Updated_Specification_Table_of_Contents.pdf
PDF 8 KB Posted
- Attached to
- Repair Hanger 3087 Duke Field
- Solicitation number
- FA4417-14-R-0038
About this file
Updated Specification Table of Contents
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA4417-14-R-0038 _Amendment_4.doc | DOC document | |
| Updated_Section_09_90_00.pdf | ||
| FA4417-14-R-0038 _Amendment_3.doc | DOC document | |
| Questions_and_Answers_15_Aug_2014.doc | DOC document | |
| Specification_Section_23_08_00_00_10.pdf | ||
| Amendment_0002.doc | DOC document | |
| Specification_Section_09_67_23.16.pdf | ||
| REVISED_HEAD_WALL_DETAIL_4-A4.pdf | ||
| Questions_and_Answers_1-22 _13_Aug_2014.doc | DOC document | |
| FA4417-14-R-0038 _Amendment_1.doc | DOC document | |
| Site_Visit_MFR_and_Sign_In_Sheet _14R0038.pdf | ||
| Attachment_5_-_Financial_Reference_Sheet.docx | DOCX document | |
| Attachment_7_-_DHS_Form_I-9.pdf | ||
| Attachment_4_-_Past_Performance_Questionnaire.docx | DOCX document | |
| Attachment_3_-_Wage_Determination.docx | DOCX document | |
| Attachment_6_-_EAFB_Form_90.pdf | ||
| 14-R-0038_-_Repair_Hanger_-_Duke_Field.pdf | ||
| Attachment_1_-_FTFA10-1124_Specifications_Final.pdf | ||
| Attachment_2_-_FTFA101124_REPAIR_HANGAR_3087_DRAWINGS.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPAIR HANGAR 3087 FTFA 10-1124A
PROJECT TABLE OF CONTENTS Page-1
PROJECT TABLE OF CONTENTS
DIVISION 01 – GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRITIONS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 54 00 AFFIRMATIVE PROCUREMENT
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 57 20.01 SUPPLEMENTAL ENVIRONMENTAL PROTECTION
01 58 00 PROJECT IDENTIFICATION
01 78 00 CLOSEOUT SUBMITTALS
DIVISION 02 EXISTING CONDITIONS
02 00 50 DEMOLITION AND REMOVAL
02 22 20 EXCAVATION AND BACKFILL
02 50 00 ASPHALT PAVING
02 51 00 WATER DISTRIBUTION
02 83 13.00 20 LEAD IN CONSTRUCTION
DIVISION 03 CONCRETE
03 30 04 CONCRETE FOR MINOR STRUCTURES
DIVISION 04 MASONRY
04 20 00 MASONRY
DIVISION 05 METALS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
DIVISION 07 THERMAL AND MOISTURE PROTECTION
07 22 00 ROOF AND DECK INSULATION
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING07 60 00
07 60 00 FLASHING AND SHEET METAL
07 92 00 JOINT SEALANTS
DIVISION 08 OPENINGS
08 34 16.10 STEEL SLINDING HANGAR DOORS
08 71 00 DOOR HARDWARE
DIVISION 09 FINISHES
09 29 00 GYPSUM BOARD
09 67 23.16 FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM
09 90 00 PAINTS AND COATINGS
REPAIR HANGAR 3087 FTFA 10-1124A
PROJECT TABLE OF CONTENTS Page-2
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 20 WET PIPE SPRINKLER SYSTEM
21 13 20.00 20 HIGH EXPANSION FOAM SYSTEM
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING
DIVISION 23 - MECHANICAL
23 00 01 MECHANICAL IDENTIFICATION
23 03 00.00 20 MECHANICAL GENERAL REQUIREMENTS
23 05 17 SUPPORTS AND ANCHORS
23 05 19 GAUGES AND METERS
23 05 93 TESTING, ADJUSTING, AND BALANCING
23 07 19 PIPING INSULATION
23 08 00 COMMISSIONING HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
SYSTEMS
23 21 13 HYDRONIC PIPING
23 21 23 HVAC PUMPS
23 21 30 HYDRONIC SPECIALTIES
23 25 00 CHEMICAL WATER TREATMENT
23 34 23 POWER VENTILATORS
23 52 00 CONDENSING BOILERS
23 81 23.00 20 DUCTLESS SPLIT SYSTEM AIR CONDITIONING UNIT
23 83 00 HEATING AND VENTILATING UNITS
23 84 00 DUCTWORK
23 85 00 SPACE TEMPERATURE CONTROL SYSTEMS
DIVISION 26 – ELECTRICAL
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
DIVISON 27 COMMUNICATIONS
27 51 16 PUBLIC ADDRESS SYSTEM
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
APPENDICES
A. ROOF ASSESSMENT REPORT
B. HANGAR DOOR INSPECTION REPORT
C. ASBESTOS AND LEAD BASED PAINT SURVEY – HANGAR 3087
D. LEAD BASED PAINT SURVEY – ABOVEGROUND STORAGE TANK ADJOINING
HANGAR 3087
-- End of Project Table of Contents --