About this file
This document is a Request for Information (RFI) Log for Solicitation FA330025R0004, seeking architectural and engineering (A&E) design services for an interior/exterior refresh of Building 842 at Maxwell Air Force Base in Alabama. The project involves interior refinishing, including painting the hangar interior, hangar floor, and addressing ceiling repairs, with specific exclusions for exterior work beyond door repairs. Key requirements include submittal of a Standard Form 330 with three to five past performance projects, contractor fees, and qualifications from firms within 250 miles of the base.
The solicitation calls for proposals due by 21 March 2025, with an estimated contract value between $25,000 and $100,000 and a performance period not exceeding 90 calendar days. Evaluation factors include price, technical acceptability, past performance, and proximity to Maxwell AFB. The project involves potential lead-based paint considerations, with options for paint scraping or full abatement. Contractors must be registered in SAM.gov under NAICS codes 541310 or 541330, with registered architects or engineers. A site visit is scheduled for 5 March 2025, and all communication must be via email to the specified contracting personnel.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| M842_1ST FLR.pdf | ||
| M842_2ND FLR.pdf | ||
| 842 As builts.pdf | ||
| Scan 842 Elev 2.pdf | ||
| Scan 842 Elev 1.pdf | ||
| FA330025R0004 RFI LOG v2.pdf | ||
| RFP FA330025R0004_v2.pdf | ||
| RFP FA330025R0004_v2.pdf | ||
| RFP FA330025R0004.pdf | ||
| AE SOW PNQS 24-2543 Int_Ext Refresh Bldg 842 rev1.pdf | ||
| RFP FA330025R0004.pdf | ||
| SF330-21a.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation
Number FA330025R0004
Title PNQS 24-2543 Int / Ext Refresh 842
RFI No. RFI OPR Response
RFI - 0001 Should it be anticipated that the HVAC units on the roof will be replaced? CES No, only repair of drainage overflow or if better solution exists design to implement that
RFI - 0002
“Refinishing the exterior of the facility” and “Design the interior refinishing of the facility” from the scope of work. Does this include the following:
CES Only the interior
a. Painting entire exterior CES no
b. Replacement or repairs to roof system / roof drainage system CES no
c. Painting entire interior of hangar and interior buildings CES yes
d. Painting hangar floor CES yes
e. Repairs to hangar ceiling CES yes
RFI - 0003
Please provide any original drawings, renovation drawings, and/or as-builts. Any format will be helpful.
CES attached
RFI - 0004
Please confirm that "refinishing the exterior of the facility" includes refinishing the windows and not replacement of the windows.
CES
we are only doing the interior of the facility other than repairing the doors
RFI - 0005 Please confirm that the existing window glazing is to remain. CES yes
RFI - 0006 Please confirm if this renovation will be reviewed by the historical review committee. CES
If needed our Environmental section has a historical department and if they deem it needs SHPO approval it will be put before them.
RFI - 0007
Please confirm that "refinishing the exterior of the facility" does not include repair/replacement of the roof system.
CES
we are only doing the interior of the facility other than repairing the doors
RFI - 0008
The SOW at par. 4.4.3 requires only a 95% submittal and an RTA submittal.
However par 4.5.2 describes a 65% submittal & review process and par 4.5.3 describes a 100% submittal & review process. Par 5.1 lists a 65%, 95%, and RTA submittal. Please advise the correct submittal process.
CES 65%, 95%, RTA are the required submittals.
RFI - 0009
Are CPARs/PPQs for each of our Section F projects required as part of the SF330 submission?
CONS
CPARS will not be required, but contract numbers for past performance will be required.
RFI - 0010 Total Square Footage on building CES 32,927
RFI - 0011 We will need building plans (floor, roof, etc.) and elevations CES attached
RFI - 0012 Has there been any asbestos and lead paint studies completed on the building? CES No, part of the request is to have a complete lead based paint study completed
RFI - 0013
Do we have all the paint (interior & exterior removed (remediation) to raw metal before recoating?
CES
No exterior work. •Op on one aligns with the scope outlined in the SHPO/AHC packet that has been approved, to scrape and paint. With this option, you will scrape the paint to collect on plastic and when all scraping is done the paint chips go into a drum for Haz waste disposal as paint waste.
•Op on two, is to do a full abatement. With this op on, you will need an abatement contractor who specializes in lead abatement and the metal would have to be fully striped of paint. This option has potential to be approved if this is the option chosen.
Option two requires a lead abatement contractor that has been certified.
RFI - 0014 Will the building be occupied during work? CES We should proceed as if it will be occupied, other than the remediation.
RFI - 0015
Define scope for work involving the internal building structure (ei. offices inside the hanger)?
CES
the internal building, only working the finish on the outside and the HVAC Drainage.
RFI - 0016
User said she wanted to get rid of the EFIS/Stucco wall finish and replace with something (metal panels) they can attached signage and other equipment.
CES yes or paint
RFI - 0017 Will there be work in the attic above the wood plank ceiling? CES just the painted side
RFI - 0018 Will there be reroof work involved for main structure? CES no re-roofing
RFI - 0019
Will any of the windowpanes be replaced? Noted that several were broken and of wire glass?
CES no
RFI - 0020
With “price” being listed as a primary evaluation factor, please confirm you would like a fee proposal included with both SF330 responses.
CONS
Proposals should include the contractors fees to complete A&E design.
RFI - 0021
Please confirm the number of Section F projects and number of Section E Resumes you would like included in each of the SF330 responses.
CONS
Contractors submitting a proposals will submit a minimum of three (3), maximum (5) projects with comparable/relevant experience. Past performance should not be greater than 5 years old from 31 Mar 2025.
RFI - 0022
Drawings/Records Availability: Are there more recent or more detailed as-built drawings available (structural, mechanical, electrical) for Bldg 842 that are not in the RFP attachments?
CES will be provided to awardee
Request for Information Tracker Log
RFI - 0023
Historic Preservation Status: Is Bldg 842 considered historic or part of a historic district? If yes, are there special requirements (State Historic Preservation Office approvals, architectural style constraints, etc.)?
CES
Yes, the building was built in 1931 and the reason we are only doing interior work. Not usually for interior work but our historical POC will elalute whether SHPO will be need coordination.
RFI - 0024
Existing Surveys: Can the Government provide any past lead-based paint or asbestos surveys beyond those included in the solicitation documents?
CES those were all I could find
RFI - 0025
Abatement Protocols: Should the design include detailed abatement plans, or only testing and identification services? Is there a preferred specification section or approach for LBP abatement?
CES
see RFI 0013 and attached LBP Specs
RFI - 0026
Door Manufacturer & Spare Parts: Are original manufacturer’s specifications or spare-part details available for the existing hangar doors/rollers?
CES
the CE shops used for repairs but no one has parts anymore so they woul need to fabricate the parts. CE Operations has the name of the company that would fabricate them
RFI - 0027
Load Requirements for Tracks: Are there any updated structural load requirements or known issues with the overhead track structure?
CES
I have not seen anything on that unless the are on the as-builts but I doubt that would be on them
RFI - 0028 Existing HVAC Documentation: Is there any existing design documentation or shop drawing for the rooftop HVAC unit over the Honor Guard area?
CES no I cannot find anything. There could be more in drawings in the vault but as said before I have no way to scan them
RFI - 0029
Access and Maintenance Requirements: Are there special maintenance or clearance requirements that need to be incorporated into the new design?
CES
no
RFI - 0030 Utility Drawings: Where can we find the most current utility site plan(s)? CES they are available for contract awardee
RFI - 0031
Emergency Power or Backup Systems: Is there any existing generator or backup power feed that the design needs to integrate?
CES
no
RFI - 0032
Interior Partition Types: Are there known restrictions on the materials or thickness of partitions to maintain egress or code requirements?
CES
just to meet the current life safety code and NFPA
RFI - 0033
Fire Protection Upgrades: Should we assume any new or upgraded fire alarm / fire suppression equipment is required if we alter interior spaces?
CES
no
RFI - 0034 Applicability of UFC 4-010-01: To what extent do the DoD minimum antiterrorism standards apply to this specific renovation project (given it’s an existing hangar)?
CES
not applicable to the interior
RFI - 0035 Waivers or Exceptions: Are there existing waivers that exempt certain upgrades for older facilities?
CES
the state historical preservation office has considered this a historic building so there are not waivers, we have to run most changes through them
RFI - 0036
Access and Security Clearance: Will contractors need special base passes or escorts?
CONS
Awarded contractor will have to request in writing desire to visit site 14 days in advance to the Contracting Officer (CO). CO will issue an Entry Authorization Letter to Security Forces. Upon approval Contractor will be issued a temporary pass to gain access.
RFI - 0037
Staging and Laydown Areas: Where can contractors stage equipment/materials during construction?
CES
those would be decided after award
RFI - 0038
Review Turnaround Time: Can we assume the Government will adhere to a standard 10-day review window for each submittal phase (65%, 95%, etc.)?
CES
Yes
RFI - 0039
On-Base Design Meetings: Will face-to-face design review meetings be required, or are virtual meetings acceptable?
CES
Prefer face to face, but can do virtual
RFI - 0040
Coordination with Base Personnel: Should we coordinate directly with certain
Maxwell AFB facility managers for interior access?
CONS
Contractors will coordinate interior access with CO and CES representative.
RFI - 0041
Point of Contact for Site Visits: If additional site inspections are needed, who will be the Government’s point of contact to arrange them?
CONS
The Contracting Officer
RFI - 0042
Preferred Format for Deliverables: Confirm any specific digital deliverable format requirements (beyond what’s stated in the SOW)—for instance, do they want
SpecsIntact files or just PDFs?
CES MS Word, .pdfs and at RTA, CADD files. No SpecsIntact files required
RFI - 0045
Regarding the Description Item 7. Evaluation Factors, a. Price – we plan to submit qualifications in accordance with the Federal Brooks Act. If selected based on those qualifications, we will negotiate a fair and reasonable fee based on the project’s parameters. Please confirm this is acceptable.
CONS
Yes
RFI - 0046
Regarding the submittal of qualifications, what is the method of submission for the
Standard Form 330, A-E Qualifications?
CES
I accept paper or electronic versions.
RFI - 0047
Please clarify what is meant by the term “Technical Acceptability” under Selection
Criteria and if there are specific items you would like submitted for this factor.