Atch_22_Preproposal_Conference_12_July_18.pdf

PDF 590 KB Posted

Attached to
Repair (SUS) Various Building Systems; B861
Solicitation number
FA440718R0004
Issued by

About this file

Attachment 22 - Pre-proposal Conference Slides

View the file

Other files

File Type Posted
Atch_20_Proposal_Checklist_FA440718R0004.pdf PDF
Amendment_10_Conform_Version.pdf PDF
Amendment_10.pdf PDF
Amendment_9.pdf PDF
Atch_1_-_SOW_8_Aug__2018.pdf PDF
Atch_2_-__B861_Phasing_Plan.pdf PDF
E3-E4.zip ZIP file
16967E01.dwg DWG drawing
Amendment_6.pdf PDF
M5-M6.zip ZIP file
E1-E2.zip ZIP file
P2.zip ZIP file
E3-E4.zip ZIP file
Atch_21_-_RFI_Log_B861_-_27_July_18.pdf PDF
M4.zip ZIP file
M14-M18.zip ZIP file
16967E01.txt TXT text file
E7.zip ZIP file
X1.zip ZIP file
M1.zip ZIP file
M11-M12.zip ZIP file
Atch_21_RFI_Log_B861_-_26_July_18.pdf PDF
Atch_24_Post_Investigation_Report.pdf PDF
Atch_2_B861_Phasing_Plan_17_Jul_18.pdf PDF
Atch_21_RFI_Log_B861_-_19_July_18.pdf PDF
Atch_25_Additional_Site_Visit_Sign_in_Sheet.pdf PDF
Atch_23_Preproposal_Conference_Sign-in_Sheets.pdf PDF
FA440718R00040003.pdf PDF
Atch_1_Bldg_861_SOW_7.10.18.pdf PDF
Atch_20_Proposal_Checklist_FA440718R0004.pdf PDF
Atch_9_Schedule_of_Materials_Submittals.pdf PDF
Atch_6_B861_Fire_System_Drawings.PDF PDF
Atch_20_RFP_Checklist.pdf PDF
Atch_4_B861_100__Drawings.pdf PDF
Attch_1_B861_SOW_6.22.18_Final.pdf PDF
Atch_3_B861_-_100__Specification.pdf PDF
Atch_13_AFAA_Furniture.pdf PDF
Atch_11_TEKLAB_Sample_Results-B861.pdf PDF
Atch_8_Termite_Treatment_Report.pdf PDF
RFP_FA440718R0004.pdf PDF
Atch_2_Phasing_Plan_062118.pdf PDF
Atch_18_Past_Performance_Information.pdf PDF
Atch_4_B861_Fire_System_Drawings.PDF PDF
Atch_13_AFAA_Furniture.pdf PDF
Atch_9_B861_Glass_Door.pdf PDF
Atch_10_B861_Phasing_Plan.pdf PDF
Atch_8_Schedule_of_Materials_Submittals.pdf PDF
Atch_7_B861_SOW.pdf PDF
Atch_2_B861_100__Drawings.pdf PDF
Atch_5_Site_Utility_Plan.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

375th CONTRACTING

SQUADRON

Pre-Proposal Conference Repair Various Building Systems, Bldg 861

Please turn off cell phones

Conference Overview Introductions Proposal Submission Requirements Labor Considerations Q & A Rules of Engagement Project Site Visit

Key Personnel “The Acquisition Team” Contracting Team

– Contracting Officer - Rodney Brown

– Team Lead PKA2 - Jody Noram

– Contract Supervisor - SSgt Jorge Alvarez

Civil Engineering Team

– Team Lead CENME - Melissa Lewis

– Project Manager - Gary Smith

Contractors

Demo Solicitation Features

RFP No. FA440718R0004 Project Magnitude $5M - $10M Proposals Due: 1:00 PM CDT, 25July 18

Solicitation Features (cont)

Evaluation Process described in Section M of the Solicitation FA440718R0004

Performance/Price Trade-off Performance approximately equal to price.

Total Price to include base bid plus all options will be used to evaluate Price.

Proposal Submission Requirements

VOLUME I

SF 1442

– Blocks 14 - 16 and 19 - 20 (A - C)

– Block 28 – Check box to acknowledge proposal

– Block 30A and sign and date blocks 30B and 30C

– Submit a completed copy of Price Schedule (p. 5)

SF 1442 Amendments

– Complete blocks 8 and 15 (A – C) for each amendment

Clauses and Provisions

– Section G Administrative Data

– Sections I, K, and L Fill-In as applicable

VOLUME I (Cont’d) Bid Bond

– Submit electronically with visible seals and signatures

– 20% of proposed project price

Section 8(a) Status

– Provide copy of SBA letter

Joint Venture and Teaming/Partnering Agreements

– Must disclose and comply with Section K and Section L, paragraphs L-1.4 or L-1.5 as applicable Attachment 12 – Proposal Checklist

– Submit completed copy with proposal

VOLUME II

Work Plan

– Narrative Format

– Proposed Organization & Technical Approach

• Phasing Plan

• Drawings

• Specifications

• SOW

VOLUME III

Past Performance Information Sheets

– Submit 3 References - Attachment 18

– Recency = Within the past 5 years

– Relevance = Reflect experience in delivering similar construction projects

– Past Performance is approximately equal to price

Labor Considerations Davis Bacon Act applies Prevailing wages in effect at time of award apply Employees subject to labor interviews

Q&A Rules of Engagement

• No changes to RFP unless amended

• Submit Requests for Information (RFI) in writing to SSgt Jorge Alvarez and Mr. Jody Noram via e-mail (jorge.alvarez.7@us.af.mil and jody.noram.1@us.af.mil)

• RFI Deadline 3:00 PM CDT, 18 July 2018

• RFI posted on FBO mailto:jorge.alvarez.7@us.af.mil mailto:jody.noram.1@us.af.mil

BLDG 861 Inner Drive

BLDG 52 E Winters St.

Site Visit Location

QUESTIONS?

375th CONTRACTING

SQUADRON

Slide Number 1
Slide Number 2
Conference Overview
Key Personnel�“The Acquisition Team”
Demo Solicitation Features
Solicitation Features (cont)
Proposal Submission Requirements
Proposal Submission Requirements
Proposal Submission Requirements
Proposal Submission Requirements
Labor Considerations
Q&A Rules of Engagement
Slide Number 13
Slide Number 14

File details come from the government source that posted it.