Atch_8_Schedule_of_Materials_Submittals.pdf

PDF 602 KB Posted

Attached to
Repair (SUS) Various Building Systems; B861
Solicitation number
FA440718R0004
Issued by

About this file

Atch 8 Schedule of Materials Submittals

View the file

Other files

File Type Posted
Amendment_10.pdf PDF
Atch_20_Proposal_Checklist_FA440718R0004.pdf PDF
Amendment_10_Conform_Version.pdf PDF
Amendment_9.pdf PDF
Atch_1_-_SOW_8_Aug__2018.pdf PDF
Atch_2_-__B861_Phasing_Plan.pdf PDF
E3-E4.zip ZIP file
Atch_21_-_RFI_Log_B861_-_27_July_18.pdf PDF
M4.zip ZIP file
M14-M18.zip ZIP file
16967E01.txt TXT text file
E7.zip ZIP file
X1.zip ZIP file
M1.zip ZIP file
M11-M12.zip ZIP file
E3-E4.zip ZIP file
16967E01.dwg DWG drawing
Amendment_6.pdf PDF
M5-M6.zip ZIP file
E1-E2.zip ZIP file
P2.zip ZIP file
Atch_21_RFI_Log_B861_-_26_July_18.pdf PDF
Atch_24_Post_Investigation_Report.pdf PDF
Atch_25_Additional_Site_Visit_Sign_in_Sheet.pdf PDF
Atch_2_B861_Phasing_Plan_17_Jul_18.pdf PDF
Atch_21_RFI_Log_B861_-_19_July_18.pdf PDF
FA440718R00040003.pdf PDF
Atch_1_Bldg_861_SOW_7.10.18.pdf PDF
Atch_23_Preproposal_Conference_Sign-in_Sheets.pdf PDF
Atch_20_Proposal_Checklist_FA440718R0004.pdf PDF
Atch_3_B861_-_100__Specification.pdf PDF
Atch_13_AFAA_Furniture.pdf PDF
Atch_11_TEKLAB_Sample_Results-B861.pdf PDF
Atch_8_Termite_Treatment_Report.pdf PDF
RFP_FA440718R0004.pdf PDF
Atch_2_Phasing_Plan_062118.pdf PDF
Atch_9_Schedule_of_Materials_Submittals.pdf PDF
Atch_6_B861_Fire_System_Drawings.PDF PDF
Atch_20_RFP_Checklist.pdf PDF
Atch_4_B861_100__Drawings.pdf PDF
Attch_1_B861_SOW_6.22.18_Final.pdf PDF
Atch_19_Past_Performance_Questionnaire.pdf PDF
Atch_7_B861_SOW.pdf PDF
Atch_2_B861_100__Drawings.pdf PDF
Atch_5_Site_Utility_Plan.pdf PDF
Atch_4_B861_Fire_System_Drawings.PDF PDF
Atch_13_AFAA_Furniture.pdf PDF
Atch_9_B861_Glass_Door.pdf PDF
Atch_10_B861_Phasing_Plan.pdf PDF
Atch_12_AFCEC_D_Wing_Renovation.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT TITLE Repair (SUS) Various Building Systems Comm Fac; Bldg. 861

100% Submittal

CONTRACT NO. FA4407-14-D-0018

PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made regardless of whether or not they are listed.

SUB

ID NO.

SPECIFICATION

PARAGRAPH

NUMBER OR

DRAWING NO.

TYPE OF

SUBMITTAL

DESCRIPTION OF MATERIAL PLANNED

SUBMITTAL

DATE

DATE

REC’D

FROM

CONTR.

DATE TO

CEC

DATE

RETURNED

FROM CEC

TO CONTR.

APPROVED/

DISAPPRV.

RESUBMIT

FROM

CONTR.

REMARKS

SAFB FORM SMS Page 1 of 23

1. 02 41 00.00 40

1.6

Submittals Preconstruction Submittals:

Demolition Plan; Existing

Conditions

2. 02 41 00.00 40

1.6

Submittals Certificates: Notification of

Demolition & Renovation Form

3. 02 41 00.00 40

1.6

Submittals Closeout Submittals: Receipts

4. 05 40 00.00 40

1.2

Submittals Shop Drawings: Framing

Components; Steel Studs, Joists, Tracks, Bracing, Bridging and

Accessories

5. 05 40 00.00 40

1.2

Submittals Design Data: Metal Framing

Calculations

6. 05 40 00.00 40

Submittals Certificates: Load-Bearing Cold-

Formed Metal Framing Welds

7. 05 40 00.00 40

Submittals Closeout Submittals: Recycled

Content of Steel Products

8. 06 10 00.00 40

1.3B

Product Data Technical Data for Wood

Preservative Materials and

Application Instructions

9. 06 10 00.00 40

1.3C

Manufacturer’s

Certificate

Certify Wood Products Supplied for Rough Carpentry Meet or

Exceed Specified Requirements

10. 06 20 00

Submittals Shop Drawings: Detail Drawing

Indicating all Wood Assemblies

11. 06 20 00

Submittals Product Data: Wood Products

12. 06 20 00

1.2

Submittals Product Data: Countertops

13. 06 20 00

1.2

Submittals Product Data: Treated Wood

Products

14. 06 20 00

Submittals Product Data: Hardware and

Accessories

PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made

SPECIFICATION

PARAGRAPH

NUMBER OR

DRAWING NO.

TYPE OF

SUBMITTAL

DESCRIPTION OF MATERIAL PLANNED

SUBMITTAL

DATE

DATE

REC’D

FROM

CONTR.

DATE TO

CEC

DATE

RETURNED

FROM CEC

TO CONTR.

APPROVED/

DISAPPRV.

RESUBMIT

FROM

SAFB FORM SMS Page 2 of 23

15. 06 20 00

Submittals Samples

16. 06 20 00

1.2

Submittals Certificates: Certificates of

Grade

17. 06 20 00

Submittals Closeout Submittals: VOC

Content for Softwood Plywood

18. 06 20 00

Submittals Closeout Submittals: Indoor Air

Quality for Non-Aerosol

Adhesives

19. 06 20 00

Content for MDF/Particleboard

20. 06 20 00

Submittals Closeout Submittals: Indoor Air

Quality for Aerosol Adhesives

21. 06 65 10

1.4.A.1

Submittals Product Data: For each type of product indicated

22. 06 65 10

1.4.B

Shop Drawings 1. Show location of each item, dimensioned plans and elevations, large-scale details, attachment devices and other components.

a. Show full-size details, edge details, thermoforming requirements, attachments, etc.

b. Show locations and sizes of furring, blocking, including concealed blocking and reinforcement specified in other

Sections.

c. Show locations and sizes of cutouts and holes for plumbing fixtures, faucets, soap dispensers, waste receptacle and other items installed in solid surface.

PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made

SPECIFICATION

PARAGRAPH

NUMBER OR

DRAWING NO.

TYPE OF

SUBMITTAL

DESCRIPTION OF MATERIAL PLANNED

SUBMITTAL

DATE

DATE

REC’D

FROM

CONTR.

DATE TO

CEC

DATE

RETURNED

FROM CEC

TO CONTR.

APPROVED/

DISAPPRV.

RESUBMIT

FROM

SAFB FORM SMS Page 3 of 23

23. 06 65 10

1.4.C

Shop Drawings C. Samples:

1. For each type of product indicated.

a. Submit minimum 6-inch by 6-inch sample in specified gloss.

b. Cut sample and seam together for representation of inconspicuous seam.

c. Indicate full range of color and pattern variation.

2. Approved samples will be retained as a standard for work.

24. 06 65 10

1.4.D

Submittals D. Product data:

1. Indicate product description, fabrication information and compliance with specified performance requirements.

25. 06 65 10

1.4.E

Submittals E. Fabricator/installer qualifications:

1. Provide copy of certification number.

26. 06 65 10

1.4.F

Submittals F. Manufacturer certificates:

1. Signed by manufacturers certifying that they comply with requirements.

27. 06 65 10

1.4.G

Submittals G. Maintenance data:

1. Submit manufacturer’s care and maintenance data, including repair and cleaning instructions.

a. Maintenance kit for finishes shall be submitted.

2. Include in project closeout documents.

PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made

SPECIFICATION

PARAGRAPH

NUMBER OR

DRAWING NO.

TYPE OF

SUBMITTAL

DESCRIPTION OF MATERIAL PLANNED

SUBMITTAL

DATE

DATE

REC’D

FROM

CONTR.

DATE TO

CEC

DATE

RETURNED

FROM CEC

TO CONTR.

APPROVED/

DISAPPRV.

RESUBMIT

FROM

SAFB FORM SMS Page 4 of 23

28. 07 21 13

1.2

Submittals Product Data: Manufacturer’s

Standard Details

29. 07 21 13

Submittals Product Data: Block or Board

Insulation

30. 07 21 13

Submittals Product Data: Vapor Retarder

31. 07 21 13

1.2

Submittals Product Data: Pressure Sensitive

Tape

32. 07 21 13

Submittals Product Data: Protection Board or Coating

33. 07 21 13

Submittals Product Data: Accessories

Including Sealants

34. 07 21 13

Submittals Certificates: Block or Board

35. 07 21 13

Submittals Certificates: Vapor Retarder

36. 07 21 13

1.2

Submittals Certificates: Protection Board or

Coating

37. 07 21 13

Submittals Certificates: ULE Greenguard

38. 07 21 13

1.2

Submittals Manufacturer’s Instructions:

Block or Board Insulation

39. 07 21 13

40. 07 21 13

Submittals Closeout Submittals: ULE

Greenguard

41. 07 21 13

Submittals Closeout Submittals: Volatile

Organic Compound (VOC)

Content

42. 07 21 13

Content

43. 07 21 23

Submittals Product Data: Loose Fill

PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made

SPECIFICATION

PARAGRAPH

NUMBER OR

DRAWING NO.

TYPE OF

SUBMITTAL

DESCRIPTION OF MATERIAL PLANNED

SUBMITTAL

DATE

DATE

REC’D

FROM

CONTR.

DATE TO

CEC

DATE

RETURNED

FROM CEC

TO CONTR.

APPROVED/

DISAPPRV.

RESUBMIT

FROM

SAFB FORM SMS Page 5 of 23

44. 07 21 23

Loose Fill Insulation

45. 07 21 23

Submittals Closeout Submittals

46. 07 90 05

1.4.A

Submittals Product Data: Provide data indicating sealant chemical characteristics, performance criteria, substrate preparation, limitations, and color availability.

47. 07 90 05

Submittals Samples: Submit three samples, 1 x 1 inch (.254 x .254 mm) in size illustrating sealant colors for selection.

48. 07 90 05

1.4.C

Submittals Manufacturer's Installation

Instructions: Indicate special procedures, surface preparation, and perimeter conditions requiring special attention.

49. 09 21 16

1.4.A

Submittals Product Data: Provide data on gypsum board, accessories, joint finishing system, accessories, and joint finishing system.

50. 09 21 16

Submittals Product Data: Provide manufacturer's data on partition head to structure connectors, showing compliance with requirements.

51. 09 30 10

Submittals Shop Drawings: Detail Drawings

52. 09 30 10

1.2

Submittals Product Data: Tile

53. 09 30 10

Submittals Product Data: Setting-Bed

PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made

SPECIFICATION

PARAGRAPH

NUMBER OR

DRAWING NO.

TYPE OF

SUBMITTAL

DESCRIPTION OF MATERIAL PLANNED

SUBMITTAL

DATE

DATE

REC’D

FROM

CONTR.

DATE TO

CEC

DATE

RETURNED

FROM CEC

TO CONTR.

APPROVED/

DISAPPRV.

RESUBMIT

FROM

SAFB FORM SMS Page 6 of 23

54. 09 30 10

1.2

Submittals Product Data: Mortar, Grout, and

Adhesive

55. 09 30 10

Submittals Samples: Tile

56. 09 30 10

1.2

Submittals Samples: Accessories

57. 09 30 10

1.2

Submittals Samples: Transition Strips

58. 09 30 10

1.2

Submittals Samples: Grout

59. 09 30 10

1.2

Submittals Certificates: Tile

60. 09 30 10

1.2

Submittals Certificates: Mortar, Grout, and

Adhesive

61. 09 30 10

Maintenance Instructions

62. 09 30 10

Submittals Operation and Maintenance Data:

Installation

63. 09 30 10

Submittals Closeout Submittals: Tile

64. 09 30 10

1.2

Submittals Closeout Submittals: Adhesives

65. 09 30 10

1.3.1

Other Submittal

Requirements

Local/Regional Materials:

Submit documentation indicating distance between manufacturing facility and the project site and also the distance of raw material origin from the project site. For

Tile and Reinforcing Wire Fabric indicate percentage of post-industrial and post-consumer recycled content per unit of product. Indicate relative dollar value of recycled content

PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made

SPECIFICATION

PARAGRAPH

NUMBER OR

DRAWING NO.

TYPE OF

SUBMITTAL

DESCRIPTION OF MATERIAL PLANNED

SUBMITTAL

DATE

DATE

REC’D

FROM

CONTR.

DATE TO

CEC

DATE

RETURNED

FROM CEC

TO CONTR.

APPROVED/

DISAPPRV.

RESUBMIT

FROM

SAFB FORM SMS Page 7 of 23 products to total dollar value of products included in project.

66. 09 30 10

1.3.2

Other Submittal

Requirements

Environmental Data: Submit

Table 1 of ASTM E2129 for the

Following Products: Tile

67. 09 51 00

1.3.A

Submittals Shop Drawings: Indicate grid layout and related dimensioning, junctions with other ceiling finishes, and mechanical and electrical items installed in the ceiling.

68. 09 51 00

1.3.B

Submittals Product Data: Provide data on suspension system components, acoustical units, and accessories.

69. 09 51 00

1.3.C

Submittals Samples: Submit two samples 12 x 12 inch (305 x 305 mm) in size illustrating material and finish of acoustical units.

70. 09 51 00

1.3.D

Submittals Samples: Submit two samples each, 6 inches (150 mm) long, of suspension system main runner, cross runner, and perimeter molding.

71. 09 90 00

1.4.A

Submittals Product Data: Provide data on all finishing products, special coatings, and painting products.

Reference data to the Architect's painting systems schedule.

Include manufacturer's statement that components are appropriate to each painting system.

72. 09 90 00

Submittals Samples: Submit two painted samples, illustrating selected colors and textures for each color and system selected. Submit on

PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made

SPECIFICATION

PARAGRAPH

NUMBER OR

DRAWING NO.

TYPE OF

SUBMITTAL

DESCRIPTION OF MATERIAL PLANNED

SUBMITTAL

DATE

DATE

REC’D

FROM

CONTR.

DATE TO

CEC

DATE

RETURNED

FROM CEC

TO CONTR.

APPROVED/

DISAPPRV.

RESUBMIT

FROM

SAFB FORM SMS Page 8 of 23 paint cards, 8-1/2 x 11 inch (216 x 279 mm) in size.

73. 09 90 00

1.4.C

Submittals Manufacturer's Instructions:

Indicate special surface preparation procedures and substrate conditions requiring special attention.

74. 09 90 00

1.4.D

Submittals Maintenance Data: Submit data on cleaning, touch-up, and repair of painted and coated surfaces.

75. 10 21 13

Submittals Shop Drawings: Fabrication

Drawings

76. 10 21 13

Submittals Shop Drawings: Installation

77. 10 21 13

Submittals Product Data: Cleaning and

Maintenance Instructions

78. 10 21 13

Submittals Product Data: Colors and

Finishes

79. 10 21 13

Submittals Product Data: Galvanized Steel

Sheet

80. 10 21 13

Submittals Product Data: Sound-Deadening

Cores

81. 10 21 13

Submittals Product Data: Anchoring

Devices and Fasteners

82. 10 21 13

Submittals Product Data: Hardware and

Fittings

83. 10 21 13

Submittals Product Data: Brackets

84. 10 21 13

1.2

Submittals Product Data: Door Hardware

85. 10 21 13

1.2

Submittals Product Data: Local/Regional

Materials Documentation

86. 10 21 13

Submittals Product Data: Toilet Enclosures

PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made

SPECIFICATION

PARAGRAPH

NUMBER OR

DRAWING NO.

TYPE OF

SUBMITTAL

DESCRIPTION OF MATERIAL PLANNED

SUBMITTAL

DATE

DATE

REC’D

FROM

CONTR.

DATE TO

CEC

DATE

RETURNED

FROM CEC

TO CONTR.

APPROVED/

DISAPPRV.

RESUBMIT

FROM

SAFB FORM SMS Page 9 of 23

87. 10 21 13

1.2

Submittals Product Data: Room Entrance

Screens

88. 10 21 13

Submittals Product Data: Urinal Screens

89. 10 21 13

1.2

Submittals Product Data: Pilaster Shoes

90. 10 21 13

1.2

Submittals Samples: Colors and Finishes

91. 10 21 13

1.2

Submittals Samples: Hardware and Fittings

92. 10 21 13

1.2

Submittals Samples: Anchoring Devices and

Fasteners

93. 10 21 13

Submittals Certificates: Warranty

94. 10 21 13

1.2

Plastic Identification

95. 10 21 13

Submittals Closeout Submittals:

Local/Regional Materials

Documentation

96. 10 21 13

Submittals Closeout Submittals: Toilet

Enclosures

97. 10 21 13

Submittals Closeout Submittals: Room

Entrance Screens

98. 10 21 13

Submittals Closeout Submittals: Urinal

Screens

99. 10 21 13

Submittals Closeout Submittals: Pilaster

Shoes

100. 10 28 13

Submittals Product Data: Finishes

101. 10 28 13

1.2

Submittals Product Data: Accessory Items

102. 10 28 13

1.2

Submittals Samples: Finishes

103. 10 28 13 Submittals Samples: Accessory Items

PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made

SPECIFICATION

PARAGRAPH

NUMBER OR

DRAWING NO.

TYPE OF

SUBMITTAL

DESCRIPTION OF MATERIAL PLANNED

SUBMITTAL

DATE

DATE

REC’D

FROM

CONTR.

DATE TO

CEC

DATE

RETURNED

FROM CEC

TO CONTR.

APPROVED/

DISAPPRV.

RESUBMIT

FROM

SAFB FORM SMS Page 10 of 23

104. 10 28 13

1.2

Submittals Certificates: Accessory Items

105. 10 28 13

1.2

Electric Hand Dryer

106. 22 00 00

1.2.1a

Submittals Shop Drawings: Plumbing

System: Detail drawings consisting of schedules, performance charts, instructions, diagrams, and other information to illustrate the requirements and operations of systems that are not covered by the Plumbing Code.

Detail drawings for the complete plumbing system including piping layouts and locations of connections; dimensions for roughing-in, foundation, and support points; schematic diagrams and wiring diagrams or connection and interconnection diagrams. Detail drawings shall indicate clearances required for maintenance and operation.

Where piping and equipment are to be supported other than as indicated, details shall include loadings and proposed support methods. Mechanical drawing plans, elevations, views, and details, shall be drawn to scale.

107. 22 00 00

1.2.2a

Product Data Fixtures:

1. Flush Valve Water Closets

2. Flush Valve Urinals

3. Countertop Lavatories

PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made

SPECIFICATION

PARAGRAPH

NUMBER OR

DRAWING NO.

TYPE OF

SUBMITTAL

DESCRIPTION OF MATERIAL PLANNED

SUBMITTAL

DATE

DATE

REC’D

FROM

CONTR.

DATE TO

CEC

DATE

RETURNED

FROM CEC

TO CONTR.

APPROVED/

DISAPPRV.

RESUBMIT

FROM

SAFB FORM SMS Page 11 of 23

4. Service Sinks

5. Water Heaters; Electric

6. Backflow Prevention

Assemblies

108. 22 00 00

1.2.2b

Welding A copy of qualified procedures and a list of names and identification symbols of qualified welders and welding operators

109. 22 00 00

1.2.2c

Plumbing

System

Diagrams, instructions, and other sheets proposed for posting.

Manufacturer's recommendations for the installation of bell and spigot and hubless joints for cast iron soil pipe.

110. 22 00 00

1.2.3a

Test Reports Tests, Flushing and Disinfection:

Test reports in booklet form showing all field tests performed to adjust each component and all field tests performed to prove compliance with the specified performance criteria, completion and testing of the installed system. Each test report shall indicate the final position of controls

111. 22 00 00

1.2.3b

Test of

Backflow

Prevention

Assembies

Certification of proper operation shall be as accomplished in accordance with state regulations by an individual certified by the state to perform such tests. If no state requirement exists, the

Contractor shall have the manufacturer's representative test the device, to ensure the unit is

PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made

SPECIFICATION

PARAGRAPH

NUMBER OR

DRAWING NO.

TYPE OF

SUBMITTAL

DESCRIPTION OF MATERIAL PLANNED

SUBMITTAL

DATE

DATE

REC’D

FROM

CONTR.

DATE TO

CEC

DATE

RETURNED

FROM CEC

TO CONTR.

APPROVED/

DISAPPRV.

RESUBMIT

FROM

SAFB FORM SMS Page 12 of 23 properly installed and performing as intended. The Contractor shall provide written documentation of the tests performed and signed by the individual performing the tests.

112. 22 00 00

1.2.4a

Operation and

Maintenance

Data

Plumbing System: Submit in accordance with Section 01 78 23

OPERATION AND

MAINTENANCE DATA.

113. 22 00 00

1.2.5a

Closeout

Submittals

Water-Efficient Products

114. 22 00 00

1.2.5a

Closeout

Energy-Efficient Water Heaters

115. 22 07 19.00 40

Shop Drawings

Installation Drawings

116. 22 07 19.00 40

1.2.2a

Product Data Adhesives

117. 22 07 19.00 40

1.2.2a

Product Data Coatings

118. 22 07 19.00 40

1.2.2a

Product Data Insulating Cement

119. 22 07 19.00 40

1.2.2a

Product Data Insulation Materials

120. 22 07 19.00 40

1.2.2a

Product Data Jacketing

121. 22 07 19.00 40

1.2.2a

Product Data Tape

122. 22 07 19.00 40

1.2.3a

Manufacturer’s

Instructions

Installation Manual

123. 22 07 19.00 40

1.2.3a

Closeout

Submittals

Record Drawings

124. 22 07 19.00 40

1.2.3a

Closeout

PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made

SPECIFICATION

PARAGRAPH

NUMBER OR

DRAWING NO.

TYPE OF

SUBMITTAL

DESCRIPTION OF MATERIAL PLANNED

SUBMITTAL

DATE

DATE

REC’D

FROM

CONTR.

DATE TO

CEC

DATE

RETURNED

FROM CEC

TO CONTR.

APPROVED/

DISAPPRV.

RESUBMIT

FROM

SAFB FORM SMS Page 13 of 23

125. 22 07 19.00 40

1.2.3a

Closeout

Submittals

Coatings

126. 22 07 19.00 40

1.2.3a

Closeout

Submittals

Insulation Materials

127. 22 07 19.00 40

1.2.3a

Closeout

Submittals

Recycled Materials

128. 23 00 00

1.3.1a

Shop Drawings Centrifugal Fans

129. 23 00 00

1.3.1b

Shop Drawings Automatic Isolation Dampers

130. 23 00 00

1.3.2a

Descriptive

Literature of

Catalog Cut

Product Data

Centrifugal Fans

131. 23 00 00

1.3.2b

Descriptive

Literature of

Catalog Cut

Product Data

Automatic Isolation Dampers

132. 23 00 00

1.3.3a

Test Data Performance Tests

133. 23 05 15

1.3.1a

Shop Drawings Pipe and Fittings

134. 23 05 15

1.3.1b

Shop Drawings Piping Specialties

135. 23 05 15

1.3.1c

Shop Drawings Valves

136. 23 05 15

1.3.1d

Shop Drawings Miscellaneous Materials

137. 23 05 15

1.3.1e

Shop Drawings Supporting Elements

138. 23 05 15

1.3.2a

Descriptive

Literature of

Catalog Cut

Product Data

Pipe and Fittings

PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made

SPECIFICATION

PARAGRAPH

NUMBER OR

DRAWING NO.

TYPE OF

SUBMITTAL

DESCRIPTION OF MATERIAL PLANNED

SUBMITTAL

DATE

DATE

REC’D

FROM

CONTR.

DATE TO

CEC

DATE

RETURNED

FROM CEC

TO CONTR.

APPROVED/

DISAPPRV.

RESUBMIT

FROM

SAFB FORM SMS Page 14 of 23

139. 23 05 15

1.3.2b

Descriptive

Literature of

Catalog Cut

Product Data

Piping Specialties

140. 23 05 15

1.3.2c

Descriptive

Literature of

Catalog Cut

Product Data

Valves

141. 23 05 15

1.3.2d

Descriptive

Literature of

Catalog Cut

Product Data

Miscellaneous Materials

142. 23 05 15

1.3.2e

Descriptive

Literature of

Catalog Cut

Product Data

Supporting Elements

143. 23 05 15

1.3.3a

Certificate of

Material

Pipe and Fittings

144. 23 05 15

1.3.3b

Certificate of

Material

Piping Specialties

145. 23 05 15

1.3.4a

Test Data Hydrostatic Tests

146. 23 05 15

1.3.5b

Test Data Air Tests

147. 23 05 15

1.3.5 c

Test Data Valve Operating Tests

148. 23 05 15

1.3.5d

Test Data System Operation Test

149. 23 05 48.00 40

1.3.1a

Shop Drawings Mountings

150. 23 05 48.00 40

1.3.1b

Shop Drawings bases

151. 23 05 48.00 40

1.3.1c

Shop Drawings Isolators

PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made

SPECIFICATION

PARAGRAPH

NUMBER OR

DRAWING NO.

TYPE OF

SUBMITTAL

DESCRIPTION OF MATERIAL PLANNED

SUBMITTAL

DATE

DATE

REC’D

FROM

CONTR.

DATE TO

CEC

DATE

RETURNED

FROM CEC

TO CONTR.

APPROVED/

DISAPPRV.

RESUBMIT

FROM

SAFB FORM SMS Page 15 of 23

152. 23 05 48.00 40

1.3.1d

Shop Drawings Floor Mounted Piping

153. 23 05 48.00 40

1.3.1e

Shop Drawings Vertical Piping

154. 23 05 48.00 40

1.3.2a

Descriptive

Literature of

Catalog Cut

Product Data

Mountings

155. 23 05 48.00 40

1.3.2b

Descriptive

Literature of

Catalog Cut

Product Data

Bases

156. 23 05 48.00 40

1.3.2c

Descriptive

Literature of

Catalog Cut

Product Data

Isolators

157. 23 05 48.00 40

1.3.2d

Descriptive

Literature of

Catalog Cut

Product Data

Floor Mounted Piping

158. 23 05 48.00 40

1.3.2c

Descriptive

Literature of

Catalog Cut

Product Data

Vertical Piping

159. 23 05 48.00 40

1.3.3a

Test Data Type of Isolator

160. 23 05 48.00 40

1.3.3b

Test Data Type of Base

161. 23 05 48.00 40

1.3.3c

Test Data Allowable Deflection

162. 23 05 48.00 40

1.3.3d

Test Data Measured Deflection

163. 23 05 93

1.4.1a

Shop Drawings Test Reports

PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made

SPECIFICATION

PARAGRAPH

NUMBER OR

DRAWING NO.

TYPE OF

SUBMITTAL

DESCRIPTION OF MATERIAL PLANNED

SUBMITTAL

DATE

DATE

REC’D

FROM

CONTR.

DATE TO

CEC

DATE

RETURNED

FROM CEC

TO CONTR.

APPROVED/

DISAPPRV.

RESUBMIT

FROM

SAFB FORM SMS Page 16 of 23

164. 23 05 93

1.4.2a

Test Data Test Reports

165. 23 07 00

1.3.1a

Shop Drawings Insulation

166. 23 07 00

1.3.2a

Descriptive

Literature of

Catalog Cut

Product Data

Insulation

167. 23 07 00

1.3.3a

Instruction Installation Instructions

168. 23 07 00

1.3.4a

Test Data Performance Tests

169. 23 08 00.00 10

1.4.1a

Shop Drawings Commissioning Plan

170. 23 08 00.00 10

1.4.2a

Product Data Pre-Functional Performance Test

Checklists

171. 23 08 00.00 10

1.4.2b

Product Data Functional Performance Tests

172. 23 08 00.00 10

1.43a

Test Reports Commissioning Report

173. 23 08 00.00 10

1.4.4a

Certificates Commissioning Firm

174. 23 08 00.00 10

1.4.4b

Certificates Commissioning Specialist

175. 23 09 23.13 20

1.5.1a

Shop Drawings Control System Drawings

176. 23 09 23.13 20

1.5.1b

Shop Drawings Control System Diagrams

177. 23 09 23.13 20

1.5.1c

Shop Drawings Component List

178. 23 09 23.13 20

1.5.1d

Shop Drawings Variable Frequency (Motor)

179. 23 09 23.13 20 Descriptive Direct Digital Controllers

PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made

SPECIFICATION

PARAGRAPH

NUMBER OR

DRAWING NO.

TYPE OF

SUBMITTAL

DESCRIPTION OF MATERIAL PLANNED

SUBMITTAL

DATE

DATE

REC’D

FROM

CONTR.

DATE TO

CEC

DATE

RETURNED

FROM CEC

TO CONTR.

APPROVED/

DISAPPRV.

RESUBMIT

FROM

SAFB FORM SMS Page 17 of 23

1.5.2a Literature of

Catalog Cut

Product Data

180. 23 09 23.13 20

1.5.2b

Descriptive

Literature of

Catalog Cut

Product Data

Display Information

181. 23 09 23.13 20

1.5.2c

Descriptive

Literature of

Catalog Cut

Product Data

Software

182. 23 09 23.13 20

1.5.3a

Test Data Testing Plan

183. 23 09 23.13 20

1.5.3b

Test Data Testing Checklist

184. 23 09 23.13 20

1.5.3c

Test Data Reports

185. 23 09 23.13 20

1.5.4a

Parts List Operation and Maintenance Data

186. 23 09 23.13 20

1.5.4b

Parts List VFD Service Manuals

187. 23 09 23.13 20

1.5.4c

Parts List Training Documents

23 25 00

1.3.1a

Product Data Water Treatment System

188. 23 25 00

1.3.1b

Product Data Water Analysis

189. 23 25 00

1.3.1c

Product Data Spare Parts

190. 23 25 00

1.3.1d

Product Data Field Instructions

191. 23 25 00

1.3.1e

Product Data Tests

PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made

SPECIFICATION

PARAGRAPH

NUMBER OR

DRAWING NO.

TYPE OF

SUBMITTAL

DESCRIPTION OF MATERIAL PLANNED

SUBMITTAL

DATE

DATE

REC’D

FROM

CONTR.

DATE TO

CEC

DATE

RETURNED

FROM CEC

TO CONTR.

APPROVED/

DISAPPRV.

RESUBMIT

FROM

SAFB FORM SMS Page 18 of 23

192. 23 25 00

1.3.1f

Product Data Training Course

193. 23 25 00

1.3.2a

Test Reports Chilled Water QA Tests

194. 23 25 00

1.3.2b

Test Reports Heating Water QA Tests

195. 23 25 00

1.3.3a

Operation and

Maintenance

Data

Water Treatment System

196. 23 31 13.00 40

1.4.1a

Shop Drawings Connection Drawings

197. 23 31 13.00 40

1.4.1b

Shop Drawings Record Drawings

198. 23 31 13.00 40

1.4.2a

Descriptive

Literature of

Catalog Cut

Product Data

Performance Data

199. 23 31 13.00 40

1.4.2b

Descriptive

Literature of

Catalog Cut

Product Data

Galvanized Steel Ductwork

Materials

200. 23 31 13.00 40

1.4.3a

Certificate of

Material

Conformance With Referred

Standards

201. 23 31 13.00 40

1.4.3b

Certificate of

Material

Galvanized Steel Ductwork

Materials

202. 23 36 00.00 40

Preconstruction

Submittals

Records of Existing Conditions

203. 23 36 00.00 40

1.2.2a

Shop Drawings Fan-Powered Air Terminal Units

204. 23 36 00.00 40

1.2.2b

Shop Drawings Shutoff Single-Duct Air Terminal

Units

205. 23 36 00.00 40

1.2.2c

Shop Drawings Record Drawings

PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made

SPECIFICATION

PARAGRAPH

NUMBER OR

DRAWING NO.

TYPE OF

SUBMITTAL

DESCRIPTION OF MATERIAL PLANNED

SUBMITTAL

DATE

DATE

REC’D

FROM

CONTR.

DATE TO

CEC

DATE

RETURNED

FROM CEC

TO CONTR.

APPROVED/

DISAPPRV.

RESUBMIT

FROM

SAFB FORM SMS Page 19 of 23

206. 23 36 00.00 40

1.2.3a

Product Data Fan-Powered Air Terminal Units

207. 23 36 00.00 40

1.2.3b

Product Data Shutoff Single-Duct Air Terminal

Units

208. 23 37 13.00 40

1.3.1a

Preconstruction

Submittals

Material, Equipment, and Fixture

Lists

209. 23 37 13.00 40

1.3.1b

Preconstruction

Submittals

Records of Existing Conditions

210. 23 37 13.00 40

1.3.2a

Shop Drawings Fabrication Drawings

211. 23 37 13.00 40

1.3.2b

Shop Drawings Installation Drawings

212. 23 37 13.00 40

1.3.3a

Product Data Equipment and Performance Data

213. 23 37 13.00 40

1.3.4a

Samples Manufacturer’s Standard Color

Chart

214. 23 37 13.00 40

1.3.5a

Operation and

Maintenance

Data

Type TS Supply Troffer

215. 23 37 13.00 40

1.3.5b

Operation and

Maintenance

Data

Type TSR Combination Supply and Return Troffer

216. 23 64 26

1.3.1.a

Shop Drawings Grooved Mechanical Connections for Steel

217. 23 64 26

1.3.1.b

Shop Drawings Grooved Mechanical Connections for Copper

218. 23 64 26

1.3.1.c

Shop Drawings Calibrated Balancing Valves

219. 23 64 26

1.3.1.d

Shop Drawings Automatic Flow Control Valves

220. 23 64 26

1.3.1.e

Shop Drawings Pump Discharge Valve

221. 23 64 26

1.3.1.f

Shop Drawings Water Temperature Mixing Valve

PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made

SPECIFICATION

PARAGRAPH

NUMBER OR

DRAWING NO.

TYPE OF

SUBMITTAL

DESCRIPTION OF MATERIAL PLANNED

SUBMITTAL

DATE

DATE

REC’D

FROM

CONTR.

DATE TO

CEC

DATE

RETURNED

FROM CEC

TO CONTR.

APPROVED/

DISAPPRV.

RESUBMIT

FROM

SAFB FORM SMS Page 20 of 23

222. 23 64 26

1.3.1.g

Shop Drawings Water Temperature Regulating

Valves

223. 23 64 26

1.3.1.h

Shop Drawings Water Pressure Reducing Valve

224. 23 64 26

1.3.1.i

Shop Drawings Pressure Relief Valve

225. 23 64 26

1.3.1.j

Shop Drawings Combination Pressure and

Temperature Relief Valves

226. 23 64 26

1.3.1.k

Shop Drawings Expansion Joints

227. 23 64 26

1.3.1.l

Shop Drawings Pumps

228. 23 64 26

1.3.1.m

Shop Drawings Combination Strainer and Pump

Suction Diffuser

229. 23 64 26

1.3.1.n

Shop Drawings Expansion Tanks

230. 23 64 26

1.3.1.o

Shop Drawings Air Separator Tanks

231. 23 64 26

1.3.1.p

Shop Drawings Water Treatment Systems

232. 23 64 26

1.3.2.a

Test Reports Piping Welds NDE Report

233. 23 64 26

1.3.2.b

Test Reports Pressure Tests Reports

234. 23 64 26

1.3.2.c

Test Reports Condenser Water Quality Test

Reports

235. 23 64 26

1.3.2.d

Test Reports One-Year Inspection Report for

Cooling Water

236. 23 64 26

1.3.3.a

Certificates Employer’s Record Documents for Welding

237. 23 64 26

1.3.3.b

Certificates Welding Procedures and

Qualifications

238. 23 64 26

1.3.3.c

Certificates Piping for Steam & Condensate

PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made

SPECIFICATION

PARAGRAPH

NUMBER OR

DRAWING NO.

TYPE OF

SUBMITTAL

DESCRIPTION OF MATERIAL PLANNED

SUBMITTAL

DATE

DATE

REC’D

FROM

CONTR.

DATE TO

CEC

DATE

RETURNED

FROM CEC

TO CONTR.

APPROVED/

DISAPPRV.

RESUBMIT

FROM

SAFB FORM SMS Page 21 of 23

239. 23 64 26

1.3.3.d

Certificates Piping for High-Pressure

Compressed Air Systems

240. 23 64 26

1.3.3.e

Certificates Fittings

241. 23 64 26

1.3.3.f

Certificates Unions

242. 23 64 26

1.3.3.g

Certificates Flanges

243. 23 64 26

1.3.3.h

Certificates Gaskets

244. 23 64 26

1.3.3.i

Certificates Bolting

245. 23 64 26

1.3.4.a

Manufacturer’s

Instructions

Lesson Plan for the Instruction

Course

246. 23 64 26

1.3.5.a

Operation and

Maintenance

Data

Water Treatment Systems

247. 23 64 26

1.3.5.b

Operation and

Maintenance

Data

Calibrated Balancing Valves

248. 23 64 26

1.3.5.c

Operation and

Maintenance

Data

Automatic Flow Control Valves

249. 23 64 26

1.3.5.d

Operation and

Maintenance

Data

Pump Discharge Valve

250. 23 64 26

1.3.5.e

Operation and

Maintenance

Data

Water Temperature Mixing Valve

251. 23 64 26

1.3.5.f

Operation and

Maintenance

Data

Water Temperature Regulating

Valves

252. 23 64 26

1.3.5.g

Operation and

Maintenance

Water Pressure Reducing Valve

PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made

SPECIFICATION

PARAGRAPH

NUMBER OR

DRAWING NO.

TYPE OF

SUBMITTAL

DESCRIPTION OF MATERIAL PLANNED

SUBMITTAL

DATE

DATE

REC’D

FROM

CONTR.

DATE TO

CEC

DATE

RETURNED

FROM CEC

TO CONTR.

APPROVED/

DISAPPRV.

RESUBMIT

FROM

SAFB FORM SMS Page 22 of 23

Data

253. 23 64 26

1.3.5.h

Operation and

Maintenance

Data

Pressure Relief Valve

254. 23 64 26

1.3.5.i

Operation and

Maintenance

Data

Combination Pressure and

Temperature Relief Valves

255. 23 64 26

1.3.5.j

Operation and

Maintenance

Data

Expansion Joints

256. 23 64 26

1.3.5.k

Operation and

Maintenance

Data

Pumps

257. 23 64 26

1.3.5.l

Operation and

Maintenance

Data

Combination Strainer and Pump

Suction Diffuser

258. 23 64 26

1.3.5.m

Operation and

Maintenance

Data

Expansion Tanks

259. 23 64 26

1.3.5.n

Operation and

Maintenance

Data

Air Separator Tanks

260. 26 00 00.00 20

1.5.1

Shop Drawings Wiring Diagrams & Installation

Details of Equipment

261. 26 00 00.00 20

1.5.2

Product Data Performance & Characteristic

Curves

262. 26 20 00

1.3.1a

Shop Drawings Receptacles

263. 26 20 00

1.3.1b

Shop Drawings Switches

264. 26 20 00

1.3.1c

Shop Drawings Motor Controllers

265. 26 20 00

1.3.1d

Shop Drawings Fuses

PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made

SPECIFICATION

PARAGRAPH

NUMBER OR

DRAWING NO.

TYPE OF

SUBMITTAL

DESCRIPTION OF MATERIAL PLANNED

SUBMITTAL

DATE

DATE

REC’D

FROM

CONTR.

DATE TO

CEC

DATE

RETURNED

FROM CEC

TO CONTR.

APPROVED/

DISAPPRV.

RESUBMIT

FROM

SAFB FORM SMS Page 23 of 23

266. 26 20 00

1.3.1e

Shop Drawings Conduit

267. 26 20 00

1.3.1f

Shop Drawings Disconnect Switches

268. 26 20 00

1.3.1g

Shop Drawings Wireways

269. 26 20 00

1.3.1h

Shop Drawings Circuit Breakers

270. 26 20 00

1.3.2a

Certificate of

Material

Fuses

271. 26 20 00

1.3.3a

Test Reports 600 Volt Wiring Test

272. 26 20 00

1.3.3b

Test Reports Ground Fault Receptacles Test

273. 26 20 00

13.4a

Parts List Motor Controllers

274. 26 51 00

1.5.1a

Submittals Descriptive Literature of Catalog

Cut Product Data: Lighting

Fixtures

275. 26 51 00

1.5.1b

Submittals Descriptive Literature of Catalog

Cut Product Data: LED Drivers