REPAIR HANGAR 3087 FTFA 10-1124A

PROJECT TABLE OF CONTENTS Page-1

PROJECT TABLE OF CONTENTS

DIVISION 01 – GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRITIONS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 54 00 AFFIRMATIVE PROCUREMENT

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 57 20.01 SUPPLEMENTAL ENVIRONMENTAL PROTECTION

01 58 00 PROJECT IDENTIFICATION

01 78 00 CLOSEOUT SUBMITTALS

DIVISION 02 EXISTING CONDITIONS

02 00 50 DEMOLITION AND REMOVAL

02 22 20 EXCAVATION AND BACKFILL

02 50 00 ASPHALT PAVING

02 51 00 WATER DISTRIBUTION

02 83 13.00 20 LEAD IN CONSTRUCTION

DIVISION 03 CONCRETE

03 30 04 CONCRETE FOR MINOR STRUCTURES

DIVISION 04 MASONRY

04 20 00 MASONRY

DIVISION 05 METALS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 06 WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

DIVISION 07 THERMAL AND MOISTURE PROTECTION

07 22 00 ROOF AND DECK INSULATION

07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING07 60 00

07 60 00 FLASHING AND SHEET METAL

07 92 00 JOINT SEALANTS

DIVISION 08 OPENINGS

08 34 16.10 STEEL SLINDING HANGAR DOORS

08 71 00 DOOR HARDWARE

DIVISION 09 FINISHES

09 29 00 GYPSUM BOARD

09 67 23.16 FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM

09 90 00 PAINTS AND COATINGS

REPAIR HANGAR 3087 FTFA 10-1124A

PROJECT TABLE OF CONTENTS Page-2

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 20 WET PIPE SPRINKLER SYSTEM

21 13 20.00 20 HIGH EXPANSION FOAM SYSTEM

21 30 00 FIRE PUMPS

DIVISION 22 - PLUMBING

22 00 00 PLUMBING

DIVISION 23 - MECHANICAL

23 00 01 MECHANICAL IDENTIFICATION

23 03 00.00 20 MECHANICAL GENERAL REQUIREMENTS

23 05 17 SUPPORTS AND ANCHORS

23 05 19 GAUGES AND METERS

23 05 93 TESTING, ADJUSTING, AND BALANCING

23 07 19 PIPING INSULATION

23 08 00 COMMISSIONING HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

SYSTEMS

23 21 13 HYDRONIC PIPING

23 21 23 HVAC PUMPS

23 21 30 HYDRONIC SPECIALTIES

23 25 00 CHEMICAL WATER TREATMENT

23 34 23 POWER VENTILATORS

23 52 00 CONDENSING BOILERS

23 81 23.00 20 DUCTLESS SPLIT SYSTEM AIR CONDITIONING UNIT

23 83 00 HEATING AND VENTILATING UNITS

23 84 00 DUCTWORK

23 85 00 SPACE TEMPERATURE CONTROL SYSTEMS

DIVISION 26 – ELECTRICAL

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

DIVISON 27 COMMUNICATIONS

27 51 16 PUBLIC ADDRESS SYSTEM

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

APPENDICES

A. ROOF ASSESSMENT REPORT

B. HANGAR DOOR INSPECTION REPORT

C. ASBESTOS AND LEAD BASED PAINT SURVEY – HANGAR 3087

D. LEAD BASED PAINT SURVEY – ABOVEGROUND STORAGE TANK ADJOINING

HANGAR 3087

-- End of Project Table of Contents --