MAPC_Revised_RFI_5_May.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- Multiple Award Paving Contract (MAPC) Federal contract opportunity
- Solicitation number
- FA4407-15-R-0002
About this file
This RFI was revised on 5 May 2015.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Revised_RFI_27_April.xlsx | XLSX spreadsheet | |
| RFI_-_MAPC_2015.xls | XLS spreadsheet | |
| Preproposal_Conference_MAPC2015.pptx | PPTX presentation | |
| Pre-Proposal_Conf._Minutes.pdf | ||
| MAPC_2015_Amendment_1.pdf | ||
| Revised_SOW_23_April_15.pdf | ||
| Sign_in_sheet.pdf | ||
| MAPC_2015_RFP-Final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| # | QUESTION | RESPONSE |
| 1 | Does the government intend for the contractor to remove and dispose of the asphalt millings or do you intend to have the contractor haul the millings to a stockpile on base? | The CONTRACTOR is responsible to remove/dispose the asphalt millings off base. |
| 2 | There are no stripes on the existing road, does the customer want striping on this road? | Yes, per the SOW. |
| 3 | On the revised SOW it states "Remove and replace 2 inches asphalt on McCullough Road from the two entrances on East Drive heading to Bldg. 3900 Park Lot." The map is showing 2" at the entrance and 4" on the road to the parking lot at Building 3900. Does the map need to be updated to show 2" (instead of 4") on the road to the parking lot? | I revised the drawing to reflect Mill and overlay 2" throughout. |
| 4 | When the revised SOW was issued the square foot measurements were not carried forward. Are those measurements correct for us to use to bid, as the area is not accessible? | Use the SF per the SOW. |
| 5 | ||