Revised_SOW_23_April_15.pdf

PDF 19 KB Posted

Attached to
Multiple Award Paving Contract (MAPC) Federal contract opportunity
Solicitation number
FA4407-15-R-0002
Issued by
Department of the Air Force Air Mobility Command

About this file

Revised SOW

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Paving Contract (MAPC), newest first.
File Type Posted
MAPC_Revised_RFI_5_May.xlsx XLSX spreadsheet
Revised_RFI_27_April.xlsx XLSX spreadsheet
RFI_-_MAPC_2015.xls XLS spreadsheet
Preproposal_Conference_MAPC2015.pptx PPTX presentation
Pre-Proposal_Conf._Minutes.pdf PDF
MAPC_2015_Amendment_1.pdf PDF
Sign_in_sheet.pdf PDF
MAPC_2015_RFP-Final.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVISED

STATEMENT of WORK

FOR

VDYD 14-1159

Repair (SUS) McCullough Road (Tower Road), F7400

AT

SCOTT AIR FORCE BASE, ILLINOIS

23 April 2015 375th CIVIL ENGINEER SQUADRON

1. Description of Work: The work consists of furnishing all labor, materials and equipment necessary to repair McCullough Road (From East Drive to Bldg. 3900 PL). See Attached Drawing

A. Remove and Replace 2 inches Asphalt on McCullough Road from the two entrances on East Drive heading to Bldg. 3900 Parking Lot. See Attached Drawing.

a. Mill 2 inches of existing asphalt. See attached drawing for locations.

b. Furnish and install a tack coat to IDOT standards.

c. Furnish and install a 2 inch Hot-Mix asphalt wear course to IDOT standards.

d. The contractor shall leave one lane open at all times. Contractor shall provide signage for lane closures.

2 Accomplishment of Work: All work shall be accomplished between the hours of 7:30 a.m.

and 4:30 p.m. Contractor needs to provide two weeks notification of road or parking lot closures prior to commencing work to provide occupants time to adjust parking locations during repair work. Contractor shall provide construction schedule showing phasing of work.

A. Contractor shall site verify any and all dimensions and/or existing site conditions prior to the commencement of work. Commencement of work shall begin within ten (10) calendar days upon the receipt of the Notice to Proceed issued by the Contracting Officer.

3. Field Conditions: The Contractor shall be responsible for all field measurements to accomplish work. Quantity and sizes of materials shall be determined from site visits and drawings. The contractor shall carefully examine the entire site and shall make all necessary investigations to become thoroughly aware of the existing conditions and all difficulties involved in the completion of the work in accordance with the contract documents.

4. Work Conditions: The contractor shall coordinate work with the Contracting Officer. The Contractor shall notify the Contracting Officer or the inspection representative the day he/she moves onto the work site to commence work. The Contractor shall again provide notification the day he moves back to the work site after an interruption of work of two or more days duration.

The Contractor shall also provide an original work schedule and updates if required. This schedule shall describe major work items and projected completion dates.

pg 1 of 2

5. Protection of Building Property: Not applicable.

6. Cleanup: The contractor shall cleanup each work site at the end of each work day to the satisfaction of the Contracting Officer. Upon completion of the work, all construction equipment and debris shall be removed from the site and the area shall be left in a neat and completely acceptable condition as required by the General Provisions. Contractor must always recycle materials, such as, but not limited to cardboard and paper. The Contractor will use whatever means necessary to store all recyclable materials and responsible for turning in recyclable materials to the Base Recycling Center.

7. Patching and Repairing: After the work has been completed, holes, cuts, and damages made in the finished surfaces of the work site and adjacent areas shall be properly repaired and restored to match the existing finishes. Any abrasion or disfigurement of the finish work or any portion of the building where any such abrasion or disfigurement is caused by the activities of the Contractor shall be repaired and neatly refinished to match the adjacent work to the satisfaction of the Contracting Officer.

8. Products: All products shall conform to their respective manufacturing and performance publications. All materials and equipment used in the work area shall be the products of manufacturers regularly engaged in the manufacture of construction products.

9. Specifications: Work shall be performed in strict accordance with this contract’s general specifications, American Disability Act (ADA) regulations, Illinois Department of Transprotation (IDOT) Specifications for Roadways and Bridges, National Roof Contractor's Association specifications, and American Society for Testing and Materials (ASTM) specifications. Safety issues must adhere to all applicable Occupational Safety and Health Act (OSHA) regulations, to include all other issues listed in the US Army Corps of Engineers Safety and Health Requirements manual (EM 385-1-1).

pg 2 of 2