802 CONS/LGCAB
FA3047-12-B-0010
Lackland AFB, TX
Design-Build, Repair 3rd Floor Bldg 9225 (JIEDDO)
SEQ CHAPTER \h \r 1QUESTIONS & ANSWERS # 5-10 6 August 2012 Question 5: The requirement to use "39.5 lighting requires it meet Energy Efficiency Standards and Policy." and if this equates to the required FAR clause 52.223-15 (attached). If so does the Government considered going green on this project by using LED panels vice Fluorescent fixtures? Please see attached simple ROI calculator and Flyer---this does not consider reduction in labor for rebulbing fluorescent bulbs or elimination of hazardous waste requirements for using LEDs.
Government Response: Does the GCO1230 (47 Watt) include the driver? If so, then this would be acceptable. If not, how many watts is the driver pulling?
Question 6: SIPRNET drops inside each room being repaired-renovated are clearly shown, but to what room-location is the SIPRNET cabling being run-terminated on the 3rd floor or within the building?
Government Response: 802 CES and JIEDDO will provide specific drop locations after award; contingent on furniture layout currently being prepared with FF&E package by end-user.
Question 7: NIPRNET drops inside each room being repaired-renovated are shown on Attachment 1 Appendix G, but to what room-location is the NIPRNET cabling being run-terminated on the 3rd floor or within the building?
Government Response: : 802 CES and JIEDDO will provide specific drop locations after award; contingent on furniture layout currently being prepared with FF&E package by end-user.
Question 8: NIPRNET drops are shown on Attachment 1 Appendix G, but the room configuration-dimensions shown in Appendix G don't match the field conditions or the overall renovation floor plan - what is the correct orientation of the rooms shown with the NIPRNET and furniture layouts?
Government Response: 802 CES and JIEDDO will provide specific drop locations after award; contingent on furniture layout currently being prepared with FF&E package by end-user.
Question 9: Do the furniture layouts indicated in Attachment 1 Appendix G represent the approved furniture layouts planned-required inside rooms 315-323?
Government Response: No. 802 CES and JIEDDO will provide furniture layout currently being prepared with FF&E package by end-user.
Question 10: Confirm that all new electrical power circuits will be run to electrical panels located in Electrical Closet 308?
Government Response: Contractor shall verify this via bidder’s conference site visit and as-built drawings provided.
(END)
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .