Questions and Answer for (Conex)(28 Aug 26).pdf
PDF 128 KB Posted
- Solicitation number
- FA330026P0819
About this file
This is a Solicitation Questions & Answers document for a Conex (shipping container) Refurbishment Requirement dated 28 AUG 2026. The document addresses 18 clarification questions from contractors regarding project scope, site access, materials specifications, and work requirements across four facilities: CQV (7 containers), Delta (5 containers), Bravo (7 containers), and Alpha (11 containers), totaling 30 containers rather than the originally stated 27.
Key work requirements clarified include: gates will be open for vehicle access during work hours, contractors may use their own UTVs, on-site porta Johns are available for contractor use, and weekend work is not desired but may be approved post-award. For materials and repairs, flooring replacement requires 3/4 marine grade plywood with rot-prevention sealer and epoxy coating with 2-part slip-resistant finish. Window replacement across all facilities must use polycarbonate (Lexan, 3/16"–1/4") or equivalent to prevent shattering; all windows must be replaced to protect interior investments. All peeling paint on walls and ceilings must be scraped and repainted inside. Door hardware locks must be replaced per the offsite facility manager with preference for a single master key system. Additional work includes reattaching fallen insulation board at Bravo Facility, redoing electrical connections where applicable, and ensuring containers are environmentally sound. The Schedule of Supplies/Services lists two line items—Materials and Installation—each as item 0001 with quantity of 1 each, referencing the entire scope of work rather than unit pricing, as each container requires different materials and labor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION
QUESTIONS & ANSWERS
Conex Refurbishment Requirement
28 AUG 2026
1. QUESTION: Will the gates adjacent to the sites be open for easier access to repair the
Connex boxes during contract work hours?
ANSWER: Yes.
2. QUESTION: Will contractor be able to access all four facilities by vehicle? We will need to have dump trailers and man lifts at these sites. Is the Contractor allowed to bring their own UTV?
ANSWER: Yes, the gates shall serve as means for entry and exit of larger vehicles for all sites. Contractor may utilize their own UTV’s if they would like.
3. QUESTION: Will Contractors need to have porta Johns at each site, or will they be able to use the porta Johns that are on site provided by the owner?
ANSWER: Contractor may use on site porta Johns.
4. QUESTION: The plywood that is being replaced in the flooring of the cons, will it need to be 3/4 Marine grade plywood or regular 3/4 BC plywood?
ANSWER: Marine grade, with a sealer to prevent rot.
5. QUESTION: On the Bravo Facility do we need to add in our price attaching the insulation board back that has fallen?
ANSWER: Yes
6. QUESTION: Alpha Facility do you want to replace all 32 windows with new working windows or repair the existing windows?
ANSWER: Replace them with something that does not shatter.
7. QUESTION: Alpha Facility, the existing plywood floor has been sprayed will we need to spray they replaced plywood? If so, could you provide the name of the product that was used.
ANSWER: Marine grade, with a sealer to prevent rot
8. QUESTION: Alpha Facility, Will you be requiring the contractor to scrape the peeling paint from the walls and ceiling? If so, will it need to be painted back, this could also include the other three facilities that have peeling paint.
ANSWER: Yes, re-paint inside.
9. QUESTION: Will there be specs on the windows that will have to be replaced?
ANSWER: Polycarbonate (Lexan, 3/16"–1/4") or equivalent to avoid shattering.
10. QUESTION: Can the contractor work on weekends to complete the project faster and if so, what are the hours they can work on the weekends to get the project completed?
ANSWER: Not desired. Possibility for approval via government post contract award.
Recommend planning with the assumption no work on weekends.
11. QUESTION: SOW states 27 containers during our walk through we counted 29 please advise which area if our count is incorrect?
SITE NO. NAME TOTAL CONTAINERS
1 CQV 7 7
2 DELTA 5 5
3 BRAVO 7 7
4 ALPHA 10 11
TOTAL CONTAINERS 29 30
ANSWER:
12. QUESTION: The SOW states indirectly in 2.1.1- 2.2.1-2.3. 3- that the containers must be environmentally sound. We recommend that the units be brushed, blasted, primed and painted on the outside and inside at a minimum on the outside as some units have extensive rusting, especially the units in the Bravo and Alpha area.
ANSWER: Contractor is responsible for the minimum requirements as outlined in the
Statement of Requirement.
13. QUESTION: Also, once all floors have been repaired do you require them to be epoxy coated with a 2 parts slip resistant coating to prolong floor life. This will prevent the decay you are having now due to exposure over time?
14. QUESTION: Some units have electrical connections that could be redone. Do you want to include this work in the SOW as well?
15. QUESTION: In Bravo area 1 unit is severely damaged, and they are using foam to try and seal this unit recommend replacing this unit completely.
ANSWER: Contractor is responsible for the minimum requirements as outlined in the Statement of
Requirement.
16. QUESTION: Confirm that contractor is only to replace door hardware if locks are missing or not working. Is there a specification for the new hardware or is it to match existing?
ANSWER: Replace all locks per offsite facility manager. Prefer 1 master key for those.
17. QUESTION: Regarding SOR 2.2.1 – The windows that are currently installed are for manufactured homes. Are we to replace all windows or only the ones not working or damaged? Is there a specification for new widows?
ANSWER: Replace all to protect new interior investments.
18. QUESTION: Please clarify the Schedule of Supplies/Services – Both are listed as item
0001 and Quantity is listed as 1 each. Should the first item “Materials” be the materials for the entire project and the second item “Installation” be labor for the entire project? Each conex will have different materials and labor so unit pricing would not be applicable to this project.
ANSWER: Yes, each line item is referencing the entire scope of the requirement.