Text version
Prepared By
19219 Katy Freeway Suite 100
Houston, Texas 77094-1009
30 May 2018
AECOM Project No.: 60556602
Project Manual
Upgrade UPS/HVAC System Building 328
Laughlin AFB, Del Rio, TX
100% - FINAL DESIGN
Contract No. FA3099-13-D-0001
Task No. FA3099-17-F-0040
MXDP 16-1015
UPGRADE UPS/HVAC SYSTEMS B.328 URS/AECOM
Laughlin AFB, Del Rio, TX
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 32 01.00 10 PROJECT SCHEDULE
01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 86 12.07 40 RELIABILITY CENTERED ACCEPTANCE FOR MECHANICAL SYSTEMS
01 91 00.15 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 82 13.00 10 ASBESTOS ABATEMENT
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER
BUILDING CONTROL SYSTEMS
23 23 00 REFRIGERANT PIPING
23 31 13.00 40 METAL DUCTS
23 81 23.00 20 COMPUTER ROOM AIR CONDITIONING UNITS
DIVISION 25 - INTEGRATED AUTOMATION
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END
AND INTEGRATION
DIVISION 26 - ELECTRICAL
PROJECT TABLE OF CONTENTS Page 1
FA3099-13-D-0001 FA3099-17-F-0040
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 28 21.00 40 AUTOMATIC TRANSFER SWITCHES
26 32 14.00 10 DIESEL-GENERATOR SET, STATIONARY 15-300 KW, STANDBY
APPLICATIONS
26 33 53.00 20 UNINTERRUPTIBLE POWER SUPPLY (UPS) - BATTERY REPLACEMENT
ONLY
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 24 PAGES
LAFB Bldg. 328 UPS/HVAC
01 11 00 SD-01 Preconstruction Submittals
1.7 GSalvage Plan
01 14 00 SD-01 Preconstruction Submittals
1.3.2.2 GList of Contact Personnel
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.5.1 GPreliminary Project Schedule
3.5.2 GInitial Project Schedule
3.7.2 GPeriodic Schedule Update
01 32 16.00 20 SD-01 Preconstruction Submittals
1.2 GConstruction Schedule
SD-07 Certificates
1.4Monthly Updates
01 33 00 SD-01 Preconstruction Submittals
1.7 GSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.4.3.1 GPreliminary High Performance
and Sustainable Building Checklist
1.4.3.1 GPreliminary Sustainability
eNotebook
SD-11 Closeout Submittals
1.4.3.1 GFinal High Performance and
Sustainable Building Checklist
1.4.3.1 GFinal Sustainability eNotebook
1.4.3.1 GAmended Final Sustainability
eNotebook
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 24 PAGES
01 33 29 1.4.3.1 GAmended Final High
Performance and Sustainable
Building Checklist
01 35 26 SD-01 Preconstruction Submittals
1.10 GAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.16Notifications and Reports
1.16.2 GAccident Reports
SD-07 Certificates
1.12Activity Hazard Analysis (AHA)
1.13.1Confined Space Entry Permit
1.13.1Hot Work Permit
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9.2Verification Statement
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.7.1 GTraffic Control Plan
SD-06 Test Reports
Backflow Preventer Tests
SD-07 Certificates
Backflow Tester
Backflow Preventers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 24 PAGES
01 57 19 SD-01 Preconstruction Submittals
1.8.1Preconstruction Survey
1.12 GSolid Waste Management Permit
1.8.2 GRegulatory Notifications
1.9 GEnvironmental Protection Plan
1.9.9.1 GDirt and Dust Control Plan
1.8.5 GEmployee Training Records
1.8.4 GEnvironmental Manager
Qualifications
SD-06 Test Reports
3.6.1.1.2Laboratory Analysis
3.6.2.1 GSolid Waste Management Report
SD-07 Certificates
1.8.5 GEmployee Training Records
SD-11 Closeout Submittals
3.6.1 GWaste Determination
Documentation
3.6.3.6 GDisposal Documentation for
Hazardous and Regulated Waste
1.8.5 GAssembled Employee Training
Records
1.12 GSolid Waste Management Permit
3.6.2.1 GSolid Waste Management Report
3.6.3.1 GHazardous Waste/Debris
Management
1.8.2 GRegulatory Notifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 24 PAGES
01 57 19 3.6.2.1 GSales Documentation
01 78 00 SD-03 Product Data
1.6.2Warranty Management Plan
1.6.5Warranty Tags
1.5Spare Parts Data
SD-08 Manufacturer’s Instructions
1.6.2Instructions
SD-10 Operation and Maintenance
Data
3.3 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.2 GRecord Drawings
Final Approved Shop Drawings
Construction Contract
Specifications
2.1 GCertification of EPA Designated
Items
01 78 23 SD-10 Operation and Maintenance
Data
1.4 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 24 PAGES
01 78 23 3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
01 86 12.07 40 SD-01 Preconstruction Submittals
1.3 GQuality Control Plan
2.2 GMaterial, Equipment, and Fixture
Lists
SD-02 Shop Drawings
3.2 GConnection Diagrams
2.2.1 GFabrication Drawings
3.2 GInstallation Drawings
SD-03 Product Data
2.2.1 GManufacturer's Catalog Data
2.2.1 GEquipment Foundation Data
2.2.2 GSpecific Equipment Data
2.2.3 GSpare Parts List
1.4 GWarranty
SD-08 Manufacturer’s Instructions
3.2 GManufacturer's Instructions
SD-10 Operation and Maintenance
Data
3.4 GOperations and Maintenance
Manuals
SD-11 Closeout Submittals
3.2 GRecord Drawings
3.5 GAcceptance Documentation
01 91 00.15 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 24 PAGES
01 91 00.15 1.7 GCommissioning Firm
1.7.1 GLead Commissioning Specialist
1.7.2 GTechnical Commissioning
Specialists
GCommissioning Firm's Contract
SD-06 Test Reports
3.1.4 GDesign Review Report
3.1.3.1 GInterim Construction Phase
Commissioning Plan
3.1.3.2 GFinal Construction Phase
Commissioning Plan
3.1.6.2 GPre-Functional Checklists
1.9Issues Log
3.2 GCommissioning Report
3.3.1 GPost-Construction Trend Log
Report
SD-07 Certificates
1.10 GCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.1.7 GTraining Plan
3.1.7 GTraining Attendance Rosters
SD-11 Closeout Submittals
3.1.3.1 SConstruction Phase
Commissioning Plan
3.2 SFinal Commissioning Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 24 PAGES
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
1.10Existing Conditions
SD-07 Certificates
1.6 GNotification
SD-11 Closeout Submittals
3.3.4Receipts
02 82 13.00 10 SD-02 Shop Drawings
1.4 GDetailed Drawings
SD-03 Product Data
3.9.3.1 GAsbestos Waste Shipment
Records
1.1Weight Bills and Delivery Tickets
2.1 GEncapsulants
1.9.1 GRespiratory Protection Program
3.9 GCleanup and Disposal
1.6.1 GQualifications
1.10Training Program
1.8.1Licenses, Permits and
Notifications
3.9.3.2 GAsbestos Management Plan
SD-06 Test Reports
3.7Exposure Assessment and Air
Monitoring
SD-07 Certificates
2.1 GEncapsulants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 24 PAGES
02 82 13.00 10 1.9Medical Surveillance
Requirements
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping System
SD-03 Product Data
2.2 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates
1.5.2Inspector Qualifications
2.2Firestopping Materials
1.5.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.2 GSealants
2.3 GPrimers
2.4 GBond Breakers
2.5 GBackstops
3.1 GField Adhesion
SD-07 Certificates
1.4.1 GIndoor Air Quality
SD-11 Closeout Submittals
2.2.1 SIndoor Air Quality For Interior
Sealants
2.2.3 SIndoor Air Quality For Interior
Floor Joint Sealants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 24 PAGES
07 92 00 2.6 SIndoor Air Quality For Interior
Caulking
21 13 13.00 10 SD-02 Shop Drawings
1.4.3 GShop Drawings
3.8As-Built Drawings
SD-03 Product Data
1.4.1Fire Protection Related
Submittals
2.3 GMaterials and Equipment
1.6Spare Parts
3.7 GPreliminary Tests
3.8 GFinal Acceptance Test
3.9 GOnsite Training
1.4.1 GFire Protection Specialist
1.4.2 GSprinkler System Installer
SD-05 Design Data
1.4.3 GSway Bracing
1.2.1.2 GHydraulic Calculations
SD-06 Test Reports
3.7Preliminary Test Report
3.8Final Acceptance Test Report
SD-07 Certificates
3.3Inspection by Fire Protection
Specialist
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 24 PAGES
21 13 13.00 10 3.9 GOperating and Maintenance
Manuals
22 00 00 SD-02 Shop Drawings
3.6.1Plumbing System
SD-03 Product Data
2.5Fixtures
1.5.1Welding
3.6.1Plumbing System
SD-06 Test Reports
3.6Tests, Flushing and Disinfection
3.6.1.1Test Of Backflow Prevention
Assemblies
SD-07 Certificates
1.3Materials and Equipment
2.2.1Bolts
SD-10 Operation and Maintenance
Data
3.6.1Plumbing System
SD-11 Closeout Submittals
2.1.1 SWater-Efficient Products
23 00 00 SD-02 Shop Drawings
1.4.5 GDetail Drawings
SD-03 Product Data
2.11.1.1Metallic Flexible Duct
2.11.1.2Insulated Nonmetallic Flexible
Duct Runouts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 24 PAGES
23 00 00 2.11.1.2Duct Connectors
2.11.2 GDuct Access Doors
2.11.3Fire Dampers
2.11.4 GManual Balancing Dampers
2.11.12.1Diffusers
2.11.12.2Registers and Grilles
2.11.13Air Vents, Penthouses, and
Goosenecks
2.12.1.1Centrifugal Type Power Roof
Ventilators
2.13.1.1 GConstant Volume, Single Duct
Terminal Units
2.13.1.2 GVariable Volume, Single Duct
Terminal Units
1.4.6Test Procedures
1.2.1.2 GDiagrams
SD-06 Test Reports
3.13 GPerformance Tests
3.11 GDamper Acceptance Test
SD-07 Certificates
1.4.3Ozone Depleting Substances
SD-08 Manufacturer’s Instructions
3.3Manufacturer's Installation
Instructions
3.15.2Operation and Maintenance
Training
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 24 PAGES
23 00 00 SD-10 Operation and Maintenance
Data
3.15.1 GOperation and Maintenance
Manuals
2.11.3 GFire Dampers
2.11.4 GManual Balancing Dampers
2.13.1.1 GConstant Volume, Single Duct
Terminal Units
2.13.1.2 GVariable Volume, Single Duct
Terminal Units
SD-11 Closeout Submittals
2.1.1 SEnergy Efficient Equipment
2.1.2 SReduce Volatile Organic
Compounds (VOC)
3.1 SIndoor Air Quality During
Construction
2.1.3 SOzone Depleting Substances for
Refrigerants
23 03 00.00 20 SD-11 Closeout Submittals
2.1.1 SEnergy Efficient Equipment for
Motors
2.1.2 SReduce Volatile Organic
Compounds (VOC)
23 05 93 SD-01 Preconstruction Submittals
GRecords of Existing Conditions
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 24 PAGES
23 05 93 1.3.3 GTAB Schematic Drawings and
Report Forms
SD-03 Product Data
1.3 GEquipment and Performance
Data
SD-06 Test Reports
GCompleted Pre-Final DALT
Report
GCertified Final DALT Report
SD-07 Certificates
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
GDALT and TAB Submittal and
Work Schedule
GTAB Pre-Field Engineering
Report
23 07 00 SD-02 Shop Drawings
3.2.2.4 GMICA Plates
2.4Pipe Insulation Systems
3.2Pipe Insulation Systems
3.3Duct Insulation Systems
3.4Equipment Insulation Systems
SD-03 Product Data
2.4 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 24 PAGES
23 07 00 3.4 GEquipment Insulation Systems
SD-04 Samples
2.3.1.3 GThermal Insulation
3.1.1 GDisplay Samples
SD-08 Manufacturer’s Instructions
2.4 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
SD-11 Closeout Submittals
2.1.1 SReduce Volatile Organic
Compounds (VOC)
2.1.2 SRecycled Content
23 09 00 SD-02 Shop Drawings
3.3 GDDC Contractor Design Drawings
3.3 GDraft As-Built Drawings
3.3 GFinal As-Built Drawings
SD-03 Product Data
1.8.1 GProgramming Software
1.8.2 GController Application Programs
2.2 GManufacturer's Product Data
2.2.1 GXIF files
3.5.3 GDraft LNS Database
3.6.4 GFinal LNS Database
1.8.3 GLNS Plug-ins
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 24 PAGES
23 09 00 3.1.1Existing Conditions Report
3.5.2 GStart-Up Testing Report
3.6.1 GPVT Procedures
3.6.3 GPVT Report
1.9.1 GPre-Construction Quality Control
(QC) Checklist
1.9.2 GPost-Construction Quality Control
(QC) Checklist
SD-10 Operation and Maintenance
Data
3.7 GOperation and Maintenance
(O&M) Instructions
3.9.1 GTraining Documentation
SD-11 Closeout Submittals
2.5 GEnclosure Keys
3.2.6.1 GPassword Summary Report
1.9.3 GCloseout Quality Control (QC)
Checklist
23 23 00 SD-02 Shop Drawings
2.3 GRefrigerant Piping System
SD-03 Product Data
2.3Refrigerant Piping System
1.5.2Spare Parts
1.3.1Qualifications
3.5Refrigerant Piping Tests
3.1Verification of Dimensions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 24 PAGES
23 23 00 SD-06 Test Reports
3.5Refrigerant Piping Tests
SD-07 Certificates
2.1Service Organization
SD-10 Operation and Maintenance
Data
1.5 GMaintenance
3.4 GOperation and Maintenance
Manuals
3.4 GDemonstrations
23 31 13.00 40 SD-01 Preconstruction Submittals
Part 2 GMaterial, Equipment, and Fixture
Lists
2.1.1 GRecords of Existing Conditions
SD-02 Shop Drawings
2.1 GConnection Diagrams
2.2.1 GOffset Fitting Configurations
SD-03 Product Data
2.1.1Equipment and Performance
Data
2.3.1 GGalvanized Steel Ductwork
Materials
2.3.2Brazing Materials
2.3.3Mill-Rolled Reinforcing and
Supporting Materials
2.2.1 GRound Sheet Metal Duct Fittings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 24 PAGES
23 31 13.00 40 2.2.2 GRound, High-Pressure, Double-Wall Sheet Metal Ducts
2.2.5 GTurning Vanes
2.2.7 GFlexible Connectors
2.2.10Flexible Duct Materials
2.2.13 GPower Operated Dampers
2.2.14 GFire Dampers and Wall Collars
2.2.12 GGravity Backdraft and Relief
Dampers
2.2.11 GManual Volume Dampers
SD-05 Design Data
2.1.1 GDesign Analysis and Calculations
SD-06 Test Reports
3.4.2 GDuctwork Leakage Tests
3.4.1 GOperational Tests
SD-07 Certificates
1.3Listing of Product Installations
2.3.1Galvanized Steel Ductwork
Materials
2.3.2Brazing Materials
2.3.3Mill-Rolled Reinforcing and
Supporting Materials
2.2.1Round Sheet Metal Duct Fittings
2.2.2Round, High-Pressure, Double-Wall Sheet Metal Ducts
2.2.5Turning Vanes
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 24 PAGES
23 31 13.00 40 2.2.6Dampers
2.2.7Flexible Connectors
SD-10 Operation and Maintenance
Data
3.5.1 GOperation and Maintenance
Manuals
2.2.13 GPower Operated Dampers
2.2.14 GFire Dampers and Wall Collars
SD-11 Closeout Submittals
3.5.2 GRecord Drawings
23 81 23.00 20 SD-03 Product Data
2.2 GComputer room air conditioning
units
2.3.2 GSpace temperature control
system drawings
2.2.4Filters
1.4Refrigerants
SD-06 Test Reports
3.4.2 GField Test Schedule
3.4.1 GManufacturer's Field Test Plans
3.4.6 GField Test Reports
2.2.2Aquatic Toxicity
SD-07 Certificates
3.4.3 GCredentials of the Manufacturer's
Field Test Representative
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 24 PAGES
23 81 23.00 20 3.2.2Installation Manual for Each Type of CRACU
SD-10 Operation and Maintenance
Data
2.2 GComputer Room Air Conditioning
Units
SD-11 Closeout Submittals
2.1.1 SEnergy Efficient Equipment for
Computer Room Air Conditioning
Units
2.1.2 SOzone Depleting Substances
3.1.1 SIndoor Air Quality During
Construction
25 10 10 SD-02 Shop Drawings
3.2.2UMCS Contractor Design
Drawings
3.2.3Draft As-Built Drawings
3.2.3Final As-Built Drawings
SD-03 Product Data
2.1.5Product Data Sheets
2.4Computer Software
2.6.1Enclosure Keys
SD-05 Design Data
3.2.1UMCS IP Network Bandwidth
Usage Estimate
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 24 PAGES
25 10 10 1.6Pre-Construction QC Checklist
1.6Post-Construction QC Checklist
3.1Existing Conditions Report
3.6 GStart-Up and Start-Up Testing
Report
3.7.1PVT Phase I Procedures
3.7.2 GPVT Phase I Report
3.7.3 GPVT Phase II Report
SD-10 Operation and Maintenance
Data
1.7Operation and Maintenance
(O&M) Instructions
3.8.8.1Preventive Maintenance Work
Plan
3.9.1Basic Training Documentation
3.9.1Advanced Training
Documentation
3.9.1Refresher Training
Documentation
SD-11 Closeout Submittals
1.6Closeout QC Checklist
26 20 00 SD-02 Shop Drawings
2.12 GPanelboards
2.14 GTransformers
2.3 GBusway
GCable trays
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 24 PAGES
26 20 00 SD-03 Product Data
2.11 GReceptacles
2.12.3 GCircuit breakers
2.9 GSwitches
2.14 GTransformers
2.13 GEnclosed circuit breakers
2.23 GSurge protective devices
SD-06 Test Reports
3.5.2 G600-volt wiring test
3.5.5 GGrounding system test
3.5.3 GTransformer tests
3.5.4 GGround-fault receptacle test
SD-07 Certificates
2.10 GFuses
26 28 21.00 40 SD-02 Shop Drawings
2.1 GConnection Diagrams
2.1 GFabrication Drawings
2.1 GInstallation Drawings
SD-03 Product Data
2.1 GEquipment and Performance
Data
2.2.1 GContacts
2.2.2 GIndicating Lights
2.2.3 GTerminal Board
2.2.5 GEnclosures
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 24 PAGES
26 28 21.00 40 2.3.1 GQualification Testing
2.3.1 GOperation Tests
SD-07 Certificates
1.3.1 GListing of Product Installations
SD-08 Manufacturer’s Instructions
3.1Manufacturer's Instructions
26 32 14.00 10 SD-02 Shop Drawings
1.4.5 GDetailed Drawings
3.11 GAcceptance
SD-03 Product Data
2.4Manufacturer's Catalog
3.10 GInstructions
1.4.3Experience
1.4.4Field Engineer
1.4.2Site Welding
3.2General Installation
3.1Site Visit
SD-05 Design Data
2.8 GSound Limitations
2.14Generator
2.5.4Integral Main Fuel Storage Tank
Day Tank
3.6.2.2Power Factor
2.7.2Heat Exchanger
2.18.5Time-Delay on Alarms
2.7Cooling System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 24 PAGES
26 32 14.00 10 1.2.5Vibration Isolation
SD-06 Test Reports
3.6.6Performance Tests
3.6 GOnsite Inspection and Tests
SD-07 Certificates
1.2.5Vibration Isolation
3.4Prototype Tests
1.2.6Reliability and Durability
2.11Emissions
2.8Sound limitations
2.14.1Current Balance
2.3Materials and Equipment
2.27Factory Inspection and Tests
3.6.4Inspections
2.7Cooling System
SD-10 Operation and Maintenance
Data
1.6.1 GOperation Manual
1.6.2 GMaintenance Manual
1.6.3Extra Materials
26 33 53.00 20 SD-02 Shop Drawings
GUPS Drawings
GUPS Installation
SD-03 Product Data
GBATTERY Module
2.10Factory Testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 24 PAGES
26 33 53.00 20 BATTERY System
SD-06 Test Reports
1.6.3 GWork Plan
1.6.4 GFactory Test Plan
1.6.5 GPerformance Test Plan
GFactory Tests
1.6.7 GPerformance Tests Report
1.6.6 GFactory Tests Report
SD-09 Manufacturer’s Field
Reports
3.2.2 GInitial Inspection and Tests
3.2.3 GPerformance Tests
SD-10 Operation and Maintenance
Data
1.10.1 GUPS Operation and Maintenance
SD-11 Closeout Submittals
3.1Installation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
a description of work covered in this contract and is required for use in all projects
PART 1 GENERAL
1.1 SUBMITTALS
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
1.2.2 Regulatory Requirements
1.2.3 Warranty Requiremnts
1.2.4 Pre Design and Pre Construction Conferences
1.2.5 Location
1.3 OCCUPANCY OF PREMISES
1.4 SURVEY AND VERIFICATION OF EXISTING CONDITIONS
1.5 EXISTING WORK
1.6 LOCATION OF UNDERGROUND UTILITIES
1.6.1 Notification Prior to Excavation
1.7 SALVAGE MATERIAL AND EQUIPMENT
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
MXDP 16-1053 SECTION 01 11 00
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals Salvage Plan ; G
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work includes : updates to the existing Uninterruptible Power Supply (UPS) systems t Building 328 and the HVAC system that supplies the rooms and incidental related work. Provide all documents, labor, materials, equipment, nd oversight to upgrade the existig Uninterruptable Power Supply (UPS) and Heating, Ventilation & Air Conditioning (HVAC systems at Building 328. The UPS system was installed to provide stability and surge protection for the T-1, T-6, and T-38 Flight Simulators and is currently offline due to the batteries in the two of the UPS units overheating, which resulted in two thermal runaway incidents and hazardous conditions in the building to the extent tht the uilding had to be evacuated.
Upgrades to the UPS system shall include the installation of stationary battery monitoring and controls to remotely monitor, control and alarm key personnel of an impending suystem failure. In addition, the HVAAAC system, that supplies conditioned air to pump rooms where the UPS units are installed, shall be upgraded to efffectively condition the space and externally exhaust the air fumes generated from the rooms. Currently, the rooms are not adequately conditioned ti maintain the ambient temperatures below the manufacturer's recommendations, resulting in the batteries in the UPS units overheating and failing. In addition, the exhaust return air in the rooms is being recirculated thru the air handlers that serve occupied spaces, which is a code violation. Work shall also include, bringing the UPS system and the HVAC system that supplies and exhaust conditioned air to/from the room, into compliance with all necessary codes for Valve Regulated Lead Acid (VRLA) Storage Batteries for Stationary Applications.
The upgraded UPS storage battery monitoring system shall be required to tie into the existing base Fire Department Emergency Communication Center
(ECC).
1.2.2 Regulatory Requirements
a. The project shall conform to all applicable Federal, State and local laws, regulations and base- specific standards and applicable
Unified Facilities Criteria (UFC). Where there is a conflict between the referenced standards, the most stringent shall take precedence.
All work accomplished by the Contractor shall comply with these criteria unless a waiver is obtained from Laughlin AFB when conditions warrant such consideration
b. The Contractor shall ensure that only qualified, competent personnel carry out the tasks outlined in the Statement Of Work (SOW) or Statement of Objectives (SOO). Competent is defined as a registered professional or, where registration is not applicable, trained and/or certified in the respective field
1.2.3 Warranty Requiremnts
a. The General Contractor shall provide a 1-year all warranty for all work associated with this contract.
1.2.4 Pre Design and Pre Construction Conferences
Prior to commencing design or construction work, the Contractor shall meet with the Contracting Officer's Representative (COR) and other designated technical personnel at a mutually agreeable time to discuss and develop mutual understandings concerning the design and construction progress schedule and the administration of work
1.2.5 Location
The work is located at the Laughlin Air Force Base Building 328 , approximately as indicated. The exact location will be shown by the Contracting Officer.
1.3 OCCUPANCY OF PREMISES
Building 328 will be occupied during performance of work under this Contract.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.4 SURVEY AND VERIFICATION OF EXISTING CONDITIONS
The Contractor shall perform all surveying necessary to complete the work and shall be solely responsible for verification and validation of existing conditions, coordination of existing conditions in parallel with proposed requirements, and above- and below-grade condition assessment.
Use of existing condition data provided by the Air Force does not relieve the Contractor of liability.
1.5 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
c. The contractor shall investigate the adequacy of existing raods and their allowable load liimit and shall repair any damage to existing raods caused by construction operations at no additional cost to the Governemt.
d. Vehicular traffic on concrete walkway pavement shall be restricted to equipment with pneumatic tires.
e. All work that must cross existing roads shal be accomplished by boring, rateht than trenching. Trenching may ne approved in special circumstances, but the Contractor shall not expect this or rely in it unless specified in the contract documents.
1.6 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.
Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed.
1.6.1 Notification Prior to Excavation
Notify the Contracting Officer at least 15 days prior to starting excavation work.
1.7 SALVAGE MATERIAL AND EQUIPMENT
Equipment and materials (i.e., signs) removed during construction shall be salvaged (as applicable) and installed at their original location or at the new location as needed or identified by the Contracting Officer prior to acceptance of the work.
Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the storage area located within 100 miles of the construction site.
Provide a salvage plan , listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 14 00
WORK RESTRICTIONS
work and site restrictions
PART 1 GENERAL
1.1 SUBMITTALS
1.2 CONTRACTOR ACCESS AND USE OF PREMISES
1.2.1 Supervision of Work
1.2.2 Activity Regulations
1.2.2.1 Safety Assurance
1.2.2.2 Subcontractors and Personnel Contacts
1.2.2.3 No Smoking Policy
1.2.2.3.1 AETC Smoking Policy
1.2.3 Working Hours
1.2.4 Work Outside Regular Hours
1.2.5 Exclusionary Period
1.2.6 Occupied Building
1.2.7 Utility Cutovers and Interruptions
1.3 SUBCONTRACTORS RESPONSIBILITIES
1.4 NOTIFICATION REQUIREMENT WHEN CHANGING KEY PERSONNAL
1.5 SECURITY REQUIREMENTS
1.5.1 Criminal Background Investigation Check
1.5.2 Base Policies
1.6 CONTRACTOR PARKING
1.7 TRANSPORTATION OF CONSTRUCTION EQUIPMENT
1.8 UNAUTHORIZED RECONNAISSANCE
1.9 WORK BY THE GOVERNMENT
1.10 GOVERNMENT LIABILITY
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
MXDP 16-1053 SECTION 01 14 00
SECTION 01 14 00
WORK RESTRICTIONS
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel ; G
1.2 CONTRACTOR ACCESS AND USE OF PREMISES
1.2.1 Supervision of Work
a. The site superintendent or approved alternate and Quality Control Manager (QC) or approved alternate shall be on the job site any time work is being accomplished. THE QC AND SUPERINTENDENT MUST BOTH BE
ONSITE DURING WORK.
b. The qualifications of the superintendent, QC, and alternates shall be approved by the Contracting Officer prior to assuming their responsibilities and shall include a minimum of five years' experience on similar projects. Qualifications shall be submitted to the Contracting Officer in resume format prior to the start of construction
c. The on-site superintendent shall be reachable by telephone at all times when work is being accomplished. The Contractor's superintendent or contract manager shall be reachable by telephone 24 hours a day, seven days a week, for the duration of the contract.
1.2.2 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.
1.2.2.1 Safety Assurance
a. Post award Safety Meeting: Representatives of the contractor shall meet with the Contracting Officer and his/her representative(s) prior to the start of repair, alteration or construction activities for the purpose of reviewing the contractor's safety and health programs and discussing implementation of all safety and health provisions pertinent to the work to be performed under the contract. The contractor shall be prepared to discuss, in detail, the measures he/she intends to take in order to control any unsafe or unhealthy conditions associated with the work to be performed under the contract. This meeting may be held in conjunction with the pre-construction conference, if so directed by the Contracting Officer. The conduct of this meeting is not contingent upon a general pre-construction meeting. The level of detail for the safety meeting is dependent upon the nature of the work and the potential inherent hazards. The contractor's principal on site representative(s), the general superintendent, and his/her safety representative(s) shall attend this meeting.
b. Contractor Responsibility: The contractor shall assume full responsibility and liability for compliance with the applicable regulations pertaining to the health and safety of personnel during the execution of work and shall hold the Government harmless for any action on his part or that of his employees or subcontractors which results in illness, injury or death.
c. Inspections, Tests, and Reports: The inspections, tests and reports made by the contractor, subcontractors, specially trained technicians, equipment manufacturers, and others as required by a CLIN, shall be furnished in accordance with the terms of the contract.
A report shall consist of the results of lab tests.
d. Materials and Equipment: Special facilities, devices, equipment, clothing, and similar items used by the contractor in the execution of work shall comply with the applicable regulations.
e. Hazardous Materials: The contractor shall bring to the attention of the Contracting Officer any previously unknown material suspected of being hazardous which he encounters during execution of the work. A determination will be made by the Contracting Officer as to whether the contractor shall perform tests to determine if the material is hazardous. If the Contracting Officer directs the contractor to perform tests, and/or if the material is found hazardous and additional protective measures are needed, a contract change may be required, subject to equitable adjustment under the terms of the contract.
1.2.2.2 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.2.2.3 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
1.2.2.3.1 AETC Smoking Policy
Contractors are advised that the Commander has placed restrictions on the smoking of tobacco products in AETC facilities. AFI 40-102, Tobacco Use in the Air Force, and its AETC Supplement 1, outlines the procedures used by the Commander to control smoking in our facilities. Contractor employees are subject to the same restrictions as government personnel. Smoking is permitted only in designated smoking areas.Text
1.2.3 Working Hours
Regular working hours must consist of an 9 hour period established by the Contracting Officer, between 7:30 a.m. and 4:30 p.m., Monday through Friday, , excluding Government holidays , with no work expected on weekends.
1.2.4 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer.
For those activities when work is prohibited, the Contractor shall have all equipment and materials removed and/or shall organize materials and equipment on the site as directed by the Contracting Officer. The Contractor shall have all the areas cleaned.
The Contractor's personnel shall present a neat appearance and be easily recognized. This may be accomplished by distinctive clothing bearing the name of the company or by wearing employee badges, which contain the company and the employee name. The Contractor's personnel shall be responsible for wearing personal protection equipment throughout the execution of the project. The Contractor assumes responsibility for these actions of all the employees, subcontractors, and suppliers when on Laughlin AFB.
1.2.5 Exclusionary Period
No work must be performed during the period of quiet times for special events. Graduation ceremonies typically occur once every three weeks and require quiet times from 1600 to 2000 on Thursday and Friday morning.
Times may vary. Unplanned events may occur during the life of the project. Coordinate with the Contracting Officer for specific dates and times as the project progresses. This period has not been considered in computing the time allowed for the performance of this contract.
1.2.6 Occupied Building
The Contractor shall be working in an existing building which isoccupied.
Do not enter the building without prior approval of the Contracting Officer.
The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.
Provide dust covers or protective enclosures to protect existing work that remains and Government material located in the B328 during the construction period.
1.2.7 Utility Cutovers and Interruptions
a. Any utility and communications outages necessitated by the work shall be requested in writing at least 14 calendar days prior to the proposed outage. The request shall be directed to the Contracting Officer and shall stipulate the specific utility system(s) to be affected and the proposed duration for the outage. Primary electrical outages including those that require power to be shut of at the transformer must be requested,in writing, 21 calendar days in advance, no exceptions.
b. If utilities are considered main utilities (water mains, overhead electrical, etc.) then 47 CES must provide the shutdown , but all other utilities should be de-energized or disconnected by the Contractor. The Contractor will provide the necessary lock-out tags devices to ensure utilities will not be energized or turned on. The Contractor shall coordinate lockout/tagout with the 47 CES/CENMP. .
c. All street and parking lot closures necessitated by the work shall be requested in writing at least 14 calendar days prior to the proposed closure. The Contractor shall comply with the recommendations contained in Part 6 of the U.S. Department of Transportation, Federal Highway Administration's Manuel on Uniform Traffic Control Devices and TxDOT'S Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges to ensure proper warning to motorists.
Adequate traffic control devices shall be provided by the Contractor.
The Contractor shall submit a complete traffic control plan for approval by the base. Work cannot begin until the traffic control plan is approved.
d. All base gate closures necessitated by the work shall be requested in writing at least 45 calendar days prior to the proposed closure.
1.3 SUBCONTRACTORS RESPONSIBILITIES
The Contractor will be responsible for the management and performance of all subcontractors.