Bldg 1446 blueprints.pdf
PDF 128 KB Posted
- Attached to
- Solicitation - FY26 Project X Fans
- Solicitation number
- FA330026R2003
About this file
This is a detailed architectural floor plan for Building 1446 drawn to a scale of 3/32" = 1'-0". The plan depicts a 300'-0" by 90'-0" facility containing 22 numbered tasks distributed across the building footprint. The facility includes multiple pools, platforms, and specialized equipment areas. Key structural elements include typical columns, footers, and an 8" concrete block wall that is 5' tall. Materials specified include galvanized cable (4 No. 9), 3" galvanized pipe (typical), 2" angles positioned flat-side up on the ground, 8"x8" wood posts with caps, 8" logs, and 4" pipe. The plan indicates the presence of an electrical switch marked as non-functional, rope installations at various locations, crawl pipe installations, and a shield element. Dimensions are provided throughout the layout with specific measurements for task areas, spacing between columns, and structural components. The building appears to be designed for training or operational purposes given the multiple task stations and pool areas arranged sequentially across the facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Project X - Picture 5.jpg | JPG image | |
| Project X - Picture 6.jpg | JPG image | |
| Project X - Picture 7.jpg | JPG image | |
| Project X - Picture 3.jpg | JPG image | |
| Project X - Picture 2.jpg | JPG image | |
| Statement of Requirements - FY26 Project X Fans.pdf | ||
| Provisions and Clauses - ProjectX Fans.pdf | ||
| Project X - Picture 1.jpg | JPG image | |
| SAM RFQ - ProjectX Fans.pdf | ||
| Project X - Picture 4.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCALE: 3/32" = 1'-0"
Bldg 1446 FLOOR PLAN
NORTH
300'-0"
TASK 1
TASK 2
PLATFORM
PLATFORM
POOL
POOL
5'-8" 32'-0" 5'-8"
7'-0" 11'-0" 7'-0" 7'-0"
7'-0" 7'-0" 11'-0" 7'-0"
4'-0" 12'-0" 12'-0" 4'-0"
COLUMN TYP.
TASK 3
POOL
5'-6" 15'-0"
5'-6"
5'-6"5'-0"7'-0"
COLUMN
TYP.
SHIELD
CRAWL
PIPE TYP.
2'-8"
TASK 4
POOL
11'-9"
2'-8"
22'-6"
P I P
E
TASK 5
POOL
10'-6"5'-2"
1'-8" 13'-0" 1'-4"
2'-0"
PIPE
PIPE
PIPE
PIPE
ELEC.
SWITCH
(NON-
FUNC.)
PIPE
P I P
E
3'-2"
16'-4"5'-0"
ROPE
TASK 6
POOL
1'-6"
1'-11"
9'-8" 24'-0"
2'-5" 5'-4"
2'-2 1/4"4'-9 1/2"2'-8 1/4"
7'-9"
16'-0"
7'-4" 17'-0" 7'-4"
TASK 7
POOL
PLATFORM
PLATFORM
PLATFORMPLATFORM
P I P
E
P I P
E
P I P
E P
I P
E
P I P
E P
I P
E
6'-11" 6'-10" 5'-2"
6'-2"8'-0"4'-4"8'-0"
COLUMN TYP.
FOOTER TYP.
COLUMN
TYP.
TASK 8TASK 9
FOOTER TYP.
8'-0"
2'-3"2'-3"
2'-3"2'-3"
N
O
G
A L V
C
A B
L E
TASK 10
G
A L V
P
I P
E
T
Y P
TASK 11
8'-0"
1'-6"
9'-0"
COLUMN TYP.
2" ANGLE
9'-0"3'-6" 3'-6"
8" CONC. BLOCK
WALL 5' TALL
TYP.
TASK 12
TASK 13
5'-0"
6'-0"
6'-0"
5'-1 1/2"
4'-0"
8" WOOD
POST
2" ANGLE
FLAT SIDE UP
ON GROUND
TASK 14
CONCRETE PIT
2" ANGLE
FLAT SIDE UP
ON GROUND
8"x8" WOOD
POST & CAP
6'-0"
12'-0"
TASK 15
POOL
4" PIPE
10'-0"
TASK 16
11'-0"
8" LOGS
POOL
TASK 17
7'-8" 6'-0"
POOL
TASK 18
POOL
ROPE TYP.
8'-0"
7'-0"
8'-11"
8'-6 1/2"
TASK 19
14'-0"
5'-0"
1'-0"
5'-0"
1'-0"
2'-0"
4"
8"
3'-0"
1'-0"
2'-0"
2'-8"
R
TASK 20
POOL
POOL
6'-6" 9'-0"
1'-6"
3'-0"
TASK 21
POOL
10'-0"
2'-0" 3'-6"
3'-0"
2'-0"
TASK 22