SCHEDULE OF MATERIAL SUBMITTALS
PROJECT TITLE Repair (SUS) Various Building Systems Comm Fac; Bldg. 861
100% Submittal
CONTRACT NO. FA4407-14-D-0018
PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made regardless of whether or not they are listed.
SUB
ID NO.
SPECIFICATION
PARAGRAPH
NUMBER OR
DRAWING NO.
TYPE OF
SUBMITTAL
DESCRIPTION OF MATERIAL PLANNED
SUBMITTAL
DATE
DATE
REC’D
FROM
CONTR.
DATE TO
CEC
DATE
RETURNED
FROM CEC
TO CONTR.
APPROVED/
DISAPPRV.
RESUBMIT
FROM
CONTR.
REMARKS
SAFB FORM SMS Page 1 of 23
1. 02 41 00.00 40
1.6
Submittals Preconstruction Submittals:
Demolition Plan; Existing
Conditions
2. 02 41 00.00 40
1.6
Submittals Certificates: Notification of
Demolition & Renovation Form
3. 02 41 00.00 40
1.6
Submittals Closeout Submittals: Receipts
4. 05 40 00.00 40
1.2
Submittals Shop Drawings: Framing
Components; Steel Studs, Joists, Tracks, Bracing, Bridging and
Accessories
5. 05 40 00.00 40
1.2
Submittals Design Data: Metal Framing
Calculations
6. 05 40 00.00 40
Submittals Certificates: Load-Bearing Cold-
Formed Metal Framing Welds
7. 05 40 00.00 40
Submittals Closeout Submittals: Recycled
Content of Steel Products
8. 06 10 00.00 40
1.3B
Product Data Technical Data for Wood
Preservative Materials and
Application Instructions
9. 06 10 00.00 40
1.3C
Manufacturer’s
Certificate
Certify Wood Products Supplied for Rough Carpentry Meet or
Exceed Specified Requirements
10. 06 20 00
Submittals Shop Drawings: Detail Drawing
Indicating all Wood Assemblies
11. 06 20 00
Submittals Product Data: Wood Products
12. 06 20 00
1.2
Submittals Product Data: Countertops
13. 06 20 00
1.2
Submittals Product Data: Treated Wood
Products
14. 06 20 00
Submittals Product Data: Hardware and
Accessories
PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made
SPECIFICATION
PARAGRAPH
NUMBER OR
DRAWING NO.
TYPE OF
SUBMITTAL
DESCRIPTION OF MATERIAL PLANNED
SUBMITTAL
DATE
DATE
REC’D
FROM
CONTR.
DATE TO
CEC
DATE
RETURNED
FROM CEC
TO CONTR.
APPROVED/
DISAPPRV.
RESUBMIT
FROM
SAFB FORM SMS Page 2 of 23
15. 06 20 00
Submittals Samples
16. 06 20 00
1.2
Submittals Certificates: Certificates of
Grade
17. 06 20 00
Submittals Closeout Submittals: VOC
Content for Softwood Plywood
18. 06 20 00
Submittals Closeout Submittals: Indoor Air
Quality for Non-Aerosol
Adhesives
19. 06 20 00
Content for MDF/Particleboard
20. 06 20 00
Submittals Closeout Submittals: Indoor Air
Quality for Aerosol Adhesives
21. 06 65 10
1.4.A.1
Submittals Product Data: For each type of product indicated
22. 06 65 10
1.4.B
Shop Drawings 1. Show location of each item, dimensioned plans and elevations, large-scale details, attachment devices and other components.
a. Show full-size details, edge details, thermoforming requirements, attachments, etc.
b. Show locations and sizes of furring, blocking, including concealed blocking and reinforcement specified in other
Sections.
c. Show locations and sizes of cutouts and holes for plumbing fixtures, faucets, soap dispensers, waste receptacle and other items installed in solid surface.
PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made
SPECIFICATION
PARAGRAPH
NUMBER OR
DRAWING NO.
TYPE OF
SUBMITTAL
DESCRIPTION OF MATERIAL PLANNED
SUBMITTAL
DATE
DATE
REC’D
FROM
CONTR.
DATE TO
CEC
DATE
RETURNED
FROM CEC
TO CONTR.
APPROVED/
DISAPPRV.
RESUBMIT
FROM
SAFB FORM SMS Page 3 of 23
23. 06 65 10
1.4.C
Shop Drawings C. Samples:
1. For each type of product indicated.
a. Submit minimum 6-inch by 6-inch sample in specified gloss.
b. Cut sample and seam together for representation of inconspicuous seam.
c. Indicate full range of color and pattern variation.
2. Approved samples will be retained as a standard for work.
24. 06 65 10
1.4.D
Submittals D. Product data:
1. Indicate product description, fabrication information and compliance with specified performance requirements.
25. 06 65 10
1.4.E
Submittals E. Fabricator/installer qualifications:
1. Provide copy of certification number.
26. 06 65 10
1.4.F
Submittals F. Manufacturer certificates:
1. Signed by manufacturers certifying that they comply with requirements.
27. 06 65 10
1.4.G
Submittals G. Maintenance data:
1. Submit manufacturer’s care and maintenance data, including repair and cleaning instructions.
a. Maintenance kit for finishes shall be submitted.
2. Include in project closeout documents.
PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made
SPECIFICATION
PARAGRAPH
NUMBER OR
DRAWING NO.
TYPE OF
SUBMITTAL
DESCRIPTION OF MATERIAL PLANNED
SUBMITTAL
DATE
DATE
REC’D
FROM
CONTR.
DATE TO
CEC
DATE
RETURNED
FROM CEC
TO CONTR.
APPROVED/
DISAPPRV.
RESUBMIT
FROM
SAFB FORM SMS Page 4 of 23
28. 07 21 13
1.2
Submittals Product Data: Manufacturer’s
Standard Details
29. 07 21 13
Submittals Product Data: Block or Board
Insulation
30. 07 21 13
Submittals Product Data: Vapor Retarder
31. 07 21 13
1.2
Submittals Product Data: Pressure Sensitive
Tape
32. 07 21 13
Submittals Product Data: Protection Board or Coating
33. 07 21 13
Submittals Product Data: Accessories
Including Sealants
34. 07 21 13
Submittals Certificates: Block or Board
35. 07 21 13
Submittals Certificates: Vapor Retarder
36. 07 21 13
1.2
Submittals Certificates: Protection Board or
Coating
37. 07 21 13
Submittals Certificates: ULE Greenguard
38. 07 21 13
1.2
Submittals Manufacturer’s Instructions:
Block or Board Insulation
39. 07 21 13
40. 07 21 13
Submittals Closeout Submittals: ULE
Greenguard
41. 07 21 13
Submittals Closeout Submittals: Volatile
Organic Compound (VOC)
Content
42. 07 21 13
Content
43. 07 21 23
Submittals Product Data: Loose Fill
PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made
SPECIFICATION
PARAGRAPH
NUMBER OR
DRAWING NO.
TYPE OF
SUBMITTAL
DESCRIPTION OF MATERIAL PLANNED
SUBMITTAL
DATE
DATE
REC’D
FROM
CONTR.
DATE TO
CEC
DATE
RETURNED
FROM CEC
TO CONTR.
APPROVED/
DISAPPRV.
RESUBMIT
FROM
SAFB FORM SMS Page 5 of 23
44. 07 21 23
Loose Fill Insulation
45. 07 21 23
Submittals Closeout Submittals
46. 07 90 05
1.4.A
Submittals Product Data: Provide data indicating sealant chemical characteristics, performance criteria, substrate preparation, limitations, and color availability.
47. 07 90 05
Submittals Samples: Submit three samples, 1 x 1 inch (.254 x .254 mm) in size illustrating sealant colors for selection.
48. 07 90 05
1.4.C
Submittals Manufacturer's Installation
Instructions: Indicate special procedures, surface preparation, and perimeter conditions requiring special attention.
49. 09 21 16
1.4.A
Submittals Product Data: Provide data on gypsum board, accessories, joint finishing system, accessories, and joint finishing system.
50. 09 21 16
Submittals Product Data: Provide manufacturer's data on partition head to structure connectors, showing compliance with requirements.
51. 09 30 10
Submittals Shop Drawings: Detail Drawings
52. 09 30 10
1.2
Submittals Product Data: Tile
53. 09 30 10
Submittals Product Data: Setting-Bed
PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made
SPECIFICATION
PARAGRAPH
NUMBER OR
DRAWING NO.
TYPE OF
SUBMITTAL
DESCRIPTION OF MATERIAL PLANNED
SUBMITTAL
DATE
DATE
REC’D
FROM
CONTR.
DATE TO
CEC
DATE
RETURNED
FROM CEC
TO CONTR.
APPROVED/
DISAPPRV.
RESUBMIT
FROM
SAFB FORM SMS Page 6 of 23
54. 09 30 10
1.2
Submittals Product Data: Mortar, Grout, and
Adhesive
55. 09 30 10
Submittals Samples: Tile
56. 09 30 10
1.2
Submittals Samples: Accessories
57. 09 30 10
1.2
Submittals Samples: Transition Strips
58. 09 30 10
1.2
Submittals Samples: Grout
59. 09 30 10
1.2
Submittals Certificates: Tile
60. 09 30 10
1.2
Submittals Certificates: Mortar, Grout, and
Adhesive
61. 09 30 10
Maintenance Instructions
62. 09 30 10
Submittals Operation and Maintenance Data:
Installation
63. 09 30 10
Submittals Closeout Submittals: Tile
64. 09 30 10
1.2
Submittals Closeout Submittals: Adhesives
65. 09 30 10
1.3.1
Other Submittal
Requirements
Local/Regional Materials:
Submit documentation indicating distance between manufacturing facility and the project site and also the distance of raw material origin from the project site. For
Tile and Reinforcing Wire Fabric indicate percentage of post-industrial and post-consumer recycled content per unit of product. Indicate relative dollar value of recycled content
PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made
SPECIFICATION
PARAGRAPH
NUMBER OR
DRAWING NO.
TYPE OF
SUBMITTAL
DESCRIPTION OF MATERIAL PLANNED
SUBMITTAL
DATE
DATE
REC’D
FROM
CONTR.
DATE TO
CEC
DATE
RETURNED
FROM CEC
TO CONTR.
APPROVED/
DISAPPRV.
RESUBMIT
FROM
SAFB FORM SMS Page 7 of 23 products to total dollar value of products included in project.
66. 09 30 10
1.3.2
Other Submittal
Requirements
Environmental Data: Submit
Table 1 of ASTM E2129 for the
Following Products: Tile
67. 09 51 00
1.3.A
Submittals Shop Drawings: Indicate grid layout and related dimensioning, junctions with other ceiling finishes, and mechanical and electrical items installed in the ceiling.
68. 09 51 00
1.3.B
Submittals Product Data: Provide data on suspension system components, acoustical units, and accessories.
69. 09 51 00
1.3.C
Submittals Samples: Submit two samples 12 x 12 inch (305 x 305 mm) in size illustrating material and finish of acoustical units.
70. 09 51 00
1.3.D
Submittals Samples: Submit two samples each, 6 inches (150 mm) long, of suspension system main runner, cross runner, and perimeter molding.
71. 09 90 00
1.4.A
Submittals Product Data: Provide data on all finishing products, special coatings, and painting products.
Reference data to the Architect's painting systems schedule.
Include manufacturer's statement that components are appropriate to each painting system.
72. 09 90 00
Submittals Samples: Submit two painted samples, illustrating selected colors and textures for each color and system selected. Submit on
PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made
SPECIFICATION
PARAGRAPH
NUMBER OR
DRAWING NO.
TYPE OF
SUBMITTAL
DESCRIPTION OF MATERIAL PLANNED
SUBMITTAL
DATE
DATE
REC’D
FROM
CONTR.
DATE TO
CEC
DATE
RETURNED
FROM CEC
TO CONTR.
APPROVED/
DISAPPRV.
RESUBMIT
FROM
SAFB FORM SMS Page 8 of 23 paint cards, 8-1/2 x 11 inch (216 x 279 mm) in size.
73. 09 90 00
1.4.C
Submittals Manufacturer's Instructions:
Indicate special surface preparation procedures and substrate conditions requiring special attention.
74. 09 90 00
1.4.D
Submittals Maintenance Data: Submit data on cleaning, touch-up, and repair of painted and coated surfaces.
75. 10 21 13
Submittals Shop Drawings: Fabrication
Drawings
76. 10 21 13
Submittals Shop Drawings: Installation
77. 10 21 13
Submittals Product Data: Cleaning and
Maintenance Instructions
78. 10 21 13
Submittals Product Data: Colors and
Finishes
79. 10 21 13
Submittals Product Data: Galvanized Steel
Sheet
80. 10 21 13
Submittals Product Data: Sound-Deadening
Cores
81. 10 21 13
Submittals Product Data: Anchoring
Devices and Fasteners
82. 10 21 13
Submittals Product Data: Hardware and
Fittings
83. 10 21 13
Submittals Product Data: Brackets
84. 10 21 13
1.2
Submittals Product Data: Door Hardware
85. 10 21 13
1.2
Submittals Product Data: Local/Regional
Materials Documentation
86. 10 21 13
Submittals Product Data: Toilet Enclosures
PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made
SPECIFICATION
PARAGRAPH
NUMBER OR
DRAWING NO.
TYPE OF
SUBMITTAL
DESCRIPTION OF MATERIAL PLANNED
SUBMITTAL
DATE
DATE
REC’D
FROM
CONTR.
DATE TO
CEC
DATE
RETURNED
FROM CEC
TO CONTR.
APPROVED/
DISAPPRV.
RESUBMIT
FROM
SAFB FORM SMS Page 9 of 23
87. 10 21 13
1.2
Submittals Product Data: Room Entrance
Screens
88. 10 21 13
Submittals Product Data: Urinal Screens
89. 10 21 13
1.2
Submittals Product Data: Pilaster Shoes
90. 10 21 13
1.2
Submittals Samples: Colors and Finishes
91. 10 21 13
1.2
Submittals Samples: Hardware and Fittings
92. 10 21 13
1.2
Submittals Samples: Anchoring Devices and
Fasteners
93. 10 21 13
Submittals Certificates: Warranty
94. 10 21 13
1.2
Plastic Identification
95. 10 21 13
Submittals Closeout Submittals:
Local/Regional Materials
Documentation
96. 10 21 13
Submittals Closeout Submittals: Toilet
Enclosures
97. 10 21 13
Submittals Closeout Submittals: Room
Entrance Screens
98. 10 21 13
Submittals Closeout Submittals: Urinal
Screens
99. 10 21 13
Submittals Closeout Submittals: Pilaster
Shoes
100. 10 28 13
Submittals Product Data: Finishes
101. 10 28 13
1.2
Submittals Product Data: Accessory Items
102. 10 28 13
1.2
Submittals Samples: Finishes
103. 10 28 13 Submittals Samples: Accessory Items
PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made
SPECIFICATION
PARAGRAPH
NUMBER OR
DRAWING NO.
TYPE OF
SUBMITTAL
DESCRIPTION OF MATERIAL PLANNED
SUBMITTAL
DATE
DATE
REC’D
FROM
CONTR.
DATE TO
CEC
DATE
RETURNED
FROM CEC
TO CONTR.
APPROVED/
DISAPPRV.
RESUBMIT
FROM
SAFB FORM SMS Page 10 of 23
104. 10 28 13
1.2
Submittals Certificates: Accessory Items
105. 10 28 13
1.2
Electric Hand Dryer
106. 22 00 00
1.2.1a
Submittals Shop Drawings: Plumbing
System: Detail drawings consisting of schedules, performance charts, instructions, diagrams, and other information to illustrate the requirements and operations of systems that are not covered by the Plumbing Code.
Detail drawings for the complete plumbing system including piping layouts and locations of connections; dimensions for roughing-in, foundation, and support points; schematic diagrams and wiring diagrams or connection and interconnection diagrams. Detail drawings shall indicate clearances required for maintenance and operation.
Where piping and equipment are to be supported other than as indicated, details shall include loadings and proposed support methods. Mechanical drawing plans, elevations, views, and details, shall be drawn to scale.
107. 22 00 00
1.2.2a
Product Data Fixtures:
1. Flush Valve Water Closets
2. Flush Valve Urinals
3. Countertop Lavatories
PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made
SPECIFICATION
PARAGRAPH
NUMBER OR
DRAWING NO.
TYPE OF
SUBMITTAL
DESCRIPTION OF MATERIAL PLANNED
SUBMITTAL
DATE
DATE
REC’D
FROM
CONTR.
DATE TO
CEC
DATE
RETURNED
FROM CEC
TO CONTR.
APPROVED/
DISAPPRV.
RESUBMIT
FROM
SAFB FORM SMS Page 11 of 23
4. Service Sinks
5. Water Heaters; Electric
6. Backflow Prevention
Assemblies
108. 22 00 00
1.2.2b
Welding A copy of qualified procedures and a list of names and identification symbols of qualified welders and welding operators
109. 22 00 00
1.2.2c
Plumbing
System
Diagrams, instructions, and other sheets proposed for posting.
Manufacturer's recommendations for the installation of bell and spigot and hubless joints for cast iron soil pipe.
110. 22 00 00
1.2.3a
Test Reports Tests, Flushing and Disinfection:
Test reports in booklet form showing all field tests performed to adjust each component and all field tests performed to prove compliance with the specified performance criteria, completion and testing of the installed system. Each test report shall indicate the final position of controls
111. 22 00 00
1.2.3b
Test of
Backflow
Prevention
Assembies
Certification of proper operation shall be as accomplished in accordance with state regulations by an individual certified by the state to perform such tests. If no state requirement exists, the
Contractor shall have the manufacturer's representative test the device, to ensure the unit is
PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made
SPECIFICATION
PARAGRAPH
NUMBER OR
DRAWING NO.
TYPE OF
SUBMITTAL
DESCRIPTION OF MATERIAL PLANNED
SUBMITTAL
DATE
DATE
REC’D
FROM
CONTR.
DATE TO
CEC
DATE
RETURNED
FROM CEC
TO CONTR.
APPROVED/
DISAPPRV.
RESUBMIT
FROM
SAFB FORM SMS Page 12 of 23 properly installed and performing as intended. The Contractor shall provide written documentation of the tests performed and signed by the individual performing the tests.
112. 22 00 00
1.2.4a
Operation and
Maintenance
Data
Plumbing System: Submit in accordance with Section 01 78 23
OPERATION AND
MAINTENANCE DATA.
113. 22 00 00
1.2.5a
Closeout
Submittals
Water-Efficient Products
114. 22 00 00
1.2.5a
Closeout
Energy-Efficient Water Heaters
115. 22 07 19.00 40
Shop Drawings
Installation Drawings
116. 22 07 19.00 40
1.2.2a
Product Data Adhesives
117. 22 07 19.00 40
1.2.2a
Product Data Coatings
118. 22 07 19.00 40
1.2.2a
Product Data Insulating Cement
119. 22 07 19.00 40
1.2.2a
Product Data Insulation Materials
120. 22 07 19.00 40
1.2.2a
Product Data Jacketing
121. 22 07 19.00 40
1.2.2a
Product Data Tape
122. 22 07 19.00 40
1.2.3a
Manufacturer’s
Instructions
Installation Manual
123. 22 07 19.00 40
1.2.3a
Closeout
Submittals
Record Drawings
124. 22 07 19.00 40
1.2.3a
Closeout
PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made
SPECIFICATION
PARAGRAPH
NUMBER OR
DRAWING NO.
TYPE OF
SUBMITTAL
DESCRIPTION OF MATERIAL PLANNED
SUBMITTAL
DATE
DATE
REC’D
FROM
CONTR.
DATE TO
CEC
DATE
RETURNED
FROM CEC
TO CONTR.
APPROVED/
DISAPPRV.
RESUBMIT
FROM
SAFB FORM SMS Page 13 of 23
125. 22 07 19.00 40
1.2.3a
Closeout
Submittals
Coatings
126. 22 07 19.00 40
1.2.3a
Closeout
Submittals
Insulation Materials
127. 22 07 19.00 40
1.2.3a
Closeout
Submittals
Recycled Materials
128. 23 00 00
1.3.1a
Shop Drawings Centrifugal Fans
129. 23 00 00
1.3.1b
Shop Drawings Automatic Isolation Dampers
130. 23 00 00
1.3.2a
Descriptive
Literature of
Catalog Cut
Product Data
Centrifugal Fans
131. 23 00 00
1.3.2b
Descriptive
Literature of
Catalog Cut
Product Data
Automatic Isolation Dampers
132. 23 00 00
1.3.3a
Test Data Performance Tests
133. 23 05 15
1.3.1a
Shop Drawings Pipe and Fittings
134. 23 05 15
1.3.1b
Shop Drawings Piping Specialties
135. 23 05 15
1.3.1c
Shop Drawings Valves
136. 23 05 15
1.3.1d
Shop Drawings Miscellaneous Materials
137. 23 05 15
1.3.1e
Shop Drawings Supporting Elements
138. 23 05 15
1.3.2a
Descriptive
Literature of
Catalog Cut
Product Data
Pipe and Fittings
PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made
SPECIFICATION
PARAGRAPH
NUMBER OR
DRAWING NO.
TYPE OF
SUBMITTAL
DESCRIPTION OF MATERIAL PLANNED
SUBMITTAL
DATE
DATE
REC’D
FROM
CONTR.
DATE TO
CEC
DATE
RETURNED
FROM CEC
TO CONTR.
APPROVED/
DISAPPRV.
RESUBMIT
FROM
SAFB FORM SMS Page 14 of 23
139. 23 05 15
1.3.2b
Descriptive
Literature of
Catalog Cut
Product Data
Piping Specialties
140. 23 05 15
1.3.2c
Descriptive
Literature of
Catalog Cut
Product Data
Valves
141. 23 05 15
1.3.2d
Descriptive
Literature of
Catalog Cut
Product Data
Miscellaneous Materials
142. 23 05 15
1.3.2e
Descriptive
Literature of
Catalog Cut
Product Data
Supporting Elements
143. 23 05 15
1.3.3a
Certificate of
Material
Pipe and Fittings
144. 23 05 15
1.3.3b
Certificate of
Material
Piping Specialties
145. 23 05 15
1.3.4a
Test Data Hydrostatic Tests
146. 23 05 15
1.3.5b
Test Data Air Tests
147. 23 05 15
1.3.5 c
Test Data Valve Operating Tests
148. 23 05 15
1.3.5d
Test Data System Operation Test
149. 23 05 48.00 40
1.3.1a
Shop Drawings Mountings
150. 23 05 48.00 40
1.3.1b
Shop Drawings bases
151. 23 05 48.00 40
1.3.1c
Shop Drawings Isolators
PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made
SPECIFICATION
PARAGRAPH
NUMBER OR
DRAWING NO.
TYPE OF
SUBMITTAL
DESCRIPTION OF MATERIAL PLANNED
SUBMITTAL
DATE
DATE
REC’D
FROM
CONTR.
DATE TO
CEC
DATE
RETURNED
FROM CEC
TO CONTR.
APPROVED/
DISAPPRV.
RESUBMIT
FROM
SAFB FORM SMS Page 15 of 23
152. 23 05 48.00 40
1.3.1d
Shop Drawings Floor Mounted Piping
153. 23 05 48.00 40
1.3.1e
Shop Drawings Vertical Piping
154. 23 05 48.00 40
1.3.2a
Descriptive
Literature of
Catalog Cut
Product Data
Mountings
155. 23 05 48.00 40
1.3.2b
Descriptive
Literature of
Catalog Cut
Product Data
Bases
156. 23 05 48.00 40
1.3.2c
Descriptive
Literature of
Catalog Cut
Product Data
Isolators
157. 23 05 48.00 40
1.3.2d
Descriptive
Literature of
Catalog Cut
Product Data
Floor Mounted Piping
158. 23 05 48.00 40
1.3.2c
Descriptive
Literature of
Catalog Cut
Product Data
Vertical Piping
159. 23 05 48.00 40
1.3.3a
Test Data Type of Isolator
160. 23 05 48.00 40
1.3.3b
Test Data Type of Base
161. 23 05 48.00 40
1.3.3c
Test Data Allowable Deflection
162. 23 05 48.00 40
1.3.3d
Test Data Measured Deflection
163. 23 05 93
1.4.1a
Shop Drawings Test Reports
PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made
SPECIFICATION
PARAGRAPH
NUMBER OR
DRAWING NO.
TYPE OF
SUBMITTAL
DESCRIPTION OF MATERIAL PLANNED
SUBMITTAL
DATE
DATE
REC’D
FROM
CONTR.
DATE TO
CEC
DATE
RETURNED
FROM CEC
TO CONTR.
APPROVED/
DISAPPRV.
RESUBMIT
FROM
SAFB FORM SMS Page 16 of 23
164. 23 05 93
1.4.2a
Test Data Test Reports
165. 23 07 00
1.3.1a
Shop Drawings Insulation
166. 23 07 00
1.3.2a
Descriptive
Literature of
Catalog Cut
Product Data
Insulation
167. 23 07 00
1.3.3a
Instruction Installation Instructions
168. 23 07 00
1.3.4a
Test Data Performance Tests
169. 23 08 00.00 10
1.4.1a
Shop Drawings Commissioning Plan
170. 23 08 00.00 10
1.4.2a
Product Data Pre-Functional Performance Test
Checklists
171. 23 08 00.00 10
1.4.2b
Product Data Functional Performance Tests
172. 23 08 00.00 10
1.43a
Test Reports Commissioning Report
173. 23 08 00.00 10
1.4.4a
Certificates Commissioning Firm
174. 23 08 00.00 10
1.4.4b
Certificates Commissioning Specialist
175. 23 09 23.13 20
1.5.1a
Shop Drawings Control System Drawings
176. 23 09 23.13 20
1.5.1b
Shop Drawings Control System Diagrams
177. 23 09 23.13 20
1.5.1c
Shop Drawings Component List
178. 23 09 23.13 20
1.5.1d
Shop Drawings Variable Frequency (Motor)
179. 23 09 23.13 20 Descriptive Direct Digital Controllers
PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made
SPECIFICATION
PARAGRAPH
NUMBER OR
DRAWING NO.
TYPE OF
SUBMITTAL
DESCRIPTION OF MATERIAL PLANNED
SUBMITTAL
DATE
DATE
REC’D
FROM
CONTR.
DATE TO
CEC
DATE
RETURNED
FROM CEC
TO CONTR.
APPROVED/
DISAPPRV.
RESUBMIT
FROM
SAFB FORM SMS Page 17 of 23
1.5.2a Literature of
Catalog Cut
Product Data
180. 23 09 23.13 20
1.5.2b
Descriptive
Literature of
Catalog Cut
Product Data
Display Information
181. 23 09 23.13 20
1.5.2c
Descriptive
Literature of
Catalog Cut
Product Data
Software
182. 23 09 23.13 20
1.5.3a
Test Data Testing Plan
183. 23 09 23.13 20
1.5.3b
Test Data Testing Checklist
184. 23 09 23.13 20
1.5.3c
Test Data Reports
185. 23 09 23.13 20
1.5.4a
Parts List Operation and Maintenance Data
186. 23 09 23.13 20
1.5.4b
Parts List VFD Service Manuals
187. 23 09 23.13 20
1.5.4c
Parts List Training Documents
23 25 00
1.3.1a
Product Data Water Treatment System
188. 23 25 00
1.3.1b
Product Data Water Analysis
189. 23 25 00
1.3.1c
Product Data Spare Parts
190. 23 25 00
1.3.1d
Product Data Field Instructions
191. 23 25 00
1.3.1e
Product Data Tests
PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made
SPECIFICATION
PARAGRAPH
NUMBER OR
DRAWING NO.
TYPE OF
SUBMITTAL
DESCRIPTION OF MATERIAL PLANNED
SUBMITTAL
DATE
DATE
REC’D
FROM
CONTR.
DATE TO
CEC
DATE
RETURNED
FROM CEC
TO CONTR.
APPROVED/
DISAPPRV.
RESUBMIT
FROM
SAFB FORM SMS Page 18 of 23
192. 23 25 00
1.3.1f
Product Data Training Course
193. 23 25 00
1.3.2a
Test Reports Chilled Water QA Tests
194. 23 25 00
1.3.2b
Test Reports Heating Water QA Tests
195. 23 25 00
1.3.3a
Operation and
Maintenance
Data
Water Treatment System
196. 23 31 13.00 40
1.4.1a
Shop Drawings Connection Drawings
197. 23 31 13.00 40
1.4.1b
Shop Drawings Record Drawings
198. 23 31 13.00 40
1.4.2a
Descriptive
Literature of
Catalog Cut
Product Data
Performance Data
199. 23 31 13.00 40
1.4.2b
Descriptive
Literature of
Catalog Cut
Product Data
Galvanized Steel Ductwork
Materials
200. 23 31 13.00 40
1.4.3a
Certificate of
Material
Conformance With Referred
Standards
201. 23 31 13.00 40
1.4.3b
Certificate of
Material
Galvanized Steel Ductwork
Materials
202. 23 36 00.00 40
Preconstruction
Submittals
Records of Existing Conditions
203. 23 36 00.00 40
1.2.2a
Shop Drawings Fan-Powered Air Terminal Units
204. 23 36 00.00 40
1.2.2b
Shop Drawings Shutoff Single-Duct Air Terminal
Units
205. 23 36 00.00 40
1.2.2c
Shop Drawings Record Drawings
PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made
SPECIFICATION
PARAGRAPH
NUMBER OR
DRAWING NO.
TYPE OF
SUBMITTAL
DESCRIPTION OF MATERIAL PLANNED
SUBMITTAL
DATE
DATE
REC’D
FROM
CONTR.
DATE TO
CEC
DATE
RETURNED
FROM CEC
TO CONTR.
APPROVED/
DISAPPRV.
RESUBMIT
FROM
SAFB FORM SMS Page 19 of 23
206. 23 36 00.00 40
1.2.3a
Product Data Fan-Powered Air Terminal Units
207. 23 36 00.00 40
1.2.3b
Product Data Shutoff Single-Duct Air Terminal
Units
208. 23 37 13.00 40
1.3.1a
Preconstruction
Submittals
Material, Equipment, and Fixture
Lists
209. 23 37 13.00 40
1.3.1b
Preconstruction
Submittals
Records of Existing Conditions
210. 23 37 13.00 40
1.3.2a
Shop Drawings Fabrication Drawings
211. 23 37 13.00 40
1.3.2b
Shop Drawings Installation Drawings
212. 23 37 13.00 40
1.3.3a
Product Data Equipment and Performance Data
213. 23 37 13.00 40
1.3.4a
Samples Manufacturer’s Standard Color
Chart
214. 23 37 13.00 40
1.3.5a
Operation and
Maintenance
Data
Type TS Supply Troffer
215. 23 37 13.00 40
1.3.5b
Operation and
Maintenance
Data
Type TSR Combination Supply and Return Troffer
216. 23 64 26
1.3.1.a
Shop Drawings Grooved Mechanical Connections for Steel
217. 23 64 26
1.3.1.b
Shop Drawings Grooved Mechanical Connections for Copper
218. 23 64 26
1.3.1.c
Shop Drawings Calibrated Balancing Valves
219. 23 64 26
1.3.1.d
Shop Drawings Automatic Flow Control Valves
220. 23 64 26
1.3.1.e
Shop Drawings Pump Discharge Valve
221. 23 64 26
1.3.1.f
Shop Drawings Water Temperature Mixing Valve
PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made
SPECIFICATION
PARAGRAPH
NUMBER OR
DRAWING NO.
TYPE OF
SUBMITTAL
DESCRIPTION OF MATERIAL PLANNED
SUBMITTAL
DATE
DATE
REC’D
FROM
CONTR.
DATE TO
CEC
DATE
RETURNED
FROM CEC
TO CONTR.
APPROVED/
DISAPPRV.
RESUBMIT
FROM
SAFB FORM SMS Page 20 of 23
222. 23 64 26
1.3.1.g
Shop Drawings Water Temperature Regulating
Valves
223. 23 64 26
1.3.1.h
Shop Drawings Water Pressure Reducing Valve
224. 23 64 26
1.3.1.i
Shop Drawings Pressure Relief Valve
225. 23 64 26
1.3.1.j
Shop Drawings Combination Pressure and
Temperature Relief Valves
226. 23 64 26
1.3.1.k
Shop Drawings Expansion Joints
227. 23 64 26
1.3.1.l
Shop Drawings Pumps
228. 23 64 26
1.3.1.m
Shop Drawings Combination Strainer and Pump
Suction Diffuser
229. 23 64 26
1.3.1.n
Shop Drawings Expansion Tanks
230. 23 64 26
1.3.1.o
Shop Drawings Air Separator Tanks
231. 23 64 26
1.3.1.p
Shop Drawings Water Treatment Systems
232. 23 64 26
1.3.2.a
Test Reports Piping Welds NDE Report
233. 23 64 26
1.3.2.b
Test Reports Pressure Tests Reports
234. 23 64 26
1.3.2.c
Test Reports Condenser Water Quality Test
Reports
235. 23 64 26
1.3.2.d
Test Reports One-Year Inspection Report for
Cooling Water
236. 23 64 26
1.3.3.a
Certificates Employer’s Record Documents for Welding
237. 23 64 26
1.3.3.b
Certificates Welding Procedures and
Qualifications
238. 23 64 26
1.3.3.c
Certificates Piping for Steam & Condensate
PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made
SPECIFICATION
PARAGRAPH
NUMBER OR
DRAWING NO.
TYPE OF
SUBMITTAL
DESCRIPTION OF MATERIAL PLANNED
SUBMITTAL
DATE
DATE
REC’D
FROM
CONTR.
DATE TO
CEC
DATE
RETURNED
FROM CEC
TO CONTR.
APPROVED/
DISAPPRV.
RESUBMIT
FROM
SAFB FORM SMS Page 21 of 23
239. 23 64 26
1.3.3.d
Certificates Piping for High-Pressure
Compressed Air Systems
240. 23 64 26
1.3.3.e
Certificates Fittings
241. 23 64 26
1.3.3.f
Certificates Unions
242. 23 64 26
1.3.3.g
Certificates Flanges
243. 23 64 26
1.3.3.h
Certificates Gaskets
244. 23 64 26
1.3.3.i
Certificates Bolting
245. 23 64 26
1.3.4.a
Manufacturer’s
Instructions
Lesson Plan for the Instruction
Course
246. 23 64 26
1.3.5.a
Operation and
Maintenance
Data
Water Treatment Systems
247. 23 64 26
1.3.5.b
Operation and
Maintenance
Data
Calibrated Balancing Valves
248. 23 64 26
1.3.5.c
Operation and
Maintenance
Data
Automatic Flow Control Valves
249. 23 64 26
1.3.5.d
Operation and
Maintenance
Data
Pump Discharge Valve
250. 23 64 26
1.3.5.e
Operation and
Maintenance
Data
Water Temperature Mixing Valve
251. 23 64 26
1.3.5.f
Operation and
Maintenance
Data
Water Temperature Regulating
Valves
252. 23 64 26
1.3.5.g
Operation and
Maintenance
Water Pressure Reducing Valve
PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made
SPECIFICATION
PARAGRAPH
NUMBER OR
DRAWING NO.
TYPE OF
SUBMITTAL
DESCRIPTION OF MATERIAL PLANNED
SUBMITTAL
DATE
DATE
REC’D
FROM
CONTR.
DATE TO
CEC
DATE
RETURNED
FROM CEC
TO CONTR.
APPROVED/
DISAPPRV.
RESUBMIT
FROM
SAFB FORM SMS Page 22 of 23
Data
253. 23 64 26
1.3.5.h
Operation and
Maintenance
Data
Pressure Relief Valve
254. 23 64 26
1.3.5.i
Operation and
Maintenance
Data
Combination Pressure and
Temperature Relief Valves
255. 23 64 26
1.3.5.j
Operation and
Maintenance
Data
Expansion Joints
256. 23 64 26
1.3.5.k
Operation and
Maintenance
Data
Pumps
257. 23 64 26
1.3.5.l
Operation and
Maintenance
Data
Combination Strainer and Pump
Suction Diffuser
258. 23 64 26
1.3.5.m
Operation and
Maintenance
Data
Expansion Tanks
259. 23 64 26
1.3.5.n
Operation and
Maintenance
Data
Air Separator Tanks
260. 26 00 00.00 20
1.5.1
Shop Drawings Wiring Diagrams & Installation
Details of Equipment
261. 26 00 00.00 20
1.5.2
Product Data Performance & Characteristic
Curves
262. 26 20 00
1.3.1a
Shop Drawings Receptacles
263. 26 20 00
1.3.1b
Shop Drawings Switches
264. 26 20 00
1.3.1c
Shop Drawings Motor Controllers
265. 26 20 00
1.3.1d
Shop Drawings Fuses
PROJECT NO. VDYD: 15-1246 *****NOTE***** Submittals required by specifications and/or drawings shall be made
SPECIFICATION
PARAGRAPH
NUMBER OR
DRAWING NO.
TYPE OF
SUBMITTAL
DESCRIPTION OF MATERIAL PLANNED
SUBMITTAL
DATE
DATE
REC’D
FROM
CONTR.
DATE TO
CEC
DATE
RETURNED
FROM CEC
TO CONTR.
APPROVED/
DISAPPRV.
RESUBMIT
FROM
SAFB FORM SMS Page 23 of 23
266. 26 20 00
1.3.1e
Shop Drawings Conduit
267. 26 20 00
1.3.1f
Shop Drawings Disconnect Switches
268. 26 20 00
1.3.1g
Shop Drawings Wireways
269. 26 20 00
1.3.1h
Shop Drawings Circuit Breakers
270. 26 20 00
1.3.2a
Certificate of
Material
Fuses
271. 26 20 00
1.3.3a
Test Reports 600 Volt Wiring Test
272. 26 20 00
1.3.3b
Test Reports Ground Fault Receptacles Test
273. 26 20 00
13.4a
Parts List Motor Controllers
274. 26 51 00
1.5.1a
Submittals Descriptive Literature of Catalog
Cut Product Data: Lighting
Fixtures
275. 26 51 00
1.5.1b
Submittals Descriptive Literature of Catalog
Cut Product Data: LED Drivers