Amendment_8.pdf
PDF 157 KB Posted
- Attached to
- Repair (SUS) Various Building Systems; B861
- Solicitation number
- FA440718R0004
About this file
FA440718R00040008
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VDYD 15-1246
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
A. Incorporate the revised version of Attachment 1 - SOW 8 Aug 2018.
B. Incorporate the revised version of Attachment 21 - RFI Log 8 Aug 2018.
C. Incorporate the revised version of Attachment 7 - Site Utility Plan 7 Aug 2018.
D. Incorporate the revised version of Attachment 2 - B861 Phasing Plan 7 Aug 2018.
E. Incorporate Attachment 28 - Termite Application Form.
F. Incorporate Attachment 29 - B861 Abatement Reports.
G. Extensively revise Schedule B to adjust the Option CLINS to match new SOW.
H. Removed Attachment 8 and 24 from solicitation.
I. Extend the solicitation due date to 17 August 2018 at 0:100 PM (CDT).
J. Extend the submission of questions and request for Information to 13 August at 08:00 AM (CDT).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Aug-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA440718R0004
X 9B. DATED (SEE ITEM 11)
22-Jun-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Aug-2018
CODE
375 CONS/PK
201 E WINTERS STREET BLDG 50
SCOTT AFB IL 62225-5015
FA4407 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA440718R0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 08-Aug-2018 01:00 PM to 17-Aug-2018 01:00 PM.
The required performance has changed from A. Project Title: REPAIR (SUS) VARIOUS BUILDING SYSTEMS, COMM FAC; BUILDING 861, Scott AFB IL.B. Proposals are due by 15 Aug 18 at 01:00 PM (CDT).C. The Period of Performance will be the total number of days following Notice to Proceed (NTP)>D. The project magnitude is between $5,000,000 and $10,000,000.E. This solicitation is a total small business set-aside IAW FAR 19.502-2. NAICS code is 236220.F. Notice to Offerors: Funds are not presently available for this project.
No award will be made under this solication until funds are available.G. A pre-proposal conference/site visit will be held on 12 July 18 at 1:00 PM (CDT). All parties will meet at the 375th Contracting Squadron conference room in bldg 52, Scott AFB IL 62225.H. The Government reserves the right to cancel this solicitation/RFP either before or after the RFP closing date. to A. Project Title: REPAIR (SUS) VARIOUS BUILDING SYSTEMS, COMM FAC;
BUILDING 861, Scott AFB IL.B. Proposals are due by 17 Aug 18 at 01:00 PM (CDT).C. The Period of Performance will be the total number of days following Notice to Proceed (NTP)>D. The project magnitude is between $5,000,000 and $10,000,000.E. This solicitation is a total small business set-aside IAW FAR 19.502-2.
NAICS code is 236220.F. Notice to Offerors: Funds are not presently available for this project. No award will be made under this solication until funds are available.G. A pre-proposal conference/site visit will be held on 12 July 18 at 1:00 PM (CDT). All parties will meet at the 375th Contracting Squadron conference room in bldg 52, Scott AFB IL 62225.H. The Government reserves the right to cancel this solicitation/RFP either before or after the RFP closing date..
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
The contractor shall perform all efforts needed to execute this project. This includes, without limitation providing, all plant, labor, materials, equipment, transportation, and supervision necessary to perform repair of various building systems within building 861 as per Attachments within Section J.
To:
Base Bid - The contractor shall perform all efforts needed to execute this project. This includes, without limitation providing, all plant, labor, materials, equipment, transportation, and supervision necessary to perform repair of various building systems within building 861 as per Attachments within Section J.
CLIN 0002
Totla proposed price to include base bid (CLIN 0001), plus Option CLINS 1001, 1002, 1003, 1004, 1005 & 1006.
Total proposed price to include base bid (CLIN 0001), plus Bid Option CLINS 1001, 1002, 1003, 1004, 1005 & 1006.
The FSC code Y1JZ has been added.
The PROG code C20 has been added.
The WSC Equipment code 000 has been added.
The NAICS code 236220 has been added.
The MDAP/MAIS Code 000 has been added.
CLIN 1001
The CLIN description has changed from Bid Option One to Bid Option One (Downspouts and Hangers).
The CLIN extended description has changed from:
The contractor shall perform all efforts needed to execute this bid option. This includes, without limitation providing, all plant, labor, materials, equipment, transportation, and supervision necessary to perform repair of various building systems within building 861 as per Attachment 1 - Statement of Work (21 Jun 18), Section 7, page 7 of 12.
The contractor shall perform all efforts needed to execute this bid option. This includes, without limitation providing, all plant, labor, materials, equipment, transportation, and supervision necessary to perform repair of various building systems within building 861 as per Attachment 1 - Statement of Work (8 Aug 18), Section 3, paragraph o., page 5 of 15.
CLIN 1002
The CLIN description has changed from Bid Option Two to Bid Option Two (Exterior Building).
The CLIN extended description has changed from:
The contractor shall perform all efforts needed to execute this bid option. This includes, without limitation providing, all plant, labor, materials, equipment, transportation, and supervision necessary to perform repair of various building systems within building 861 as per Attachment 1 - Statement of Work (21 Jun 18), Section 8, page
The contractor shall perform all efforts needed to execute this bid option. This includes, without limitation providing, all plant, labor, materials, equipment, transportation, and supervision necessary to perform repair of various building systems within building 861 as per Attachment 1 - Statement of Work (8 Aug 18), Section 3, paragraphs p. & q., page 5 of 15.
CLIN 1003
The CLIN description has changed from Bid Option Three to Bid Option Three (Restrooms & Plumbing).
The contractor shall perform all efforts needed to execute this bid option. This includes, without limitation providing, all plant, labor, materials, equipment, transportation, and supervision necessary to perform repair of various building systems within building 861 as per Attachment 1 - Statement of Work (21 Jun 18), Section 9, page
The contractor shall perform all efforts needed to execute this bid option. This includes, without limitation providing, all plant, labor, materials, equipment, transportation, and supervision necessary to perform repair of various building systems within building 861 as per Attachment 1 - Statement of Work (8 Aug 18), Section 3, paragraphs r. and s., page 6 of 15 as well as Section 4, paragraphs f., g., & h., pages 7 and 8 of 15.
CLIN 1004
The CLIN description has changed from Bid Option Four (Mech Rm Sewer Line) to Bid Option Four (Interior Lights).
The CLIN extended description has changed from:
The contractor shall perform all efforts needed to execute this bid option. This includes, without limitation providing, all plant, labor, materials, equipment, transportation, and supervision necessary to perform repair of various building systems within building 861 as per Attachment 1 - Statement of Work (10 Jul 18), Section 4, paragraph b. 14.
The contractor shall perform all efforts needed to execute this bid option. This includes, without limitation providing, all plant, labor, materials, equipment, transportation, and supervision necessary to perform repair of various building systems within building 861 as per Attachment 1 - Statement of Work (8 Aug 18), Section 3, paragraph t., page 6 of 15.
CLIN 1005
The CLIN description has changed from Bid Option Five (Replace Carpet B2 wing) to Bid Option Five (Wing B2 and D2 Work).
The CLIN extended description has changed from:
The contractor shall perform all efforts needed to execute this bid option. This includes, without limitation providing, all plant, labor, materials, equipment, transportation, and supervision necessary to perform repair of various building systems within building 861 as per Attachment 1 - Statement of Work (10 Jul 18), Section 7, paragraph 7e..
The contractor shall perform all efforts needed to execute this bid option. This includes, without limitation providing, all plant, labor, materials, equipment, transportation, and supervision necessary to perform repair of various building systems within building 861 as per Attachment 1 - Statement of Work (8 Aug 18), Section 4, paragraphs i., j., and k, page 8 of 15.
CLIN 1006
The CLIN description has changed from Bid Option Six (Replace Carpet D2 Wing) to Bid Option Six (Termite Treatment).
The CLIN extended description has changed from:
he contractor shall perform all efforts needed to execute this bid option. This includes, without limitation providing, all plant, labor, materials, equipment, transportation, and supervision necessary to perform repair of various building systems within building 861 as per Attachment 1 - Statement of Work (10 Jul 18), Section 7, paragraph 9e.
The contractor shall perform all efforts needed to execute this bid option. This includes, without limitation providing, all plant, labor, materials, equipment, transportation, and supervision necessary to perform repair of various building systems within building 861 as per Attachment 1 - Statement of Work (8 Aug 18), Section 4, paragraph l., page 8 of 15.
CLIN 1007
The contractor shall perform all efforts needed to execute the work described within Attachment 21 - RFI # 159. The contractor will provide a square foot cost to replace and once construction has started the contractor will provide total amount of work in square feet. This includes, without limitation providing, all plant, labor, materials, equipment, transportation, and supervision necessary to perform the work.
The contractor shall perform all efforts needed to execute the work described within Attachment 21 - RFI # 159. The contractor will provide a square foot cost to replace. Once construction has started the contractor will provide total amount of work in square feet. This includes, without limitation providing, all plant, labor, materials, equipment, transportation, and supervision necessary to perform the work.
SECTION E - INSPECTION AND ACCEPTANCE
The Acceptance/Inspection Schedule for CLIN 0002 has been changed from:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
To:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF ATTACHMENTS
LIST OF ATTACHMENTS
(End of Summary of Changes)
Attachment Title Date Pages 1 Statement of Work 8-Aug-18 15 2 B861 Phasing Plan 7-Aug-18 7 3 B861 100% Specification 25-Apr-17 540 4 B861 100% Drawings 25-Apr-17 45 5 B861 100% Design Analysis 25-Apr-17 292 6 B861 Fire System Drawings 21-Mar-18 4 7 Site Utility Plan 7-Aug-18 1 8 Termite Treatment Report (Removed) 23-Feb-18
9 Schedule of Materials Submittals 17-May-18 23 10 B861 Glass Door 17-May-18 1 11 TEKLAB Sample Results-B861 29-May-18 7 12 AFCEC D Wing Renovation 17-May-18 1 13 AFAA Furniture 17-May-18 1 14 Wage Determination IL 17 180017 11-May-18 14 15 Required Electrical On Equipment Inventory Sheet 15-Mar-17 1 16 Required HVAC on Equipment Inventory Sheet Jun 18 1 17 Real ID Act Feb-18 3 18 Past Performance Information 29-May-18 2 19 Past Performance Questionnaire 29-May-18 4 20 RFP Checklist 29-May-18 1 21 RFI Log B861 8-Aug-18 19 22 Preproposal Conference Slides 12-Jul-18 14 23 Preproposal Conference Sign In Sheet 12-Jul-18 5 24 Post Investigation Report (Removed) 23-Jan-18 25 Additional Site Visit Sign in Sheet 18-Jul-18 1 26 S-File Room Designation 25-Jul-18 1 27 B861 CAD 25-Apr-17 Multiple Files 28 Termite Application Form 7-Aug-18 1 29 B861 Abatement Reports Multiple Dates 9
File details come from the government source that posted it.