Atch_20_Proposal_Checklist_FA440718R0004.pdf

PDF 49 KB Posted

Attached to
Repair (SUS) Various Building Systems; B861
Solicitation number
FA440718R0004
Issued by

About this file

Attachment 20 - Proposal Checklist FA440718R0004

View the file

Other files

File Type Posted
Atch_21_-_RFI_Log_B861_14_Aug_2018.pdf PDF
Amendment_9_-_Conform.pdf PDF
FA440718R00040008_-_Conform.pdf PDF
Atch_29_-_B861_Abatement_Reports.pdf PDF
Atch_21_-_RFI_Log_B861_8_Aug_2018.pdf PDF
Atch_7_-_Site_Utility_Plan.pdf PDF
Atch_28_-_Termite_Application_Form.pdf PDF
Amendment_8.pdf PDF
Amendment_7.pdf PDF
M9-M10M13.zip ZIP file
FP1.zip ZIP file
P1.zip ZIP file
E5-E6.zip ZIP file
E7.zip ZIP file
M7-M8.zip ZIP file
M2-M3.zip ZIP file
M1.zip ZIP file
P3.zip ZIP file
E1-E2.zip ZIP file
E3-E4.zip ZIP file
FP1.zip ZIP file
P4.zip ZIP file
Amendment_5.pdf PDF
Atch_26_B861_-_S-File_Room_Designation.pdf PDF
Atch_24_Post_Investigation_Report.pdf PDF
Atch_1_B861_SOW_7.18.18.pdf PDF
FA440718R00040004.pdf PDF
Atch_21_RFI_Log_B861_July_11.pdf PDF
Atch_22_Preproposal_Conference_12_July_18.pdf PDF
FA440718R00040003.pdf PDF
Atch_1_Bldg_861_SOW_7.10.18.pdf PDF
Amendment_2.pdf PDF
Atch_19_Past_Performance_Questionnaire.pdf PDF
Atch_16_HVAC_ON_EQUIP_INVENTORY.pdf PDF
Atch_5_B861-100__Design_Analysis.pdf PDF
Atch_15_ELEC_ON_EQUIP_INVENTORY.pdf PDF
Atch_18_Past_Performance_Information.pdf PDF
Atch_7_Site_Utility_Plan.pdf PDF
Atch_14_Wage_Determination_IL17_180017.pdf PDF
Atch_12_AFCEC_D_Wing_Renovation.pdf PDF
Atch_17_Real_ID_Act.pdf PDF
Atch_10_B861_Glass_Door.pdf PDF
Atch_3_B861_-_100__Specification.pdf PDF
Atch_13_AFAA_Furniture.pdf PDF
Atch_12_AFCEC_D_Wing_Renovation.pdf PDF
Atch_1_B861_-_100__Specification.pdf PDF
Atch_3_B861-100__Design_Analysis.pdf PDF
Atch_6_Termite_Treatment_Report.pdf PDF
Atch_11_TEKLAB_Sample_Results-B861.pdf PDF
Atch_8_Schedule_of_Materials_Submittals.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA440718R0004

Section J, Atch 20

15 August 2018

Proposal Checklist FA440718R0004 Repair Various Bldg Sys; B861

The following is a list of important dates and documents required for proposal submission (in chronological order)

� Request Access for Site Visit NLT 9:00 AM (Local Time) 9 July 2018 � Attend Site Visit 1:00 PM (Local Time), 12 July 2018 � Submission of Questions/Requests for Information (RFI) Due 13 August 2018 8:00 AM

(Local Time)

Volume I

� SF 1442 - Complete Blocks 14 – 16 and 19 – 20 (A – C) of SF1442 and all fill-in clauses in solicitation Sections G and I – K. Complete block 30A and sign and date blocks 30B and 30C. Submit a completed copy of Price Schedule, page 5 of this solicitation, with signed SF1442.

� SF 1442 - Complete Blocks 8 and 15 (A – C) for each amendment issued under this solicitation.

� Clauses and Provisions - Offerors shall complete all areas contained in Administrative Data of Section G, FAR Provision 52.219-28 in Section I, FAR Provisions 52.204-8 and 52.209-7 in Section K, and all other clauses and provisions, including exceptions or deviations, within Sections I, K, and L, as applicable to the offeror.

� Bid Bond - Bonds shall be submitted electronically with proposals in the amount of 20% of the proposed project price in accordance with FAR Clause 52.228-1 found in Section I of this solicitation. Offerors shall ensure all seals and signatures are plainly visible in electronically-submitted bonds.

� Section 8(a) Status – Provide a copy of your Small Business Administration letter for companies certifying as 8(a) business.

� Joint Ventures and Teaming / Partnering Agreements: Joint ventures and teaming or partnering agreements must be disclosed and comply with Section K and Section L, paragraphs L-1.4 or L-1.5, as applicable, of the solicitation.

� Submit a completed copy of Attachment 20, Proposal Submission Checklist.

Volume II

� Work Plan

Volume III

� Past Performance Information Sheets Offerors must submit three (3) project references that have been awarded, completed, or are ongoing within five (5) years from the date of this solicitation (SF1442 Block 3)