12-B-0010-0002 IFB Amendment
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
SECTION B - SUPPLIES OR SERVICES AND PRICES (Changes to the CLINS). USE attached revised pages 3 of 45
CLIN 0001 is hereby changed to read:
DESIGN – CONSTRUCTION
Firm Fixed Price (FFP)
Design-Build, Repair 3rd Floor Bldg 9225, JIEDDO in accordance with (IAW) Revised Statement of Work (SOW), dated 13 Aug 12
PAYMENT CLIN (WAWF)
SUBCLIN 000101 is hereby changed to read:
DESIGN
FFP
Design-Build, the contractor shall provide all labor, materials, tools, equipment, supervision, and all items necessary for the renovation of the 3rd Floor Bldg 9225 , IAW Revised SOW, dated 13 Aug 12 Contractor shall present a 60%, 100% and As-Built design for review
60% Design Submittal - 30 Calendar Days after Notice to Proceed (NTP)
100% Design Submittal - 20 Calendar Days after NTP
As-Built Submittal - 10 Calendar Days after Final Acceptance of Construction Work
INFORMATIONAL CLIN
SUBCLIN 000102 is hereby changed to read:
CONSTRUCTION
FFP
Design – Build, the contractor shall provide all labor, materials, tools, equipment, supervision, and all items necessary for the renovation of the 3rd Floor Bldg 9225 , IAW Revised SOW, dated 13 Aug 12 50 Calendar Days after NTP
INFORMATIONAL CLIN
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
***The following have been modified***:
ATTACHMENTS
Documents Type Description Pages Date
***Attachment 1 Revised Statement of Work (SOW) 13 Aug 12
Appendix A 25 Jun 12
Appendix B 25 Jun 12
Appendix C
Appendix D
Appendix E 27 Jul 12
Appendix F Revised Layout 2 Aug 12
Appendix G 6 Jun 12
Appendix H
7 Jun 12
Appendix I 30 Jun 12
Appendix J
25 Jun 12
Attachment 2 Wage Determination Building 20 April 12
Attachment 3 Schedule of Materials Submittals AF Form 66 19 Apr 12