FA3047-12-B-0010 IFB.pdf
PDF 482 KB Posted
- Attached to
- Design-Build, Repair 3rd Floor Bldg 9225, JIEDDO Federal contract opportunity
- Solicitation number
- FA3047-12-B-0010
About this file
FA3047-12-B-0010 (Solicitation) IFB SF 1442
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
***SEE SECTION H, BLOCK 10 CONTINUATION***
X
SFC ELMER I HOWARD III 210-671-1714
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
16-Jul-2012
(RFP)
(IFB)
CALL:
Design-Build, Repair 3rd Floor Bldg 9225 (JIEDDO)
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within _______ 10 calendar days and complete it within ________ 110 calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________ 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ 1 copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________ 15 Aug 2012 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ 46 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
802D CONTRACTING SQUADRON
1655 SELFRIDGE AVE
LACKLAND AFB TX 78236-5253
FA3047
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
01:00 PM (CST) (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
MPLS 11-0114
8. ADDRESS OFFER TO (If Other Than Item 7)
210-671-3360 FAX: TEL: 210-671-1700 TEL: FAX:
FA3047-12-B-0010 45
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
FA3047-12-B-0010
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lump Sum Design-Construction
Firm-Fixed Price (FFP)
Design-Build, Repair 3rd Floor Bldg 9225, JIEDDO, in accordance with (IAW)
Statement of Work (SOW), dated 12 Jul 12.
PAYMENT CLIN (WAWF)
FOB: Destination
NSN: Z2AZ-00-000-0000
SIGNAL CODE: A
000101 Lump Sum Design
FFP
Design -Build, the contractor shall provide all labor, materials, tools, equipment, supervision and all items necessary for the renovation of the 3rd Floor Bldg 9225
SOW, dated 12 Jul 12.
Contractor shall present a 60%, 100% and As-Built design for review.
60% Design Submittal: 30 Calendar Days after Notice to Proceed (NTP)
100% Design Submittal: 20 Calendar Days after NTP
As-Built Submittal: 10 Calendar Days after Final Aceptance of Construction
INFORMATIONAL CLIN
000102 Lump Sum Construction
FFP
Design -Build, the contractor shall provide all labor, materials, tools, equipment, supervision and all items necessary for the renovation of the 3rd Floor Bldg 9225
SOW dated 12 Jul 12.
50 Calendar Days after NTP
INFORMATIONAL CLIN
TOTAL AMOUNT for CLINS 0001 $ .
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
000101 Destination Government Destination Government
000102 Destination Government Destination Government
CLAUSES INCORPORATED BY FULL TEXT
52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
(a) Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not--
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the
Contracting Officer's written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the
Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the
Contractor's right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the
Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.
(End of clause)
52.246-13 INSPECTION--DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS (AUG 1996)
(a) Unless otherwise designated by the specifications, all workmanship performed under the contract is subject to
Government inspection at all times and places where dismantling or demolition work is being performed. The
Contractor shall furnish promptly, and at no increase in contract price all reasonable facilities, labor, and materials necessary for safe and convenient inspection by the Government. The Government shall perform inspections in a manner that will not unduly delay the work.
(b) The Contractor is responsible for damage to property caused by defective workmanship. The Contractor shall promptly segregate and remove from the premises any unsatisfactory facilities, materials, and equipment used in contract performance, and promptly replace them with satisfactory items. If the Contractor fails to proceed at once in a workmanlike manner with performance of the work or with the correction of defective workmanship, the
Government may (1) by contract or otherwise, replace the facilities, materials, and equipment or correct the workmanship and charge the cost to the Contractor and (2) terminate for default the Contractor's right to proceed.
The Contractor and any surety shall be liable, to the extent specified in the contract for any damage or cost of repair or replacement.
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 N/A 1 HQ AFSFC F2MTCW
SALVADOR HERNANDEZ, DONNA
PARKER
1517 BILLY MITCHELL BLVD
BLDG 954
LACKLAND AFB TX 78236
210 925-5015, 210 925-5620, F2MTCW
000101 60% Design Submittal: 30
Calendar Days after Notice to
Proceed (NTP)
100% Design Submittal: 20
Calendar Days after NTP
As-Built Submittal: 10
Calendar Days after Final
Aceptance of Construction
000102 50 Calendar Days after NTP FOB: Destination
CLAUSES INCORPORATED BY REFERENCE
52.247-34 F.O.B. Destination NOV 1991
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the
Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 110 calendar days. The time stated for completion shall include final cleanup of the premises.
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $540.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
Section G - Contract Administration Data
ADMINISTRATIVE AUTHORITY
The resultant contract will be administered by the 802d Contracting Squadron. The address, telephone number and fax number of the Contracting Officer / Team Lead is as follows:
802 CONS/LGCAB
JACKIE L. MURRAY
1655 Selfridge Ave
Lackland AFB, TX 78238-5253
Phone: 210-671-1711
Fax: 210-671-3360
E-mail: jackie.murray@us.af.mil
The Contracting Officer (CO) is the only person authorized to approve changes or modify any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the CO. In the event the contractor effects any such changes at the direction of any person other than the CO, the change will be considered made without authority and no adjustment will be made in the contract price to cover increase in costs incurred as a result thereof.
Contractual problems, of any nature, which might occur during the life of the contract, must be handled in conformance with very specific public laws and regulations (i.e., Federal Acquisition Regulation), and must be referred to the CO for resolution. Only the CO is authorized to formally resolve such problems. Therefore, the contractor is hereby directed to bring all such contractual problems to the immediate attention of the CO.
Any request for contract changes/modification shall be submitted to the CO.
The contractor and the Government may agree to perform a no-cost field change. Field changes are made when the change appears to be mutually beneficial to all parties and would not require changing the negotiated line items. An example of a field change is: rerouting planned location of a sidewalk to avoid a tree (when quantities are not changed). All field changes must be approved by the CO prior to execution.
All correspondence concerning this contract, such as requests for information (RFI), explanation of terms, and contract interpretation, shall be submitted to the CO.
ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (LACKLAND 0003) (FEB 11)
PAYMENT: Contractors shall submit payment requests using Wide Area Workflow-Receipt Acceptance (WAWF-RA).
To register and submit invoices, go to https://wawf.eb.mil
Payment questions can be forwarded to the Payment Office's Customer Telephone Inquiry Number for DFAS
Limestone at 800-756-4571 or online at http://www.dfas.mil under Contract/Vendor Pay: Home.
The following codes and information will be required to route your invoice(s) and additional e-mail(s) correctly through WAWF:
Contract Number: FA3047-12-C-XXXX
Delivery Order: N/A
Issue-by DoDDAC: FA3047 mailto:jackie.murray@us.af.mil
Admin DoDAAC: FA3047
Inspected By DoDAAC/BPN: F2MTCW
Ship-to Code/BPN: F2MTCW
Service Acceptor/BPN: N/A
Pay DoDAAC: F67100
Contracting POC’s:
SFC ELMER I HOWARD III MSGT CHRISTINA WARNER
Contract Administrator Contract Administrator
Phone: 210-925-1714 Phone: 210-925-1712 e-mail: elmer.howard@us.af.mil e-mail: christina.warner@us.af.mil
RYAN D. BUENO
Contracting Officer
Phone: 210-925-1842 e-mail: ryan.bueno.1@us.af.mil
Customer:
ISAIAS N. ARANDA JR
802 CES/CEPMZ
Phone: 210-671-1541 e-mail: isaias.aranda.1@us.af.mil
Contractor:
To be completed at the time of award.
FINAL PAYMENT
Final Payment for each delivery order will be made only after receipt of all contrator’s payrolls to include their subcontractors, SF 1413, Statement and Acknowledgement of each sub-contractor, materials submittals, warranty documents, test reports, as-builds, and release of claims.
(End of Clause) mailto:elmer.howard@us.af.mil mailto:robert.delarosa.1@us.af.mil mailto:ryan.bueno.1@us.af.mil mailto:isaias.aranda.1@us.af.mil
Section H - Special Contract Requirements
SF 1442, BLOCK 10 CONTINUATION
Title: Design – Build, Repair 3 rd
Floor Bldg 9225 (JIEDDO)
This Acquisition is a Service Disabled Veteran Owned Set Aside
The Magnitude of this project is between $500,000.00 and $1,000,000.00.
NAICS: 236220 (Commercial and Instructional Building Construction)
Davis Bacon Strictly Enforced, General Decision:
Building: General Decision Number: TX120002 04/20/2012 TX2, Section J Attachment 2
Instructions: The contractor shall complete as part of offer and submit to SF 1442, Block 7 above the following documents:
Section A, SF 1442 with completed Blocks #14, #15, #16 (if different than block 14) #17, #20a, #20b, #20c, and block #19 if amendments have been issued. An authorized official of the firm must sign the SF 1442. Block #20b.
Section B, complete pricing information CLINS 0001, 000101 & 000102.
Section I, complete appropriate certifications in clauses 52.219-28, 52.223-3 and 252.223-7001.
Section K, complete all appropriate and applicable Representations and Certifications.
Notice to Offerors: No award will be made under this solicitation until funds are available. The government reserves the right to cancel this solicitation either on or after the bid opening date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse a bidder for any cost.
Bid Envelopes: Please attach an Option Form 17 to your bid envelopes. This may be obtained from the General
Service Administration (Use Link Below).
http://www.gsa.gov/portal/forms/download/0E07BBC27942972A852569B30083A175
Hard Copies of the solicitation will not be provided. The documents may be found and downloaded at:
http://www.fbo.gov
Any prospective bidder desiring an explanation or interpretation of the solicitation or associated documents must request in writing no later than ten (10) days prior to closing date.
Total Amount Breakout. Awardee shall submit to the Contracting Officer within 15 calendar days after award a detailed cost breakout of their Bid. Cost breakout shall include: Design Costs; Direct, indirect, other direct costs
(subcontractors…), including G&A and fee (rates). Construction Costs: Direct labor (including labor burden), material, other direct costs (equipment, subcontractors…), including overhead, profit and bonding (rates).
http://www.gsa.gov/portal/forms/download/0E07BBC27942972A852569B30083A175 http://www.fbo.gov/
52.232-18 AVAILABILITY OF FUNDS (APR 1984)
Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the
Contracting Officer.
5352.201-9101 OMBUDSMAN (APR 2010)
(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the party to another official who can resolve the concern.
(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).
(c) If resolution cannot be made by the contracting officer, concerned parties may contact the Center/MAJCOM or
AFISRA ombudsmen. The AETC ombudsman is the Deputy Chief, Contracting Division, 2035 First Street West, Randolph AFB TX 78150-4304, 210-652-7907; facsimile 210-652-8344. The alternate AETC ombudsman is Chief, Acquisition Support Branch, 2035 First Street West, Randolph AFB TX 78150-4304, 210-652-7075. The
Associate Deputy Assistant Secretary (Contracting) (ADAS(C)) is the Air Force Ombudsman for Procurement
Integrity Issues. Concerns, issues, disagreements, and recommendations that cannot be resolved at the
MAJCOM/DRU or ARISRA level, may be brought by the concerned party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (703) 588-7004, facsimile number (703) 588-1067.
(d) The ombudsman has no authority to render a decision that binds the agency.
(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer.
5352.223-9001 HEALTH AND SAFETY ON GOVERNMENT INSTALLATIONS (JUN 1997)
(a) In performing work under this contract on a Government installation, the contractor shall:
(1) Comply with the specific health and safety requirements established by this contract;
(2) Comply with the health and safety rules of the Government installation that concern related activities not directly addressed in this contract;
(3) Take all reasonable steps and precautions to prevent accidents and preserve the health and safety of contractor and Government personnel performing or in any way coming in contact with the performance of this contract; and
(4) Take such additional immediate precautions as the contracting officer may reasonably require for health and safety purposes.
(b) The contracting officer may, by written order, direct Air Force Occupational Safety and Health (AFOSH)
Standards and/or health/safety standards as may be required in the performance of this contract and any adjustments resulting from such direction will be in accordance with the Changes clause of this contract.
(c) Any violation of these health and safety rules and requirements, unless promptly corrected as directed by the contracting officer, shall be grounds for termination of this contract in accordance with the Default clause of this
5352.242-9000 CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS (AUG 2007)
(a) The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
(b) The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or security police for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, valid vehicle insurance certificate, and [insert any additional requirements to comply with local security procedures] to obtain a vehicle pass.
(c) During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
(d) When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with AFI 31-101, Volume 1, The Air Force Installation Security Program, and AFI 31-501, Personnel
Security Program Management, citing the appropriate paragraphs as applicable.
(e) Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
(f) Failure to comply with these requirements may result in withholding of final payment.
802 CONS LACKLAND AFB REQUIREMENTS:
Hazardous Materials (HazMat) Requirements. The awardee will be required to register prior to performance with the 802 CES/CEANP Installation HazMat Management Program (IHMP) Office. The contractor shall obtain the
Contractor HazMat Usage Form from the IHMP Office (210-671-5350/0333, Bldg 5595). This is to be accomplished immediately after receipt of award or Notice of Award. The contractor shall provide an inventory and
Material Safety Data Sheet (MSDS) of all HazMat to be used or stored on Lackland AFB prior to beginning performance. The contractor shall submit a monthly usage report for all HazMat consumed during the preceding month to the IHMP Office by the fifth work day of the subsequent month.
Utilities Conservation. The contractor will be required to participate in government energy conservation programs.
For the purpose of this contract, utilities such as water, electricity, etc., will be furnished by the government at no cost to the contractor. Long distance and Defense Switched Network (DSN) telephone services will not be provided.
Availability of Utilities Services. Notwhithstanding the provisions of the contract clause FAR 52.236-14, Availability and Use of Utilitiy Services, all reasonable required amount sof water, gas, electricity, etc., essential to contract performance shall be made available, at no cost to the contractor, from existing outlets and supplies. All temporary connections, outlets, and distribution lines as may be required will be installed by the contractor at the contractor’s own expense.
Inspection and Acceptance. 802d Civil Engineer Squadron (CES) is designated as the office responsible for inspecting the work while the Contracting Officer (CO) is responsible for final acceptance of the work.
Quiet Hours. The quiet hours in the Lackland AFB housing and dormitory areas are between 2200-0600 daily.
Quiet Zones. All motor vehicles, including automobiles, trucks, motorcycles, and off-road vehicles (ORV) are prohibited from being operated in the on base residential areas, in sch a manner as to create a disturbance of the peace. Accelerating a vehicle in such a manner as to cause a loud or unusual noise, or exhibtion of speed, is prohibited. Offensive music or similar offensive audio (cursing, racial, or sexual slurs) noise emmanting from a vehicle at any distance is prohibited. The vehicle operator will be identified and AF Form 3545 will be accomplished and, if necessary, the vehicle operator will be apprehended.
Civilian traffic offenders will be issued the DD Form 1805, except when the offender is operating a GOV.
Issuance of DD 1805, United Sated District Court Violation Notice.
Hours of Work. The normal duty hours of work on Lackland AFB are from 07:30 a.m. to 4:30 p.m., Monday thru
Friday excluding holidays. The lunch period for the contractor requiring escorts is from 11:30a.m. to 12:30p.m.
Access to work sites may be restricted to these hours and days. For work during other than normal duty hours, the contractor shall submit in writing for the Contracting Officer’s approval , a notice of any period of scheduled work at times other than normal duty hours for work specified above. This notice shall be submitted no less than three (3) workdays prior to each period of work scheduled at times other than normal duty hours of work including Federal
Holidays.
Technical Representatives. 802 CES/CEPMZ is designated as the technical representative to ensure project progression, workmanship, and inspection of materials for work being performed under this contract. This clause in no way authorizes anyone other than the Contracting Officer to commit the Government to changes in the terms and conditions of the contract.
Recording and Preserving Historical and Archeological Finds. All items having any apparent historical and archeological interest which are discovered in the course of any construction activities shall be carefully preserved.
The contractor shall leave the archeological find undisturbed and shall immediately report the find to the Contracting
Officer.
Field Changes. The contractor and the government may agree to perform a no cost field change. Field changes are made when the change appears to be mutually beneficial to all parties and would not require changing the negotiated items. All field changes must be approved by the Contracting Officer prior to execution.
Smoking in AETC Facilities. Contractors are advised that the Commander has placed restrictions on the smoking of tobacco products in AETC facilities. AFI 40-102, Tobacco Use in the Air Force, and its AETC Supplement 1, outline the procedures used by the commander to control smoking in our facilities. Contractor employees and visitors are subject to the same restrictions as government personnel. Smoking is permitted only in designated smoking areas.
Lackland Air Force Base Traffic Code. All applicable Traffic Codes will be enforced and apply to all personnel operating vehicles on Lackland Air Force Base (LAFB). They are extracted from LAFB Instruction 31-204. For a complete listing of all LAFB Traffic Codes and all other applicable traffic policies and procedures, please contact the Contracting Office for a copy of LAFB Instruction 31-204.
Cell Phone Usage. Contractors are advised that LAFB Instruction 31-204 prohibits cellular telephone usage when approaching and entering any installation entry gate, or exiting of Lackland AFB. Cell phone usage by drivers on
LAFB is prohibited in moving vehicles unless used with a hands-free device. The 802d Security Forces Squadron
(SFS) is strictly enforcing this regulation. Those found in violation of this regulation are subject to be ticketed.
Base Fire Prevention Program. The contractor will be required to comply with the applicable Fire Prevention
Program, for LAFB the applicable directive is LAFB Instruction 32-2001, dated 20 Feb 04. Contact the Contracting
Office for a copy of Lackland AFB Instruction 32-2001.
Base Entry and Vehicle Control Requirements. Contractor shall comply with AFFARS Clause 5352.242-9000, ―Contractor access to Air Force installations‖ which is hereby incorporated by reference if not otherwise included.
Contractor personnel shall comply with all on-base traffic laws. Background investigations will be conducted by the government at no additional cost to the contractor on all contractor personnel prior to issuance of any base pass.
Government Computer Access Requirements. If this contract requires contractor personnel to have access to government computers, contractor personnel requiring access to government computers shall successfully complete, a National Agency Check with Inquiries (NACI) request, before obtaining access to the computer. These investigations shall be submitted by the government at no additional cost to the contractor. All contractor employees affected by this requirement must have completed an acceptable submission that complies with all directions for completion of the investigation request through the government security office within 30 calendar days of Contract
Award or Notice of Award. To begin this process, all affected contractor employees must complete within 15 calendar days after Contract Award or Notice of Award Standard Form 85P worksheet that can be downloaded from http://www.opm.gov/forms/pdf_fill/SF85P.pdf . The contractor shall notify the Quality Assurance Evaluator or
Government Inspector when the worksheet is complete. The affected employee will then be scheduled by the government for two or more appointments to complete the security package. If at any point after submission of the security worksheet, disqualifying information is discovered or developed, the government reserves the right to deny computer access. In this instance the Contracting Officer will notify the contractor of the denial. That individual will no longer be allowed to perform duties requiring computer access. After submission of the complete security package through the security office and completion of an adjudicated NACI, contractor employees may obtain their
―Common Access Card‖ (CAC) for the duration of their contract, unless disqualifying information is subsequently discovered. In this instance access will be revoked. The NACI adjudication process normally takes 2 to 5 months after submission of the package. Contractor shall comply with AFFARS Clause 5352.242-9001 Common Access
Cards (CACs) for Contractor Personnel which is hereby incorporated by reference if not otherwise included. The contractor shall comply with DODD 5200.08R Physical Security Program, (Chapter 3, Section C.3) requirements.
Installation Access. Criminal History Check will be conducted on all prime/subcontractor employees requiring base access. The contractor shall provide the Contracting Officer and the Information Protection Office a current list of employees needing access within 3 working days after receiving award or Notice of Award. The list shall include employee’s name, date of birth, state driver’s license/state ID number and state of issue. Notifications of contractor employee additions and deletions shall be provided with the same information listed above and within 3 working http://www.opm.gov/forms/pdf_fill/SF85P.pdf days. Within 10 business days after receipt of the list the Government will notify the Contractor that installation access passes are available for those employees clearing the criminal history check. The duration of any pass issued will not exceed one year or the duration of the contract, whichever is shorter. This process will be repeated at the exercise of any option period.
Government Data. The Contractor shall manage all data created for Government use or legally controlled by the
Government, in support of the functional activity or required by AF publication, IAW with the records management procedures in Air Force Instruction (AFI) 33 - 322, Records Management Program, Air Force Manual (AFMAN)
33-363, Management of Records, and the Air Force Records Disposition Schedule (AF RDS) located at https://www.my.af.mil/gcss-af61a/afrims/afrims/rims.cfm
Reporting Requirements. The contractor shall comply with AFI 71-101, Volume 1, Criminal Investigations and
Volume-2, Protective Service Matters and AFI 31-401 (Chapter 8). Contractor shall report to Security Forces any information or circumstances which may pose a threat to DOD or contractor personnel, resources, or DOD information.
Freedom of Information. The contractor shall not respond to any Freedom of Information Act request or release any information in response to a Freedom of Information request. Any request for information received by the contractor under the Freedom of Information Act will be referred to the Contracting Officer.
Physical Security. The contractor shall comply with Force Protection Condition (FPCON) procedures, Random
Antiterrorism Measures (RAMS) and local search/identification requirements.
The contractor shall safeguard all government property, including controlled forms, provided for contractor use. At the close of each work period, government training equipment, ground aerospace vehicles, facilities, support equipment, and other valuable materials shall be secured.
Key Control. The contractor shall safeguard all keys issued by the government and ensure they are used only by authorized contractor personnel. The contractor shall not duplicate issued keys and shall report lost keys to the contracting officer immediately. The contractor will be charged for lost keys, re-keying, and lock replacement as applicable.
Additional Security Requirements (if required). NACI’s will be IAW Homeland Security Presidential Directive 12
(HSPD-12). If this contract requires access to classified materials the contractor shall comply with DOD 5200.1-R, AFI 31-401, AFI 33-201, Volume 1, and Volume 2 (COMSEC) , AFSSI 7700 (Emission Security), AFSSI 8502, (Organizational Computer Security), and AFPD 16-14, (Information Protection), and Operations Security (OPSEC)
Instructions.
Unescorted Entry to Restricted/Controlled Areas. If this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with DOD 5200.2-R, Appendix 1, and AFI 31-501, Personnel Security Program
Management (Paragraph 3.24). If the performance of this contract requires unescorted entry to a restricted/controlled area, personnel must have a favorably adjudicated NACI investigation. All contractor employees affected by this requirement must have completed an acceptable submission that complies with all directions for completion, of the investigation request through the government security office within 30 calendar days of Contract Award or Notice of Award. To begin this process, all affected contractor employees must complete within 15 calendar days after Contract Award or Notice of Award Standard Form 85P worksheet that can be downloaded from http://www.opm.gov/forms/pdf_fill/SF85P.pdf . The contractor shall notify the Quality Assurance
Evaluator or Government Inspector when the worksheet is complete. The affected employee will then be scheduled by the government for two or more appointments to complete the security package. If at any point after submission of the security worksheet, disqualifying information is discovered or developed, the government reserves the right to deny entry to restricted/controlled areas. In this instance the Contracting Officer will notify the contractor of the denial. That individual will not be allowed to perform duties requiring access to restricted/controlled areas. Upon receipt of a favorable investigation results and authorization by the appropriate commander, the contractor member will receive appropriate entry credentials for access to restricted/controlled areas, unless disqualifying information is subsequently discovered. In this instance access will be revoked. The NACI adjudication process normally takes 2 to 5 months after submission of the package.
https://www.my.af.mil/gcss-af61a/afrims/afrims/rims.cfm http://www.opm.gov/forms/pdf_fill/SF85P.pdf
Credentials Turn-In. Upon completion of performance, termination of the contract or termination of performance on this contract by any individual for any reason, the contractor shall turn in all CAC Cards, Base Identification Passes, Restricted Area Badges, and any other documents issued by the government to the Issuing office, Quality Assurance
Evaluator, or Project Manager.
Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned vehicle or privately-owned vehicle while on Lackland
AFB.
Contractor Personnel Conduct. The contractor will ensure that its employees conduct themselves in a professional manner while on the installation and refrain from disruptive, offensive, or otherwise improper behavior that undermines order and discipline. The contracting officer may direct the contractor to remove from performance of this contract on this installation any contractor employee engaging in such misconduct.
Contract Work Hours.
1. The contractor shall provide service on the dates and at the times specified in the contract. Any deviation to these dates and times will be only as authorized by the Contracting Officer. Contract performance requirements are governed by the contract. Contractor personnel shall take their direction concerning their duty status and hours of performance from their contractor management chain and not from government personnel.
2. The contractor is advised that special activities including but not limited to commander’s calls, sports days, employee quality of life meetings, late reporting, staggered reporting times, early release, down-days (goal days), physical fitness time, office picnics, and holiday parties are for government personnel only and do not apply to the contractor employees unless expressly stated otherwise in the contract. If any special activity occurs, the contractor will continue to perform contract requirements unless expressly excused by the contracting officer. In the event that the contracting officer excuses performance, the contractor understands that its employees’ participation in such event will not be at government expense. The contractor is further advised that any special time off granted by the president or other competent authority is for government personnel only and does not apply to the contractor employees.
3. If the contractor is prevented from performing due to acts beyond the contractor’s control including emergency base closure the standards in clause 52.212-4(f) and or 52.249-8/9/10 as appropriate will be applied to determine if the non-performance is excusable. In the event of an emergency base closure due to weather or other contingency situation the contracting officer will notify the contractor of any changes in performance requirements. The
Contractor shall be responsible for instructing contractor personnel concerning their duty status. Under no circumstances will the contractor be paid for supplies or services not delivered.
Section I - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions JAN 2012
52.203-3 Gratuities APR 1984
52.203-5 Covenant Against Contingent Fees APR 1984
52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006
52.203-7 Anti-Kickback Procedures OCT 2010
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
JAN 1997
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity JAN 1997
52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.204-2 Security Requirements AUG 1996
52.204-2 Alt I Security Requirements (Aug 1996) - Alternate I APR 1984
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-7 Central Contractor Registration FEB 2012
52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for
Debarment
DEC 2010
52.209-9 Updates of Publicly Available Information Regarding
Responsibility Matters
FEB 2012
52.211-4 Availability for Examination of Specifications Not Listed in the
GSA Index of Federal Specifications, Standards and
Commercial Item Descriptions
JUN 1988
52.214-3 Amendments To Invitations For Bids DEC 1989
52.214-4 False Statements In Bids APR 1984
52.214-26 Audit and Records--Sealed Bidding OCT 2010
52.214-27 Price Reduction for Defective Certified Cost or Pricing Data -
Modifications - Sealed Bidding
AUG 2011
52.214-28 Subcontracting Certified Cost Or Pricing Data--Modifications--
Sealed Bidding
OCT 2010
52.216-7 Alt I Allowable Cost and Payment (Jun 2011) - Alternate I FEB 1997
52.219-8 Utilization of Small Business Concerns JAN 2011
52.222-1 Notice To The Government Of Labor Disputes FEB 1997
52.222-3 Convict Labor JUN 2003
52.222-6 Davis Bacon Act JUL 2005
52.222-7 Withholding of Funds FEB 1988
52.222-8 Payrolls and Basic Records JUN 2010
52.222-9 Apprentices and Trainees JUL 2005
52.222-10 Compliance with Copeland Act Requirements FEB 1988
52.222-11 Subcontracts (Labor Standards) JUL 2005
52.222-12 Contract Termination-Debarment FEB 1988
52.222-13 Compliance with Davis-Bacon and Related Act Regulations. FEB 1988
52.222-14 Disputes Concerning Labor Standards FEB 1988
52.222-15 Certification of Eligibility FEB 1988
52.222-19 Child Labor -- Cooperation with Authorities and Remedies MAR 2012
52.222-21 Prohibition Of Segregated Facilities FEB 1999
52.222-25 Affirmative Action Compliance APR 1984
52.222-26 Equal Opportunity MAR 2007
52.222-27 Affirmative Action Compliance Requirements for Construction FEB 1999
52.222-35 Equal Opportunity for Veterans SEP 2010
52.222-36 Affirmative Action For Workers With Disabilities OCT 2010
52.222-37 Employment Reports on Veterans SEP 2010
52.222-38 Compliance With Veterans' Employment Reporting
Requirements
SEP 2010
52.222-50 Combating Trafficking in Persons FEB 2009
52.223-4 Recovered Material Certification MAY 2008
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011
52.223-6 Drug-Free Workplace MAY 2001
52.223-7 Notice Of Radioactive Materials JAN 1997
52.223-10 Waste Reduction Program MAY 2011
52.223-12 Refrigeration Equipment and Air Conditioners MAY 1995
52.223-15 Energy Efficiency in Energy-Consuming Products DEC 2007
52.223-18 Encouraging Contractor Policies To Ban Text Messaging While
Driving
AUG 2011
52.225-11 Alt I Buy American Act--Construction Materials Under Trade
Agreements (MAY 2012) Alternate I
MAR 2012
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008
52.227-1 Authorization and Consent DEC 2007
52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
DEC 2007
52.228-2 Additional Bond Security OCT 1997
52.228-4 Workers' Compensation and War-Hazard Insurance Overseas APR 1984
52.228-5 Insurance - Work On A Government Installation JAN 1997
52.228-10 Vehicular and General Public Liability Insurance APR 1984
52.228-11 Pledges Of Assets JAN 2012
52.228-12 Prospective Subcontractor Requests for Bonds OCT 1995
52.228-15 Performance and Payment Bonds--Construction OCT 2010
52.229-4 Federal, State, And Local Taxes (State and Local Adjustments) APR 2003
52.232-5 Payments under Fixed-Price Construction Contracts SEP 2002
52.232-16 Progress Payments APR 2012
52.232-17 Interest OCT 2010
52.232-23 Assignment Of Claims JAN 1986
52.232-23 Alt I Assignment of Claims (Jan 1986) - Alternate I APR 1984
52.232-24 Prohibition of Assignment of Claims JAN 1986
52.232-25 Prompt Payment OCT 2008
52.232-27 Prompt Payment for Construction Contracts OCT 2008
52.232-33 Payment by Electronic Funds Transfer--Central Contractor
Registration
OCT 2003
52.233-1 Disputes JUL 2002
52.233-3 Protest After Award AUG 1996
52.236-2 Differing Site Conditions APR 1984
52.236-3 Site Investigation and Conditions Affecting the Work APR 1984
52.236-5 Material and Workmanship APR 1984
52.236-6 Superintendence by the Contractor APR 1984
52.236-7 Permits and Responsibilities NOV 1991
52.236-8 Other Contracts APR 1984
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984
52.236-11 Use and Possession Prior to Completion APR 1984
52.236-12 Cleaning Up APR 1984
52.236-13 Accident Prevention NOV 1991
52.236-14 Availability and Use of Utility Services APR 1984
52.236-15 Schedules for Construction Contracts APR 1984
52.236-16 Quantity Surveys APR 1984
52.236-17 Layout of Work APR 1984
52.236-21 Specifications and Drawings for Construction FEB 1997
52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) -
Alternate I
APR 1984
52.236-23 Responsibility of the Architect-Engineer Contractor APR 1984
52.236-24 Work Oversight in Architect-Engineer Contracts APR 1984
52.236-25 Requirements for Registration of Designers JUN 2003
52.242-13 Bankruptcy JUL 1995
52.242-14 Suspension of Work APR 1984
52.243-1 Changes--Fixed Price AUG 1987
52.243-1 Alt I Changes--Fixed Price (Aug 1987) - Alternate I APR 1984
52.243-4 Changes JUN 2007
52.243-5 Changes and Changed Conditions APR 1984
52.244-4 Subcontractors and Outside Associates and Consultants
(Architect-Engineer Services)
AUG 1998
52.244-5 Competition In Subcontracting DEC 1996
52.246-21 Warranty of Construction MAR 1994
52.246-21 Alt I Warranty of Construction (Mar 1994) - Alternate I APR 1984
52.248-2 Value Engineering--Architect-Engineer MAR 1990
52.248-3 Value Engineering-Construction OCT 2010
52.249-2 Termination For Convenience Of The Government (Fixed-
Price)
APR 2012
52.249-2 Alt I Termination for Convenience of the Government (Fixed-Price)
(Apr 2012) - Alternate I
SEP 1996
52.249-7 Termination (Fixed-Price Architect-Engineer) APR 1984
52.249-10 Default (Fixed-Price Construction) APR 1984
52.249-10 Alt I Default (Fixed-Price Construction) (Apr 1984) Alternate I APR 1984
52.253-1 Computer Generated Forms JAN 1991
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-
Contract-Related Felonies
DEC 2008
252.204-7000 Disclosure Of Information DEC 1991
252.204-7003 Control Of Government Personnel Work Product APR 1992
252.204-7004 Alt A Central Contractor Registration Alternate A SEP 2007
252.204-7007 Alternate A, Annual Representations and Certifications MAY 2012
252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Terrorist Country
DE…
This is the start of the file's text. The full file is on GovTribe.