FA3047-15-R-0065 SF 1442 Attachment 4
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0003.pdf | ||
| FA3047-15-R-0065_QAs.docx | DOCX document | |
| FA3047-15-R-0065.pdf | ||
| Attachment_1.docx | DOCX document | |
| Attachment_5.xls | XLS spreadsheet | |
| SF_1142_FA3047-15-R-0065.doc | DOC document | |
| Attachment_2.pdf | ||
| Attachment_3.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| TYMX 15078 | Project Title: | ||
| Repair/Maintenance – Randolph Airfields | Solicitation / Contract Number: |
FA3047-15-R-0065
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | |||||||||||||
| Number of Copies Required | Remarks | ||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | CERTIFICATION OF | ||||||||||||||
| COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S | |||||||||||
| RECOMMENDATIONS | MANUFACTURER'S | ||||||||||||||
| WARRANTY | CATALOG DATA | OPERATING | |||||||||||||
| INSTRUCTIONS | DOCUMENT | Technical Data | Test Reports | Field Reports | Required Submission Date | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Submittal Numbers | Date Contractor | |||||
| Notified | Contractor Resubmittal | Final Approval | |||||||||||||
| Approved | Disapproved | ||||||||||||||
| 1 | Design Submittals - Hard Copies 35% (SOW Ref) | ||||||||||||||
| 2 | Design Submittals - CD/DVD 35% (SOW Ref) | ||||||||||||||
| 3 | Design Submittals - Hard Copies 65% (SOW Ref) | ||||||||||||||
| 4 | Design Submittals -CD/DVD 65% (SOW Ref) | ||||||||||||||
| 5 | Design Submittals - Hard Copies 95% (SOW Ref) | ||||||||||||||
| 6 | Design Submittals -CD/DVD 95% (SOW Ref) | ||||||||||||||
| 7 | Design Submittals - Hard Copies 100% (SOW Ref) | ||||||||||||||
| 8 | Contract Progress Schedule AF Form 3064 (SOW Ref) | 1 | |||||||||||||
| 9 | Safety Plan (SOW Ref) | 1 | |||||||||||||
| 10 | SWPPP (SOW Ref) | 1 | |||||||||||||
| 11 | DD 1354 (SOW Ref 7.2) | 2 | |||||||||||||
| 12 | Checklist for DD 1354 | 1 | |||||||||||||
| 13 | Warranty Letters (SOW Ref) | 2 | |||||||||||||
| 14 | Operation and Maintenance Data (SOW Ref) | 1 | 1 | ||||||||||||
| 15 | Training Schedule (SOW Ref) | 1 | |||||||||||||
| 16 | As-Built Drawings (SOW Ref) | 2 | |||||||||||||
| 17 | Integrated Master Schedule (SOW 4.2) | 1 | |||||||||||||
| 18 | Health and Safety Plan (SOW 5.1) | 1 | |||||||||||||
| 19 | Quality Assurance Plan (SOW 5.2) | 1 | |||||||||||||
| 20 | Work Plan (SOW 5.3) | 1 | |||||||||||||
| 21 | Meeting Minutes (SOW 4.4) | 1 | |||||||||||||
| 22 | Warranty Letters (SOW 7.3) | 1 | |||||||||||||
| 23 | Permits (SOW 4.7) | 1 | |||||||||||||
| 24 | Sampling and Testing Reports | 1 | |||||||||||||
| 25 | Pre-Final Inspection Report | 1 | |||||||||||||
| 26 | Final Inspection Report | 1 | |||||||||||||
| 27 | Manufacturer's Recommendations | 1 | |||||||||||||
| 28 | List of Proposed Equipment | 1 | |||||||||||||
| 29 | Primer [if required] (Ref Div 32: Section 32 01 19, para 1.4) | 1 | 1 | 1 | |||||||||||
| 30 | Backup Material (Ref Div 32: Section 32 01 19, para 1.4) | 1 | 1 | ||||||||||||
| 31 | Boring Logs (N/A) | ||||||||||||||
| 32 | Demolition Plan (N/A\) | ||||||||||||||
| 33 | Waste Manifests (SOW Ref 6.1) | 1 | |||||||||||||
| 34 | Asbestos. Lead Based Paint Abatement Plan (N/A) | ||||||||||||||
| 35 | Division 3 Concrete (N/A) | ||||||||||||||
| 36 | Division 4 Masonry (N/A) | ||||||||||||||
| 37 | Division 5 Metals (N/A) | ||||||||||||||
| 38 | Division 6 Wood, Plastics, Composites (N/A) | ||||||||||||||
| 39 | Division 7 Thermal and Moisture Protection (N/A) | ||||||||||||||
| 40 | Division 8 Openings (N/A) | ||||||||||||||
| 41 | Division 9 Finishes (N/A) | ||||||||||||||
| 42 | Joint Cleaning Equipment (Ref Div 32: Section 32 13 73, para. 1.4) | 1 | |||||||||||||
| 43 | Compression Seals (Ref Div 32: Section 32 13 73, para. 1.4) | 1 | 1 | ||||||||||||
| 44 | Test Reports (Ref Div 32: Section 32 13 73, para. 1.4) | 1 | |||||||||||||
| 45 | Division 10 Specialties (N/A) | ||||||||||||||
| 46 | Division 11 Equipment (N/A) | ||||||||||||||
| 47 | Division 12 Furnishings (N/A) | ||||||||||||||
| 48 | Division 13 Special Construction (N/A) | ||||||||||||||
| 49 | Division 14 Conveying Equipment (N/A) | ||||||||||||||
| 50 | Division 21 Fire Supression (N/A) | ||||||||||||||
| 51 | Division 22 Plumbing (N/A) | ||||||||||||||
| 52 | Division 23 HVAC (N/A) | ||||||||||||||
| 53 | Division 25 Integrated Automation (N/A) | ||||||||||||||
| 54 | Division 26 Electrical (N/A) | ||||||||||||||
| 55 | Division 27 Communications (N/A) | ||||||||||||||
| 56 | Division 28 Electronic Safety and Security (N/A) | ||||||||||||||
| 57 | Division 31 Earthwork (N/A) | ||||||||||||||
| 58 | Division 32 Exterior Improvements (SOW Ref) | ||||||||||||||
| 59 | Division 33 Utilities (N/A) | ||||||||||||||
| 60 | Division 34 Transportation (N/A) | ||||||||||||||
| 61 | Division 35 Waterway and Marine Construction (N/A) | ||||||||||||||
| 62 | Division 40 Process Integration (N/A) | ||||||||||||||
| 63 | Division 41 Material Processing and Handling Eqpt (N/A) | ||||||||||||||
| 64 | Division 42 Process Heating, Cooling, and Drying Egpt (N/A) | ||||||||||||||
| 65 | Division 43 Process Gas & Liquid Handling, Purification & Storage Eqpt (N/A) | ||||||||||||||
| 66 | Division 44 Pollution Control Equipment (N/A) | ||||||||||||||
| 67 | Division 48 Electric Power Generation (N/A) |
&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12FA3047-15-R-0065 Attachment 4 &R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
File details come from the government source that posted it. Updated .