Follow_up_-_question__27.docx

DOCX document 10 KB Posted

Attached to
Repair Runway Edge Lighting Federal contract opportunity
Solicitation number
FA4417-13-R-0020
Issued by
Department of the Air Force Special Operations Command

About this file

Follow up question for question 27

View the file

Other files for this federal contract opportunity

Other files attached to Repair Runway Edge Lighting, newest first.
File Type Posted
13-R-0020_Questions_and_Answers.doc DOC document
Site_Visit_Sign_In_Sheet-FBO.pdf PDF
Site_Visit_BRIEF.pdf_-_FBO.pdf PDF
Attach_3 _13-R-0020 _Wage_Determination.docx DOCX document
Attach_4 _13-R-0020 _Past_Performance_Questionnaire.docx DOCX document
FA4417-13-R-0020_-_Solicitation.pdf PDF
FTEV_12-1096_SPECIFICATIONS_Final_(2).pdf PDF
Attach_5 _13-R-0020 _Financial_Questionnaire.docx DOCX document
FTEV_12-1096_DRAWINGS_PDF.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

27. FOLLOW UP QUESTION TO PREVIOUS QUESTION #17 –

The plans show to remove the connection between the ground rod and the light base can. It will be very costly to do this because the lights are in paved shoulders, and most likely the ground rod is also under the pavement. To remove the connection, we will have to either cut or core the pavement, then seal and/or replace the pavement. Either way it is going to be a very expensive operation for simply disconnecting a grounding connection.

ANSWER: The can must only be grounded to the new safety ground conductor run with the series lighting circuit. Removal of the ground conductor is required.