Table 1
| SUBMITTAL REGISTER | CONTRACT NO. | |||
| TITLE AND LOCATION | ||||
| LAFB Bldg. 328 UPS/HVAC | CONTRACTOR | |||
| A C T I V I T Y | ||||
| N O | T R A N S M I T T A L | |||
| N O | S P E C | |||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 01 11 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Salvage Plan | 1.7 | G | ||||||||||||||||
| 01 14 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| List of Contact Personnel | 1.3.2.2 | G | ||||||||||||||||
| 01 32 01.00 10 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Project Scheduler Qualifications | 1.3 | G | ||||||||||||||||
| Preliminary Project Schedule | 3.5.1 | G | ||||||||||||||||
| Initial Project Schedule | 3.5.2 | G | ||||||||||||||||
| Periodic Schedule Update | 3.7.2 | G | ||||||||||||||||
| 01 32 16.00 20 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Construction Schedule | 1.2 | G | ||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Monthly Updates | 1.4 | |||||||||||||||||
| 01 33 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Submittal Register | 1.7 | G | ||||||||||||||||
| 01 33 29 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Preliminary High Performance | 1.4.3.1 | G | ||||||||||||||||
| and Sustainable Building Checkli | st | |||||||||||||||||
| Preliminary Sustainability | 1.4.3.1 | G | ||||||||||||||||
| eNotebook | ||||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Final High Performance and | 1.4.3.1 | G | ||||||||||||||||
| Sustainable Building Checklist | ||||||||||||||||||
| Final Sustainability eNotebook | 1.4.3.1 | G | ||||||||||||||||
| Amended Final Sustainability | 1.4.3.1 | G | ||||||||||||||||
| eNotebook | ||||||||||||||||||
| 01 33 29 | Amended Final High | 1.4.3.1 | G | |||||||||||||||
| Performance and Sustainable | ||||||||||||||||||
| Building Checklist | ||||||||||||||||||
| 01 35 26 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Accident Prevention Plan (APP) | 1.10 | G | ||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Monthly Exposure Reports | 1.4 | |||||||||||||||||
| Notifications and Reports | 1.16 | |||||||||||||||||
| Accident Reports | 1.16.2 | G | ||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Activity Hazard Analysis (AHA) | 1.12 | |||||||||||||||||
| Confined Space Entry Permit | 1.13.1 | |||||||||||||||||
| Hot Work Permit | 1.13.1 | |||||||||||||||||
| 01 45 00.00 10 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Contractor Quality Control (CQC) | 3.2 | G | ||||||||||||||||
| Plan | ||||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Verification Statement | 3.9.2 | |||||||||||||||||
| 01 50 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Construction Site Plan | 1.3 | G | ||||||||||||||||
| Traffic Control Plan | 3.7.1 | G | ||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Backflow Preventer Tests | ||||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Backflow Tester | ||||||||||||||||||
| Backflow Preventers | ||||||||||||||||||
| 01 57 19 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Preconstruction Survey | 1.8.1 | |||||||||||||||||
| Solid Waste Management Permit | 1.12 | G | ||||||||||||||||
| Regulatory Notifications | 1.8.2 | G | ||||||||||||||||
| Environmental Protection Plan | 1.9 | G | ||||||||||||||||
| Dirt and Dust Control Plan | 1.9.9.1 | G | ||||||||||||||||
| Employee Training Records | 1.8.5 | G | ||||||||||||||||
| Environmental Manager | 1.8.4 | G | ||||||||||||||||
| Qualifications | ||||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Laboratory Analysis | 3.6.1.1.2 | |||||||||||||||||
| Solid Waste Management Report | 3.6.2.1 | G | ||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Employee Training Records | 1.8.5 | G | ||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Waste Determination | 3.6.1 | G | ||||||||||||||||
| Documentation | ||||||||||||||||||
| Disposal Documentation for | 3.6.3.6 | G | ||||||||||||||||
| Hazardous and Regulated Waste | ||||||||||||||||||
| Assembled Employee Training | 1.8.5 | G | ||||||||||||||||
| Records | ||||||||||||||||||
| Solid Waste Management Permit | 1.12 | G | ||||||||||||||||
| Solid Waste Management Report | 3.6.2.1 | G | ||||||||||||||||
| Hazardous Waste/Debris | 3.6.3.1 | G | ||||||||||||||||
| Management | ||||||||||||||||||
| Regulatory Notifications | 1.8.2 | G | ||||||||||||||||
| 01 57 19 | Sales Documentation | 3.6.2.1 | G | |||||||||||||||
| 01 78 00 | SD-03 Product Data | |||||||||||||||||
| Warranty Management Plan | 1.6.2 | |||||||||||||||||
| Warranty Tags | 1.6.5 | |||||||||||||||||
| Spare Parts Data | 1.5 | |||||||||||||||||
| SD-08 Manufacturer’s Instructions | ||||||||||||||||||
| Instructions | 1.6.2 | |||||||||||||||||
| SD-10 Operation and Maintenance | ||||||||||||||||||
| Data | ||||||||||||||||||
| Operation and Maintenance | 3.3 | G | ||||||||||||||||
| Manuals | ||||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| As-Built Drawings | 3.1 | G | ||||||||||||||||
| Record Drawings | 3.2 | G | ||||||||||||||||
| Final Approved Shop Drawings | ||||||||||||||||||
| Construction Contract | ||||||||||||||||||
| Specifications | ||||||||||||||||||
| Certification of EPA Designated | 2.1 | G | ||||||||||||||||
| Items | ||||||||||||||||||
| 01 78 23 | SD-10 Operation and Maintenance | |||||||||||||||||
| Data | ||||||||||||||||||
| O&M Database | 1.4 | G | ||||||||||||||||
| Training Plan | 3.1.1 | G | ||||||||||||||||
| Training Outline | 3.1.3 | G | ||||||||||||||||
| Training Content | 3.1.2 | G | ||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| 01 78 23 | Training Video Recording | 3.1.4 | G | |||||||||||||||
| Validation of Training Completion | 3.1.6 | G | ||||||||||||||||
| 01 86 12.07 40 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Quality Control Plan | 1.3 | G | ||||||||||||||||
| Material, Equipment, and Fixture | 2.2 | G | ||||||||||||||||
| Lists | ||||||||||||||||||
| SD-02 Shop Drawings | ||||||||||||||||||
| Connection Diagrams | 3.2 | G | ||||||||||||||||
| Fabrication Drawings | 2.2.1 | G | ||||||||||||||||
| Installation Drawings | 3.2 | G | ||||||||||||||||
| SD-03 Product Data | ||||||||||||||||||
| Manufacturer's Catalog Data | 2.2.1 | G | ||||||||||||||||
| Equipment Foundation Data | 2.2.1 | G | ||||||||||||||||
| Specific Equipment Data | 2.2.2 | G | ||||||||||||||||
| Spare Parts List | 2.2.3 | G | ||||||||||||||||
| Warranty | 1.4 | G | ||||||||||||||||
| SD-08 Manufacturer’s Instructions | ||||||||||||||||||
| Manufacturer's Instructions | 3.2 | G | ||||||||||||||||
| SD-10 Operation and Maintenance | ||||||||||||||||||
| Data | ||||||||||||||||||
| Operations and Maintenance | 3.4 | G | ||||||||||||||||
| Manuals | ||||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Record Drawings | 3.2 | G | ||||||||||||||||
| Acceptance Documentation | 3.5 | G | ||||||||||||||||
| 01 91 00.15 | SD-01 Preconstruction Submittals | |||||||||||||||||
| 01 91 00.15 | Commissioning Firm | 1.7 | G | |||||||||||||||
| Lead Commissioning Specialist | 1.7.1 | G | ||||||||||||||||
| Technical Commissioning | 1.7.2 | G | ||||||||||||||||
| Specialists | ||||||||||||||||||
| Commissioning Firm's Contract | G | |||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Design Review Report | 3.1.4 | G | ||||||||||||||||
| Interim Construction Phase | 3.1.3.1 | G | ||||||||||||||||
| Commissioning Plan | ||||||||||||||||||
| Final Construction Phase | 3.1.3.2 | G | ||||||||||||||||
| Commissioning Plan | ||||||||||||||||||
| Pre-Functional Checklists | 3.1.6.2 | G | ||||||||||||||||
| Issues Log | 1.9 | |||||||||||||||||
| Commissioning Report | 3.2 | G | ||||||||||||||||
| Post-Construction Trend Log | 3.3.1 | G | ||||||||||||||||
| Report | ||||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Certificate of Readiness | 1.10 | G | ||||||||||||||||
| SD-10 Operation and Maintenance | ||||||||||||||||||
| Data | ||||||||||||||||||
| Training Plan | 3.1.7 | G | ||||||||||||||||
| Training Attendance Rosters | 3.1.7 | G | ||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Construction Phase | 3.1.3.1 | S | ||||||||||||||||
| Commissioning Plan | ||||||||||||||||||
| Final Commissioning Report | 3.2 | S | ||||||||||||||||
| 02 41 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Demolition Plan | 1.2.1 | G | ||||||||||||||||
| Existing Conditions | 1.10 | |||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Notification | 1.6 | G | ||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Receipts | 3.3.4 | |||||||||||||||||
| 02 82 13.00 10 | SD-02 Shop Drawings | |||||||||||||||||
| Detailed Drawings | 1.4 | G | ||||||||||||||||
| SD-03 Product Data | ||||||||||||||||||
| Asbestos Waste Shipment | 3.9.3.1 | G | ||||||||||||||||
| Records | ||||||||||||||||||
| Weight Bills and Delivery Tickets | 1.1 | |||||||||||||||||
| Encapsulants | 2.1 | G | ||||||||||||||||
| Respiratory Protection Program | 1.9.1 | G | ||||||||||||||||
| Cleanup and Disposal | 3.9 | G | ||||||||||||||||
| Qualifications | 1.6.1 | G | ||||||||||||||||
| Training Program | 1.10 | |||||||||||||||||
| Licenses, Permits and | 1.8.1 | |||||||||||||||||
| Notifications | ||||||||||||||||||
| Asbestos Management Plan | 3.9.3.2 | G | ||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Exposure Assessment and Air | 3.7 | |||||||||||||||||
| Monitoring | ||||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Encapsulants | 2.1 | G | ||||||||||||||||
| 02 82 13.00 10 | Medical Surveillance | 1.9 | ||||||||||||||||
| Requirements | ||||||||||||||||||
| 07 84 00 | SD-02 Shop Drawings | |||||||||||||||||
| Firestopping System | 2.1 | G | ||||||||||||||||
| SD-03 Product Data | ||||||||||||||||||
| Firestopping Materials | 2.2 | G | ||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Inspection | 3.3 | G | ||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Inspector Qualifications | 1.5.2 | |||||||||||||||||
| Firestopping Materials | 2.2 | |||||||||||||||||
| Installer Qualifications | 1.5.1 | G | ||||||||||||||||
| 07 92 00 | SD-03 Product Data | |||||||||||||||||
| Sealants | 2.2 | G | ||||||||||||||||
| Primers | 2.3 | G | ||||||||||||||||
| Bond Breakers | 2.4 | G | ||||||||||||||||
| Backstops | 2.5 | G | ||||||||||||||||
| Field Adhesion | 3.1 | G | ||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Indoor Air Quality | 1.4.1 | G | ||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Indoor Air Quality For Interior | 2.2.1 | S | ||||||||||||||||
| Sealants | ||||||||||||||||||
| Indoor Air Quality For Interior | 2.2.3 | S | ||||||||||||||||
| Floor Joint Sealants |
| 07 92 00 | Indoor Air Quality For Interior | 2.6 | S |
| Caulking | |||
| 21 13 13.00 10 | SD-02 Shop Drawings | ||
| Shop Drawings | 1.4.3 | G | |
| As-Built Drawings | 3.8 | ||
| SD-03 Product Data | |||
| Fire Protection Related | 1.4.1 | ||
| Submittals | |||
| Materials and Equipment | 2.3 | G | |
| Spare Parts | 1.6 | ||
| Preliminary Tests | 3.7 | G | |
| Final Acceptance Test | 3.8 | G | |
| Onsite Training | 3.9 | G | |
| Fire Protection Specialist | 1.4.1 | G | |
| Sprinkler System Installer | 1.4.2 | G | |
| SD-05 Design Data | |||
| Sway Bracing | 1.4.3 | G | |
| Hydraulic Calculations | 1.2.1.2 | G | |
| SD-06 Test Reports | |||
| Preliminary Test Report | 3.7 | ||
| Final Acceptance Test Report | 3.8 | ||
| SD-07 Certificates | |||
| Inspection by Fire Protection | 3.3 | ||
| Specialist | |||
| SD-10 Operation and Maintenance | |||
| Data | |||
| 21 13 13.00 10 | Operating and Maintenance | 3.9 | G |
| Manuals | |||
| 22 00 00 | SD-02 Shop Drawings | ||
| Plumbing System | 3.6.1 | ||
| SD-03 Product Data | |||
| Fixtures | 2.5 | ||
| Welding | 1.5.1 | ||
| Plumbing System | 3.6.1 | ||
| SD-06 Test Reports | |||
| Tests, Flushing and Disinfection | 3.6 | ||
| Test Of Backflow Prevention | 3.6.1.1 | ||
| Assemblies | |||
| SD-07 Certificates | |||
| Materials and Equipment | 1.3 | ||
| Bolts | 2.2.1 | ||
| SD-10 Operation and Maintenance | |||
| Data | |||
| Plumbing System | 3.6.1 | ||
| SD-11 Closeout Submittals | |||
| Water-Efficient Products | 2.1.1 | S | |
| 23 00 00 | SD-02 Shop Drawings | ||
| Detail Drawings | 1.4.5 | G | |
| SD-03 Product Data | |||
| Metallic Flexible Duct | 2.11.1.1 | ||
| Insulated Nonmetallic Flexible | 2.11.1.2 | ||
| Duct Runouts | |||
| 23 00 00 | Duct Connectors | 2.11.1.2 | |
| Duct Access Doors | 2.11.2 | G | |
| Fire Dampers | 2.11.3 | ||
| Manual Balancing Dampers | 2.11.4 | G | |
| Diffusers | 2.11.12.1 | ||
| Registers and Grilles | 2.11.12.2 | ||
| Air Vents, Penthouses, and | 2.11.13 | ||
| Goosenecks | |||
| Centrifugal Type Power Roof | 2.12.1.1 | ||
| Ventilators | |||
| Constant Volume, Single Duct | 2.13.1.1 | G | |
| Terminal Units | |||
| Variable Volume, Single Duct | 2.13.1.2 | G | |
| Terminal Units | |||
| Test Procedures | 1.4.6 | ||
| Diagrams | 1.2.1.2 | G | |
| SD-06 Test Reports | |||
| Performance Tests | 3.13 | G | |
| Damper Acceptance Test | 3.11 | G | |
| SD-07 Certificates | |||
| Ozone Depleting Substances | 1.4.3 | ||
| SD-08 Manufacturer’s Instructions | |||
| Manufacturer's Installation | 3.3 | ||
| Instructions | |||
| Operation and Maintenance | 3.15.2 | ||
| Training | |||
| 23 00 00 | SD-10 Operation and Maintenance | ||
| Data | |||
| Operation and Maintenance | 3.15.1 | G | |
| Manuals | |||
| Fire Dampers | 2.11.3 | G | |
| Manual Balancing Dampers | 2.11.4 | G | |
| Constant Volume, Single Duct | 2.13.1.1 | G | |
| Terminal Units | |||
| Variable Volume, Single Duct | 2.13.1.2 | G | |
| Terminal Units | |||
| SD-11 Closeout Submittals | |||
| Energy Efficient Equipment | 2.1.1 | S | |
| Reduce Volatile Organic | 2.1.2 | S | |
| Compounds (VOC) | |||
| Indoor Air Quality During | 3.1 | S | |
| Construction | |||
| Ozone Depleting Substances for | 2.1.3 | S | |
| Refrigerants | |||
| 23 03 00.00 20 | SD-11 Closeout Submittals | ||
| Energy Efficient Equipment for | 2.1.1 | S | |
| Motors | |||
| Reduce Volatile Organic | 2.1.2 | S | |
| Compounds (VOC) | |||
| 23 05 93 | SD-01 Preconstruction Submittals | ||
| Records of Existing Conditions | G | ||
| SD-02 Shop Drawings | |||
| 23 05 93 | TAB Schematic Drawings and | 1.3.3 | G |
| Report Forms | |||
| SD-03 Product Data | |||
| Equipment and Performance | 1.3 | G | |
| Data | |||
| SD-06 Test Reports | |||
| Completed Pre-Final DALT | G | ||
| Report | |||
| Certified Final DALT Report | G | ||
| SD-07 Certificates | |||
| Independent TAB Agency and | 1.5.1 | G | |
| Personnel Qualifications | |||
| DALT and TAB Submittal and | G | ||
| Work Schedule | |||
| TAB Pre-Field Engineering | G | ||
| Report | |||
| 23 07 00 | SD-02 Shop Drawings | ||
| MICA Plates | 3.2.2.4 | G | |
| Pipe Insulation Systems | 2.4 | ||
| Pipe Insulation Systems | 3.2 | ||
| Duct Insulation Systems | 3.3 | ||
| Equipment Insulation Systems | 3.4 | ||
| SD-03 Product Data | |||
| Pipe Insulation Systems | 2.4 | G | |
| Pipe Insulation Systems | 3.2 | G | |
| Duct Insulation Systems | 3.3 | G | |
| 23 07 00 | Equipment Insulation Systems | 3.4 | G |
| SD-04 Samples | |||
| Thermal Insulation | 2.3.1.3 | G | |
| Display Samples | 3.1.1 | G | |
| SD-08 Manufacturer’s Instructions | |||
| Pipe Insulation Systems | 2.4 | G | |
| Pipe Insulation Systems | 3.2 | G | |
| Duct Insulation Systems | 3.3 | G | |
| Equipment Insulation Systems | 3.4 | G | |
| SD-11 Closeout Submittals | |||
| Reduce Volatile Organic | 2.1.1 | S | |
| Compounds (VOC) | |||
| Recycled Content | 2.1.2 | S | |
| 23 09 00 | SD-02 Shop Drawings | ||
| DDC Contractor Design Drawings | 3.3 | G | |
| Draft As-Built Drawings | 3.3 | G | |
| Final As-Built Drawings | 3.3 | G | |
| SD-03 Product Data | |||
| Programming Software | 1.8.1 | G | |
| Controller Application Programs | 1.8.2 | G | |
| Manufacturer's Product Data | 2.2 | G | |
| XIF files | 2.2.1 | G | |
| Draft LNS Database | 3.5.3 | G | |
| Final LNS Database | 3.6.4 | G | |
| LNS Plug-ins | 1.8.3 | G | |
| SD-06 Test Reports | |||
| 23 09 00 | Existing Conditions Report | 3.1.1 | |
| Start-Up Testing Report | 3.5.2 | G | |
| PVT Procedures | 3.6.1 | G | |
| PVT Report | 3.6.3 | G | |
| Pre-Construction Quality Control | 1.9.1 | G | |
| (QC) Checklist | |||
| Post-Construction Quality Control | 1.9.2 | G | |
| (QC) Checklist | |||
| SD-10 Operation and Maintenance | |||
| Data | |||
| Operation and Maintenance | 3.7 | G | |
| (O&M) Instructions | |||
| Training Documentation | 3.9.1 | G | |
| SD-11 Closeout Submittals | |||
| Enclosure Keys | 2.5 | G | |
| Password Summary Report | 3.2.6.1 | G | |
| Closeout Quality Control (QC) | 1.9.3 | G | |
| Checklist | |||
| 23 23 00 | SD-02 Shop Drawings | ||
| Refrigerant Piping System | 2.3 | G | |
| SD-03 Product Data | |||
| Refrigerant Piping System | 2.3 | ||
| Spare Parts | 1.5.2 | ||
| Qualifications | 1.3.1 | ||
| Refrigerant Piping Tests | 3.5 | ||
| Verification of Dimensions | 3.1 | ||
| 23 23 00 | SD-06 Test Reports | ||
| Refrigerant Piping Tests | 3.5 | ||
| SD-07 Certificates | |||
| Service Organization | 2.1 | ||
| SD-10 Operation and Maintenance | |||
| Data | |||
| Maintenance | 1.5 | G | |
| Operation and Maintenance | 3.4 | G | |
| Manuals | |||
| Demonstrations | 3.4 | G | |
| 23 31 13.00 40 | SD-01 Preconstruction Submittals | ||
| Material, Equipment, and Fixture | Part 2 | G | |
| Lists | |||
| Records of Existing Conditions | 2.1.1 | G | |
| SD-02 Shop Drawings | |||
| Connection Diagrams | 2.1 | G | |
| Offset Fitting Configurations | 2.2.1 | G | |
| SD-03 Product Data | |||
| Equipment and Performance | 2.1.1 | ||
| Data | |||
| Galvanized Steel Ductwork | 2.3.1 | G | |
| Materials | |||
| Brazing Materials | 2.3.2 | ||
| Mill-Rolled Reinforcing and | 2.3.3 | ||
| Supporting Materials | |||
| Round Sheet Metal Duct Fittings | 2.2.1 | G | |
| 23 31 13.00 40 | Round, High-Pressure, | 2.2.2 | G |
| Double-Wall Sheet Metal Ducts | |||
| Turning Vanes | 2.2.5 | G | |
| Flexible Connectors | 2.2.7 | G | |
| Flexible Duct Materials | 2.2.10 | ||
| Power Operated Dampers | 2.2.13 | G | |
| Fire Dampers and Wall Collars | 2.2.14 | G | |
| Gravity Backdraft and Relief | 2.2.12 | G | |
| Dampers | |||
| Manual Volume Dampers | 2.2.11 | G | |
| SD-05 Design Data | |||
| Design Analysis and Calculations | 2.1.1 | G | |
| SD-06 Test Reports | |||
| Ductwork Leakage Tests | 3.4.2 | G | |
| Operational Tests | 3.4.1 | G | |
| SD-07 Certificates | |||
| Listing of Product Installations | 1.3 | ||
| Galvanized Steel Ductwork | 2.3.1 | ||
| Materials | |||
| Brazing Materials | 2.3.2 | ||
| Mill-Rolled Reinforcing and | 2.3.3 | ||
| Supporting Materials | |||
| Round Sheet Metal Duct Fittings | 2.2.1 | ||
| Round, High-Pressure, | 2.2.2 | ||
| Double-Wall Sheet Metal Ducts | |||
| Turning Vanes | 2.2.5 | ||
| 23 31 13.00 40 | Dampers | 2.2.6 | |
| Flexible Connectors | 2.2.7 | ||
| SD-10 Operation and Maintenance | |||
| Data | |||
| Operation and Maintenance | 3.5.1 | G | |
| Manuals | |||
| Power Operated Dampers | 2.2.13 | G | |
| Fire Dampers and Wall Collars | 2.2.14 | G | |
| SD-11 Closeout Submittals | |||
| Record Drawings | 3.5.2 | G | |
| 23 81 23.00 20 | SD-03 Product Data | ||
| Computer room air conditioning | 2.2 | G | |
| units | |||
| Space temperature control | 2.3.2 | G | |
| system drawings | |||
| Filters | 2.2.4 | ||
| Refrigerants | 1.4 | ||
| SD-06 Test Reports | |||
| Field Test Schedule | 3.4.2 | G | |
| Manufacturer's Field Test Plans | 3.4.1 | G | |
| Field Test Reports | 3.4.6 | G | |
| Aquatic Toxicity | 2.2.2 | ||
| SD-07 Certificates | |||
| Credentials of the Manufacturer's | 3.4.3 | G | |
| Field Test Representative | |||
| SD-08 Manufacturer’s Instructions | |||
| 23 81 23.00 20 | Installation Manual for Each Type | 3.2.2 | |
| of CRACU | |||
| SD-10 Operation and Maintenance | |||
| Data | |||
| Computer Room Air Conditioning | 2.2 | G | |
| Units | |||
| SD-11 Closeout Submittals | |||
| Energy Efficient Equipment for | 2.1.1 | S | |
| Computer Room Air Conditioning | |||
| Units | |||
| Ozone Depleting Substances | 2.1.2 | S | |
| Indoor Air Quality During | 3.1.1 | S | |
| Construction | |||
| 25 10 10 | SD-02 Shop Drawings | ||
| UMCS Contractor Design | 3.2.2 | ||
| Drawings | |||
| Draft As-Built Drawings | 3.2.3 | ||
| Final As-Built Drawings | 3.2.3 | ||
| SD-03 Product Data | |||
| Product Data Sheets | 2.1.5 | ||
| Computer Software | 2.4 | ||
| Enclosure Keys | 2.6.1 | ||
| SD-05 Design Data | |||
| UMCS IP Network Bandwidth | 3.2.1 | ||
| Usage Estimate | |||
| SD-06 Test Reports | |||
| 25 10 10 | Pre-Construction QC Checklist | 1.6 | |
| Post-Construction QC Checklist | 1.6 | ||
| Existing Conditions Report | 3.1 | ||
| Start-Up and Start-Up Testing | 3.6 | G | |
| Report | |||
| PVT Phase I Procedures | 3.7.1 | ||
| PVT Phase I Report | 3.7.2 | G | |
| PVT Phase II Report | 3.7.3 | G | |
| SD-10 Operation and Maintenance | |||
| Data | |||
| Operation and Maintenance | 1.7 | ||
| (O&M) Instructions | |||
| Preventive Maintenance Work | 3.8.8.1 | ||
| Plan | |||
| Basic Training Documentation | 3.9.1 | ||
| Advanced Training | 3.9.1 | ||
| Documentation | |||
| Refresher Training | 3.9.1 | ||
| Documentation | |||
| SD-11 Closeout Submittals | |||
| Closeout QC Checklist | 1.6 | ||
| 26 20 00 | SD-02 Shop Drawings | ||
| Panelboards | 2.12 | G | |
| Transformers | 2.14 | G | |
| Busway | 2.3 | G | |
| Cable trays | G | ||
| 26 20 00 | SD-03 Product Data | ||
| Receptacles | 2.11 | G | |
| Circuit breakers | 2.12.3 | G | |
| Switches | 2.9 | G | |
| Transformers | 2.14 | G | |
| Enclosed circuit breakers | 2.13 | G | |
| Surge protective devices | 2.23 | G | |
| SD-06 Test Reports | |||
| 600-volt wiring test | 3.5.2 | G | |
| Grounding system test | 3.5.5 | G | |
| Transformer tests | 3.5.3 | G | |
| Ground-fault receptacle test | 3.5.4 | G | |
| SD-07 Certificates | |||
| Fuses | 2.10 | G | |
| 26 28 21.00 40 | SD-02 Shop Drawings | ||
| Connection Diagrams | 2.1 | G | |
| Fabrication Drawings | 2.1 | G | |
| Installation Drawings | 2.1 | G | |
| SD-03 Product Data | |||
| Equipment and Performance | 2.1 | G | |
| Data | |||
| Contacts | 2.2.1 | G | |
| Indicating Lights | 2.2.2 | G | |
| Terminal Board | 2.2.3 | G | |
| Enclosures | 2.2.5 | G | |
| SD-06 Test Reports | |||
| 26 28 21.00 40 | Qualification Testing | 2.3.1 | G |
| Operation Tests | 2.3.1 | G | |
| SD-07 Certificates | |||
| Listing of Product Installations | 1.3.1 | G | |
| SD-08 Manufacturer’s Instructions | |||
| Manufacturer's Instructions | 3.1 | ||
| 26 32 14.00 10 | SD-02 Shop Drawings | ||
| Detailed Drawings | 1.4.5 | G | |
| Acceptance | 3.11 | G | |
| SD-03 Product Data | |||
| Manufacturer's Catalog | 2.4 | ||
| Instructions | 3.10 | G | |
| Experience | 1.4.3 | ||
| Field Engineer | 1.4.4 | ||
| Site Welding | 1.4.2 | ||
| General Installation | 3.2 | ||
| Site Visit | 3.1 | ||
| SD-05 Design Data | |||
| Sound Limitations | 2.8 | G | |
| Generator | 2.14 | ||
| Integral Main Fuel Storage Tank | 2.5.4 | ||
| Day Tank | |||
| Power Factor | 3.6.2.2 | ||
| Heat Exchanger | 2.7.2 | ||
| Time-Delay on Alarms | 2.18.5 | ||
| Cooling System | 2.7 | ||
| 26 32 14.00 10 | Vibration Isolation | 1.2.5 | |
| SD-06 Test Reports | |||
| Performance Tests | 3.6.6 | ||
| Onsite Inspection and Tests | 3.6 | G | |
| SD-07 Certificates | |||
| Vibration Isolation | 1.2.5 | ||
| Prototype Tests | 3.4 | ||
| Reliability and Durability | 1.2.6 | ||
| Emissions | 2.11 | ||
| Sound limitations | 2.8 | ||
| Current Balance | 2.14.1 | ||
| Materials and Equipment | 2.3 | ||
| Factory Inspection and Tests | 2.27 | ||
| Inspections | 3.6.4 | ||
| Cooling System | 2.7 | ||
| SD-10 Operation and Maintenance | |||
| Data | |||
| Operation Manual | 1.6.1 | G | |
| Maintenance Manual | 1.6.2 | G | |
| Extra Materials | 1.6.3 | ||
| 26 33 53.00 20 | SD-02 Shop Drawings | ||
| UPS Drawings | G | ||
| UPS Installation | G | ||
| SD-03 Product Data | |||
| BATTERY Module | G | ||
| Factory Testing | 2.10 | ||
| 26 33 53.00 20 | BATTERY System | ||
| SD-06 Test Reports | |||
| Work Plan | 1.6.3 | G | |
| Factory Test Plan | 1.6.4 | G | |
| Performance Test Plan | 1.6.5 | G | |
| Factory Tests | G | ||
| Performance Tests Report | 1.6.7 | G | |
| Factory Tests Report | 1.6.6 | G | |
| SD-09 Manufacturer’s Field | |||
| Reports | |||
| Initial Inspection and Tests | 3.2.2 | G | |
| Performance Tests | 3.2.3 | G | |
| SD-10 Operation and Maintenance | |||
| Data | |||
| UPS Operation and Maintenance | 1.10.1 | G | |
| SD-11 Closeout Submittals | |||
| Installation | 3.1 |