between the hours of 1600 CST and 0700 CST Monday to Friday or on weekends. The Contractor shall perform the services required in this performance work statement using standard industry practices and shall comply with all Environmental laws, Office of Safety and Health Administration (OSHA) standards and applicable federal, state, and local laws. Prior to ordering parts and/or commencing work, the contractor shall submit a detailed estimate to the AGR for approval. The estimate shall include at minimum, parts, labor, shipping and handling, and/or any other costs involved.

1.1. ROUTINE SERVICE CALL: The AGR shall coordinate and schedule repairs for routine service calls. The contractor shall respond within three (3) business days of notification, and must contact the AGR before entering the base. Within two (2) days after responding, the contractor shall submit an estimate to the AGR identifying nature of work, location, labor hours, reimbursable parts, and any other costs involved. The contractor shall commence work only after the approval from the AGR. The AGR may only approve reimbursement for work up to and under $2,500. All reimbursement over $2,500, must be approved by the Contracting Officer prior to commencing work. Routine service shall be completed within seven (7) days after approval. The AGR may grant extra time for parts to be ordered but the contractor shall submit a request in writing for extensions to be considered. All electrical connections between the door or gate and existing power source shall be the contractor’s responsibility, but the contractor shall not be responsible for providing new power source from existing circuit breaker panels.

1.2. EMERGENCY SERVICE CALL: The AGR will notify the contractor of emergency repairs to be made. The contractor shall respond to an emergency service call within four (4) hours of notification. After correcting the emergency situation by means of a temporary or permanent solution, the contractor shall submit an estimate to the AGR identifying nature of work, location, labor hours, reimbursable parts, and any other costs involved. The contractor shall commence work only after the approval from the AGR. The AGR may only approve reimbursement for work up to and under $2,500. All reimbursement over $2,500, must be approved by the Contracting Officer prior to commencing work. Emergency service shall be completed within seven (7) days of approval. The AGR may grant extra time for parts to be ordered but the contractor shall submit a request in writing for extensions to be considered. All electrical connections between the door or gate and existing power source shall be the contractor’s responsibility, but the contractor shall not be responsible for providing new power source from existing circuit breaker panels.

1.3. INSPECTIONS & PREVENTIVE MAINTENANCE: The contractor shall provide a schedule for inspections and preventative maintenance of doors and gates. Preventative maintenance shall be performed in accordance with standard commercial practices or manufacturer’s written instructions, whichever is more stringent. The contractor shall submit a schedule within the first three (3) working days of each month and results of inspections and preventative maintenance to the AGR within three (3) working days of completed inspections. The documentation shall include identification of door/gate system, location, date of inspection, inspector, adequately describe the work performed and/or to be performed, estimated costs of any needed repairs, and overall condition of door/gate. The estimate shall include at minimum, parts, labor, shipping and handling, and/or any other costs involved.

1.4. CONTRACTOR-ACQUIRED ITEMS (REIMBURSABLE). The Contractor shall be responsible for the acquisition of all materials and supplies to perform work under this contract and will be reimbursed at cost for all parts acquired to perform repairs during Routine and Emergency Service Calls. Office supplies are not reimbursable. Original sales receipt must support each request for reimbursement. The contractor shall obtain competition to the maximum extent possible for all parts (individual or aggregate). Parts over $3,500.00 require quotes from at least three (3) independent sources of supply. Contractor shall provide documentation of competition to the AGR prior to purchase and approval from the contracting officer must be obtained. At a minimum, the quote/receipt must identify the following:

(1) Manufacturer or brand name of item

(2) Unit of issue

(3) Actual cost to contractor (original receipt to the contractor)

(5) Labor hours and rate (if subcontracted)

2. SERVICE DELIVERY SUMMARY

Performance Objective
PWS Para
Performance Threshold

Routine Service Calls

1.1.
Doors/Gates repaired within the time specified 95% of the time.

Contractor responds within time specified 95% of the time.

Emergency Service Calls

1.2.

Doors/Gates repaired within the time specified 95% of the time

Contractor responds within time specified 95% of the time

Perform annual inspections and preventive maintenance on all doors 1.3.

Inspections and preventive maintenance performed as required and results appropriately documented and provided to the Government within time specified 95% of the time.

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES

3.1. UTILITIES. The Government will make available, from existing outlets, all reasonably required amounts of utilities (e.g., electricity and water). The contractor shall conserve all utilities that are furnished without charge. The Contractor shall be required to install, maintain, and remove all temporary connections at his own expense. Removal of such connections or lines will be accomplished prior to final acceptance of the work.

3.2. OTHER SERVICES. The Government will provide standard police and fire protection. The Contractor and its employees are authorized to use the Hurlburt Field Medical Facility for emergency medical services. Reimbursements of expenses incurred by the Contractor or any its employees are the responsibility of the Contractor.

4. GENERAL INFORMATION.

4.1. QUALITY CONTROL. Contractor shall develop and maintain a quality control program to ensure maintenance and repair services are performed in accordance with this Performance Work Statement, applicable commercial standards, and manufacturer’s instructions. The program shall include procedures to identify, prevent, and/or correct defective services.

4.2. QUALITY ASSURANCE. The Government reserves the right to perform inspections, as it deems appropriate. Contractor shall contact AGR at the start of each job (PMs and service calls) and when work is completed.

4.3. HOURS OF OPERATION. For preventative maintenance and routine service calls, normal duty hours are Monday through Friday, 0615 to 1545, excluding federally observed holidays. For emergency service calls the contractor shall respond 24 hours a day, 7 days per week, including weekends, nights, and all U.S. Government holidays.

4.4. FEDERAL HOLIDAYS. The following is a list of federal holidays observed by this installation.

New Year’s Day, January 1 or the Friday preceding or Monday following

Martin Luther King’s Birthday, 3rd Monday in January

President’s Day, 2nd Monday in February

Memorial Day, last Monday in May

Independence Day, July 4 or the Friday preceding or Monday following

Labor Day, 1st Monday in September

Columbus Day, 2nd Monday in October

Veteran’s Day, November 11 or the Friday preceding or Monday following

Thanksgiving Day, 4th Thursday in November

Christmas Day, December 25 or the Friday preceding or Monday following

4.5 REPORTING PROCEDURES. The contractor shall provide contact information for the project manager assigned. The project manager shall have means of being contacted at all times while on Hurlburt Field.

4.5.1. AUTHORIZED GOVERNMENT REPRESENTATIVE. Contact number for the AGR (Service Contracts Section, 1 SOCES/CEOES) is (850) 884-7712 during normal duty hours. The Service Call Center (850) 884-6683 is the contact point after normal duty hours.

4.6. ENVIRONMENTAL CONCERNS. Performance under this contract shall not violate in any manner the environmental requirements of any applicable local, state, or federal entity, including the Department of Defense. The Contractor shall be responsible to ensure that any and all waste products produced by his efforts or the efforts of his subcontractors are properly disposed of off base in a manner, which complies with all applicable environmental regulations.

4.7. EMPHASIS ON GOVERNMENT AUTHORIZED REPRESENTATIVE. Any work performed that is not authorized by the Contracting Officer or AGR as specified in the PWS is done at the Contractor’s own risk and responsibility.

4.8. SMOKING. Smoking will be permitted in authorized areas only.

4.9. CONTRACTOR/EMPLOYEE BASE PASS AND IDENTIFICATION, SPECIAL CLEARANCES, AND VEHICLE PASSES. The contractor shall obtain base identification and vehicle passes, if required for all contractor personnel who make frequent visits to or perform work on Air Force installation(s) cite in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished contractor identification badges while visiting or performing work on the installation. The contractor shall be required to complete the following forms (to be provided at the pre-performance conference) in order for employees to gain access to the installation:

a. Contractor Employee Listing

4.9.1. THE CONTRACTOR EMPLOYEE LIST. This form shall list every employee requiring access. Every time employees change, it shall be updated to reflect additions and/or deletions. Identify those individuals who require escort authority by including the word “escort” next to their names. Limit the number of individuals designated as escorts to a reasonable number (i.e. one or two). For work locations please use building numbers or areas (i.e. Bldg. 90618 or RED HORSE, AMMO Area, etc.). Once completed, email the list to the Contracting Officer in EXCEL or WORD format. The Contracting Officer will then prepare and attach a cover letter, and forward the Employee List to the Visitor Control Center. Upon notification that the Employee List has been forwarded to the Visitor Control Center, the other two forms (DHS I-9 & CAB) shall be completed and hand carried to the Visitor Control Center by the employee. If everything is in order, they will receive a contractor badge. If an employee will be driving on Hurlburt Field they are required to provide a valid driver’s license, vehicle registration, and proof of insurance. NOTE: The section of the Visitor Control Center administrating this function is closed after 1400 (2:00 p.m.), therefore, employees must arrive prior to this time in order for their documentation to be processed. During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site. Upon completion or termination of the contract or expiration of the identification passes, the contractor shall ensure that all base identification passes issued to employees are returned to the issuing office.

4.9.2. Flight-line Access

4.9.2.1. Drivers. Training must be completed prior to operating vehicles or mowers on the flight line. All employees working on airfield grounds shall be required to have an AF Form 483, Certificate of Competency (flight-line driver’s license) with them at all times.

4.9.2.1. Vehicles. Vehicles must have a valid POV pass issued by Airfield Management prior to operating on the flight line. No equipment will be left unattended while working in these areas. The contractor shall be responsible for insuring that all foreign objects and debris produced by grounds maintenance is cleared off of all taxiways, runways, and aircraft parking aprons before leaving the work area.

4.10. Reporting Full-Time-Equivalent (FTE) Data. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields at the Contractor Manpower Reporting Application (CMRA) site http://www.ecmra.mil (select the US Air Force logo). Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the CMRA help desk.

4.10.1. Reporting Period. Contractors are required to input data by 31 October of each year.

4.10.2. Uses and Safeguarding of Information. Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.

4.10.3. User Manuals. User manuals are available on the front page of the CMRA link at http://www.ecmra.mil.

5. APPENDICES:

A.

Estimated Workload Data/ Historical Parts Breakdown B.

List of Overhead Doors C.

List of Electric Vehicle Gates D.

List of Automatic Personnel Doors Overhead Doors (Annual PM)

ITEM
SERVICE
ESTIMATED QUANTITY
1
Preventive Maintenance/Inspections
670
Ea
2
Routine Calls
350
Hrs
3
Emergency Calls
45
Hrs

Electric Vehicle Gates (Semi-Annual PM)

ITEM
SERVICE
ESTIMATED QUANTITY
1
Preventive Maintenance/Inspections
40
Ea
2
Routine Calls
20
Hrs
3
Emergency Calls
20
Hrs

Automatic Personnel Doors (Semi-Annual PM)

ITEM
SERVICE
ESTIMATED QUANTITY
1
Preventive Maintenance/Inspections
56
Ea
2
Routine Calls
23
Hrs
3
Emergency Calls
23
Hrs

Historical Reimburseable Parts Quantity Breakdown

Frequently Replaced Part Description
Annual Estimated Quantities

Electric Gates

Auto Gate Control Board
5
Lift Master Control Board
5
Photo Eye Set w/ Shroud
3
Guide Wheel - Sliding Gate
5
Drive Belt - Primary
5
Drive Belt - Secondary
5
Emergency Backup Batteries
5
Entry Key Pad
5
Exit Push Button
5
Hall Sensor
5
Motor
5
Brake
5
Loop Detector
5
Vehicle Exit Detector
5

Automated Doors

Doors Slides
5
Pivot Pin Set
5
Presense Detector
4
Single Door Operator
3
Doublt Door Operator
3
Control Module
3
Motor/Gearbox Module
5

Overhead Doors

Capacitor
5
Motor
5
Drive Belts
5
Vertical Seal Set
5
Drum Bearing Set
5
Safety Edge Cord Reels
5
Safety Edge
5
Limit Switch Chains/w Sproket
5
Door Operator
5
BLDG
DOORS
SIZE
TYPE
BLDG
DOORS
SIZE
TYPE
BLDG
DOORS
SIZE
TYPE
90005
1
12x12
ELECT
90141
2
10x10
ELECT
90612
1
20x20
MAN
90008
1
10x12
ELECT
90220
1
10.5x5
MAN
90612
22
15X15
MAN
90010
2
12.5x15
ELECT
90220
1
11.5x5
MAN
90618
1
11X14
MAN
90015
1
13x14
ELECT
90220
1
5x5
MAN
90618
1
21.5x10
ELECT
90020
1
10x10
ELECT
90220
1
9x5
MAN
90621
4
12x10
ELECT
90021
1
12 x 20
ELECT
90220
1
8.5x10
MAN
90625
2
9x12
MAN
90023
6
12x27
MAN
90225
2
17x60
ELECT
90626
5
10x12
MAN
90026
6
12x10
ELECT
90225
4
16x20
ELECT
90627
1
10x12
MAN
90028
1
10x10
MAN
90225
7
16x20
MAN
90628
4
10x12
MAN
90028
4
10x12
MAN
90228
2
10x10
MAN
90629
4
12x10
MAN
90029
1
12.5x12.5
ELECT
90232
1
8x7
MAN
90632
4
12x12
ELECT
90029
3
10.5x12.6
ELECT
90304
1
10x10
ELECT
90635
2
12x15
MAN
90030
1
10x12
ELECT
90340
1
8x7
MAN
90640
2
10x12
ELECT
90030
1
10X12
MAN
90402
4
10x12
MAN
90642
4
10x20
MAN
90032
1
15x20
ELECT
90409
1
12x12
ELECT
90700
8
14x15
ELECT
90033
1
12x12
ELECT
90410
4
15x12
ELECT
90701
1
10x8'9"
ELECT
90034
2
16x13
ELECT
90423
8
12x12
MAN
90702
1
12x13
MAN
90035
2
15x20
MAN
90425
20
10x10
MAN
90707
5
13x10.5
ELECT
90039
1
15x13
ELECT
90426
4
13X12
ELECT
90710
4
10x10
MAN
90051
1
10x10
ELECT
90427
2
10x10
ELECT
90710
2
10X10
ELECT
90053
4
8x8
MAN
90427
1
14x14
MAN
90710
5
12X14
ELECT
90053
2
16x8
MAN
90428
2
12x14
ELECT
90714
6
10x12
ELECT
90053
2
10x8
MAN
90430
2
14x14
ELECT
90717
1
10x12
MAN
90054
5
10x10
MAN
90431
2
14x14
ELECT
90720
2
12.5x13
MAN
90055
4
12x10
MAN
90432
2
14x14
ELECT
90726
1
5x6
MAN
90056
1
12x12
ELECT
90433
2
14x14
ELECT
90727
2
12x10
ELECT
90058
1
26x14
ELECT
90434
2
14x14
ELECT
90731
2
12x16.5
ELECT
90059
1
12x14
ELECT
90436
2
14x14
ELECT
90731
1
8x9
MAN
90070
2
10.5x12
ELECT
90438
2
12x12
ELECT
90731
1
9x10
MAN
90073
1
8x8.5
ELECT
90439
2
12x12
ELECT
90734
9
13x15
ELECT
90075
4
10x10
MAN
90518
1
7x7
MAN
90742
3
12x10
ELECT
90076
2
11x10
ELECT
90519
1
12x12
MAN
90761
2
12x9
ELECT
90081
2
14x10
ELECT
90521
1
12x12
ELECT
90761
2
16x9
ELECT
90084
1
12x10
ELECT
90523
4
10x10
ELECT
90761
1
6x8
ELECT
90085
1
MAN
ELECT
90527
2
12x10
ELECT
90761
2
8x10
ELECT
90102
32
12x24
ELECT
90531
3
10X9
MAN
90761
1
10x10
ELECT
90102
4
16x24
ELECT
90535
4
12x10
ELECT
90761
4
14x16
ELECT
90102
4
12X12
ELECT
90536
1
12x10
ELECT
90802
6
12x12
MAN
90106
4
12x24
ELECT
90539
2
10x10
ELECT
90809
1
17x18
ELECT
90111
1
12x27
MAN
90577
1
10X10
MAN
90809
1
16x17
ELECT
90113
6
8x8
MAN
90580
1
15x12
ELECT
90810
1
15x20
ELECT
90121
1
8x10
ELECT
90581
4
12x10
ELECT
90810
1
13x14
ELECT
90131
3
20x18
ELECT
90600
4
10x10
ELECT
90810
1
12x17
ELECT
90131
1
16x13
ELECT
90606
3
10x12
MAN
90812
2
12x15
MAN
90131
1
13x7
ELECT
90609
1
10x12
ELECT
90815
2
14x14
ELECT
90133
6
8X8
ELECT
90610
2
12x15
MAN
90816
3
10x12
MAN
BLDG
DOORS
SIZE
TYPE
BLDG
DOORS
SIZE
TYPE
BLDG
DOORS
SIZE
TYPE
90816
1
11x12
ELECT
91137
5
14x14
ELECT
91161
2
14x14
MAN
90816
1
10.5x9
MAN
91141
2
20x15
ELECT
91162
2
14x14
MAN
90817
3
10.5X16
MAN
91145
3
14x14
ELECT
91163
2
14x14
MAN
90822
2
10x12
MAN
91145
1
8x8.5
MAN
91164
2
14x14
MAN
90822
1
20x12
MAN
91147
2
14.5x16
ELECT
91252
6
10x14
ELECT
90822
2
17x14
MAN
91149
1
12x10
ELECT
91257
1
10x10
ELECT
90825
3
14x20
MAN
91151
1
18x13
ELECT
91258
4
14x14
ELECT
90827
7
16X12
ELECT
91155
2
10x8
MAN
91259
3
8x8
ELECT
90833
2
20x20
ELECT
91157
1
12x10
ELECT
91259
1
17X11
ELECT
90833
3
15x10
ELECT
91159
1
9x11
MAN
91259
1
16X8
ELECT
91012
1
26x10
ELECT
91161
2
14x14
MAN
91262
2
20x20
ELECT
91012
2
8x9
ELECT
91162
2
14x14
MAN
91266
2
20x20
ELECT
91013
9
8x9
ELECT
91163
2
14x14
MAN
91266
2
12x10
ELECT
91013
1
6x8
ELECT
91164
2
14x14
MAN
91301
4
8x7
MAN
91024
2
10x10
ELECT
91252
6
10x14
ELECT
91302
1
8x8
MAN
91025
1
18X12
ELECT
91257
1
10x10
ELECT
91310
1
9x7
MAN
91028
1
40X20
ELECT
91258
4
14x14
ELECT
91330
3
10x12
ELECT
91028
1
18X12
ELECT
91259
3
8x8
ELECT
91350
4
13x13
ELECT
91028
1
24X12
ELECT
91259
1
17X11
ELECT
91360
3
12x12
MAN
91028
1
10X8
ELECT
91259
1
16X8
ELECT
91361
1
12x12
ELECT
91029
2
16x16
ELECT
91262
2
20x20
ELECT
91362
3
10x10
MAN
91029
3
15.5x14
ELECT
91266
2
20x20
ELECT
91404
2
16x10
ELECT
91029
1
10.5X9
MAN
91266
2
12x10
ELECT
91520
2
10x10
ELECT
91029
1
10x10
ELECT
91301
4
8x7
MAN
91520
2
8x8
ELECT
91031
3
12x12
ELECT
91302
1
8x8
MAN
91601
1
12x10
ELECT
91033
2
12x12
ELECT
91310
1
9x7
MAN
92275
1
14.5x14
MAN
91036
2
18X12
ELECT
91330
3
10x12
ELECT
92276
1
14.5x14
ELECT
91042
1
10x9
ELECT
91350
4
13x13
ELECT
92485
1
10x10
ELECT
91045
1
10.5x9.5
ELECT
91360
3
12x12
MAN
Total
670
91045
1
8.5X9
ELECT
91361
1
12x12
ELECT
91045
2
14.5X14
ELECT
91362
3
10x10
MAN
91047
2
12x12
ELECT
91404
2
16x10
ELECT
91050
2
10x14
ELECT
91520
2
10x10
ELECT
91057
1
10x10
ELECT
91520
1
10x8
ELECT
91058
1
10x10
ELECT
91520
2
8x8
ELECT
91059
2
10x10
ELECT
91601
1
12x10
ELECT
91103
2
16x16
MAN
91137
5
14x14
ELECT
91119
2
14x14
MAN
91141
2
20x15
ELECT
91120
6
14.5x14
MAN
91145
3
14x14
ELECT
91124
19
16x12
ELECT
91145
1
8x8.5
MAN
91126
2
14x14
ELECT
91147
2
14.5x16
ELECT
91127
2
12x10
ELECT
91149
1
12x10
ELECT
91129
1
12x10
ELECT
91151
1
18x13
ELECT
91131
1
12x10
ELECT
91155
2
10x8
MAN
91132
8
14x16
ELECT
91157
1
12x10
ELECT
91133
2
14x14
ELECT
91159
1
9x11
MAN

Flightline Gates

Gate Number
Name
1
Red Horse Rd Gate
2
Fraiser Gate
3
Base Ops Gate
4
Fuels Flightline Gate B1
5
Fuels Flightline Gate B2
6
Bravo (ECP 10)
7
91028 Flightline

Base Entrance Gates

Gate Number
Name
1
Main Gate
2
Back Gate
3
Soundside Gate

Facility/Area Gates

Gate Number
Name
1
Fuels Gate
2
90531 Gate
3
TACP Gate
4
91500 Gate
5
Ammo Gate
6
91031 Gate
7
90535 Gate 1
8
90535 Gate 2
9
90053 Gate
10
91045 Gate
Total Gates
20
BLDG
DOORS
SIZE
TYPE
90075
Shoppette
2
Double
Sliding
90075
Shoppette
1
Single
Sliding
90710
Supply
2
Double
Sliding
91012
BX
3
Double
Sliding
91012
BX
2
Single
Swing
91012
BX
2
Double
Swing
91013
Comm
4
Double
Sliding
91020
Med
4
Double
Sliding
Bldg 1
HQ
2
Double
Revolving
90353
Child Dev
1
Double
Swing
91168
Child Dev
1
Double
Sliding
90307
Child Dev
1
Double
Sliding
90509
Billeting
1
Single
Swing
90229
ITT
1
Single
Bi-Fold
90918
Soundside
1
Double
Swing
Total
28
Deliverable (Report, Document, etc.)
PWS paragraph
Due Date (Calendar Days)
Schedule of Inspections and Preventative Maintenance
1.3
Within the first three (3) working days of each month
Quality Control Plan
4.1
Prior to Pre-Performance Conference and if any changes occur
Contractor Employee Listing
4.9.1
As needed for changes in contractor personnel

File details come from the government source that posted it. Updated .