Attachment_5.xls
XLS spreadsheet 36 KB Posted
- Attached to
- Repair/Maintenance Randolph Airfields Federal contract opportunity
- Solicitation number
- FA3047-15-R-0065
About this file
FA3047-15-R-0065 SF 1442 Attachment 5
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0003.pdf | ||
| FA3047-15-R-0065_QAs.docx | DOCX document | |
| FA3047-15-R-0065.pdf | ||
| Attachment_4.xls | XLS spreadsheet | |
| Attachment_3.docx | DOCX document | |
| SF_1142_FA3047-15-R-0065.doc | DOC document | |
| Attachment_2.pdf | ||
| Attachment_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Details
| CONSTRUCTION COST ESTIMATE BREAKDOWN | OMB No. 0704-0193 | ||||||||||
| CONTRACTOR | ADDRESS | ||||||||||
| Line Items Subtotal | |||||||||||
| Labor Burden | $0.00 | ||||||||||
| Subtotal | $0.00 | ||||||||||
| 82.20% | RSMeans San Antonio, TX CCI | $0.00 | |||||||||
| Overhead | $0.00 | ||||||||||
| Profit | $0.00 | ||||||||||
| Bonding | $0.00 | ||||||||||
| Contingency | $0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | Proposed Total Project Price | $0.00 | |||||||||
| Repair Airfields | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||||
| TYMX150078 | |||||||||||
| LINE NO. | ITEM DESCRIPTION | UNIT OF MEASURE | MATERIAL COSTS | LABOR COSTS | EQUIPMENT COSTS | OTHER COSTS | LINE |
TOTAL
| QUANTITY | UNIT | TOTAL | Crew | Man-hours | Average Rate | TOTAL | UNIT | TOTAL | UNIT | TOTAL | |||
| 1 | 01-31-13-20-0200 Field personnel, project manager, average | Week | |||||||||||
| 2 | 01-31-13-20-0260 Field personnel, superintendent, average | Week | |||||||||||
| 3 | 01-74-13-20-0050 Cleaning up, cleanup of floor area, continuous, per day, during construction | M.S.F. | |||||||||||
| 4 | 03-15-16-20-0186 Control joints, saw cut, sawcut joint reservoir in cured concrete, 3/4" wide x 1-1/2" deep, with double saw blades | L.F. | |||||||||||
| 5 | 03-15-16-20-0200 Control joints, saw cut, air blast joint to blow out debris and air dry, 2 passes | L.F. | |||||||||||
| 6 | 07-91-16-10-4800 Joint gaskets, joint gaskets, neoprene, closed cell with adhesive, 3/4" x 1-1/2" | L.F. | |||||||||||
| 7 | 07-91-23-10-0070 Backer rods, backer rod, polyethylene, 3/4" diameter | C.L.F. | |||||||||||
| ITEMS LISTED ARE NOT ALL INCLUSIVE |
&CFA3047-15-R-0065
Attachment 5
File details come from the government source that posted it. Updated .