FA3047-15-R-0065 SF 1442 Attachment 4

View the file

Other files for this federal contract opportunity

Other files attached to Repair/Maintenance Randolph Airfields, newest first.
File Type Posted
Amendment_0003.pdf PDF
FA3047-15-R-0065_QAs.docx DOCX document
FA3047-15-R-0065.pdf PDF
Attachment_1.docx DOCX document
Attachment_5.xls XLS spreadsheet
SF_1142_FA3047-15-R-0065.doc DOC document
Attachment_2.pdf PDF
Attachment_3.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

Project Number:
TYMX 15078Project Title:
Repair/Maintenance – Randolph AirfieldsSolicitation / Contract Number:

FA3047-15-R-0065

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies RequiredRemarks
Item or Description of Item, Contract Reference, Type of SubmittalCERTIFICATION OF
COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S
RECOMMENDATIONSMANUFACTURER'S
WARRANTYCATALOG DATAOPERATING
INSTRUCTIONSDOCUMENTTechnical DataTest ReportsField ReportsRequired Submission DateDate Received in ContractingDate to Civil EngineeringReturn Suspense DateSubmittal NumbersDate Contractor
NotifiedContractor ResubmittalFinal Approval
ApprovedDisapproved
1Design Submittals - Hard Copies 35% (SOW Ref)
2Design Submittals - CD/DVD 35% (SOW Ref)
3Design Submittals - Hard Copies 65% (SOW Ref)
4Design Submittals -CD/DVD 65% (SOW Ref)
5Design Submittals - Hard Copies 95% (SOW Ref)
6Design Submittals -CD/DVD 95% (SOW Ref)
7Design Submittals - Hard Copies 100% (SOW Ref)
8Contract Progress Schedule AF Form 3064 (SOW Ref)1
9Safety Plan (SOW Ref)1
10SWPPP (SOW Ref)1
11DD 1354 (SOW Ref 7.2)2
12Checklist for DD 13541
13Warranty Letters (SOW Ref)2
14Operation and Maintenance Data (SOW Ref)11
15Training Schedule (SOW Ref)1
16As-Built Drawings (SOW Ref)2
17Integrated Master Schedule (SOW 4.2)1
18Health and Safety Plan (SOW 5.1)1
19Quality Assurance Plan (SOW 5.2)1
20Work Plan (SOW 5.3)1
21Meeting Minutes (SOW 4.4)1
22Warranty Letters (SOW 7.3)1
23Permits (SOW 4.7)1
24Sampling and Testing Reports1
25Pre-Final Inspection Report1
26Final Inspection Report1
27Manufacturer's Recommendations1
28List of Proposed Equipment1
29Primer [if required] (Ref Div 32: Section 32 01 19, para 1.4)111
30Backup Material (Ref Div 32: Section 32 01 19, para 1.4)11
31Boring Logs (N/A)
32Demolition Plan (N/A\)
33Waste Manifests (SOW Ref 6.1)1
34Asbestos. Lead Based Paint Abatement Plan (N/A)
35Division 3 Concrete (N/A)
36Division 4 Masonry (N/A)
37Division 5 Metals (N/A)
38Division 6 Wood, Plastics, Composites (N/A)
39Division 7 Thermal and Moisture Protection (N/A)
40Division 8 Openings (N/A)
41Division 9 Finishes (N/A)
42Joint Cleaning Equipment (Ref Div 32: Section 32 13 73, para. 1.4)1
43Compression Seals (Ref Div 32: Section 32 13 73, para. 1.4)11
44Test Reports (Ref Div 32: Section 32 13 73, para. 1.4)1
45Division 10 Specialties (N/A)
46Division 11 Equipment (N/A)
47Division 12 Furnishings (N/A)
48Division 13 Special Construction (N/A)
49Division 14 Conveying Equipment (N/A)
50Division 21 Fire Supression (N/A)
51Division 22 Plumbing (N/A)
52Division 23 HVAC (N/A)
53Division 25 Integrated Automation (N/A)
54Division 26 Electrical (N/A)
55Division 27 Communications (N/A)
56Division 28 Electronic Safety and Security (N/A)
57Division 31 Earthwork (N/A)
58Division 32 Exterior Improvements (SOW Ref)
59Division 33 Utilities (N/A)
60Division 34 Transportation (N/A)
61Division 35 Waterway and Marine Construction (N/A)
62Division 40 Process Integration (N/A)
63Division 41 Material Processing and Handling Eqpt (N/A)
64Division 42 Process Heating, Cooling, and Drying Egpt (N/A)
65Division 43 Process Gas & Liquid Handling, Purification & Storage Eqpt (N/A)
66Division 44 Pollution Control Equipment (N/A)
67Division 48 Electric Power Generation (N/A)

&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12FA3047-15-R-0065 Attachment 4 &R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)