FA3047-16-R-0013-0001.pdf
PDF 191 KB Posted
- Solicitation number
- FA3047-16-R-0013
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_2.pdf | ||
| Attachment_3_Pricing_Sheet_21_Jan_16.xlsx | XLSX spreadsheet | |
| Attachment_1_Performance_Work_Statement_21_Jan_16.pdf | ||
| FA3047-16-R-0013_Solicitation.pdf | ||
| QA_Hood_and_Duct2.pdf | ||
| Site_Visit_Minutes_Hood__Duct.pdf | ||
| Site_Visit_Attendance_Record.pdf | ||
| AIAC_Access_Roster_Form_(Blank).xlsx | XLSX spreadsheet | |
| Q A_Hood_and_Duct.pdf | ||
| Atttachment_3_Pricing_Sheet_25_Nov_15.xlsx | XLSX spreadsheet | |
| Attachment_2_Wage_Determination_14_July_2015.pdf | ||
| FA3047-16-R-0013.pdf | ||
| Attachment_1_Performance_Work_Statement.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this modif ication is to add Clause 52.237-1 Site Visit and to extend due date
Contract Specialist: Amber Molina (210) 671-1736; email: amber.molina@us.af.mil
Contracting Officer: Jorge Canavati, (210) 671-1728; email: jorge.canavati@us.af.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Jan-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA3047-16-R-0013
X 9B. DATED (SEE ITEM 11)
22-Dec-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Jan-2016
CODE
502D CONTRACTING SQUADRON
1655 SELFRIDGE AVE
JBSA LACKLAND TX 78236-5253
FA3016 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA3047-16-R-0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
52.237-1 SITE VISIT (APR 1984)
Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
(End of provision)
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 19-Jan-2016 12:00 PM to 02-Feb-2016 03:00 PM.
The following have been modified:
Addenda to FAR 52.212-1 Instructions to Offerors – Commercial Items Addendum to 52.212-1(b), Submission of Offers. The paragraph is tailored as follows:
1.0 General Instructions. The subject acquisition is being competed under FAR 13.5 Simplified Procedures for
Certain Commercial Items, utilizing the Lowest Price Technically Acceptable (LPTA) procedures. This section provides general guidance for preparing proposals, as well as specific instructions on the format and content of the proposal. Throughout this solicitation, the term “Offeror” includes subcontractors, teammates and/or joint venture partners. The Offeror’s proposal must include all data and information requested, and must be submitted in accordance with (IAW) these instructions. The Offeror shall be compliant with the requirements as stated in the solicitation. A proposal that is sufficiently documented to support technical capability and price in a complete, orderly, and specific detailed manner will enable the Government to perform a thorough and fair evaluation.
Compliance with the instructions and solicitation is mandatory. Failure to comply may result in an unfavorable proposal evaluation and render the proposal ineligible for award.
2.0 Information Regarding Submission Requirements. Documents submitted in response to this solicitation must comply with requirements of the solicitation and Performance Work Statement (PWS).
To be considered, the complete proposal must be received not later than the date and time established in Block 8 of the SF 1449, at:
502 CONS/JBKAA
Attn: Mr. Jorge Canavati
1655 Selfridge Avenue, Building 5450
JBSA Lackland, TX 78236
All proposals delivered in response to this solicitation shall reflect the following information on the address label:
(1) Solicitation Number FA3047-16-R-0013
(2) The legend "To be delivered unopened to the Contracting Officer/ Specialist"
(3) The volume and copy numbers contained in each box
Offerors are cautioned that JBSA Lackland has visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor pass prior to entrance. SOME DELAY SHOULD BE ANTICIPATED WHEN
HAND-CARRYING PROPOSALS. Offerors should allow sufficient time to obtain a visitor pass and arrive at the location PRIOR to the time specified for receipt. Offerors should be aware of the potential that the Government experiences delays in the postal service to JBSA Lackland and take all necessary precautions. Late proposals will be processed in accordance with FAR 52.212-1(f) “Late submission, modifications, revisions, and withdrawals of offers.”
All proposals must be in English. Fax or email proposals will not be considered. All questions must be submitted in writing no later than 15 January 2016 at noon CST via email to Amber Molina, amber.molina@us.af.mil or Jorge Canavati at jorge.canavati@us.af.mil. Questions submitted after this date will not be considered. Any proposal, modification, or revision, that is received at the designated Government office after the exact time specified for receipt of proposals is “late” and will not be considered unless it is received before award is made, the contracting officer determines that accepting the late proposal would not unduly delay the acquisition; and (i) there is acceptable evidence to establish that it was received at the Government installation designated for receipt of proposals and was under the Government’s control prior to the time set for receipt of proposals; or (ii) It was the only proposal received.
3.0 Proposal Preparation and Format Instructions. This section provides general guidance for preparing proposals in regards to the format and content of the proposal. Each volume shall be complete in itself. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein; all the requirements specified in this solicitation are mandatory. Offerors are representing that your firm will perform all the requirements specified in the solicitation by submitting your proposal. Offerors are required to meet all solicitation requirements, including terms and conditions, and representations and certifications, in addition to those identified as evaluation factors or sub factors. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.
3.1 Page Limitations. Page limitations shall be treated as maximums. Total page count will be based on the printed proposal submission. If page limitations are exceeded, excess pages will not be read nor considered in the evaluation of the proposal. A page is defined as each face of an 8.5 x 11-inch sheet of paper containing information.
All information except for document numbers, page number, etc., shall be provided in an image area with no less than one inch in margin. Two pages may be printed back-to-back on one sheet of paper. However, this will be considered two (2) pages for the purpose of page count. The background color of each page of the proposal submission shall be white or ivory stock only. The maximum number of pages for each volume is listed below. Price information shall be limited to Volume I. Excess pages will not be evaluated, but will be retained in the file. See table below for specific number of copies required and pages for each of the Volumes.
mailto:amber.molina@us.af.mil mailto:jorge.canavati@us.af.mil
TITLE NUMBER OF COPIES MAXIMUM NUMBER OF PAGES
Volume I. Contracting & Pricing Original and 3 copies
1 Compact Disk
No page limitation.
Only the Pricing Schedule spreadsheet is required as an electronic copy in the Compact
Disk
Volume II. Technical Original and 3 copies Limited to no more than thirty (30) pages total.
3.2 Pages Counted. Each page shall be counted except for the following:
(a) Cover pages
(b) Table of Contents
(c) List of Figures
(d) Glossaries
(e) Tabs
(f) Dividers
(g) Blank pages
3.3 Text. Text type should be Times New Roman or Arial, no smaller than 12-point with normal proportional spacing. Illustrations and tables shall be no smaller than Times New Romans or Arial 10 point. Text lines will be, at a minimum, single-spaced.
3.4 Tables, Charts, Graphs, and Figures. Legible tables, charts, graphs and figures shall be used wherever practical to depict organizations, systems and layout, implementation schedules, plans, etc. These displays shall be uncomplicated, legible, and shall not exceed 11 x 17 inches in size. Foldout pages shall fold entirely within the volume, and count as a single page. Foldout pages may only be used for large tables, charts, graphs, diagrams and schematics not for pages of text. For graphics, exhibits and figures, text shall be no smaller than
Times New Roman or Arial 10-point font. Text within tables shall be no smaller than Times New Roman or
Arial 10-point font.
3.5 Binding and Labeling. Each volume (Contracting & Pricing, Technical) of the proposal will be bound separately, with each volume in a standard loose-leaf three-ring binder. Each volume shall be written on a stand-alone basis so that its contents may be evaluated on a stand-alone basis. Cross Referencing between volumes is not permitted. Information required for proposal evaluation which is not found in its designated volume will be assumed to have been omitted from the proposal. Cross-referencing within a proposal volume is permitted. Elaborate format and binding are neither necessary nor desirable. The cover and spine of each binder will clearly identify the Offeror's name, volume number, Request for Proposal (RFP) number "FA3047-
16-R-0013", RFP title "JBSA Fort Sam Houston, Camp Bullis and JBSA Randolph Hood and Duct Cleaning
Service", and copy number, e.g., copy 2 of 2. The original for each volume will be clearly identified on the cover and the spine. All binders will allow for easy removal and replacement of pages. Replacement pages in response to evaluation notices (if any), shall be colored stock with lines in the margin designating the change and the change highlighted.
3.6 Electronic Copies. The content of the electronic copy of the Pricing Schedule spreadsheet must be identical to the hard copy schedule of supplies and services. The electronic copy shall be submitted on compact disk/read only memory (CD/ROM) disks in a Microsoft Operation System and as a minimum saved using Microsoft
Office 2007® format. Replacement disks may be required in response to Evaluation Notices (ENs). Offerors are advised to perform a computer virus check prior to submission. The Government will perform computer virus checks on all submitted electronic media and any disk found to be infected will eliminate the offeror from competition. In the event of discrepancies between hard copies and electronic copies of a proposal, the hard copies will be used for evaluation.
3.7 Proposal Clarity. The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation of the Offeror’s capabilities and for substantiating the validity of stated claims. The Offeror’s proposal shall not simply rephrase, reiterate, or restate the Government’s own language, but rather shall provide convincing rationale describing how it intends to fulfill the requirement. Legibility, clarity, and coherence are very important. Provide as specifically as possible the actual methodology you would use for accomplishing and satisfying the requirements. The Offeror shall assume that the Government has no prior knowledge of its capabilities, facilities and experience, and will base the evaluation on the information presented in the Offeror’s proposal.
4.0 Specific Proposal Instructions. To assure timely and equitable evaluation of the proposal, the Offeror must follow the instructions contained herein. The proposal must be complete, stand-alone, and respond directly to the requirements of this solicitation. The response shall consist of two (2) separate volumes.
Each Offeror shall submit a contracting & pricing volume IAW the format below:
Volume I – Contracting & Pricing
Volume II – Technical
4.1 Volume I – Contracting & Pricing.
4.1.1 Instructions. The CO has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the CO will review this determination and if, in the
CO’s opinion, adequate price competition exists no additional cost information will be requested.
However, if at any time during this competition the CO determines that adequate price competition no longer exists offerors may be required to submit other than certified cost or pricing data to the extent necessary for the CO to determine the reasonableness of the price.
Tab 1: Solicitation.
A complete copy of the solicitation shall be submitted to include:
Schedule of Supplies/Services. The Offeror shall complete the Schedule of Supplies/Services of the RFP and the electronic Pricing Schedule spreadsheet and submit within Volume I. A unit price shall be proposed and inserted for each Firm Fixed Price (FFP) Contract Line Item Number (CLIN) for each performance period and shall be rounded up to two decimal places. The extended amount must equal the unit price multiplied by the number/quantity of units. The proposed prices shall be based on the Offeror’s own approach and the
Government’s Performance Work Statement (PWS) requirements as set forth herein. Offerors who change the quantities stated in the solicitation will render the proposal ineligible for award.
The Offeror shall submit only pricing information that will be evaluated for award or become part of the resulting contract. Supply costs and associated General and Administrative (G&A) cost plus profit or fee, should be included in the unit price for each task listed in the Pricing Spreadsheet. Wages will be subject to
SCA increases over the contract life.
Representations and Certifications. Complete the necessary fill-ins, certifications, and provisions. The offeror shall complete only paragraph (b) of the provision FAR 52.212-3 if the Offeror has completed the annual representations and certification electronically via the System for Award Management (SAM) Web site. If the offeror has not completed the annual representations and certifications electronically, the offeror shall complete only paragraphs (c) through (p) of the provision FAR 52.212-3 and return it along with the proposal.
Tab 2: Financial Disclosure Release Statement. Provide a release statement authorizing the Government to request information from current financial institutions or lenders must be submitted on official letterhead. In addition to this authorization, the offeror should include the financial institution or lender’s address, and a point of contact including email and phone number to be contacted with the authorization.
A signed copy of the SF 1449 from an individual legally authorized to bind the offeror, and completed blocks 12, 17, and 30; in doing so, the Offeror accedes to the contract terms and conditions as written in the solicitation with attachments. In the event that any amendments (SF 30) to the solicitation are issued, a signed copy of each amendment should be placed before the solicitation in order starting with the most recent amendment issued.
Complete all contract clause fill-ins if applicable. The "original" shall be clearly marked under separate cover.
4.2 Volume II - Technical Proposal. Each Offeror shall submit a technical volume with its proposal IAW the format below. Offerors are cautioned that the Government will only use data provided by each Offeror in this volume in the technical evaluation. By your proposal submission, you are representing that you will perform all the requirements specified in the solicitation. It is not necessary or desirable for you to tell us so in your proposal. Do not merely reiterate the objectives or reformulate the requirements specified in the solicitation.
Tab 1: Technical Factors and Sub factors. All the requirements specified in the solicitation are mandatory. The contractor shall address the proposed approach to meeting the minimum performance or capability requirements of each technical Sub factor. The responses will be evaluated against FAR 52.212-2, Evaluation Factors.
Marketing presentations are not wanted and will not be evaluated. Hard and compelling evidence of capabilities is required to receive credit for evaluation factors. Legibility, clarity, and coherence are very important. Offerors are strongly encouraged to provide as specifically as possible, the actual methodology to be used for accomplishing and satisfying the requirements.
(A) Factor # 1 – Management Plan
The offeror shall submit a management plan that illustrates the corporate philosophy and management approach to demonstrate evidence of sound organization, appropriate manning and qualifications proposed, and performance management processes to successfully accomplish tasks delineated in the PWS. The plan should provide evidence of knowledge and capability delivering hood and duct cleaning services as defined in the solicitation. At a minimum, the plan should:
i. Demonstrate a business approach to plan, control, and direct the labor force to meet the requirements of the
PWS.
ii. Provide mitigating strategies and processes designed to prevent and proactively identify and forecast potential risks that could have an adverse impact to schedule or performance.
(B) Factor # 2 -- Quality Control Plan:
The offeror shall provide a “quality control plan” (QCP) with a complete written system for identifying and correcting deficiencies and degradation in the quality of services before the level of performance becomes unacceptable as part of the submitted proposal. At a minimum, the plan should specifically address contract requirements and location(s) listed and provide the following:
i. Address responsibilities for oversight of the QCP, functions, and personnel associated with such oversight, and specify authority to coordinate with the COR and CO.
ii. Describe the methodology to monitor deficiencies/complaints in relation to the performance standards, approach to inform employees of validated deficiencies/complaints, and a process to ensure that the deficiencies/complaints are corrected and eradicated.
(C) Factor # 3 – Certifications
The offeror shall provide certifiction documentation on all personnel performing hood and duct cleaning services.
Proof may be shown in one of two ways:
i. International Kitchen Exhaust Cleaning Association’s (IKECA’s) “Certified Exhaust
Cleaning Specialist (CECS) certification or
ii. Phil Ackland Exhaust Cleaners Certification “Phil Ackland Company Qualification
(PA/CQ) and Phil Acland Crew Leader Certification (PAC).
Addendum to 52.212-1(c) Period for Acceptance of Offers. The paragraph is tailored as follows: “The offeror agrees to hold the prices in its offer firm for 180 calendar days from the date specified for receipt of offers.”
Addendum to 52.212-1(d), Product Samples, is deleted in its entirety.
Addendum to 52-212-1(e), Multiple Offers, is deleted in its entirety.
Addendum to 52.212-1(g), Contract Award. The following sentence is added: “If the Contracting Officer determines discussion are to be conducted, a competitive range will be established.”
Addendum to 52.212-1(h), Multiple Awards is deleted in its entirety.
(End of Addenda)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .